Upload
buiduong
View
218
Download
1
Embed Size (px)
Citation preview
O
CONSU Im C P P C C D
INDUST M O W C E H R K A H Lo M
CHRON
HSE
Visio
Cons
O - 602.358156
LTANT mplement PrPM Schedulrimavera Soreparation oonstruction onstruction
Database expe
TRIES/PROJEMinerals InduOil & Gas Waste Water/oal ‐ ROM & lectric PowerHeavy Commeesorts & Ca‐12 Schools Airports & perHeavy & Highwocks & DamsMedical Facilit
OLOGY
Contractors
on Consultano Primavo Servedo Workeo Engine
sultant/Sr. P
o CPM So Experto Develo
Design
8.8152 C - 601 N. 50t
imavera Softing Expert, Iolution Provof Manuals,Claims ExpeIndustry Arbert (FileMake
ECT TYPES stry ‐ Continu
/Water PlantWashing ‐ Cor ‐ Coal, gas, oercial & Lightsinos
ripheral facilitway ‐ Roads &s ties
s, Senior Con
nts, LLC, Convera Consultad as Primaveed with over eering & Con
PM/ VP 1988
Scheduling/Dt Witness (laroped Severaln (Mechanica
602-418-4th Street,
ware Systemnstructor, Mider & Certi proceduresert Witness abitrator ‐ Amer, Access, SQ
uous/batch p
s oal Firing oil fired & cogt Commercial
ties & Structures
nsultant
nsultant — ant, Implemera Dealer Prim150 Companstruction Con
8 — 1992
Delay Analysisrgest Claim inl Analysis Datal, Structural,
4225 gor Scottsda
ms within ComMentor, Schefied Instrucs, specificatand Impact/merican ArbitQL) and repo
processing ‐ M
generation l
Professionaenter & Instrumavera Instrnies/Agenciesnsultant/Exp
s Expert (US‐Wn excess of $3tabase System Process Flow
don@hsecale, Arizo
mpanies, Ageedule Creatoctor (Primavions, & tech/Delay Analytration Assocrt designer (C
Materials Han
al Services 19uctor uctor/Consus providing copert Witness
Wide) 32M) ms for CPM Pw)
contractona 85254
ncies, & Enteor/Reviewer vera Instructhnical graphysis Expert ciation (29 yCrystal & Inf
ndling
992 — Prese
ltant ontractual se
Process Plant
ors.com 4
erprises.
tor) hics
years) oMaker)
nt
ervices
t Layout and
O
Gene
Indus
1982
Worl
Engin
ProjectPerman
O - 602.358156
o Engineo CPM So Experto Develo
Designo Engineo Followo CPM so Manago Interfao Drafte
eral Contrac
o Head oo Interno Manago Projec
strial Equipm
o Manago Redeso Manag
ldwide Proc
o Helpeo Develoo Coordo Introdo Worke
neer to Sr. Po Projec
t Owner nente
8.8152 C - 601 N. 50t
eering GroupScheduling/Dt Witness (laroped Severaln (Mechanicaeering Groupw jobs to the fscheduling usged small andaced with othed Technical S
ctor, Sr. PM,
of Schedulingal Claims Expged 3 Wastewct Cl oser
ment Manu
ged 11 PMs asigned their Pged the Com
cess Equipm
d integrate Uoped Processinated Plant duced Schedued on various
PM 1964 — 1ct Recap:
Year D1979 L
602-418-4th Street,
p ManagemeDelay Analysisrgest Claim inl Analysis Datal, Structural,p Managemefield as Eng. Rsing Mainframd large Proceher EngineeriSpecifications
VP & Qualif
g and Contropert & Arbitrawater/Powe
facturing (C
and 2 PAs oveProject Procedmpany's Mini C
ent Supplie
US Practices ins Equipment/Requiremenuling and Projs projects and
1977
Descriptiononghorn Preh
4225 gor Scottsda
nt and Drawis Expert (US‐Wn excess of $3tabase System Process Flownt and DrawiRep. me Computeessing Plant Ping Companies
fying Party 1
ols (Primaveraator r Plant Projec
Claudius Pete
erseeing all cdures ManuaComputer an
r (KHD), Sen
nto a Europe/Plant Proposts with their ject Controls d new techno
heater Expans
don@hsecale, Arizo
ing ReleaseWide) 32M) ms for CPM Pw) ing Release
er Projects es
1982 — 1988
a)
cts and Heav
ers), Manag
company proal and Trainend terminals
