1 (2018) Report Construction Projects 1 of 18 American Chamber of Commerce in Egypt - Business Information Center Construction Projects Sector - Q1 2018 Report

Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

1 (2018) Report

Construction Projects

1 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 2: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Copyright ©2018, American Chamber of Commerce in Egypt (AmCham). All rights reserved. Neither the content of the Tenders Alert Service (TAS) nor any part of it may be reproduced, sorted in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the American Chamber of Commerce in Egypt. In no event shall AmCham be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits.

Non-Tenders Section

Special RemarksThe Construction Projects Q1 2018 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders, big projects and important news.

- Business News - Projects Awards - Projects in Pre-Tendering Phase - Privatization and Investments - Published Co. Performance - Loans & Grants - Fairs and Exhibitions

Copyright Notice

List of sub-sectors

Administrative Buildings

Bridges

Cultural Buildings & Clubs

Earthmoving Works

Hospitals

Hotels & Tourist Development

Integrated works

Parks & Landscaping

Renovation, Concrete Treatment & Paints

Residential Buildings

Roads Construction

Sea Ports

Steel Structure, Possible Prefab

This report includes tenders with bid bond greater than L.E. 50,000 and valuable tenders without bid bond

Tenders may be posted under more than one sub-sector

- Client

- Generating Sector

- Supply Jobs

(the sector of the client who issued the tender and who would pay for the goods & services ordered)

- Client

- Generating Sector

- Integrated Jobs (Having a certain engineering component) - sorted by

Tenders Section

2 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 3: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Administrative Buildings - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Energy Central Delta Electricity Production Co. - New, The Cashier

Construction of two buildings near the location of Al Borollos power station 160,000 LE

Mar 28, 2018 Apr 23, 2018

Dakahleyya Governorate, the Administration of Markaz El Senbellawin, The CashierConstruction & revamping of the Senbellawin Traffic Dept. bldg 57,000 LE

Jan 16, 2018 Jan 22, 2018

El Wadi El Gedid Governorate, the Housing Directorate, The CashierConstruction of (a) an administrative annex to the Social Directorate's Building, (b) a second upper floor above Balat Local Municipality, (c) renovation & maintenance of a youth hostel & the sportsmen Hotel in El Kharga & (d) a shopping complex in El Farafra. Deadlines 2/26, 2/27, 2/28 & 3/1/2018

25,000 & 33,000 & 35,000 & 50,000

LE

Feb 19, 2018 Mar 01, 2018

General Dept. for Giza DrainageConstruction of (a) an administration building on Al Mohit Canal to host the General Dept. Offices, also (b) conducting the required purging, dredging & maintenance of open drainage canals serving Helwan & El Saff engineering domain

200,000 & 70,000 LE

Feb 20, 2018 Mar 05, 2018

Misr Petroleum Co., General Dept. for EquipmentDemolition, re-building & elevation of the welding workshop building at the fuelling station of Cairo International Airport Building. Cairo. Ref. 1/ M/ 2018

50,000 LE

Feb 27, 2018 Mar 19, 2018

Sharkeyya Governorate, the Housing DirectorateConstruction of (a) misr public library in Faqqous, (b) a workshops building & a generators room at the same & (c) a services complex at Zagazig Fist District

170,000 & 25,000 & 25,000

LE

Jan 30, 2018 Nov 02, 2018

3 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 4: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Bridges - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Local Administration Authorities E.N.R. Egyptian National Railways Authority, the Purchases & Stores Dept

Construction of two concrete railway bridges to replace the existing Mit Nama Metallic Bridge on Abul Manga Canal at Kilo 10.300 in Cairo/ Alex railway line

150,000 LE

Feb 12, 2018 Mar 06, 2018

General Dept. for Horizontal Expansion & Irrigation Projects in AssuitConducting the required (a) treatment of deteriorations along 150 meters long section of the right side of Ibrahimiya Canal within Marlaz Abu Qorqas in Minya Governorate, also (b) rehabilitation/ replacement of a 70 tons bridge across Al Kasra Canal by means of rotary drilling, in Markaz Gerga, in Sohag Governorate

130,000 & 45,000 LE

Feb 25, 2018 Mar 08, 2018

General Dept. for Port Said Drainage in Ismaileyya, The CashierConstruction of four reinforced concrete bridges on piles by means of rotary drilling across both Sarhan Canal & El Tina Canal to go under finance from the African Development Bank as part of the 3rd National Drainage Project

370,000 LE

Jan 17, 2018 Feb 26, 2018

General Dept. for Southern Minya DrainageRehabilitation/ replacement of two concrete bridges to serve both Naway & Delga El Bahary drainage Canal Outlets at Subordinated locations

50,000 LE

Jan 10, 2018 Jan 22, 2018

4 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 5: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Bridges - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Local Administration Authorities General Dept. of El Salam Canal & Irrigation Projects in Mansoura

Construction of (a) Brambal Canal at Kilo 35.700 on El,Bahr El Saghir Canal & (b) Hammam lock barrage at Kilo 27.800 on El Bouhiya Canal

65,000 & 35,000 LE

Feb 21, 2018 Mar 06, 2018

Bridges - Non Tenders Section Type Description Date Published

Business News Giant Turkish contractors are said to have succeeded to generate $ 14.7 billion revenues from overseas contracts during 2017. That was revealed in a report published by the Turkish Ministry of Economy in the local media. Report disclosed that those companies have implemented since 1972 almost 9,260 projects valued almost $ 354.7 billion in about 119 countries most of which have been Soviet Republics & Middle Eastern countries, but obviously Turkish companies have performed reasonably well in those markets that they were able to capitalized on their performance. Interesting thing is that same is said to commodity exports to those markets & tourist arrivals from them.

