CONSULTANT CONTRACTOR
SHOP DRAWING FORM
Item of Work : GENERAL ITEM
No. Pay Item : A-7, A-8
Location : SITE PLAN AREA1
Date & Time : 21/09/2015
No. of Drawing : SD-SP1-001 s/d SD-SP1-014
No.Date Title of
Shop DrawingDrawing
No.Revision of Note of Revision
In Out
SITE PLAN AREA 1 SD-BW.1-001
ENGINEER DORMITORY(1/4) SD-BW.1-002
ENGINEER DORMITORY(2/4) SD-BW.1-003
ENGINEER DORMITORY(3/4) SD-BW.1-004
ENGINEER DORMITORY(4/4) SD-BW.1-005
ENGINEER OFFICE(1/4) SD-BW.1-006
ENGINEER OFFICE(2/4) SD-BW.1-007
ENGINEER OFFICE(3/4) SD-BW.1-008
ENGINEER OFFICE(4/4) SD-BW.1-009
OWNER OFFICE(1/5) SD-BW.1-010
OWNER OFFICE(2/5) SD-BW.1-011
OWNER OFFICE(3/5) SD-BW.1-012
OWNER OFFICE(4/5) SD-BW.1-013
OWNER OFFICE(5/5) SD-BW.1-014
E M P L O Y E R E N G I N E E R C O N T R A C T O R
Knowledge by :Date/Time :
(…………………………………..)
Checked by :Date/Time :
(…………………………………..)
Approved by :Date/Time :
(…………………………………..)
Prepared by :Construction Eng.Date/Time :
(…………………………………..)
Submited by :Construction Mgr.Date/Time :
(…………………………………..)
CONSULTANT CONTRACTOR
SHOP DRAWING FORM
Item of Work : GENERAL ITEM
No. Pay Item : A-7, A-8
Location : SITE PLAN AREA1
Date & Time : 21/09/2015
No. of Drawing : SD-SP1-015 s/d SD-SP1-025
No.Date Title of
Shop DrawingDrawing
No.Revision of Note of Revision
In Out
MUSHOLA (1/2) SD-BW.1-015
MUSHOLA (2/2) SD-BW.1-016
GUARD HOUSE (1/4) SD-BW.1-017
GUARD HOUSE (2/4) SD-BW.1-018
GUARD HOUSE (3/4) SD-BW.1-019
GUARD HOUSE (4/4) SD-BW.1-020
LIVING QUARTER (1/5) SD-BW.1-021
LIVING QUARTER (2/5) SD-BW.1-022
LIVING QUARTER (3/5) SD-BW.1-023
LIVING QUARTER (4/5) SD-BW.1-024
LIVING QUARTER (5/5) SD-BW.1-025
E M P L O Y E R E N G I N E E R C O N T R A C T O R
Knowledge by :Date/Time :
(…………………………………..)
Checked by :Date/Time :
(…………………………………..)
Approved by :Date/Time :
(…………………………………..)
Prepared by :Construction Eng.Date/Time :
(…………………………………..)
Submited by :Construction Mgr.Date/Time :
(…………………………………..)
CONSULTANT CONTRACTOR
SHOP DRAWING FORM
Item of Work : GENERAL ITEM
No. Pay Item : A-5,A-6,A-8
Location : SITE PLAN AREA2
Date & Time : 21/09/2015
No. of Drawing : SD-SP2-001 s/d SD-SP2-014
No.Date Title of
Shop DrawingDrawing
No.Revision of Note of Revision
In Out
SITE PLAN AREA 2 SD-BW.2-001
MUSHOLA (1/5) SD-BW.2-002
MUSHOLA (2/5) SD-BW.2-003
MUSHOLA (3/5) SD-BW.2-004
MUSHOLA (4/5) SD-BW.2-005
MUSHOLA (5/5) SD-BW.2-006
WORKSHOP(1/5) SD-BW.2-007
WORKSHOP(2/5) SD-BW.2-008
WORKSHOP(3/5) SD-BW.2-009
WORKSHOP(4/5) SD-BW.2-010
WORKSHOP(5/5) SD-BW.2-011
BARBENDING SHOP(1/5) SD-BW.2-012
BARBENDING SHOP(2/5) SD-BW.2-013
BARBENDING SHOP(3/5) SD-BW.2-014
E M P L O Y E R E N G I N E E R C O N T R A C T O R
Knowledge by :Date/Time :
(…………………………………..)
