13
Construction Dynamics Solutions 1 © Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE System Dynamics Construction Dynamics Solutions QUANTUM GLOBAL SOLUTIONS A quantum leap in the recovery of construction disruption costs © Construction Dynamics Solutions 2019

Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

1© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

System DynamicsConstruction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

A quantum leap in the recovery of

construction disruption costs

© Construction Dynamics Solutions 2019

Page 2: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

2© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

Three hurdles to entitlement

Damages Testability

Causation

Legal / Contractual Entitlement

The accuracy of the method needs to be testable, as well as its consistency with project data and information

The method should be applicable to the whole project, and discount contractor-responsible events

The method should establish the causal path linking disruptive events and the damages caused

Page 3: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

3© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

Contemporaneous Project Documentation

Res

ult

/Ou

tco

me

Rel

iab

ility

Recovery rates are very low

Jury Verdict / Quantum Merit

Total Unit Cost Method

Modified Total Labour Cost

General Industry Studies

(Corp of Engineers; MCAA; NECA,

Estimating Guides)

Specialty Industry Studies

Sampling Methods

Earned Value

Measured Mile

Comparable Project Studies

Total Labour Cost Method

Page 4: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

4© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

Contemporaneous Project Documentation

Res

ult

/Ou

tco

me

Rel

iab

ility

There is clearly room for innovation

Jury Verdict / Quantum Merit

Total Unit Cost Method

Modified Total Labour Cost

General Industry Studies

(Corp of Engineers; MCAA; NECA,

Estimating Guides)

Specialty Industry Studies

Sampling Methods

Earned Value

Measured Mile

System Dynamics

Comparable Project Studies

Total Labour Cost Method

Page 5: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

5© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

• The System Dynamics (“SD”) computer simulation methodology was invented at M.I.T. in the early1960s.

• It was first applied to estimate project disruption and delay back in the late 1970s, helping to settlea $900 million claim between a US defence contractor and the US Navy.

• Since then, SD models have been used as proactive project management tools on hundreds of

projects in many industries (oil & gas, aerospace, engineering, shipbuilding, software…)

• SD models have also been the basis for over forty major disruption claims worldwide, totalling over

$20bn in claim amounts.

An innovative simulation-based technology

System Dynamics

Page 6: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

6© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

Introduction to System Dynamics

Page 7: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

7© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

System Dynamics satisfies all three requirements forentitlement, making it the optimal tool to supportnegotiations, arbitration and/or litigation proceedings:

• Causation: Its simulation models transparently (and step-by-step) show the causal chain between disruptive eventsand their ultimate impact on the project.

• Resultant Damages: The models capture the full non-linearity of disruption. The analysis allocates to each eventthe disruption that it (and it alone) caused, and it alsoexplicitly accounts for the role of mitigating “managerial”actions and/or adverse decisions.

• Testability: The simulation models are constantly verifiedagainst all information known about the project. Statisticalconfidence ranges can be established for model inputsand for claim results.

System Dynamics satisfies all the requirements for entitlement:

A much better chance at recovery

Page 8: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

8© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

• Tuxedo Park was a design-bid-build development in the MENAregion, budgeted at about $1bn, that:

• Overran its budget by $500 million

• Finished 2.5 years late

• The Contractor “knew” that the Employer had substantiallyimpacted the project, but conventional analysis and the existingdata trail did not (appear to) support this view.

• Yet, a forensic analysis using Dynamic Disruption Analysis provedthat 60% of the overrun had been caused by the Employer.

• In international arbitration, the tribunal decided that the evidenceproduced by the analysis was credible and defensible, andawarded the Contractor full recovery of the Employer-riskdisruption, as determined in the System Dynamics model (i.e., theentire 60% of the overrun.)

‘Tuxedo Park’: 100% disruption recovery!

A real case: the ‘ Tuxedo Park ’ claim

Page 9: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

9© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

System Dynamics applied to Disruption

Any Questions?

Alexander Voigt Peter MurphyPartner Managing [email protected] [email protected]

Sam Mattar Moneer KhalafPartner Regional Director [email protected] [email protected]

www.constructiondynamics.global www.qgs.global

Page 10: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

10© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

The simulation matches the data

Hours expendedManpower

Progress Expected completion date

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Data “As Built” simulation Data “As Built” simulation

Data “As Built” simulationData “As Built” simulation

Hours expendedManpower

Progress Expected completion date

Page 11: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

11© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

… and it tells a more complete story!

Productivity

DataSimulatedFirst timeRework

Other

Staff allocation

• Learning curve• Inadequate contract design

• Out-of-sequence (missingshop drawings)

• Out-of-sequence(missing equipment)

• Crowding

Page 12: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

12© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

Early simulation results

Construction Labour (Headcount) Construction Progress

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Page 13: Construction System Dynamics - EIC Federation › sites › default › files › fields › ... · 2019-04-08 · System Dynamics satisfies all three requirements for entitlement,

Construction Dynamics Solutions

QUANTUMGLOBALSOLUTIONS

13© Construction Dynamics Solutions 2019 INTEGRITY COMPETENCE CONFIDENCE

System Dynamics applied to Disruption

Any Questions?

Alexander Voigt Peter MurphyPartner Managing [email protected] [email protected]

Sam Mattar Moneer KhalafPartner Regional Director [email protected] [email protected]

www.constructiondynamics.global www.qgs.global