Feb 01, 2018

Iraqi reconstruction scheme requiring almost $ 88.2 billion to cover damages and harms caused by the war & terror acts to which the country was exposed. That was formally announced by the Iraqi Minister of Planning, Mr. Salman Al Jumaily, including most serious damages incurred during the war with Daesh terrorists for almost three consecutive years. According the Iraqi Minister, figure includes $ 22 billion funds required immediately with the remaining $ 66 billion required on the medium term. Statements of the Minister came during the opening of the 3 days conference held on the issue in Kuwait. Worth indicating is that the conference was attended by Eng. Mehleb, Advisor to Presidentl El Sisi for National Projects. Highly seen Eg. Mehlib is accompanied with a delegation of representatives of 96 Egyptian companies.

Feb 13, 2018

Iraqi reconstruction scheme requiring $ 88.2 billion to recover damages of the wars & terrors. That was formally announced by the Iraqi Minister of Planning, Mr. Salman Al Jumaily, including the damages against Da'esh terror troops which continued for almost 3 years. Above funds, according to the Minister, include $ 22 billion required immediately with the remaining $ 66 billion required over the medium term. Statements of the Minister came during the opening of a 3 days conference on the issue held in Kuwait.

Feb 13, 2018

Cultural Buildings & Clubs - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Local Administration Authorities Damietta Port Authority, Central Dept. for Finance & Administration

Construction of an investment building for the port's employees including international meeting & conferences halls, a commercial mall, also a sports & cultural center at New Damietta City. This is a repeated tender with extended deadline

500,000 LE

Jan 03, 2018 Jan 22, 2018

Sharkeyya Governorate, the Housing DirectorateConstruction of (a) misr public library in Faqqous, (b) a workshops building & a generators room at the same & (c) a services complex at Zagazig Fist District

170,000 & 25,000 & 25,000

LE

Jan 30, 2018 Nov 02, 2018

5 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 6: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Cultural Buildings & Clubs - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseEngineering consultants invited to prepare designs & drawings of projects of the New Green Valley Club in Al Shorouk City. Detailed conditions are to get Deadline to submit offers and L.E. 10,000 bid bond set for 2/22/2018. Performance bond is 5 % of bid value. Pre bid meeting set for 2/15/2018. For inquiries contact Eng. Abu Bakr Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El Said, Chairman of the Broad.

Feb 09, 2018

After almost 7 years of shut-down since the revolution, measures taken to resume the renovation & revamping of the Greek/ Romanian Museum in Alexandria to go under L.E. 120 million suspended budget since 2011. It is considered the largest museum in Lower Egypt & the largest museum specialized in the Greek & Romanian Civilization in the Mediterranean Basin. According to General Samir Hesham Ibrahim, Assistant to the Minister of Antiquities for Engineering Affairs, actual works on site have already started. The museum is planned to host up to 90,000 pieces of antiquities now stored at the Ministry's warehouses. Project is deemed a sure plus to Alexandria tourism potential particularly considering pretty fast growing relations with Greece and Cyprus

Jan 29, 2018

Earthmoving Works - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Environment General Authority for New Urban Societies, Badr City Development Agency

Protection of the City from flood risks 750,000 LE

Mar 30, 2018 Apr 24, 2018

General Dept. for Horizontal Expansion & Irrigation Projects in AssuitConducting the required (a) treatment of deteriorations along 150 meters long section of the right side of Ibrahimiya Canal within Marlaz Abu Qorqas in Minya Governorate, also (b) rehabilitation/ replacement of a 70 tons bridge across Al Kasra Canal by means of rotary drilling, in Markaz Gerga, in Sohag Governorate

130,000 & 45,000 LE

Feb 25, 2018 Mar 08, 2018

Earthmoving Works - Non Tenders Section Type Description Date Published

Business News A large sized mining company searching for transport contractors to move goods & heavy equipment, also for contribution and with experience in mining & quarrying works. For inquiries contact Mobile 0106 - 1006676 or 0109 - 9676709.

Jan 12, 2018

Projects in Pre-Tendering PhaseHarounco Co. for Construction & Development was declared winner of L.E. 235 million contract to build a chain of waves stoppers at Qayet Bay Citadel Zone in Alexandria. That was reported in the media indicating that five companies were competing for the project including Arab Contractors, Qassed Kheir Co., Al Alamiya for Contracting & Sons of Abdel Salam Al Feqi. Client is the Egyptian General Co. for Coastal Protection, Tel. 02 - 24440796/ 24443928 & Fax. 02 - 24444991. Regretfully Harounco is not listed on the Telephone directory. The Authority embarks Harounco Co. for Construction & Development declared winner of L.E. 235 million contract to build a chain of waves stoppers at Qayet Bay Citadel Zone in Alexandria.

