Construction Update Oct, 2019 Sector- 73, Gurgaon Architecture & Design by:: UHA London the principal architect of this architectural masterpiece possess notably expertise in high rise structure and large scale mixed use developments.

Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done

Construction UpdateOct, 2019

Sector- 73, Gurgaon

Architecture & Design by::UHA London – the principal architect of this architectural masterpiece possess notably expertise in high rise structure and large scale mixed use developments.

Page 2: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done

TATA PrimantiSignum71ILC SattvaCHD Avenue 71Today Callidora

Page 3: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done

Entry/Exit ramp Completed

1. Ground floor -40% cast.2. Ground Floor-90% shuttering done.

Page 4: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done

Suraj Public School

BMW Trainning

CenterM3M Experia Sales

Gallery

Page 5: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done

Staircase Area

Escalator