32
Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. www.hartmaneg.com February 2018 SESVIS Conference Atlanta Mark Kram, Ph.D. Cliff Frescura www.groundswelltech.com 0 2 4 6 8 10 12 14 16 18 20 0 100 200 300 400 0 50 100 150 200 250 300 350 400 450 500 0 10 20 30 40 50 60 70 80 TCE TCE

Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

  • Upload
    others

  • View
    4

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Continuous VOC Monitoring:

Lessons Being Learned

Blayne Hartman Ph.D.

www.hartmaneg.com

February 2018

SESVIS Conference – Atlanta

Mark Kram, Ph.D.

Cliff Frescura

www.groundswelltech.com

0

2

4

6

8

10

12

14

16

18

20

0 100 200 300 4000

50

100

150

200

250

300

350

400

450

500

0 10 20 30 40 50 60 70 80

TCE

TCE

Page 2: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Presentation Summary

• Brief System Description

• Why Continuous Monitor?

• Data & Lessons Learned from Real Sites

Page 3: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Sample Event 2

Sample Event #3

Well?Sample Event 1

Name This Tune

Are Limited VI Data Any Different?

Page 4: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

System Capability

• Fully Quantitative!

• Can Reach Ultra-Low Levels (<1 ug/m3) for

TCE, PCE, Vinyl Chloride & others

• <10 min Analysis Time for TCE & PCE

• Multiple Sample Locations (16 to 30)

• Very Stable - holds calibration for months

• Real-Time Data - Groundswell Software

• Discrete Sampling Mode

Page 5: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Continuous Monitoring System

Sample Inlets12” High

Page 6: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Monitoring of Other Variables

• BP, Indoor pressure, Differential Pressure

• Wind Speed, temperature, other climatic

• Can Turn On-Off 115 V Relays6

Page 7: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

User Friendly Web-Based Data

Page 8: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Applications of Monitoring:

Short Term TCE Exposure

Page 9: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Short-Term TCE Assessment Options

• Long Term Passive/Canister Sample– One number over sampling period

– Can’t see the pattern

– No real-time feedback

– Costly if multiple rooms, multiple events

• Continuous Analyzers– Can determine duration: hours? Days?

– Can see the pattern! Day vs night? HVAC?

– Immediate response – H&S to occupants

Page 10: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

0

0.5

1

1.5

2

2.5

3

3.5

4

0 50 100 150 200 250 300 350 400 450 500 550 600

Co

nc

(ug

/m

3)

Run Number

PCE - 420 1st Floor Air

PCE

Short Term TCE: How Long Above

12/2012 3/20131/2013 2/2013

~24 hours

21 days

Page 11: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Typical Data After 14 Days

0

10

20

30

40

50

60

70

80

1 21 41 61 81 101 121 141 161 181 201 221 241 261 281 301 321 341 361 381 401 421 441 461 481 501 521 541 561 581

ug

/m3

Run #

Office Area (P2)

PCE

.15 ug/m3

Page 12: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Applications of Monitoring

• Identify VOC Entry Points

– Source from VI vs Indoor

– Unexpected VOCs

• Superior to Hapsite Screening

– Much more data collected over time

– More robust; less downtime

– No more expensive

Page 13: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Time

ug/m3

0

2

4

6

8

10

12

14

16

18

0 10 20 30 40 50 60 70 80 90 100

Room103IndoorAir- TCE(ug/m3)

Room Closed:17:00

Door Opened

8:00 am

Door Closed

8:20 am

VOC Entry Point Determination

15 hours

Page 14: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Urgent Response Options

• Air Filtration

– Costs ~ $1,000/unit

• Sealing Floor Cracks

– Hard to find them all

• Relocate People

– Could open Pandora’s box

• HVAC Modification

– How to know if effective?