Jan 03, 2018

6 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 7: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Hospitals - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Health Care Al Azhar University, the University Hospital in New Damietta, The Cashier

Revamping of the Internal Division of the Emergency Dept., also supply of medicines (ampoules & pills) under two contracts

50,000 & 250,000 LE

Jan 13, 2018 Jan 28, 2018

General Authority for New Urban Societies, Badr City Development AgencyImplementing of a Medical Center at the location of the City's Social Housing Project 90,000 LE

Feb 27, 2018 Mar 21, 2018

H.I.O. Health Insurance Org., Central El Seid BranchSupply of cooked & wrapped meals to patients & employees of El Mabarra Hospital in Assuit 100,000 LE

Feb 06, 2018 Feb 28, 2018

Hospitals - Non Tenders Section Type Description Date Published

Business News An integrated Health Care City Project was endorsed at the New Administrative Capital by the Prime Minister. Project includes three hospitals including a general hospital extending three level medical services including all medical specialties of 300 beds capacity on 20,000 M2 area, and a pediatrics hospital of 300 beds capacity & occupying equal space. Project also provides for a technical institute for nursing & a training center for doctors/ physicians. Meanwhile the Prime Minister has already directed to allocate existing complete buildings for the project. No mention was given to investments tor to completion period.

Feb 08, 2018

Projects in Pre-Tendering PhaseElag Est. of Saudi Arabia confirming its intentions to further penetrate Egypt's health care market. Sources close to Elag Co. were quoted in the media indicating their intentions to acquire Siaj Hotel in Pyramids, Giza, which shut down its operations since late 2010 after being exposed to several fire accidents which have damaged its infrastructure. Same sources further revealed that Elag is keen to procure the hotel and transfer it into a hospital after obtaining relevant approvals and licenses. Elag is keen to revive the hotel or revamp as hospital indicating that the hotel was lately evaluated at L.E. 185 million. Same sources have also revealed that Elag has finalized lately the acquisition of an administrative building, now under construction by El Nasr Co. for Civil Works, at the Embassies District in Nasr City, against L.E. 80 million. It is a 10 floors building occupying 8,000 M2 area & will be internally converted into a 100 beds hospital & considered as a branch of Al Orouba Hospital, also part of Elag Group also of 100 desa capacity.

Feb 08, 2018

Saudi German Hospital' Chain announcing plans to open 10 new hospitals in Egypt over the next 10 years involving 10 billion investments after having pumped L.E. 1 billion in its first hospital in Cairo of 300 beds capacity. That was announced by Dr. Med. Mohamed Hablas, the Executive Director of the Hospital, indicating the Group plans to reach 600 beds capacity over the next few years. Ho noted the project is an investment of Al Batarjy Family of Saudi Arabia. Worth indicating the group runs & manages also a large chain of pharmacies in the Kingdom.

Feb 20, 2018

Hotels & Tourist Development - Tenders SectionIntegrated Jobs

7 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 8: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Generating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Local Administration Authorities El Wadi El Gedid Governorate, the Housing Directorate, The Cashier

Construction of (a) an administrative annex to the Social Directorate's Building, (b) a second upper floor above Balat Local Municipality, (c) renovation & maintenance of a youth hostel & the sportsmen Hotel in El Kharga & (d) a shopping complex in El Farafra. Deadlines 2/26, 2/27, 2/28 & 3/1/2018

25,000 & 33,000 & 35,000 & 50,000

LE

Feb 19, 2018 Mar 01, 2018

Hotels & Tourist Development - Non Tenders Section Type Description Date Published

Business News Marriott Chain to soon add Mena House Obroy sign to its trade mark & manage a new hotel also in the Giza Pyramids Area. That was reported in the media indicating the existing location has hosted the historic hotel for almost 130 years.

Feb 21, 2018

Tourist arrivals January 2018 reaching 0,712 million in marking 31 % increase above their comparative level in January 2017. That was reported in Al Mal News quoting Capmas statistics for the period under caption indicating that West Europe ranked first in terms of arrivals nationality during the month with 31 % market share followed by East Europe with 25.8 % share & by Middle Eastern with 24.3 % share. Worth indicating is that total arrivals during the month declined by 10.2 % compared with arrivals during December 2017 when total arrivals reached 793,500.

Mar 15, 2018

Tourist arrivals in 2017 exceeding 8.3 million persons marking 44 % growth compared with 5.3 million tourists attracted in 2016 and generated $ 7.2 million revenues. That was reported in the media indicating that Egyptians are still awaiting the return of Russian charter flights directly to tourist resorts on the Red Sea, Hurghada & Sharm El Sheikh yet that seems to take some more time than earlier planned.

Jan 10, 2018

123,000 Arab & Foreign tourists visited Luxor last December & January representing almost 55 to 60 % increase above their number during the previous year lead by Chinese tourists, US tourists, followed by German, Spanish, French & UK tourists. 123,000 Arab & Foreign tourists visited Luxor last December & January representing almost 55 to 60 % increase above their number during the previous year lead by Chinese tourists, US tourists, followed by German, Spanish, French & UK tourists.

Jan 24, 2018

Ayata statistics for 2017 revealing that tourists arrivals to Egypt in 2017 increased by 55 % with tourists from China, India and the Arab countries having the lead. Ayata statistics for 2017 revealing that tourists arrivals to Egypt in this year increased by 55 % with tourists from China, India and the Arab countries having the lead. Agency France Press has quoted Mr. Hesham Al Domeiri, head of the Egyptian Tourist Authority, indicating that tourists from India & China are now contributing by more than 12 % to tourist arrivals in Egypt. As regards tourism from Arab countries so their share has almost doubled from 15 % to 30%. Worth considering that the return of both Russian & Italian tourism may, once fully activated, completely change the scene upside down. Here remains both the internal security and stability factors as crucial coupled with the wisdom of Egyptians in their handling issues.

