66
Tulkarem Hospital -BOQ- Construction of the third floor in Tulkarem Hospital -BOQ- 1 out of 62

Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Embed Size (px)

Citation preview

Page 1: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Construction of the third floor in Tulkarem Hospital

-BOQ-

1 out of 62

Page 2: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

1 Preliminary works prior to the construction of the new floor

* The contractor shall, when pricing the rates of this bill, take

into consideration to include and allow for the costs or

expenses of all requirements stipulated herein below or in

the preambles, drawings and the specification of the

tender.* The contractor should visit the site to verify the amount of work

and consider all other works for the proper construction of the

new floor.

* The disposal& demolished materials shall be carried out from

the construction zones through special arrangements to external

hospital yards to avoid disturbances/ noises or dust spreading

down the floors or neighboring areas. the contractor is

responsible for the disposal of all demolished and removed

materials from the site to a dump site approved by the

municipality.

* The contractor should coordinate with the client for any possible

material or elements that need to be preserved and handed over

to the client stores.

* The preserved elements such as steel doors& widows, steel

grills, steel hand rails, steel steps and metal protections for fans

shafts& service openings shall be re installed for the new

construction as directed by the engineer. while the other

materials should be handed over to the client stores.

* The contractor should take all measures to protect the hospital

belongings from any damage or disturbance to it’s functioning

systems and to ensure the safety of the hospital users during

the construction stage,

The contractor shall protect the underneath floors from leakage

or penetration of rain water from the roof above which the new

floor will be constructed.

Therefore, special arrangement and prtection zone shall be

erected in full coordination with the hospital directorate and the

engineer.

* The contractor should also protect all existing mechanical,

drainage systems and electrical networks . This include the

conduct of any necessary arrangements to ensure continuous

functioning of these systems during construction stage.

* The contractor should also take all necessary shoring measures

to protect the existing building elements during all stages of

work until safely completing all new construction work.

* The contractor should submit a clear methodology for the

proposed stages of work and protection and shoring methods

for the Engineers approval prior to commencement of works.

* Careful demolishing and reinstatement of existing structural

elements for proper construction of the new floor works; all as

sown in the demolishing plan and in accordance with the

engineer's instructions. The work includes but not limited to :

1.1 Demolishing and removal of all elements covering the steel

reinforcement for the columns starters on the existing roof, such

concrete, blocks, stone, filling materials....etc, including the

preserving and cleaning of steel reinforcement for proper

erection of the new columns (this is true for all existing columns

including perimeter columns).

LS 1

2 out of 62

Page 3: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

1.2 Demolishing the existing concrete roof slab for the machinery

room located on the existing roof. The unit price shall include

dismantling and removal all the utilities and finishing layers

above the slab including the sloped light weight concrete, water

proofing layers. All as directed by the Engineer.

M2 250

1.3 Demolish concrete slabs of the existing staircases, including

protection and preservation of the existing finishing works such

as, staircase steps, landings, tilling, steel doors, handrails

aluminum windows, walls finish and all other electrical&

mechanical utilities, fittings and equipments. …etc. the voids for

the staircases shall be protected by rigid and safe formwork or

scaffolding through out the construction stage.

M2 60

1.4 Demolish and removal of concrete roof slabs for existing

elevators shafts (roof& floor) including the protection and

preservation of all existing finishing works, steel doors, steel

steps& handrails, grills--etc, and all other electrical& mechanical

utilities, fittings and equipments, machines. …etc. the work also

includes cuttings/ making new openings for elevators doors

through the existing concrete walls to match the new proposed

locations of the elevators and perform concrete filling/

patching/adjustment of the existing doors openings at the roof.

the voids for the elevators shall be protected by rigid formwork

or scaffolding through out the construction stage.

M2 100

1.4 Demolishing and removal of the existing concrete or block

partitions, or external stone walls, this shall include demolishing

of the other wall finshes in the machinery room at the existing

roof level. The unit price shall include dismantling and

preserving the existing windows and doors . All as directed by

the Engineer.

M2 500

1.5 Demolishing and removal the finishing layers on top of the

existing roof slabs including the sloped light weight concrete,

and machine foundations. All as directed by the Engineer.

(provisional)

M2 300

1.6 Careful dismantle and preserve the doors of staircases at the

existing roof level, windows, steel hand rails& landing,

machinery protections& coverings, shafts sheets covering…etc.

the price includes re- installtion of the same dismantled units or

structures. Hence all parts and elements shall be preserved and

maintained in good condition. All as directed by the Engineer.

LS 1

3 out of 62

Page 4: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

1.7 Careful dismantle, demolish and removal of the existing sky light

structure (between grids10-13&H-J) including all elements that

blocks the construction of new design layout. The price includes

the re-installtion of the same dismantled sky light and the steel

structure at the new roof level. Hence all parts and elements of

the sky light such as transparent sheets, metal sections&

profiles, plates, anchors, sheets, flashing.......etc should be

carefully dismantled and reserved in good condition. the void for

the sky light shall be protected by rigid and safe formwork or

scaffolding throughout the construction stage. The price shall

include also cuttings in concrete walls for new windows

openings and treming the concrete wall to fit the details as

shown in drawings.

L.S 1

1.8 Dismantle and demolish parts of the existing stone roof parapet,

circular parts and parts of the chimney walls, including the

preservation of stone courses.

M2 100

1.9 Careful removal of existing coping for the stone parapet and

preservation for use in the construction of new stone parapet.

All as directed by the Engineer.

MR 245

Total of preliminary works carried to summary sheet

4 out of 62

Page 5: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

2 Concrete Works

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the tender.

All concrete works includes the supply of ready mix concrete,

placing& casting, formwork & supports, reproping, shuttering,

vibration, curing, testing and whatever needed for the

completion of the works all in accordance to the standards,

codes, specifications and as details shown in drawings.

2.1 Supply and cast reinforced concrete B300 for columns of

various dimensions and locations, maximum size of aggregate

20mm as shown on drawings.

M3 70

2.2 Supply & cast concrete B300 for 31cm thick ribbed slabs

including Light weight block "EYTONG" and drop beams as

shown on drawings. The rate includes casting the slab in stages

by providing several construction joints in order to allow for

lifting the existing chillers, machines and equipments before

completing the work. the rate also includes the special

treatments of the construction joints in accordance to the

construction codes and standards.

M2 1700

2.3 Ditto, but for 49cm thick ribbed slabs. M2 200

2.4 Ditto, but for 15 cm thick solid slabs. M2 95

2.5 Ditto, but for 18 cm thick solid slabs. M2 95

2.6 Supply and cast reinforced concrete B300 for staircase flights,

steps, landings and machine foundations of various sections.

M3 25

2.7 Supply and cast reinforced concrete B300 for walls of various

thickness, dimensions and different locations.

M3 145

2.8 Supply and cast concrete B300 behind stone walls for backing

the stone work and for windows and door lintels and where

needed; all in accordance with the engineer instructions.

M3 200

2.9 Deformed high yield steel bar reinforcement of various

diameters, characteristic strength FY=420N/mm2 for concrete

reinforcement, as shown on drawings and according to

specifications.