• Continuously Monitor

– Determine how often above target level

– See what remedies are effective

Page 15: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Applications of Monitoring

• Mitigation Remedies Feedback

– HVAC changes

– Fans on/off

– Air filtration units

– Sealing sumps & cracks

Page 16: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Proving the Effectiveness of a Remedy

Page 17: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

0

2

4

6

8

10

12

14

16

18

20

0 50 100 150 200 250

TCE

-B

ZD 2

4 (u

g/m

3)

Run #

Location BZD24

24 vs 22

Building Modification Feedback

4 ug/m3

14 ug/m3

2/24/17 3/21/17

Seal Sumps

Page 18: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

More Applications

• Remediation & Mitigation System Monitoring

– In-Situ GW/Soil Remediation

– Thermal

– Sub-Slab Depressurization Systems

18

Page 19: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

0

10

20

30

40

50

60

70

80

0 20 40 60 80 100 120 140

Vin

yl c

hlo

rid

e (

ug/

m3

)

Run #

Location EF-1 - Vinyl Chloride

Remediation MonitoringVinyl Chloride Effluent

73 ug/m3

Energized

Before Energized

3/11/17 3/21/172/27/17

Page 20: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

0

10

20

30

40

50

60

70

80

90

0 20 40 60 80 100 120 140

TCE

(ug/

m3

)

Run #

Location IA-1 - TCE

Remediation MonitoringTCE Indoors

Before Energized

Energized

80 ug/m3

2/27/17 3/11/17 3/21/17

Page 21: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Single Family Residence Monitoring

Page 22: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Residential SSD EvaluationFirst 7 days

Indoor Air Filtration Units Off

Page 23: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Air filtration units off

0

2

4

6

8

10

12

14

16

18

20

0 100 200 300 400

SSD Off

Residential SSD Evaluation30 days

Page 24: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

More Applications

• Expedited VI Assessments

– Can see pattern within days

– Can determine if from VI or Indoor source

– Can determine cause & effect

– Can try remedies & see effects

24

Can put VI Issue to Rest in Days

Rather than Months or Years!!

Page 25: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

0

50

100

150

200

250

300

350

400

450

500

0 50 100 150 200 250 300 350 400 450

tce

Temporal Variation

Same Time Every Day

300 ug/m3

Page 26: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Large Industrial Facility

Definite Correlation with Differential Pressure

Apparent Correlation with Barometric Pressure

Page 27: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

High Res Data to Rescue

• Large industrial building in east LA

• Tenant (not owner): furniture manufacturer

• TCE & PCE underneath in GW & soil gas

• TCE measured in IA with canisters – highest in

women’s bathroom

• Owner closes women’s bathroom!!!

• Hartman brought in – samples IA & SG

• TCE & PCE in SG but only TCE in IA????

• Go into monitor mode

Page 28: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

TCE Source Determination

Manufacturing Facility

0

50

100

150

200

250

300

350

400

450

500

0 10 20 30 40 50 60 70 80

TCE

TCE

7:00 am 5:00 pm 5:00 pm

7:00 am

5:00 pm

Page 29: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

TCE Not Listed!!!

Furniture FacilityRapid Resolution

Page 30: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Furniture FacilitySilicone Spray Chromatogram

Saved owner liability & >$100,000

TCE

Page 31: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Summary

• Monitoring/Response Technology Exists NOW

• TCE, PCE, VC and other VOCs

• Rapidly Address:

– No risk situations

– TCE IA exceedances

– VOC entry locations, preferential pathways

– Effectiveness of mitigation systems

– Effectiveness/optimization of remediation systems

Page 32: Continuous VOC Monitoring: Lessons Being Learned · 2018-02-13 · Continuous VOC Monitoring: Lessons Being Learned Blayne Hartman Ph.D. February 2018 SESVIS Conference –Atlanta

Mark Kram, [email protected]

Blayne Hartman, [email protected]

0

2

4

6

8

10

12

14

16

18

20

0 100 200 300 400

0

50

100

150

200

250

300

350

400

450

500

0 10 20 30 40 50 60 70 80

TCE

TCE