Jan 22, 2018

Projects in Pre-Tendering PhaseA public invitation directed to citizens of the Red Sea Governorate to attend a consultative meeting from Golden Coast Co. for Hotels & Touristic Villages to evaluate environmental & social impact of its project at Soma bay. Project is identified as City Stars Red Sea Riviera & the meeting will be held at Moevenpick Hotel Soma bay.

Feb 26, 2018

Fayyoum Governorate announcing 5 auctions to sell or lease 7 properties on Qaroun Lake at tourist locations. That included (A) two sixty feddans lots on Qaroun Lake for 50 years lease with bid bonds are for L.E. 200,000 each. Tender documents are L.E. 2,000 each. (B) one 27 feddans lot for 50 years lease. Bid bond is L.E. 100,000 & Tender Document are L.E. 1,000 (c) three lots about 1.5 to 2 feddans each on the lake for sale. Bid bond is L.E. 100,000 each (d) 21 feddans in Markaz Abishway on the lake for 25 years - Bid bond is L.E. 100,000 (e) Land of Old Povion di Chasse Hotel on the lake for 25 years lease (1.5 feddans) Bid bond is L.E. 100,000.

Mar 10, 2018

Dr. Sahar Nasr, Minister of Investment, General Abu Bakr El Gindi Minister of Local Administration & Mona Zobaa, GAFI Chairman, witnessing the signing of three investment contracts (a sort of letters of stronger intents) to build tourist & food projects in Matrouh Governorate . The package included a Disney Land like entertainment project on 5,080 feddans area in Markaz Matrouh backed by $ 3.3 million US/ Saudi investment. It also included a second agreement with Mr. Ali Bin Heidar, Chairman of El Orouba Co. for Real Estate & Tourist Investment of the UAE to build a hotel project at Abu Marqiq Zone , also in Markaz Matrouh backed by L.E. 1.2 billion investments & a third project for operation & management of a dates factory for 15 feddans area in Siwa Oasis.

Feb 02, 2018

8 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 9: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Hotels & Tourist Development - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseAl Shaye'e Kuwaiti Group searching for the acquisition of three & four star hotels in the different governorates starting with Cairo, Giza & Alexandria. That has started taking place amid a 54 % recorded growth in the number of tourist delegations & circulated projections of the IMF on the growth of its tourist revenues by $ 1.8 billion to reach $ 6 billion. Meanwhile the Kuwaiti Group is said to be preparing for a meeting with the Holding Co. of Tourism & Hotels owned by the Ministry of Public Business Sector to review the revamping, management & operation of a historic hotel at Cairo Down-Town (possibly the Continental Hotel at the Opera Square) which would open a cake of L.E. 1.5 billion if not more. The Kuwaiti Group now manages more than 80 chains of hotels in the Middle East, North Africa, Russia, Turkey & Europe.

Feb 01, 2018

Five stars Meridien Heliopolis Hotel, located on Al Oroiba Road in Heliopolis, Cairo, offered for sale in public auction to be held 2/28/2018. Pre bid meeting set for 2/18/2018. Detailed conditions set for L.E. 5,000 to get from 3 & 5 Mosaddak St., Dokki, Giza. Auctioneers in charge are Shoukri Michail Salama & Associates, with offices at 2 Soliman El Halabi St., Cairo. Auction will be held at Sonesta Hotel, Cairo.

Feb 09, 2018

Egyptian Arab Land Bank offering for sale in a public auction 358,460 M2 land of complete utilities & finishing's with 1,200 meters sea view in Sukhna, at Kilo 105 on Zaafarana/ Al Ein Al Sukhna Road next to Orlando & La Vista III Villages under credit facilities reaching up to 5 years. Bid bond & other details are at the tender conditions to get against L.E. 5,000 from the Company's offices atv11 Al Mash-hedi St., off Kasr El Nil St., Mustafa Kamel Square, Cairo, Web Site www.eal-bank.com, or c/o Real Estate Consultant Nader Khozam, 80 Mosaddak St., Dokki, Giza, Mobile 0100 - 9990009.

Jan 14, 2018

Published Co. PerformancePyramisa Hotels & Resorts Chain capitalized at L.E. 432 million has posted for the year 2017 about L.E. 143.6 million consolidated revenues compared with L.E. 93.2 million posted in 2016.

Mar 06, 2018

Integrated works - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Banking, Finance & Insurance E.N.R. Egyptian National Railways Authority, the Contracts & Equipment Dept.

Implementing a project to prolong & extend docks & establishments at 5 railway stations (Kafr Tabalouha, Kafr El Sheikh Selim, El Batanon, Kalioub/ Menouf/ Tanta etc. lines

200,000 LE

Mar 01, 2018 Mar 24, 2018

E.N.R. Egyptian National Railways Authority, the Purchases & Stores DeptRenovation of Mansoura Workshops 50,000 LE

Jan 12, 2018 Jan 28, 2018

E.N.R. Egyptian National Railways Authority, Tracks Engineering Div., Contracts & Purchases Dept.Double tracking of the railway line between Mansoura & Mit Antar including related civil works 1,500,000 LE

Jan 10, 2018 Jan 30, 2018

Egyptian National Railways Authority (E.N.R.), the Purchasing & Stores DepartmentRevamping of Mansoura workshops in Mansoura 50,000 LE

Jan 11, 2018 Jan 28, 2018

9 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 10: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