TON 130

Total of Concrete Works carried to civil summary

5 out of 62

Page 6: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

3 Stone Works

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs and expenses of

all requirements stipulated in the preambles, drawings and

technical specification of the contract. The price includes

scaffolding, formworks, supports, cutting, trimming, chamfering,

galvanized anchors& pins, angles as specified and flush

pointing works composed of white cement and sand (1/2) with

approve additive for better workability, tightness and water

proofing. The stone finishing and dressing for the new stone

works shall be similar to that rendered at the lower floors of the

existing hospital building. The unite rate shall also include cost

of all required stone pieces, (such as windows and doors

jambs, sills, lintels, corners, key stones, any other special stone

pieces etc..); all as per the stone works rendered in the lower

floors of the existing hospital and to the engineer instructions.

Accordingly, no separate cost allowance for the stone pieces.

The unit rate shall also include the cost of pointing the stone

work.

3.1 Supply and install 5 cm thick 25 cm wide Taltish stone courses

from first quality Jama'en as shown on drawings. The unit rate

shall include cost of 10cm hollow concrete blocks and anchors

for the stone walls as per drawings.

M2 950

3.2 Ditto, but 4 cm thick stone cladding. The rate includes cost of

B200 concrete backing, anchors and 6 mm steel mesh. The rate

includes all anchoring details as shown on drawings.

M2 40

3.4 Supply and install 8 cm thick stone coping , 36 cm wide a stone

roof parapet copping made from Jama'en stone . The price

includes stone pointing.

MR 100

3.5 Re-install stone copping which was dismanteled and preserved

from the existing parapet.

MR 150

Total of Stone Works carried to civil summary

6 out of 62

Page 7: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

4 Block Work:

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract.

4.1 Supply and construct 10cm hollow concrete block in cement and

sand mortar (1:4) for internal portion walls, the price includes

cost of cutting, anchors, bonding, jointing, utilities openings

complete as per drawings, specifications and as directed by the

engineer.

M2 2200

4.2 Ditto, but 20 cm hollow concrete block . M2 1050

4.3 Ditto, but 7 cm hollow concrete block around column starters on

the new roof including sand cement mortar fill.

M2 100

Supply and cast B300 concrete lintels or griddles above block

works at door or window level across the whole length of block

walls and in places as directed by the engineer. The price

including shuttering and the supply & installation of steel

reinforcement 4nos of 12mm dia. and with stirrups 8mm @ 20

cm c/c

M3 40

4.4 Supply and install 3 cm "Randopan" extruded polystyrene

boards for external stone walls, of density 24 kg/m3 as shown

on drawings.

M2 930

Total of Block Works Carried to Summary Sheet

7 out of 62

Page 8: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

5 Plastering Works:

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract.

5.1 Supply and install internal plastering for walls, columns, arches

drop beams, softies of slabs & beams, shaft walls etc

,composed of 3 coats, a bond coat 1:1, base coat 1:4, and finish

coat 1:5 as specified. The price includes the corner beads,

casing beads, metal lath, scaffoldings, shuttering, bonding

agents and the requirements as specified .

M2 5200

5.2 Ditto, but supply and install internal plastering for ceiling M2 900

5.3 Ditto but supply and install external plastering for parapet wall,

external walls or shafts and wherever needed composed of 3

coats a bond coat 1:1, a base coat 1:4 and a finish coat 1:2 with

water proofing materials all as specified.

M2 800

Total of Plastering Works carried to Summary

8 out of 62

Page 9: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

6 Flooring and Covering Works:

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract.

6.1 Supply and install 30x30x3cm Terrazzo floor tiles similar to

Halonim # 75 or equally approved. Rate includes 30cm x 10cm x

1 cm skirting, 3 cm cement sand mortar (1:3 ), sand fill

materials, cuttings, fittings, trims, grouting with white cement

and polishing, all in accordance with the specifications and

applicable Standards.

M2 890

6.2 Supply and install 20x20cm glazed ceramic class (A) tiles for

walls cladding of different colours. The tiles shall be laid and

fixed to the walls in patterns, style and forms of grouting&

jointing as directed by engineer using approved adhesive

materials. The price also includes the cost of surface

preparation to receive tiles, which shall include two coats of

cement plaster (scratch and float coat), approved adhesive

materials, grouting, aluminum protection angles as approved by

the engineer.

M2 900

6.3 Ditto, but 30x30cm ceramic tiles class (A) "Negev" model #

9001 or equivalent for walls cladding of different colours. The

tiles shall be laid and fixed to the walls in patterns, style and

forms of grouting& jointing as directed by the engineer using

approved adhesive materials. Price includes the cost of surface

preparation to receive tiles, which shall include two coats of

cement plaster (scratch and float coat), approved adhesive

materials, grouting, protection angles as approved by the

engineer.

M2 1500

6.4 Ditto, but anti bacteria ceramic 20x20cm class (A) closured wall

tiles for surgery& sterile stores using special adhesive materials

and anti fungus grouting materials as per manufacturer

instructions and in accordance with the MOH requirements and

related Standards.

M2 130

6.5 Supply and install non slip ceramic floor tiles class (A)

20x20*0.8cm of different colours, the price includes the mortar

(1:3) with water proofing materials, the sand cement fill,

cutting& trimming around floor utilities and pointing as specified.

the tiles shall be laid and fixed in patterns, style and forms of

grouting& jointing as directed by the Engineer.

M2 200

6.6 Ditto, but 30*30*0.8 cm granite porcelain floor tiles of different

colours as made by TAU ceramic, Matt finish or equivalent, the

tiles shall be laid and fixed in patterns, style and forms of

grouting& jointing as directed by the Engineer.

M2 900

6.7 Ditto but 2cm thick Perlato marble for elevator walls, the rate

include cuttings, recesses for utilities, cut pieces, rounding,

jointing& polishing, anchoring& all fixing accessories. The work

covers the cladding of elevator door sides and lintels.

M2 50

6.8 Supply and install 3cm thick, 10.5 cm wide local polished cut

stone for window thresholds with mitered edge as shown on

drawings.

MR 120

9 out of 62

Page 10: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

6.10 Supply and install 3cm thick "Perlato" marble for stair

treads(155*34*3 cm) polished one face & edge with chamfered

edges matching the existing material . The treads should be

bedded on 3cm mortar (1:3), a sand bed and pointing works.

The rate includes an edge piece for water stop.

No. 75

6.11 Ditto but 2cm thick riser(155*14 cm). No. 74

6.12 Ditto but 3 cm thick 30 cm wide for staircase landing. M2 50

6.13 Ditto but 2cm thick for steps skirting. No. 75

6.14 Ditto but 1cm thick 7cm high for landing skirting. MR 75

6.15 Supply and install Anti static PVC flooring type "Teraclean",

2mm thick or equivalent for surgery room, sterile stores and as

directed by the engineer. The price includes the installation of

skirting and copper mesh under tiles every 30cm using 1cm

wide copper strip. This mesh should be connected with the earth

system of the building. The pvc flooring should be fixed using

conductive adhesive and complete seal of joints all in

accordance to manufacturer instructions and MOH regulations

standards. The Installations for pvc flooring, skirting,

terminations with walls/outer& inner corners shall be strictly

implemented by professional and in accordance to the

manufacturer's recommendation.