Checked by :Date/Time :
(…………………………………..)
Approved by :Date/Time :
(…………………………………..)
Prepared by :Construction Eng.Date/Time :
(…………………………………..)
Submited by :Construction Mgr.Date/Time :
(…………………………………..)
CONSULTANT CONTRACTOR
SHOP DRAWING FORM
Item of Work : GENERAL ITEM
No. Pay Item : A-5,A-6,A-8
Location : SITE PLAN AREA2
Date & Time : 21/08/2015
No. of Drawing : SD-SP2-015 s/d SD-SP2-028
No.Date Title of
Shop DrawingDrawing
No.Revision of Note of Revision
In Out
BARBENDING SHOP (4/5) SD-BW.2-015
BARBENDING SHOP (5/5) SD-BW.2-016
MATERIAL WAREHOUSE (1/5) SD-BW.2-017
MATERIAL WAREHOUSE (2/5) SD-BW.2-018
MATERIAL WAREHOUSE (3/5) SD-BW.2-019
MATERIAL WAREHOUSE (4/5) SD-BW.2-020
MATERIAL WAREHOUSE (5/5) SD-BW.2-021
CONTRACTOR MAIN OFFICE (1/5) SD-BW.2-022
CONTRACTOR MAIN OFFICE (2/5) SD-BW.2-023
CONTRACTOR MAIN OFFICE (3/5) SD-BW.2-024
CONTRACTOR MAIN OFFICE (4/5) SD-BW.2-025
CONTRACTOR MAIN OFFICE (5/5) SD-BW.2-026
CONTRACTOR STAFF DORMITORY (1/4)
SD-BW.2-027
CONTRACTOR STAFF DORMITORY (2/4)
SD-BW.2-028
E M P L O Y E R E N G I N E E R C O N T R A C T O R
Knowledge by :Date/Time :
(…………………………………..)
Checked by :Date/Time :
(…………………………………..)
Approved by :Date/Time :
(…………………………………..)
Prepared by :Construction Eng.Date/Time :
(…………………………………..)
Submited by :Construction Mgr.Date/Time :
(…………………………………..)
CONSULTANT CONTRACTOR
SHOP DRAWING FORM
Item of Work : GENERAL ITEM
No. Pay Item : A-5,A-6,A-8
Location : SITE PLAN AREA2
Date & Time : 21/09/2015
No. of Drawing : SD-SP2-029 s/d SD-SP2-043
No.Date Title of
Shop DrawingDrawing
No.Revision of Note of Revision
In Out
CONTRACTOR STAFF DORMITORY (3/4)
SD-BW.2-029
CONTRACTOR STAFF DORMITORY (4/4)
SD-BW.2-030
CANTEEN 1 (1/4) SD-BW.2-031
CANTEEN 1 (2/4) SD-BW.2-032
CANTEEN 1 (3/4) SD-BW.2-033
CANTEEN 1 (4/4) SD-BW.2-034
CANTEEN 2 (1/4) SD-BW.2-035
CANTEEN 2 (2/4) SD-BW.2-036
CANTEEN 2 (3/4) SD-BW.2-037
CANTEEN 2 (4/4) SD-BW.2-038
LABORATORY (1/5) SD-BW.2-039
LABORATORY (2/5) SD-BW.2-040
LABORATORY (3/5) SD-BW.2-041
LABORATORY (4/5) SD-BW.2-042
LABORATORY (5/5) SD-BW.2-043
E M P L O Y E R E N G I N E E R C O N T R A C T O R
Knowledge by :Date/Time :
(…………………………………..)
Checked by :Date/Time :
(…………………………………..)
Approved by :Date/Time :
(…………………………………..)
Prepared by :Construction Eng.Date/Time :
(…………………………………..)
Submited by :Construction Mgr.Date/Time :
(…………………………………..)