General Dept. for Giza DrainageConstruction of (a) an administration building on Al Mohit Canal to host the General Dept. Offices, also (b) conducting the required purging, dredging & maintenance of open drainage canals serving Helwan & El Saff engineering domain

200,000 & 70,000 LE

Feb 20, 2018 Mar 05, 2018

Kafr El Sheikh Governorate, the Housing & Utilities DirectorateConstruction of (a) a multipurpose tower on the land of the spinning factory in Kafr El Sheikh & (b) a tower on the Nile in Dessouk. Deadlines 2/28 & 3/4/2018

2,000,000 & 600,000

LE

Feb 14, 2018 Mar 04, 2018

Ministry of Interior, General Dept. for Environment & Aquatic Surfaces Police, The CashierConstruction of a complex warehouses building at the military Training Center in Tora. Documents to get from the Planning & Architectural Studies Center, Behind 14 El Sobki St., Heliopolis Club, Roxi, Cairo & bids to deliver at the Concerned Dept. at Cornich El Maadi Opposite the NBE - National Bank Building

214,093 LE

Feb 27, 2018 Mar 12, 2018

N.B.E. National Bank of Egypt, the Construction Dept.Preparing & equipping of a new banking unit in Suez City 110,000 LE

Feb 20, 2018 Mar 01, 2018

Royal Sports Club, The CashierRequest of best offers & proposals for the construction & exploitation of a commercial building of 2,478 M2 area for 20 years Under the BOT System

1,000,000 LE

Jan 04, 2018 Jan 21, 2018

Sohag University,, General Dept. for Central PurchasesConstruction of two lecture halls Complexes & a University's teaching classrooms building in El Kawamel under three contracts. Deadlines 3/20, 3/21 & 3/22/2018

2,000,000 & 1,250,000 & 1,300,000

LE

Feb 15, 2018 Mar 22, 2018

Integrated works - Non Tenders Section Type Description Date Published

Business News Tourist arrivals in 2017 exceeding 8.3 million persons marking 44 % growth compared with 5.3 million tourists attracted in 2016 and generated $ 7.2 million revenues. That was reported in the media indicating that Egyptians are still awaiting the return of Russian charter flights directly to tourist resorts on the Red Sea, Hurghada & Sharm El Sheikh yet that seems to take some more time than earlier planned.

Jan 10, 2018

Iraqi reconstruction scheme requiring $ 88.2 billion to recover damages of the wars & terrors. That was formally announced by the Iraqi Minister of Planning, Mr. Salman Al Jumaily, including the damages against Da'esh terror troops which continued for almost 3 years. Above funds, according to the Minister, include $ 22 billion required immediately with the remaining $ 66 billion required over the medium term. Statements of the Minister came during the opening of a 3 days conference on the issue held in Kuwait.

Feb 13, 2018

10 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 11: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Integrated works - Non Tenders Section Type Description Date Published

Business News Iraqi reconstruction scheme requiring almost $ 88.2 billion to cover damages and harms caused by the war & terror acts to which the country was exposed. That was formally announced by the Iraqi Minister of Planning, Mr. Salman Al Jumaily, including most serious damages incurred during the war with Daesh terrorists for almost three consecutive years. According the Iraqi Minister, figure includes $ 22 billion funds required immediately with the remaining $ 66 billion required on the medium term. Statements of the Minister came during the opening of the 3 days conference held on the issue in Kuwait. Worth indicating is that the conference was attended by Eng. Mehleb, Advisor to Presidentl El Sisi for National Projects. Highly seen Eg. Mehlib is accompanied with a delegation of representatives of 96 Egyptian companies.

Feb 13, 2018

Giant Turkish contractors are said to have succeeded to generate $ 14.7 billion revenues from overseas contracts during 2017. That was revealed in a report published by the Turkish Ministry of Economy in the local media. Report disclosed that those companies have implemented since 1972 almost 9,260 projects valued almost $ 354.7 billion in about 119 countries most of which have been Soviet Republics & Middle Eastern countries, but obviously Turkish companies have performed reasonably well in those markets that they were able to capitalized on their performance. Interesting thing is that same is said to commodity exports to those markets & tourist arrivals from them.

Feb 01, 2018

Projects Awards That was reported in the media quoting Eng. Mohsen Saleh, Chairman of Arabco. indicating the project extends on 391,000 M2 area to serve 4,500 persons and is for completion in 30 months. On his side, Arabco Manager in Kuwait, Eng. Awni Tawfik, indicated the project hosts several government houses of 300 M2 area each, a 1,720 M2 area mosque, services buildings, carparks, shops, 9 Km long internal roads & 9 transformers substations.

Mar 20, 2018

Projects in Pre-Tendering PhaseAn alliance of Al Saqqaf of Saudi Arabia & Amar of Egypt announced the start of works on so called High Town Mall on 13,000 M2 land in 6th October City to go under L.E. 500 million + estimated investments. This is the second mall executed and scheduled for completion in early 2019 the City after the so called Watch Mall executed on 9,000 M2v area and scheduled for completion in early 2019.

Jan 02, 2018

Egyptian Arab Land Bank offering for sale in a public auction 358,460 M2 land of complete utilities & finishing's with 1,200 meters sea view in Sukhna, at Kilo 105 on Zaafarana/ Al Ein Al Sukhna Road next to Orlando & La Vista III Villages under credit facilities reaching up to 5 years. Bid bond & other details are at the tender conditions to get against L.E. 5,000 from the Company's offices atv11 Al Mash-hedi St., off Kasr El Nil St., Mustafa Kamel Square, Cairo, Web Site www.eal-bank.com, or c/o Real Estate Consultant Nader Khozam, 80 Mosaddak St., Dokki, Giza, Mobile 0100 - 9990009.