M2 200

6.16 Ditto, for sterile area but with out copper strips. M2 100

6.17 Supply and install VINYL Anti static flooring type Armstrong

2mm thick or equivalent for surgery rooms, sterile stores and as

directed. The price includes the installation of skirting and

copper mesh under tiles every 30cm using 1cm wide copper

strip . This mesh should be connected with the earth system of

the building. The pvc flooring should be fixed using conductive

adhesive and complete seal of joints all in accordance to

manufacturer instructions and MOH standards.

M2 30

6.18 Ditto, for sterile area but with out copper strips. M2 30

Total of wall and floor cladding Works carried to Summary

Sheet

10 out of 62

Page 11: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

7 Water Proofing

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract.

7.1 Supply and install roof water proofing membrane 5mm thick

covered with quartz granules, Pazkar or equivalent, for main

roof, machines roofs, stairs roofs, parapet walls and where

required the price includes the application of primer coat GS474

at a rate of 25 kg /m2, installation of 15*15cm angle fillet,

grooves, groove sealant, groove cover, joints over lapping,

backing sheets or pieces all around external& internal corners,

roof drains, machines foundations or up stands, roof door

thresholds and silver paints along the joints and all necessary

material and workmanship to complete the works as shown in

the drawings and as per manufacturer instructions and codes of

practice.

M2 2300

7.2 Supply and apply three coats of bitumen (25/75) at rate of

500g/m2 for each layer with two layers of fiberglass in opposite

directions including primer coat GS474. The price includes

5*5cm angle fillet with smooth sand cement mortar(1:3) and

5cm thick sand cement screed with water proofing agent as

surface layer before applying the water proofing coats.

M2 270

7.3 Supply and install a sloped light weight foam concrete of density

1000kg/m3 on the roof ( the thickness to meet the level and

slopes shown on drawings). The rate includes cost of applying

2 cm cement screed layer above the light weight concrete.

M2 2050

Total of Water Proofing carried to summary Sheet

11 out of 62

Page 12: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

8 Carpentry Works

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract.

8.1 Fabricate, supply and install the following wooden doors

complete with the metal frames, all necessary fixing

accessories, glazing, heavy duty roller hinges, stoppers,

louvers, grills, the required hydraulic closures, hardware,

protection panels and ironmongery , painting of the frame and

the exposed wooden surfaces of the door panels, the unit rate

shall also include all the works described herein below:

* The wooden door leaf shall be 45mm thick with required filling, 5

mm thick class A plywood facing on each side, the exposed

surfaces of the door panel shall be hard wood "Zan" 52*35 mm

tongued and grooved in the internal wooden fillings, sealing

strips around door panel, and door closure German made where

shown and required on the drawings, all as shown on the

drawings.

* Supply and install of heavy duty hinges, locks, cylinders are

"Yardini" or equivalent. locks to toilets-vacant/ occupied "Yardini

" type 7008 all doors shall be provided with master key system.

The hierarchy shall be specified before the supply of lock sets.

* Door handles shall be steel handles similar to Hewi type

zg1113bb and type fbg 1113 or equivalent. The colour to be

selected by the Engineer.

* Supply and installation of formed galvanized steel frame 1.5mm

thick of required width according to the wall thickness, buckets

for cylinders& locks, recess for hinges with backing plates ,

rubber knobs, side anchoring& bottom bracing and concrete

filling as specified in drawings. The frames shall be fabricated

and assembled by specialized manufacturer with all required

accessories.

* Door protection 2mm stainless steel U shape for the both sides

as shown on drawings.

* Door protection where needed as per drawings of 2mm

"Decosheet" (SPM ) or equivalent including all necessary

fittings & fixings complete as per manufacture

recommendations, the colour will be as per Eng. approval.

* Supply and installation of PVC inflammable 'Taraflex' or

equivelant 2mm thick cladding on both sides of the door panels.

* All exposed edges , louvers and door frames are" Zan" wood

and should be painted with 3 coats of liquor paint. the metal

doors frames shall be painted with primer coat of meginol

special gray 270-004 and two coats of polyour matt oil. the

colour shall be selected by the engineer.

* Door filling material should not be less than 80%.

* Rate for smoke proof doors include 100% filling , sealing strips

around door panel including the bottom of panel.

8.1.1 D01 ( 1.20 * 2.10 m) No. 23

8.1.2 Ditto, but D01G ( 1.20 * 2.10 m) with grills No. 3

8.1.3 D02 ( 1.10 * 2.10 m) No. 3

8.1.4 D03 ( 0.95 * 2.15 m) No. 21

8.1.5 D04 ( 0.95 * 2.10 m) No. 12

12 out of 62

Page 13: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

8.1.6 Ditto, but D04G ( 0.85 * 2.10 m) with grills No. 7

8.1.7 D05 ( 0.95 * 2.15 m) No. 2

8.1.8 D06 ( 0.85* 2.15 m) No. 9

8.1.10 D07 ( 0.85 * 2.15 m) No. 3

8.1.11 D08 ( 1.60 * 2.10 m) operate electrically and manually with inter-

come system

No. 3

8.1.12 D09 ( 1.70 * 2.10 m) No. 1

8.1.13 D10 ( 1.70 * 2.10 m) operate electrically and manually with inter

come system

No. 2

8.1.14 D11 ( 270 * 2.10 m) operate electrically and manually with inter

come system

No. 1

8.1.15 D12 ( 1.60 * 2.10 m) located in the Children day room No. 1

8.2 Nurse station , desks and cabinets

Fabricate, supply and install the following units, as in drawings

with all fixing accessories, drawers, shelves, hardware, and

ironmongery with a master key and made of:

18mm thick plywood for wall hung and lower cabinets, plastic

laminated " top quality from outside and laminated with regular

Formica from inside, 12mm thick sandwich panel for shelves

laminated with regular Formica. For dimensions refer to detailed

drawings.

8.2.1 kitchen lower and upper cabinets ( 120 cm length) Room No. 72

including granite counter top "Tiger eye" with top& bottom

skirting, beads, polishing, routings, jointing…etc and all

preparatory woks for the installation of the required sink and

sanitary fixtures.

No. 1

8.2.2 Ditto, but 125cm length for Room No. 28 No. 1

8.2.3 Ditto, but 130cm length for Room No. 22,32 and 65. No. 3

8.2.4 Ditto, but 135cm length for Room No. 59 No. 1

8.2.5 Room No. 31 working station, lower& upper cabinets. No. 1

8.2.6 Room No.37 working station, lower& upper cabinets. No. 1

8.2.7 Room No. 64 working station, lower& upper cabinets. No. 1

8.2.8 Room No. 97 utility working station, lower& upper cabinets. No. 1

8.2.9 Nurse station C1 No. 1

8.2.10 Nurse station C2 No. 1

8.2.11 Nurse station C3 No. 1

8.2.12 Nurse station C4 No. 1

8.2.13 Electrical cabinets of different sizes. No. 5

Total of Carpentry Works Carried to Summary Sheet

13 out of 62

Page 14: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

9 Suspended ceiling

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract. Rates for all suspended

ceilings works includes suspension system with anchors to the

structure, L& Z, main& main profiles, omega profiles. clips,

gaskets and all necessary fittings in accordance to the

manufacture technical data and related standards covering this

type of works, The rate includes also cutting and preparation for

installing lighting fixtures, ceiling recess, maintenance

openings, grills, ceiling utilities... etc.