nior Project
ean Business sals other offices into US Officology worldw
sion
contractona 85254
Process Plant
8
vy Highway
ger of PM/P
ojects d
Manager 19
Culture
s ce wide
MS
ors.com 4
t Layout and
PA Dept. 198
977 — 1980
My Job TitleSr. PM
80 –
O
Genera
Cement
Lone St
Camarg
Genera
River Ce
Gresik C
Martin
Martin
Hawaiia
Lake On
Martin
River Ce
Peabod
Hawaiia
Martin
Martin
Pacific CAggrega
Martin
Genera
Utah Po
CPM
O - 602.358156
l Portland tos Tolteca tar Industries go Correa l Portland ement Cement Marietta Marietta an Cement ntario Cemen
Marietta ement dy Coal an Cement Marietta Marietta Cement & ates Marietta l Portland ortland
Scheduling
8.8152 C - 601 N. 50t
1979 L
1977 T
1977 P
1976 B
1976 N
1976 E
1975 In
1975 P
1975 R
1974 B
nt 1974 M
1973 M
1972 C
1971 R
1970 N
1970 N
1968 N
1968 3
1967 P
1966 M
1965 C
g Throughou
602-418-4th Street,
ebec Preheat
Turnkey Ceme
Plant Expansio
Brazilian Ceme
New Plant in T
Emissions Red
ndonesia – M
Plant Improve
Roberta, AL ‐ E
Basalt Handlin
Major Plant St
Major Plant Ex
Coal mill & Kil
R.O.M. new Fa
New Processin
New Raw Mill
New (Last) We
30 mile overla
Plant Mods. &
Major Plant St
Complete New
ut my Career
4225 gor Scottsda
ter Expansion
ent Plant
on
ent Industry P
Texas
duction Projec
Major Plant Ex
ements
EPA and Majo
ng Project
tudy
xpansion
n Firing Syste
acility
ng Line
ing System
et Process Pla
and conveyor
& Improvemen
tudy of Trinity
w Raw proces
r:
don@hsecale, Arizo
n
Project
ct ‐ EPA
pansion
or Exp
em Project
ant ‐Maine
& Ship Loadi
nts
y Division ‐ Te
ssing & Feed S
contractona 85254
S
S
S
E
S
S
S
P
P
P
P
P
P
E
E
E
E
ng E
F
exas P
System E
ors.com 4
Sr. PM Sr. PM ‐ PC
Sr. PM Engineering M
Sr. PM ‐ PC
Sr. PM Sr. PM – PC
PM – Eng. Mg
PM – PC PM – Eng. Mg
PM – Analyst
PM PM – Eng. Mrg
Engineering M
Eng. Mgr. – PC
Eng. Mgr. – PC
Eng. Mgr. – PC
Eng. Mgr. – PC
Field Eng. – PC
PM – Analyst
Eng.
Manager
r.
r.
g.
Manager
C
C
C
C
C
O
Excerpts Novembe
October
March 22
not anti
add
momenexcellen
is o
his
excepti
m
O - 602.358156
s from Letter
er 11, 1985
18, 1985
2, 1999
cipate how th
the tapply to
ition to his te
the oand te
t to dnt in idenis
one of the on
ionally gratify
in the at hand. In o
more than one to the
8.8152 C - 601 N. 50t
rs of Recom
Douglas Se
Edward F.
Christine K
common heir o explain the
chnical in a
f my echnical. He difficulty ntifying futur
ly I kn
to legal a
ying
of field
our option for an
602-418-4th Street,
mmendation
eegmiller, Po
Mitchell, Att
K. Barrett, La
aboumight be ir in
Gordon
with Mr.an
He e and
now who
and accountin
d, o
a d of the
4225 gor Scottsda
received by
oole, Tinnin
torney
s Vegas Valle
ut by othe
that th
I of what i during m
cu
the o
ng w
and theour he
requireme different
don@hsecale, Arizo
y Gordon:
& Martin, At
ey Water Dis
that they areer and
e role of an
his important my urrent
of
with
ir comov
ment. During wit
contractona 85254
ttorney
strict
e not prompt, that they f
None o
in
ofmay be
with him, H
and common
ombined with ve quickly throI this time he thin the
ors.com 4
that theyfail to f
is to
f both at the
His
n to app
and
his ofough the
and oriented
do
ply
f
O
June 11,
Novembe
October
January 3
Septembe
of contr
on
the is
the a very vvery
exceptioHe work
O - 602.358156
1982 Walte
er, 1991
1, 1991
3, 1990
er 29, 1983
his ract
exhibited
n the
into the
which noteworthy.
a … In
of vervaluable contr
is technicalonal. He is thks hard – very
8.8152 C - 601 N. 50t
r Laidlaw, Pr
Charles P.