Jan 14, 2018

Harounco Co. for Construction & Development was declared winner of L.E. 235 million contract to build a chain of waves stoppers at Qayet Bay Citadel Zone in Alexandria. That was reported in the media indicating that five companies were competing for the project including Arab Contractors, Qassed Kheir Co., Al Alamiya for Contracting & Sons of Abdel Salam Al Feqi. Client is the Egyptian General Co. for Coastal Protection, Tel. 02 - 24440796/ 24443928 & Fax. 02 - 24444991. Regretfully Harounco is not listed on the Telephone directory. The Authority embarks Harounco Co. for Construction & Development declared winner of L.E. 235 million contract to build a chain of waves stoppers at Qayet Bay Citadel Zone in Alexandria.

Jan 03, 2018

A consortium grouping an Egyptian investor, a Hungarian Public Fund, other two private US & European investment funds & a UAE investor established to proceed with a University project at the Administrative Capital involving $ 50 million investments. That was reported in the media indicating the project will also depend on self finance potential of the consortium members. The University will include faculties for Transport, for railways transport, for I. T. & for other modern sciences. It will occupy 50 feddans land.

Jan 11, 2018

Two contracts signed between Polaris of Al Zamil Group & SDM Real Estate Developers on two land lots of 1.4 million M2 land lots each in Sadat City with the IDA - Industrial Development Authority. That was reported in the media quoting Mr. Ahmed Abdel Razek, head of the Authority, indicating further deals 4 million M2 land lots will be soon signed in Tenth of Ramadan City.

Feb 17, 2018

Algeria proposing a joint venture with Egypt to involve with petroleum exploration & exploitation in Africa. That was reviewed by Egypt's Minister, Eng. Tarek Al Molla in his recent meeting with the Algerian Minister of Energy, Eng. Mustafa Al Kitony. Eng. El Molla has praised during the meeting Egypt's past deals with Algeria while procuring butagas in cooperation with EGPC & Sonatrac. The Algerian Minister has also praised the past cooperation with Petrojet in Algeria and stressed the chances for joint Egyptian Algerian cooperation & opportunities on the African markets.

Feb 14, 2018

Egypt to soon complete & deliver by March 2018 the construction of 3 industrial complexes hosting 500 factories built under the slogan : Receive your factory with all licenses. Complexes are located in Sadat City, Badr City & Port Said City. That was announced by the Minister of Trade & Industry indicating the Port Said Complex includes 118 factories on 181,000 M2 area with average areas set for 300 M2, 560 M2 & 840 M2 each. The minister assured the cabinet targets to build 22 such complexes by the year 2020.

Feb 04, 2018

11 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 12: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Integrated works - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseAn unnamed large sized company expressing is intention to acquire a distinguished land lot of 150,000 to 300,000 M2 land lot at the Industrial Zone of Abu Rawash or 6th of October City. Offers to be directed to P.O.Box 12311 Agouza, Giza, or contact Tel. 01206566000 or via E Mail [email protected]

Feb 09, 2018

An alliance grouping both Orascom Construction & Al Sahraa Group of the UAE declared winner of a project to develop Al Fujaira Airport in the UAE involving $ 180 million investments with Orascom share therein worth 60 % of the contract. That was formally announced by Orascom indicating works include all major infrastructure to revamp the airport including a new control tower, the widening of the existing runway, construction of a new emergency runway apart from other systems. Weeks earlier Al Fujaira announced it is counting much on the revamping of its hotels & accommodation sector.

Mar 20, 2018

Parks & Landscaping - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Local Administration Authorities Cairo Governorate, the Housing Directorate

Renovation & revamping of Al Andalos Historic Park at Zamalek Island 240,000 LE

Mar 01, 2018 Apr 04, 2018

General Authority for New Urban Societies, Al Obour City Development AgencyParks & land scraping of the recreational zone at the city at phase 2 of the Dar Misr Housing Project 400,000 LE

Feb 09, 2018 Mar 06, 2018

12 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 13: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Renovation, Concrete Treatment & Paints - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Local Administration Authorities E.N.R. Egyptian National Railways Authority, the Purchases & Stores Dept

Construction, rehabilitation & maintenance of some culverts to secure & protect the sides of the railway lines from flood risks along Qabbary/ Matrouh railway line in the section from Kilo 219.500 to Kilo 293.600 at 19 points

250,000 LE

Jan 07, 2018 Jan 21, 2018

General Dept. for East Kafr El Sheikh Irrigation, The CashierRehabilitation/ repletion of inlets, outlets & gates controlling canals ends at different subordinated locations

101,000 LE

Feb 21, 2018 Mar 05, 2018

General Dept. for Horizontal Expansion & Irrigation Projects in AssuitConducting the required (a) treatment of deteriorations along 150 meters long section of the right side of Ibrahimiya Canal within Marlaz Abu Qorqas in Minya Governorate, also (b) rehabilitation/ replacement of a 70 tons bridge across Al Kasra Canal by means of rotary drilling, in Markaz Gerga, in Sohag Governorate

130,000 & 45,000 LE

Feb 25, 2018 Mar 08, 2018

General Dept. for Southern Minya DrainageRehabilitation/ replacement of two concrete bridges to serve both Naway & Delga El Bahary drainage Canal Outlets at Subordinated locations