9.1 Supply and install suspended ceiling for bathroom, utilities and

wet areas made from 30cm non perforated formed galvanized

metal trays of 0.6mm thick and 45mm high. The trays should be

supplied pre painted and oven cured. The unit rate shall also

include acoustic rock wool mats, 25mm thick and 25kg/m3

density, wrapped in black non inflammable dust proof sags in

accordance with specifications and the related Standards.

M2 200

9.2 Ditto, but perforated sheets(12%-20%) perforation and of 40cm

wide. The unit rate shall include cost of the of 25mm thick rock

wool.

M2 600

9.3 Ditto, but 60*60cm perforated sheets for the waiting area with

approved acoustic material "Soundex " or equivalent in

accordance to the related safety standards, rules and

regulations.

M2 220

9.4 Supply and install 60*60cm suspended ceiling for operating

room, ECOPHONE HYGINE Type Protect "A" (non perforated).

The price should include galvanized suspension system with

anchors to the structure, bacterial resistant, moisture resistant,

with standing relative humidity up to 95% at 30c fire resistant

tiles, including access panels, fittings, fixing, installation of a

closed cell gasket between the grid and panel including

retention clips to insure good seal , complete all as

specifications and drawings.

M2 150

9.5 Ditto, but for clean room areas type "Clima Plus USG" class

100 ceilings or equivalent.

M2 300

9.6 Ditto, but 60x60cm acoustic tiles suspended ceiling, type

Armstrong Georgian drop type or equivalent.

M2 100

9.7 Supply and install vertical and horizontal gypsum boards 12mm

thick for walls and ceiling cladding and for other decorative

works. The price shall include all decorative beams, edges,

recessed slab, squares, cuts, suspension& structural profiles--

etc to any shape and patterns to complete the works as

approved by the engineer.

M2 250

Total of Suspended Ceiling Works carried to Summary

Sheet

14 out of 62

Page 15: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

10 Painting Works:

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract.

Type of paint shall be in accordance with the specification and

the applicable Standards. The contractor should allow in his

pricing that the engineer will use as many different colours or

combination of colours to meet an approved colour scheme.

All paint works should conform to manufacturer instruction

regarding number of coats , rate of application or drying time

10.1 Supply and apply cement sand filling layer to the ceiling and

walls above false ceiling level. (provisional)

M2 500

10.2 Supply and apply emulsion paint on plastered walls composed

of two coats of putty and 3 coats of " supercryel " emulsion

paint.

M2 2100

10.3 Supply and apply polysid paint. M2 830

10.4 Supply and apply oil paint for walls composed of two coats of

putty, one coat of under coat and 2 coats of " polyour".

M2 600

10.5 Supply and apply oil paint for metallic surfaces "Superlac" of

including surface preparation.

M2 80

Total of Painting Works carried to Summary Sheet

15 out of 62

Page 16: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

11 Metal Works:

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract.

11.1 Aluminum Works

Fabricate supply and install the following powder coated

aluminum doors & windows Napco or equivalent, complete

with double glazing ,sekurit, silicone, handles, locks and oplite

fly screen. Shop drawings must be submitted. All as shown in

drawings and approved by the Engineer .

11.1.3 W1(1.56 * 0.90 m) No. 40

11.1.4 W2 (1.30 * 0.90 m) No. 4

11.1.5 W3 (1.56 *1.00 m) No. 3

11.1.6 W4 (0.90 *1.82 m) No. 4

11.1.7 W5 (1.56 *4.13 m) No. 1

11.1.8 W6 (1.56 *3.05 m) No. 2

11.1.9 W7 (1.56 *1.00 m) No. 3

11.1.10 W8 (1.04 * 0.60 m) No. 3

11.1.11 W9 (0.87 * 3.00 m) No. 3

11.1.12 W10 (0.87 * 2.00 m) No. 2

11.1.13 Wooden glass windows for the Children day room and

Incubators, the price shall include 6mm glass, the Ironmongery

and carpentry works as per drawings.

MR 20

11.2 Steel Works

Fabricate supply and install the following steel doors complete

with all accessories such as heavy duty roller hinges, water

flushing, master key, Yale cylinder locks, approved handles,

glazing and all fixing accessories. Door frames are made of

RHS profiles 80/40/32 mm cladded with two 1.5 mm metal

sheets. The price includes steel frame made of bent steel sheet

2mm thick and the required louvers made of 15mm thick bent

sheet metal. Shop drawings must be submitted and approved

before fabrication.

11.2.1 D12 ( 1.10 * 2.10 m) multi lock smoke proof doors similar to "

Raf Barih" or equally approved

No. 3

11.2.2 Ditto, but D13 ( 0.90 * 2.10 m) No. 1

11.2.3 D14 (1.00 * 2.10 m) No. 4

11.2.4 D15 (1.35 * 2.10 m) No. 1

11.2.5 D16 (0.80 * 2.10 m) No. 1

11.2.6 D17 (1.50 * 2.10 m) No. 2

11.2.7 D17 (2.20 * 2.10 m) No. 1

11.3 Fabricate supply and install steel handrails, similar to the

existing handrail in the staircase and as shown on drawings,

including fixing accessories, matching the . The rate includes

panting the hand rails with 2 coats of anti rust primer and oil

paint.

MR 45

Total of Metal works carried to summary sheet

16 out of 62

Page 17: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

12 Other Works

The contractor shall, when pricing the rates of this bill, take into

consideration including and allow for the costs or expenses of all

requirements stipulated in the preambles, drawings and

technical specification of the contract.

12.1 Supply and install Avis curtain rail as per detailed drawing,

complete with all fixing accessories, Aluminum carrier main

profile and locks.

Mr. 295

12.2 Supply and install wall guard rail similar to the existing rails

rendered at the second floor or equivalent with all fixing

accessories. The rate includes the stop ends and external

corners, colour to be selected by the Engineer.

Mr. 100

12.3 Corner protection similar to the existing rendered at the second

floor or equivalent(2.10 m) height.

No. 150

12.4 Supply& install 2mm "Decosheet" panel wall protections at the

beds level cut to size according to the site requirements as

made by (SPM ) or equivalent, including all necessary fittings &

fixings complete as per manufacture recommendations, the

colour will be as per Eng. approval.

M2 50

12.5 Supply and install a wooden wall guards for corridors with all

fixing accessories as per the detailed drawings and engineer

instructions. colour to be selected by the Engineer.

Mr. 300

12.6 Supply& install 2mm "Decosheet" hand plates protections

around door handles according to the site requirements as

made by (SPM ) or equivalent including all necessary fittings &

fixings complete as per manufacture recommendations, the

colour will be as per Eng. approval.

No. 20

Total of Other Works carried to Summary Sheet

17 out of 62

Page 18: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

13.0 Important Notes: All materials and accessories to be used shall

be according to the Approved Manufacturer List attached to the

electrical specifications (see attachent # 1)

Sec. 13.1) - Electrical Points.