Laurence H
David H. G
Thomas N.
Mr. him
He
in to comple
His
in n working ry complex anribution
ly he y
602-418-4th Street,
resident, Cla
Guess, P.E.,
Hampton, P.
Gartshore, Jo
. Frisby, Fris
m an
aboutvery
both He
ex of discompu
andGordon
nd difficult a plan to
in th
4225 gor Scottsda
audius Peters
, High-Point
E., High-Poi
ordan, Keeler
by & Assoc.,
valuable
t the with
h in the fielda
spute. His uter a
d delay impacn
he a
don@hsecale, Arizo
, Inc.
Schaer
nt Schaer
r & Seligman
, Attorney
valued in
this know
and the office ability toto deal w
nd
ct w a and, a
… Gor
His nd he is
contractona 85254
n, Attorney
nput, and inti
we wledge key
e, o both the with
equal
well the pritalent
of his rdon is a high
for dvery
ors.com 4
mate
wou
valuable big picture a
ly
imary ft for to
makily motivated,
detail is
uld
nd
for o ng ,
O
Construc
Major Co
SacrameClaim fileCounty JObata aSenior Cand speAs as‐buwas madsettled.
As A Cla
O - 602.358156
ction Claims/
onstruction
ento County Jaed by the ContJail facility in thnd Kassebaumonsultant. I diecific issues. Thilt schedule wde. All issues w
aims Consu
8.8152 C - 601 N. 50t
/Expert Wit
Claims Expe
ail, Sacramentotractor, Bechtee center of dom (HOK), throuirected all of there were overas reconstrucwere read, con
ultant
602-418-4th Street,
tness:
erience:
o, CA (approximel Corporationowntown Sacrgh CNA their Ehe delay analyr 3000 issues fted from contnsidered, qua
4225 gor Scottsda
mately 1‐year)n, for direct andramento. RetaErrors and Omysis, loss of prodrom RFIs and otemporaneountified and ap
don@hsecale, Arizo
‐ $19.9 Milliond delay damagained by the a
missions Insuranductivity analyother documeus documentapplied if deeme
contractona 85254
n ges on $75.7 architectural fince carrier. Myysis and reviewents to deal reation and a Bued pertinent.
ors.com 4
million multi‐strm of Helmuthy position was
w of all the impeview and anaut‐For style anaDeposition,
tory h, s pacts lyze. alysis
O
Seattle CoClaim fileconventito condunotificatsettled. Cabrillo BClaim file
harbor p
as well a
Consulta
and cost
Flagstaff HClaim levThe clienPosition
Harvey’s RAssisted construcDesign‐Bscope, caProject M
Phoenix InWe wereerector, due to lieSettled.
Pima CouWe werePosition
Light Rail I was parassignme1/2 year
O - 602.358156
onvention Center, ed by the Contraion center projeuct the delay anaion. All issues w
each Marina, Ported by Crowley C
project. I conduc
s a cost analysis
ant. Depositions
over original co
High School, Flagstvied by the Contnt was Project CProject Manage
Resort Hotel and Cthe Contractor,ction/renovationBuild Contract foaused delays anManager. Depos
nternational Racewe retained by theour client, withhes told by our cl
nty Prison, Tucsone retained by thewas Project Ma
Project in Los Angrt of the presentent to High Poins while develop
8.8152 C - 601 N. 50t
Seattle Washingtoactor, Paschen Cect in downtownalysis as Senior Cwere reviewed a
t of Los Angeles (aConstructors, Inc
cted all fact‐find
s and testified o
, attended oppo
ontract amounts
taff, AZ (approximtractor, Sletten Control, on behaer.
