Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa

Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa

Embed Size (px)

Citation preview

Prepared By:

Omar Al-Taher

Supervised By:

Dr Baraq Jum’aa

Graduation project consist of two parts :

The first part include preparing a theoretical research.

The second part includes the

application of the principle in

construction project management.

What is a Project?

A project is a temporary endeavor undertaken to accomplish a unique product or service with a defined start and end point and specific objectives .

PMBOK definition

Project management is the application of knowledge, skills, tools, and techniques applied to project activities in order to meet or exceed stakeholder needs and expectations from a project.

PMBOK definition

The PMI has identified nine topic areas to define The PMI has identified nine topic areas to define the scope of project management knowledge as the scope of project management knowledge as follows:follows:

Project Integration ManagementProject Integration ManagementProject Scope ManagementProject Scope ManagementProject Time ManagementProject Time ManagementProject Cost ManagementProject Cost ManagementProject Quality ManagementProject Quality ManagementProject Human Resource ManagementProject Human Resource ManagementProject Communication ManagementProject Communication ManagementProject Risk ManagementProject Risk ManagementProject Procurement ManagementProject Procurement Management

PROJECT PHASES AND LIFE CYCLE:

2

The project The project Consists ofConsists of

11--Ground Floor Ground Floor 263.92 m263.92 m22..

22--First First basementbasement

349.10349.10 mm22..33 - -second second

basementbasement236.28236.28 mm22..

44--EntranceEntrance5m5m22

4

Location:

NablusRafedia

1

Residential Building (Villa)

.

3

Owner:

By Private sector

( individual )

Funded by :

The owner himself

الواجهة الواجهة الشمالية الشمالية الشرقية الشرقية

Thickness of slabs

compatibility

footings

Working day = 8 hours Working days are all days except Fridays and

holidays. The electrical and mechanical work done by sub

contractor. All money paid by New Israeli Shekel (NIS) and the

fixed value of Dollar according to local coin was (1$=4 NIS).

S-CURVE FOR WE HAVE USING PRIMAVERA

100 (%) Description .

18.6% Excavations

25.7% Concrete works

17.5% Stone works

3.4% Plaster.

5.7% Tiles.

3.2% Blocks

25.9 %Finishing