The electrical power supply from electrical switchboard to first

point in circuit shall be included in the unit price of that point (by

means of wires, cables or leads in self extinguishing conduits

and cables). All as per specifications and as required.

13.1.1 Supply, install and connect standard lighting point internal or

external, in slab or over false ceiling, to include a 16 mm

diameter conduit, 1.5 or 2.5 sq.mm cross-section leads or cable,

and, as required single , double, two way or push button lighting

switch , and outlet for luminaries with junction box and terminals.

Comp. 354

13.1.2 Ditto but for emergency lighting point Comp. 80

13.1.3 Supply, install and connect a 16A wall socket point - to include a

16 mm dia. Conduit, (3x2.5) sq.mm cross-section leads or

cables, and as required 16 A wall socket .

Comp. 65

13.1.4 Ditto as item 13.1.3 but double socket. Comp. 36

13.1.5 Ditto as item 13.1.3 but with water proof socket. Comp. 66

13.1.6 Ditto as item 13.1.4 but with water proof cover. Comp. 13

13.1.7 Supply, install and connect a three-phase (5x16) A, single-circuit

wall socket point, to include a 23 mm diameter conduit, (5x2.5)

sq.mm cross section leads or cables and a (5x16) single-circuit

wall socket accessory .

Comp. 1

13.1.8 Supply, install and connect Intercom connection point (Price

includes 16 mm diameter conduit with a standard Intercom

cable, leading from point to the Intercom section in LV box).

Comp. 36

13.1.9 Supply, install and connect Public Address System connection

point (Price includes 16 mm diameter conduit with cable,

leading from point to the LV box or to the nearest point).

Comp. 11

13.1.10 Supply, install and connect Fire Alarm connection point (Price

includes 16 mm diameter conduit with cable, leading from point

to the LV box or to the nearest point).

Comp. 105

13.1.11 Supply, install and connect TV connection point (Price includes

23 mm diameter conduit with cable, boxes , and the socket

outlet leading from point to the LV box).

Comp. 19

13.1.12 Supply, install and connect SAT connection point (Price includes

23 mm diameter conduit with cable, boxes , and the socket

outlet leading from point to the LV box).

Comp. 19

13.1.13 Supply, install and connect Nurse Call connection point (Price

includes 16 mm diameter conduit with cable, leading from point

to the nurse call station).

Comp. 125

13.1.14 Supply, install and connect Computer outlet connection point

(Price includes 16 mm diameter conduit with 4 pairs shielded

cable and socket, leading from point to the nearest HUB in the

nearest LV box).

Comp. 10

18 out of 62

Page 19: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

13.1.15 Supply, install and connect Telephone socket point in a 23 mm

conduit - to include a 23 mm diameter conduit from nearest

telephone cabinet to accessory output in junction box, standard

socket telephone accessory, and standard 2x2x.5mm2-

telephone lead, inserted from cabinet to accessory including

connection at both ends.

Comp. 19

13.1.16 Supply, install and connect point for thermostat to include a 16

mm diameter conduit installed on one side near socket for fan

coils and termination with a suitable box on other side at

thermostat output. 3 mm thick Nylon draw-string shall be

inserted inside conduit.

Comp. 40

13.1.17 Supply, install and connect 6 sq. mm grounding point - to

include a 16 mm diameter conduit, connect at one end to

grounding bus-bar in nearest switchboard, and at other end to

grounded element (air-conditioning ducts, acoustic ceiling, alum.

partitions etc.

Comp. 20

13.1.18 Supply, install and connect Emergency push-button point, to

include a 16 mm diameter conduit, (3x1.5) sq.mm cross-section

leads, and a dual contact emergency push-button installed in a

box with frame, transparent plastic cover to be broken in case of

emergency, and engraved bakelite "sandwich" type sign, per

plan (box such as TELEMENIA model ZAS-E25).

Comp. 5

13.1.19 Supply, install and connect power point for bed head units, the

price to include 3x2.5mm2 NYY cable and 23mm dia conduit

from electrical switchboard to BHU junction box with all required

accessories and materials.

No. 160

13.1.20 Supply, install and connect point as above, but by a 3x1.5

sq.mm NYY cable and16mm dia conduit.

No. 190

13.1.21 Supply, install and connect point as above, but by a 6 sq.mm

cross-section grounding lead and 23 mm diameter conduit.

No. 61

13.1.22 Supply, install and connect point as above, but for

communication, by a 23 mm conduit diameter conduit.

No. 50

13.1.23 Supply, install and connect point as above, but for telephone in

B.H.U, by a 23 mm conduit and standard 2x2x.5mm2- telephone

lead.

No. 50

13.1.24 Supply, install and connect point as above, but for data, by a 23

mm conduit and standard CAT 6 lead.

No. 61

13.1.25 Supply, install and connect lighting point for the suspended

lighting fixtures in the delivery rooms, the price shall include 16

mm dia. conduit and 3*2.5 sq.mm cable or lead.

No. 9

13.1.26 Ditto as item 13.1.25, but with 5*4 sq. mm cable or lead and

23mm dia. conduit for the operating lighting fixtures.

No. 4

13.1.27 Supply, install and connect a 16A Power Point including 16A

(1PH) isolator switch, conduits, boxes and cables for the fan coil

units , the works all according to drawings, specifications and

Engineer instructions.

No. 40

13.1.28 Ditto as item 13.1.27 but for the Exhaust fans on the roof. No. 9

13.1.29 Ditto as item 13.1.27 but for Booster Pumps. No. 10

13.1.30 Ditto as item 13.1.27 but 16A ( 3PH) for Booster Pumps. No. 4

13.1.31 Supply, install and connect a 25A Power Point including 25A

(3PH) isolator switch, conduits, boxes, cables for the Package

Unit, the works according to drawings, specifications and

Engineer instructions.

No. 1

Total Sec. 13.1)- Points….carried to summary.

19 out of 62

Page 20: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

13.2 - Conduit, Rigid Piping and

Excavation Works

Supply, install and connect Self-extinguishing type plastic

conduit, processed over or under plaster or inside castings,

including junction boxes, unions, connectors, etc. including

excavation , backfilling , sand , tape , manholes and covers and

galvanized draw-strings, ready for use (for works not included in

points works).

13.2.1 23 mm diameter. ML 50

13.2.2 29 mm diameter. ML 50

13.2.3 36 mm diameter. ML 50

13.2.4 50 mm diameter. ML 50

13.2.5 4" diameter. ML 50

13.2.6 6" diameter. ML 50

Total sec. 13.2) - Conduit, Rigid Piping and Excv…..carried

to summary

20 out of 62

Page 21: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec. 13.3) - Cables

Supply, install and connect XLPE non-armored type

thermoplastic copper cables, including insertion into conduit or

attachment to structural elements or laying in ductwork,

including all associated materials, insulation materials, unions,

and connection of cable at both ends.