Casino, Lake Tahoe, Q & D Construcn of the hotel’s cor failure to perfd extra costs to sition, settled.
ways, Phoenix, AZe steel supplier/held facts that sient. It shows t
n, AZ (approximatee mechanical conager. Depositi
geles, Ongoing Assting team that wnt Schaer and alling analyses and
602-418-4th Street,
on (approximatelyContractors, Inc.n Seattle. RetainConsultant. Thend retained in t
pproximately 11 mc., for work perfo
ding investigatio
n the basis of ou
osing deposition
s. I was brought
mately 4‐5 months)Construction, onlf of the Flagstaf
e, NV (approximatction, research acasinos and restform and providthe Contractor,
Z (approximately 7/erector to devesurfaced under hat you must be
ely 4‐months) ‐ $6ontractor to asseion, settled.
signment over 1‐1/won over other mowing the opend rebuttals to co
4225 gor Scottsda
y 14 months) ‐ $27., for direct and ned by the Ownee claim consistedhe analysis if de
months) ‐ $3.7 Milormed as the wa
on, constructed a
ur analyses. Ret
s, settled by ord
t‐in late to try to
) ‐ $4 million n the delays expff School District
tely 8‐months) ‐ $6and develop its caurants. The clae an efficient de, Q & D. Case se
‐months) ‐ $750Kelop a claim for doath in depositie totally open an
600K ert a delay and d
/2 years major claims firmning of an LA offiontractor claims
don@hsecale, Arizo
7.8 Million delay damages er and Architectd of over 6500 iseemed pertinent
llion ater‐side contra
an as‐built sched
tained by Crawle
der of court. To
o help bring to c
perienced duringt. Claim mostly
6 million claim for the woaim was againstesign. Their worettled just prior t
delay and extra ons. The case snd truthful with
disruption claim
ms, such as O’Brice. I worked ous on two subway
contractona 85254
recovery on a $t. Was brought ssues via RFIs ant and substantia
actor on a new $
dule and perfor
ey Maritime, Inc
otal litigation had
conclusion.
g construction odismissed, with
ork they did on tt the Contractorrk product, far bto arbitration he
material cost dasettled, mostly in your attorney a
. Case settled ju
rien Kretzberg, gut of this office oy stations in dow
ors.com 4
$100 Million in from Phoenixnd other forms oal. Deposition,
$22 million boat
med a delay ana
c. Position was
d lasted over 5‐y
of a new high schh small payment
the interior r’s architect in a beyond the bid earing. Position
amages. The sten favor of the owand consultant.
ust prior to trial
giving this work of approximatelwntown LA.
x of
t
alysis,
Senior
years
hool. t.
n was
eel wner,
.
ly 1‐
O
HighschooThe City,incorrectwork andsettleme$1.5 mill
Major NewProvidedplus projconsortiuThis wasall or parClaim wa
City of PhI assistedForcon’sassertedthe cont
Yearout MLamb Enhire by tthe majobonding exposure
City of SaDevelopepiping, tand revie
As Vis
For M
O - 602.358156
ol, Joseph City, AZ, through the higt work performed created detail ent. Estimated vlion. Settled.
w Toll Road, Orand delay analysis ject to build 17‐um, claim for des an analysis of trt of the Contracas finally settled
oenix Multiple‐sitd Forcon Engines client, the gene by the City of Practor’s fault. T
Mechanical in Albugineering & Conhe Arizona USPFor part of Lamb’scompany), Lame to Lamb’s claim
anta Fe, NM, Wed a claim headhat caused majoew of shop draw
sion Consu
My Employ
8.8152 C - 601 N. 50t
gh school hired ed by the generareports that wevalue was
ge County, CA thrservices to URS miles of new Toelay damages duhe merits of thector’s delay claimd. I worked on th
e Cross‐Generatioers to make a sueral Contractor. Phoenix. This boThe plans used fo
uquerque, NM Depnstruction Co., oFO to Analyze ans claim. Shortlyb’s delay case inm cost.
Waste Water Ted for Federal Cor delays and diswings. I acted as
ultants
yer
602-418-4th Street,
Vision to reviewal contractor, were then used to
rough URS ConsultEngineers who woll Highway. Theue to an injunctie Contractor’s clm. It also involvhis claim off‐and
on Recreational Faurvey and assess I produced a boook was used to or construction
partment of the Naout of Salt Lake Cnd defend the N after my analysn its entirety wa
Treatment PlanCourt based on isruption to the cs both a percipie
4225 gor Scottsda
w what they beliho refused to fixo negotiate (med
tants. were the Oversie specific claim Ion involving a seaim and an evalved the theory od‐on for about 1
cilities sment of the assook that evaluatnegotiate awaywere to a great
avy – Trident MotCity, UT sued theNavy against the sis and report was dropped. This
nt mproper fabricaconstruction of ent and expert w
don@hsecale, Arizo
eved to be “shox and/or complediate) with the c
ight group to O was involved wection of the prluation of concuof the Contracto13 months.