50,000 LE

Jan 10, 2018 Jan 22, 2018

13 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 14: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Residential Buildings - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Local Administration Authorities Housing Cooperative Society of Employees at Suez Co. for Petroleum Refining, The Cashier

Request of offers from eligible engineering consultancy offices for design & supervision of works including preparing designs & studies pertaining to the implementation of a residential complex within Ataqa District in Suez Governorate

50,000 LE

Jan 10, 2018 Jan 27, 2018

Kafr El Sheikh Governorate, the Housing & Utilities DirectorateConstruction of (a) a multipurpose tower on the land of the spinning factory in Kafr El Sheikh & (b) a tower on the Nile in Dessouk. Deadlines 2/28 & 3/4/2018

2,000,000 & 600,000

LE

Feb 14, 2018 Mar 04, 2018

Residential Buildings - Non Tenders Section Type Description Date Published

Business News Iraqi reconstruction scheme requiring $ 88.2 billion to recover damages of the wars & terrors. That was formally announced by the Iraqi Minister of Planning, Mr. Salman Al Jumaily, including the damages against Da'esh terror troops which continued for almost 3 years. Above funds, according to the Minister, include $ 22 billion required immediately with the remaining $ 66 billion required over the medium term. Statements of the Minister came during the opening of a 3 days conference on the issue held in Kuwait.

Feb 13, 2018

Projects Awards That was reported in the media quoting Eng. Mohsen Saleh, Chairman of Arabco. indicating the project extends on 391,000 M2 area to serve 4,500 persons and is for completion in 30 months. On his side, Arabco Manager in Kuwait, Eng. Awni Tawfik, indicated the project hosts several government houses of 300 M2 area each, a 1,720 M2 area mosque, services buildings, carparks, shops, 9 Km long internal roads & 9 transformers substations.

Mar 20, 2018

Egyptian Contracting Co. - Mokhtar Ibrahim - declared winner of L.E. 7.3 billion contract in Sultanate of Oman to design & pump water From Sohar Zone to El Zahra Zone for completion in 31 months. That was reported in the media quoting Eng. Fayek El Banna, President of the Company, indicating the contract was won under tough competition with international contractors. Award included relevant preparations for implementation. It is not the first highly valued contract that Mokhtar Ibrahim was awarded in Oman over the past few years mostly related to water & waste water.

Mar 25, 2018

Roads Construction - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Local Administration Authorities Cairo Governorate, Misr El Adima District Adm.

Repaving of streets within the District 70,000 LE

Jan 10, 2018 Jan 21, 2018

14 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 15: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Dakahleyya Governorate, the Roads & Transport DirectorateConsolidation & repaving of (a) 3.5 Km long road Nesha/ Nabaroh, also (b) completion & repaving of another 1.4 Km long road

100,000 & 70,000 LE

Feb 16, 2018 Feb 28, 2018

General Authority for New Urban Societies, Al Obour City Development AgencyRevamping & increasing efficiency of roads, walk ways, also completing other design requirements, passages & u - turns at the 6th district in the city

600,000 LE

Jan 02, 2018 Jan 28, 2018

Roads Construction - Non Tenders Section Type Description Date Published

Business News Egypt's Minister of Transport urging the Minister of Petroleum & Minerals to find a solution to encounter bitumin shortages facing roads construction projects. That was reported in the media indicating the Minister of Transport, Dr. Eng. Hesham Arafat, has committed to solve the problem in the next few days after repeated claims were received from contractors involved in executing the National Roads Project. On his side another claim of bitumin shortage was expressed by Eng. Ali El Sayyad, Chairman of the Nile Co. for Roads Construction who indicated his company owns about 26 concrete mixers requiring thousands of tons of bitumin monthly & is suffering from its shortage on the market.

Feb 17, 2018

Iraqi reconstruction scheme requiring almost $ 88.2 billion to cover damages and harms caused by the war & terror acts to which the country was exposed. That was formally announced by the Iraqi Minister of Planning, Mr. Salman Al Jumaily, including most serious damages incurred during the war with Daesh terrorists for almost three consecutive years. According the Iraqi Minister, figure includes $ 22 billion funds required immediately with the remaining $ 66 billion required on the medium term. Statements of the Minister came during the opening of the 3 days conference held on the issue in Kuwait. Worth indicating is that the conference was attended by Eng. Mehleb, Advisor to Presidentl El Sisi for National Projects. Highly seen Eg. Mehlib is accompanied with a delegation of representatives of 96 Egyptian companies.

Feb 13, 2018

Iraqi reconstruction scheme requiring $ 88.2 billion to recover damages of the wars & terrors. That was formally announced by the Iraqi Minister of Planning, Mr. Salman Al Jumaily, including the damages against Da'esh terror troops which continued for almost 3 years. Above funds, according to the Minister, include $ 22 billion required immediately with the remaining $ 66 billion required over the medium term. Statements of the Minister came during the opening of a 3 days conference on the issue held in Kuwait.

Feb 13, 2018

Projects Awards That was reported in the media quoting Eng. Mohsen Saleh, Chairman of Arabco. indicating the project extends on 391,000 M2 area to serve 4,500 persons and is for completion in 30 months. On his side, Arabco Manager in Kuwait, Eng. Awni Tawfik, indicated the project hosts several government houses of 300 M2 area each, a 1,720 M2 area mosque, services buildings, carparks, shops, 9 Km long internal roads & 9 transformers substations.