13.3.1 3x400+200mm2+200mm2 cable M.L. 40

13.3.2 3x240+120sq. mm+120sq.mm Cu. M.L. 150

13.3.3 3x185+90mm2+90mm2 cable M.L. 150

13.3.4 3x70+35mm2+35mm2 cable M.L. 50

13.3.5 3x50+25mm2+25mm2 cable M.L. 50

13.3.6 5x16 sq.mm cross section. M.L. 50

13.3.7 5x10 sq.mm cross section. M.L. 210

13.3.8 5x6 sq.mm cross section. M.L. 100

13.3.9 5x4 sq.mm cross section. M.L. 100

13.3.10 3x2.5 sq.mm cross section. M.L. 50

13.3.11 3x1.5 sq.mm cross section. M.L. 50

Total Sec. 13.3) - Cables ……carried to summary

21 out of 62

Page 22: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec. 13.4) - Structural Elements, Cabinets and Ductwork

Supply, install and connect Prefabricated ductwork . mounted on

walls or attached to ceilings. Price to include all reinforcing and

attaching hardware, structural elements, brackets, hangers etc,

also price to include all required covers and stands for trunks

fixed on roof or out site.

13.4.1 10/7 cm. M.L. 150

13.4.2 20/7 cm. M.L. 150

13.4.3 40/7 cm. M.L. 150

Total 13.4) Structural Elements, Cabinets….. carried to

summary

22 out of 62

Page 23: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec .13.5 ) Grounding Systems

Sec. 13.5.1) - Lightning System

13.5.1 Supply, install and connect Complete lightning system (using

pulsars system) including all required materials and accessories,

all according to drawings and specifications and Engineer

instructions.(The contractor is requested to make the required

calculation for the system and take the Engineer approval).

L.S 1

Sec. 13.5.2) - Operational Theaters Grounding

13.5.2 Supply, install and connect a complete earthing system

(separated from the general earthing system) for the operation

theaters (4-op.th.) including pits, rods& all required materials

and accessories, all according to drawings and specifications

and Engineer instructions .

L.S 1

Sec. 13.5.3) - Building Grounding (Provisional Item)

13.5.3 Supply, install, connect and test the earthing system including

cables , rods , pits ,checking boxes ,main earthing box with

equipotential bus bars ,and connecting to the existing foundation

earthing ready for operation according to specifications,

drawings and engineers instructions .

L.S 1

Total sec. 13.5) - Grounding …..carried to summary

23 out of 62

Page 24: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec. 13.6) - Electrical Switchboards

a. Supply, install and connect the electrical switchboards to the

site, including all associated materials and labor, as described in

the technical specifications.

b. Cabinets with no access from the rear, made up of transparent

polycarbonate cells, or sheet-metal cabinets with a 25% surplus

space.

c. The switchboards are to be placed on the floor, in a niche

against the wall.

d. Main supply lines enter from the switchboard bottom, top or

side, while outgoing lines exit the switchboard from both its

bottom and top sides.

e. Price to include all structural elements required in order to install

the switchboard, including bus-bars, terminals, wiring, bolts,

clamps, etc. and for the equipment listed below.

f. The switchboards shall contain accessories shall be according

to the approved manufacturer list.

g. Prices for supply, installation and connection of various

accessories including all associated labor and materials such as

bus-bars, terminals, wiring reinforcements, mounts, engraved

"sandwich" type identification plates, etc. including connection to

mains supply - complete ready for use.

h. The price shall include connection of the distribution board to the

existing MDB.

13.6.1 P31 Unit 1

13.6.2 P32 Unit 1

13.6.3 P33 Unit 1

13.6.4 P34 Unit 1

13.6.5 POP Unit 1

13.6.6 MCC Unit 1

13.6.7 P-Lift ( Provisional Item) Unit 1

13.6.8 MCCB 320 A inside the existing MDB (Provisional) Unit 1

13.6.9 MCCB 250 A inside the existing MDB (Provisional) Unit 1

Total sec. 13.6) Electrical Switchboards…..carried to

summary.

24 out of 62

Page 25: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec. 13.7- Luminaries Supply and Installation

a. Supply and installation of lighting fixtures as described below,

including all necessary accessories, required in order to light it

with lamps and electronic rapid starter, complete, according to

the approved manufacturer list.

b. All lamps shall be of the energy-saving type (18,36, 58 Watts).

13.7.1 Type (A) 2x36W fluorescent light fixture Prismatic type. Unit 43

13.7.2 Type (AE) Ditto as A but with emergency charger. Unit 18

13.7.3 Type (B) Down light, with reflector lamp recessed in false ceiling

40W, IP44 die cast aluminum and stainless steel safety glass

reflector of pure anodized aluminum.

Unit 61

13.7.4 Type (C)18W fluorescent light fixture with polycarbonate body

white and opal diffuser, wall mounted, IP54.

Unit 31

13.7.5 Type (E) 1 x 8W fluorescent emergency exit sign luminaries

with white steel body, for maintained emergency lighting of 3

hour duration, legend panels (3) included (down, left and right).

Unit 12

13.7.6 Type) 5W Recessed night light corrosion proof IP65. Unit 18

13.7.7 Type) Ceiling mounted lighting 2XPL-L 11 lamp compact

fluorescent with opal diffuser controller IP20.

Unit 10

13.7.8 Type (JE) Ditto as J but with emergency charger. Unit 4

13.7.9 Type (O1) 2x34W sealed fluorescent lighting fixture , recessed

in false ceiling, with prismatic diffuser, IP65.

Unit 8

13.7.10 Type (EO1) Ditto as O1 but with emergency charger.. Unit 2

13.7.11 Type (O2) 4x18W sealed fluorescent lighting fixture , recessed

in false ceiling, with prismatic diffuser, IP65.

Unit 60

13.7.12 Type (EO2) Ditto as O2 but with emergency charger. Unit 16

13.7.13 Type (K) 2x36W, fluorescent lighting fixture, ceiling mounted

with prismatic diffuser ( Internal primes) IP20.

Unit 60

13.7.14 Type (KE) Ditto as K but with emergency charger. Unit 19

13.7.15 Type (L) Down light, recessed in false ceiling, with PL-C 13 W

compact fluorescent energy saving lamp, cast aluminum cover

and ring silver ( frosted) aluminum reflector, IP20.

Unit 19

13.7.16 Type (M) 2x36W, fluorescent lighting fixture, ceiling / pendant.

Body of grey fiber-glass reinforced polyester, prismatic

polycarbonate diffuser, IP54.

Unit 4

13.7.17 Type (ME) Ditto as M but with emergency charger. Unit 2

13.7.18 Type (P) 4x18W, fluorescent lighting fixture, recessed in false

ceiling, with prismatic diffuser ( Internal primes), IP20.

Unit 18

13.7.19 Type (QE) Ditto as P but with emergency charger. Unit 2

13.7.20 Type (Q) 4x18W, fluorescent lighting fixture, recessed in false

ceiling, with double parabolic reflector and louvers, IP20.

Unit 10

13.7.21 Type (QE) Ditto as Q but with emergency charger. Unit 9

Total sec. 13.7 )Luminaries Supply…carried to summary

25 out of 62

Page 26: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec 13.8- Nurse Calling System

Note: All equipment items for the nurse- calling system shall be

according to the approved manufacturer list.. The work to

include the supply of the equipment specified, installation of

same, connection, wiring, commissioning and all other details,

as specified in the technical specification and drawings.