serted deficiencted and if possiby most of the clapart deficient a
tor Storage Facilitye navy for both Delay portion o
was delivered to s saved the navy
ation of major pthis plant. It alswitness. Supplie
contractona 85254
otty” work and inete the work. Wcontractor and f
Orange County owith was the Conoject due to envurrent delays thar’s Right to Early
cies in the constble rebutted theaims, except for and ambiguous.
y – Camp Navajo, BDelay issues anof the Lawsuit. TLamb’s attorneyy further defens
process concreteso involved imprer went into ban
ors.com 4
ncomplete or We evaluated thefinally reach a
n the $870 millintractors, a largevironmental reaat might have ofy Completion. T
ructed project be deficiencies a few which we Settled.
Bellmont, AZ d direct costs. I The delay costs y (provided by tse costs and
e and epoxy‐lineroper specificatinkruptcy during
e
on e asons. ffset The
by
ere
was were he
ed ions
O
litigationManagerhighly te
City of DuraI assistedour favo
Fossil FuI was hirwitness delays odecision
EDUCATI
St R S P M W A P P In V
Oracle Primtaught eve
Asta Powe
Deltek Acu
Microsoft Access, Vis
As An
O - 602.358156
n. Finally settledr, having taken oechnical and fore
ango, CO, Waste Wated the PM and otr. Amount unkn
uel Power Planred by the suppto the fact thatf the project. I by the Judge.
ON/PROFES
tructural & MRegistered Pchool of ArMI Membe
Member of OWebinars foAuthor, BooPapers PreseMICOS Papenternet ArtiVarious Profe
mavera (P6 Proery Primavera s
rproject, Spide
umen Fuse, Tilo
Office (Word,sio)
n Independ
8.8152 C - 601 N. 50t
d for about $2 mover for prior PMensic investigati
er Treatment Plant thers to developnown.
t, Mechanical plier and installet they supplied did the analysi
SSIONAL
Mechanical Professionarchitectureer (Retired Oracle Univeor Turnarouoks & Articlented at 12er (Project Micles‐ 3‐yearessional Soft
o & EPPM, Risksystem DOS an
er and Phoenix
os Linear Sched
, Excel, Power
dent
602-418-4th Street,
million plus remoM who was remon.
p a large delay an
Piping, Grantser of basalt‐lineand performeds, was deposed
Engineeringal Engineer ‐ Washingtmember sinersity ‐ Primnd Schedulies, Present2 Primaveraanagement rs of Monthlytware System
k, CM) Began und Windows.
x Project Mana
duling
rPoint, Publish
4225 gor Scottsda
oval of previousoved. The colle
nd direct cost cl
, NM d pipe through d the job within and testified in
g Degrees ‐ W‐ Multiple Ston Universitnce 1980)mavera Certing ter at Industa ConferencInstitute ‐ Coy Articles on ms:
sing Primavera
ager Minjet
FileMa
her, Adobe (
Flash, In
don@hsecale, Arizo
sly charged liquiection and analy
aim against the
their attorney n industry standn Federal Court
Washington Utates (Activety ‐ St. Louis
tified
try Conference Papersollege of Scheprojectcont
a in 1983 as a b
MindManag
ker Pro Exte
Photoshop, Illu
Design, Image
contractona 85254
dated damagessis of evidence b
City of Durango
in Albuquerquedards and did n. Decision was
University ‐ Ste in AZ) s, MO
nces
eduling) trols.com
beta user of P3
ger
nded thru ver
strator, PageMa
Styler), Serif S
ors.com 4
. I was Project became part of
o. It was settled
e to act as an eot participate ialmost a 50‐50
t. Louis, MO
3, was certified
rsion 13 aker, DreamWe
Suite
a
d in
xpert n the 0 split
d and
eaver,
O
Timeline
Rox io Cantasia
Snag i t 9 Dragon N
TSQL & SQ
VBA Exce
Serif Full
(This is not
O - 602.358156
Maker
S t udio 7
aturally Spea
QL 2005 & 20
l
Suite
t all inclusive)
8.8152 C - 601 N. 50t
aking 11
008
602-418-4th Street,
4225 gor Scottsda
InfoMa
Crystal
FoxPro
dBa s e
Window
JCreato
Microso
Xara So
don@hsecale, Arizo
aker
Reports
o
ws 2000 ‐ 7P
r Pro, FrameB
oft Studio 10
ftware Suite
contractona 85254
Pro
Builder, Basic
ors.com 4
Java