4
-Resume- Dipl.-Ing A. Muftidien Kompl. Wisma kusuma indah Jl. Kusuma V no 16 Jatirahayu Pondok Gede Bekasi 17414 Phone: Home: 62-21-8461518 Mobile: +628561020143 Office: 62-21-5928963 Email: [email protected] Objective A challenging, career-oriented position as member of a team in prospective company and to manage maximum productivity and efficiency of the department Experience April 2016 – Present PT. PMI (Prikast metal Indonesia) HR Manager Make MPP (Man Power Planning) Short and Long term Make and Control Activity Plan to support Quality Objective Make and Control Recruitment planning base on Structure Organization Make and Control yearly training program Coordinate and facilitate pool of talent program Make and Control people review for support pool of talent program Make Budgeting HR Cost Make monthly report submit to director May 2013 – April 2016 PT. Binakarindo Yacoagung (Drilling Company) Kepala Yard (General Manager) Make quality objective for QHSE (Quality Health Safety and Environment) ISO 9001 and OHSAS 18001 Make Activity Plan to support Quality Objective Make monthly report submit to director Make Cost down program To control all activity each department

Contemporary Resume 2016

Embed Size (px)

Citation preview

Page 1: Contemporary Resume 2016

-Resume-

Dipl.-Ing A. Muftidien Kompl. Wisma kusuma indah Jl. Kusuma V no 16 Jatirahayu Pondok Gede Bekasi 17414

Phone:

Home: 62-21-8461518 Mobile: +628561020143 Office: 62-21-5928963 Email: [email protected]

Objective A challenging, career-oriented position as member of a team in prospective company and to manage maximum productivity and efficiency of the department

Experience April 2016 – Present PT. PMI (Prikast metal Indonesia) HR Manager

Make MPP (Man Power Planning) Short and Long term Make and Control Activity Plan to support Quality Objective Make and Control Recruitment planning base on Structure

Organization Make and Control yearly training program Coordinate and facilitate pool of talent program Make and Control people review for support pool of talent

program Make Budgeting HR Cost Make monthly report submit to director

May 2013 – April 2016 PT. Binakarindo Yacoagung (Drilling Company) Kepala Yard (General Manager)

Make quality objective for QHSE (Quality Health Safety and Environment) ISO 9001 and OHSAS 18001

Make Activity Plan to support Quality Objective Make monthly report submit to director Make Cost down program To control all activity each department

Page 2: Contemporary Resume 2016

-Resume-

To Lead weekly meeting with all department manager To manage and distribute all jobs for each department

May 2007 – Feb 2013 PT.Induktor Intiniaga Mandiri Serpong, Tangerang General Manager

Make sure the production process follow the procedure and customers requirement

Review and analyze product price Have a contact with the Customer to discuses about price and

quality product Have a contact with the Supplier to discuses about prices and

quality of raw material Responsible for company policy Make monthly Report and submit to director

May 2005 – Present PT.Induktorindo Utama Serpong, Tangerang GA&HRD Manager Make sure the recruitment process follow the procedure and

Government regulation Make yearly planning training schedule Review training effectiveness Make monthly schedule for Building facilities and Infrastructure

maintenance Have a contact with the Indonesia Labour department to discuses

about company regulation 2000 – April 2005. PT.Induktorindo Utama Serpong, Tangerang Maintenance Manager.

Make procedure for Maintenance department based on ISO 9001 & QS 9000 (since 2004 ISO/TS 16949 & ISO 9001/2000) Preventive and predictive maintenance all machine in p.t induktorindo utama based on ISO 9001 & QS 9000 Continuous improvement to reduce idle time the machine Make tools for support the production process Have a contact with supplier machine to improve the machines

work

Page 3: Contemporary Resume 2016

-Resume-

June 2000 – September 2000 p.t. induktorindo utama Ass. Quality Assurance Manager & Customer Complain

Controlled the standard quality product Controlled and inspected the quality standard incoming material from supplier Controlled the production process Controlled all the test instrument Continuous improvement the production process to reduce the productions reject As a team Advanced product quality planning (APQP) As a team to solve the customer complain

Training 1990 : German language course / Deutschkurs

Goethe Institut Jakarta 2000 : Quality Management System ISO 9001&QS9000

Tutor : Neville-Clarke Consultant 2000 : Kalibrasi alat ukur dimensional

Tutor : Kawan lama group 2001 : Lead Auditor Internal Quality Audit (IQA) ISO 9001/2000

Tutor : Aims Consultant 2004 : Quality Management System ISO/TS 16949

Tutor : Neville-Clarke Consultant 2004 : Internal Quality Audit (IQA) base on ISO/TS 16949

Tutor : Neville-Clarke Consultant 2005 : Bussines English

Tutor : SITT 2005 : LKS Bipartit

Tutor : Depnakertrans RI 2006 : Merancang Program Pelatihan

Tutor : PPM 2006 : Hubungan Kerja dan Pemutusan Hubungan Kerja

Tutor : Lembaga Info Naker

Page 4: Contemporary Resume 2016

-Resume-

Education Language

2000 Technische Fachochschule Berlin Germany Engineer, Electro technique. English, German

Interests Research, System, Computers, Volleyball sport, Automotive.