13.8.1 Master station 30- call master. Unit 1

13.8.1 Master station 20- call master. Unit 1

13.8.2 Reset button. Unit 17

13.8.3 Bedside call switch. Unit 65

13.8.4 NBY-1A metal jack. Unit 65

13.8.5 Corridor lamp. Unit 34

13.8.6 Call button. Unit 2

13.8.7 Ceiling mount 180mm O(7-1/8"O) NB-L Unit 17

13.8.8 Moisture resistant pull cord switch. Unit 17

13.8.9 Power supply. Unit 2

Total Sec.13.8) Nurse Calling System Carried to Summary

26 out of 62

Page 27: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec 13.9-Fire Alarm System

Supply install and connect complete in place and in an operable

manner the fire alarm system. The work is to include the supply

of the equipment specified, installation of same connection,

wiring, cables, commissioning and all of the details and

connecting to the existing system as specified in the technical

specifications and drawing type shall be according to the

approved manufacturer list.

13.9.1 (Provisional Item) Main addressable fire alarm control panel for

500 addressable points, expandable up to 1000 points with

batteries and charger.

Unit 1

13.9.2 Manually operated alarm call point . Unit 13

13.9.3 Indoor fire alarm siren . Unit 4

13.9.4 Ionization smoke detector. Unit 78

13.9.5 Intelligent heat detector. Unit 1

13.9.6 (Provisional Item) Automatic telephone dialer. Unit 1

13.9.7 24v DC Magnetic Door Holder for fire doors Unit 3

Total Sec. 13.9) Fire Alarm System Carried to Summary

27 out of 62

Page 28: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec 13.10 - Intercom System

Note: All equipment items for the intercom system shall be

according to the approved manufacturer list.. Work is to include

the supply of the equipment specified installation of same,

connection, wiring, commissioning and all other details, as

specified in the technical specifications and drawings.

13.10.1 Hands free master station. Unit 6

13.10.2 Power supply adaptor. Unit 6

13.10.3 Door phone adaptor. Unit 6

13.10.4 Door station . Unit 6

13.10.5 Power supply adaptor. Unit 6

13.10.6 Door release. Unit 6

13.10.7 AC transformer for door release . Unit 6

13.10.8 Digital keypad Unit 6

13.10.9 12V AC power supply transformer Unit 6

Total of Sec 13.10) Intercom System carried to summary

28 out of 62

Page 29: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec 13.11- Public Address System

Supply, install, test and commission a public address system,

the system shall be according to the approved manufacturer list,

including all required connections with the existing system of

the Hospital including all required cables and conduits complete

ready for work.

13.11.1 9/6 watt ceiling loudspeaker, 8” round with metal grille, screw

mount.

Unit 11

Total of Sec 13.11) Public Address System carried to

summary

29 out of 62

Page 30: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec-13.12- Telephone System

13.12.1 Supply install and connect main telephone cables from the low

voltage boxes to the main low voltage box in the proposed floor

and from the main low voltage box to the telephone exchange

of the Hospital. Rate to include 2 NO's. 36 pair cables, conduits,

terminal blocks and all accessories as specified in the technical

specification and drawings.

Job 1

Total of Sec 13.12) Telephone System carried to summary

30 out of 62

Page 31: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec- 13.13- LV Boxes

Supply install and connect the following LV boxes. Rate to

include all required materials, condiuts, wires, cables and

accessories manufacturing from galvanized sheet metal sheets

, painted with the same color of the switch boards all as

specified in the technical specification and drawings.

13.13.1 LVM Approximate dim.3 (80x60x25) cm No. 1

13.13.2 LVB Approximate dim.( 60x60x25) cm No. 4

Total of Sec-13.13) LV Boxes carried to summary

31 out of 62

Page 32: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Sec- 13.14- UPS System Boxes ( Provesional)

13.14.1 Supply install and connect 30KVA uninterruptible power supply

(U.P.S.) system, consisting of a charger/rectifier unit, a solid-

state inverter unit, and a static bypass transfer switch, Power

and control connecting cables between the U.P.S. system and

the battery bank, including protective devices, all in accordance

with the technical specifications .The UPS System back up time

15 min.

(Complete and ready for work, including all required materials

and connections)

No. 1

Total of Sec-13.14) UPS System carried to summary

32 out of 62

Page 33: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

Mechanical Works Bill

PREAMBLE

1 - include for excavation to any depth and width

necessary to provide working spaces planking

and strutting keeping excavations free from water,

trimming bottom to required levels, stockpiling all

suitable excavated materials for backfill and fill on

site for careful backfilling and well consolidating

excavated material and for disposal of the

surplus material as directed , all as specified .

2 - Rates for plumbing work and sanitary

installations shall include for :

a - Bends, elbows, tees, junctions, branches

and the like .

b - Joints, union, flanges and couplings in

the running lengths of pipes .

c - Nipples , air chambers , cleaning eyes and

access doors .

d - Holderbats, brackets, pipe clip and support,

hangers and piers .

e - Pipes sleeves and escutcheons .

f - Cutting and pinning ends of supports

for pipes equipments, appliances, fixtures,

fittings and all the like .

g - Flushing and testing as specified .

h - All cuttings, borings, making holes and the

like including making good .

i - Conduit, conduit fittings, wiring and the like.

j - Hoisting, lifting and fixing in position .

k - Painting as specified .

l - Protection of all sanitary installations .

3 - Rates for all heating installations shall include :

a - Assembling and jointing .

b - Factory priming paint .

c - Fixing, including nails, bolts , nuts, screws,

plugs and the like .

d - Cutting and pinning including all making good.

e - Plugging and screwing .

f - Testing all installations in accordance with a

selected International standard by the

engineer including, providing equipment and

33 out of 62

Page 34: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

personnel necessary for testing .

g - Protection of all works .

4 - Rates for all items of equipment and materials

shall be inclusive of all certificates samples test,

supply of all information and data , supply of

catalogues, charts, curves, submittals certified

drawings , and all other information services

called for in the specifications and fully

connected up in good working order .

5 - Rates shall also include for :

a - Marking positions of holes,mortices chases,

and the like etc..

b - Cutting and forming holes, chases, etc,

including pipe sleeves and making good

all works.

c - Cutting and pinning ends of supports to

structure.

d - Painting as specified .

e - Protection and maintaining the works in

good order .

f - Electrical installations including panels,

controls wiring, conduits, conduit fittings etc.

g - Preparation of plans or diagrams , working

drawings , as-built drawings , schedules,

instruction manuals, etc.

h - Insulation as required .

i - Tags, nameplates, belt guard and all

accessories and appurtenances described in

the specifications dealing with each item

or equipment.

j - Any necessary motors , starters and

necessary wiring on the equipment having

electrical goods together with such items

as insulation , piping instruments, controls

and all other items mentioned or implied in

specifications and drawings as being

supplied with the equipment and not

separately measured and enumerated in

the Bills of Quantities .

6 - Equivalent materials and equipments are

considered so , only when they are up to the

specified standard quality,price,and, moreover,

they have reliable local agent, who can provide

the after sales services.

Priority is given to high quality local products,

all according to the Engineers' judgement.

34 out of 62

Page 35: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

7 - See specifications for taking over supply item.

8 - Jointing of PVC pipes by heating is not allowed.