Mar 20, 2018

15 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 16: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Sea Ports - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Transport Damietta Port Authority, General Dept. for Financial & Commercial Affairs

Construction. management, operation & maintenance & redelivery of the property to use for handling environment friendly bulk goods & other related value added industries on an area of about 140,000 M2 for 25 years

3,000,000 LE

Feb 08, 2018 Mar 05, 2018

Steel Structure, Possible Prefab - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Airports & Ports Assuit Governorate, the Contracts & Purchasing Department

Building, equipping & supply of river ferry of 80 tons capacity 150,000 LE

Jan 03, 2018 Jan 16, 2018

Central Egypt Electricity Distribution Co., Purchases & Contracts Dept.Supply of kiosks with different capacity transformers under two contracts 1,200,000 &

1,300,000LE

Jan 03, 2018 Jan 18, 2018

E.N.R. Egyptian National Railways Authority, the Contracts & Equipment Dept.Implementing a project to prolong & extend docks & establishments at 5 railway stations (Kafr Tabalouha, Kafr El Sheikh Selim, El Batanon, Kalioub/ Menouf/ Tanta etc. lines

200,000 LE

Mar 01, 2018 Mar 24, 2018

E.N.R. Egyptian National Railways Authority, the Purchases & Stores DeptRenovation of Mansoura Workshops 50,000 LE

Jan 12, 2018 Jan 28, 2018

16 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 17: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Steel Structure, Possible Prefab - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Airports & Ports E.N.R. Egyptian National Railways Authority, the Purchases & Stores Dept

Construction of two concrete railway bridges to replace the existing Mit Nama Metallic Bridge on Abul Manga Canal at Kilo 10.300 in Cairo/ Alex railway line

150,000 LE

Feb 12, 2018 Mar 06, 2018

Egyptian Airports Co. - New Supply of two water exhaustion trucks 60,000 LE

Jan 03, 2018 Feb 04, 2018

Egyptian National Railways Authority (E.N.R.), the Purchasing & Stores DepartmentRevamping of Mansoura workshops in Mansoura 50,000 LE

Jan 11, 2018 Jan 28, 2018

El Wadi El Gedid Governorate, the Housing Directorate, The CashierConstruction of (a) an administrative annex to the Social Directorate's Building, (b) a second upper floor above Balat Local Municipality, (c) renovation & maintenance of a youth hostel & the sportsmen Hotel in El Kharga & (d) a shopping complex in El Farafra. Deadlines 2/26, 2/27, 2/28 & 3/1/2018

25,000 & 33,000 & 35,000 & 50,000

LE

Feb 19, 2018 Mar 01, 2018

General Authority for New Urban Societies, General Secretariat,, Central Stores and Purchases Dept.Supply of (a) two 10 M3 tank trucks, (b) another similar tank truck with 10 M3 stainless steel tank, (c) six tank trucks with boxes of not less than 10 tons capacity each & (d) 7 Nos. 4 x 4 agricultural tractors of 199 Hp capacity each. Deadlines 4/17, 4/17/ 4/18 & 4/19/2018

30.000 & 16,000 & 120,000 & 50,000

LE

Mar 22, 2018 Apr 19, 2018

17 of 18American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q1 2018 Report

Page 18: Construction Projects - AmCham€¦ · Abdel Hamid, head of the Engineering Dept. Tel. 0127 - 5863666 or 0109 - 3642666, Dr. Tamer Heikal, the Executive Director, also Dr. Tamer El

Steel Structure, Possible Prefab - Tenders SectionIntegrated JobsGenerating Sector

Subject Bid Bond Currency

Publish Date

Expiry Date

Financing

Airports & Ports General Org. for Hospitals & Teaching Institutes, El Mehalla Liver teaching Hospital - New, The Cashier

Conducting the required (a) rehabilitation of the service & distribution area serving the liver transplanting capsules area, (b) rehabilitation/ replacement of electric elevators & (c) supply & erection of water storage tanks, rehabilitation/ replacement of the water pipes lifting network and of the efficiency of the water tanks & pumps. Deadlines 2/1, 2/5 & 2/8/2018

30,000 & 90,000 & 28,000

LE

Jan 20, 2018 Feb 08, 2018

New Urban Communities Authority, New Sohag City Development Agency, The CashierImplementing of three water wells, a water pipeline & an underground water storage tank, also an irrigation water network to serve the road's central island

900,000 LE

Feb 16, 2018 Mar 13, 2018

Steel Structure, Possible Prefab - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseGround stone to be soon laid for Safaga multipurpose containers terminal on the Red Sea involving almost $ 400 million Chinese investments. It would cover 500,000 M2 land area & a 800 meters long doc. It is designed to handle annually 3 million containers & 1.5 million tons general cargo to reach later 7 million tons. It also targets to cope with requirements of the highly promising Golden Angle Project, also with several other projects in Upper Egypt.

Feb 13, 2018

Two contracts signed between Polaris of Al Zamil Group & SDM Real Estate Developers on two land lots of 1.4 million M2 land lots each in Sadat City with the IDA - Industrial Development Authority. That was reported in the media quoting Mr. Ahmed Abdel Razek, head of the Authority, indicating further deals 4 million M2 land lots will be soon signed in Tenth of Ramadan City.

Feb 17, 2018

18 of 18American Chamber of Commerce in Egypt - Business Information Center