9 - If any item is stipulated in more than one section and has

been priced differently in each section, then the lowest priced

unit rate will be considered for all the quantities of the item in the

various sections.

10 - The price of all items in the bill includes Supplying,

Installing, Testing and Commissioning.

11- Over-all understanding of the electrical wiring and cabling in

the mechanical works section is that the mechanical sub-

contractor has the responsibility for the supply and installation of

all the electrical works within his work limits. Others (main or

electrical contractor) will have the responsibility of providing

power to the electro-mechanical power and control boards. This

implies the following criteria:

- The supply and installation of all power and control cables and

wires (including rigid conduits, hangers, supports, clips, glands,

flexible conduits, cable trays, earthing …etc) from equipment

(all kind of equipment) to the designated sub or main power

and/or control board, as well as the power and control wires and

cables between any inter-related equipment, should all be

included in the respective equipment unit rate. This applies to all

wiring and cabling works, regardless to where their respective

electric panels are described and included;

whether in the mechanical or electrical works sections.

- Wherever two or more similar equipment are specified to

serve the same purpose, alternating mode should be applied in

the control scheme.

- Any equipment, regardless to its type, power consumption and

location, should be supplied with compatible and suitable power

isolating switch for maintenance purposes.

- All power and control panels serving the mechanical works,

and are included in the mechanical bill, should be priced in full.

The price should cover the panels and all related gadgets -such

as but not limited to relays, contactors, breakers, isolating

switches, selector switches, lights, meters, buss-bars, terminals,

etc- according to the power and control scheme requirements.

- Essential equipment are always energized by the primary and

the stand-by power sources, while non-essential equipment are

energized by the primary power source. Experienced contractors

should be able to differentiate between both types, and should

be able to envisage an acceptable control scheme if such

scheme is not already defined in the tender documents,

which should subsequently give them the ability to price the works

accurately.

35 out of 62

Page 36: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

- All related electro-mechanical sub-equipment and gadgets,

whether control, sensing, protective, alarming, or On-Off,

installed on the main equipment should be wired to meet a

reasonable control scheme, while the price of such wiring should

be included in the unit rate of the main equipment, or of the

gadget if it is specified in a separate bill item. This includes, but

not limited to, pressure switches, flow switches, cut-outs, shunt

pumps, motorized valves, thermostats (both duct and wall

mounted), float switches, etc.

36 out of 62

Page 37: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

14 Waste and drainage system:

The Contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

The following notes should be considered when pricing:

1- The price shall include all required digging or excavation

backfilling and cement covering as specified.

2- The price shall include all connections to existing drainage

cast iron pipes.

3- The contractor must consider keeping the system running

during the whole construction period.

14.1 Supply and install (S & I) PVC pipes (UAP, Royal, or equally

approved (E.A)) for air conditioning drainage network. Price

includes all kinds of digging in concrete slabs and walls,

supports, hangers and all rubber joints and sealants, syphone

and connection to floor drain and flexible connections and all

types of fittings. All done according to drawings, specifications

and approval of the Engineer.

14.1.1 2" Lm 250

14.1.2 11/2" Lm 23

14.1.3 11/4" Lm 70

14.2 S & I cast iron type Dukar or E.A 4" waste or stand pipes,

running exposed along partitions, false ceiling, walls, shafts,

under tiles or laid in walls. Price include all type of fittings,

supports, hooks, connection to existing manholes, stainless

steel fasteners and all excavation and quarrying, all done

according to drawings specifications and the approval of the

Engineer.

Lm 28

14.3 S & I HDPE as made by Costline or E.A waste or stand pipes,

running exposed along partitions, false ceiling, walls, shafts,

under tiles or laid in walls. Price include all type of fittings,

supports, hooks, connection to existing sewage and drainage

system, stainless steel fasteners and all excavation and

quarrying, HDPE connections to be done according to

specifications, all done according to drawings, specifications and

the approval of the Engineer.

14.3.1 6" pipe Lm 10

14.3.2 4" pipe Lm 490

14.3.3 3" pipe Lm 15

14.3.4 2" pipe Lm 320

37 out of 62

Page 38: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

14.4 S & I Floor drain 4" threaded 15x15cm chrome plated cover

multi inlet adjustable with trap. All complete with floor clean out

plug, HDPE syphone and all types of fittings. The rate shall

include excavation and backfilling for all connections with drain

pipes and fixtures. All done according to drawings, specifications

and approval of the Engineer.

No 50

14.4.1 Ditto, but connection box 4"/2" type Lipski or E.A, all done

according to drawings, specifications and approval of the

Engineer.

No 10

14.5 S & I heavy duty non adjustable 11x11 cm floor clean out with

HDPE body, with gas and water tight ABS plug and frame,

complete with all needed elbow and all types of fittings, all done

according to drawings, specifications and the approval of the

Engineer.

No 40

Total of waste and drainage systems Carried to Summary

Sheet

38 out of 62

Page 39: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

15 Roof drain system:

The Contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract. All

removed pieces from the existing roof should be submitted

to the engineer of the hospital.

15.1 S & I HDPE pipe and fittings as made by Costline or E.A. The

rate shall include all needed connections to existing rain water

pipes and all types of fittings, all done according to drawings,

specifications and the approval of the Engineer.

15.1.1 4" pipe LM 60

15.1.2 3" pipe LM 15

15.2 S & I Polypropelyne (PP) Roof rain water drain size 4" with

cover of 20x20 plastic mesh (REDI make or E.A) to be

connected to rain water vertical pipes with all required fittings,

price shall include the piping works until the connection to the

vertical rain pipe, all done according to drawings, specifications

and the approval of the Engineer.

No 10

15.3 S & I REDI or E.A. 4" roof vent with screened cap for vent

stacks including connection to the vent pipe by solvent welding.

The rate include all needed connection accessories, all done

according to drawings, specifications and the approval of the

Engineer.

No 34

Total of Roof drain system Carried to Summary Sheet

39 out of 62

Page 40: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

16 Sanitary fixture and their accessories:

The Contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

16.1 S & I Porcelain wall hung Semi pedestal wash basin for patient

toilets type SAN-REMO Ideal Standard (IS) or E.A of size

600x490 mm model A7460. The rate shall include Fixing

galvanized screws, White Color syphone" heavy duty" and all

the needed accessories to complete the job as per drawings,

specifications and the approval of the Engineer.

No. 31

16.1.1 Ditto, But of size 550x450 Model A7450 or E.A. No. 11

16.2 S & I Chrome plated gear mixer type CERADISC (IS) model

A5390 or E.A complete with all the needed fixing accessories,

sockets, copper adaptors and 3"/8" angle valves type (Giacomini

or E.A.) to connection with water pipes. All to be done as per

drawings, specifications and the approval of the Engineer.

No. 42

16.3 S & I Porcelain floor monted W.C white color size 670x355

European type SANREMO (IS) S-trap model G6401 or E.A.

Price shall include all fixation and hanging bracket, 9-lt capacity

cistern, valves, fittings, hard solid seat and 13mm stop angle

valves, chrome plated 13mm hose, and accessories, side l m

length 13mm Chrome plated hand shower for wc (heavy duty)

with spring nozzle outlet and all other required materials,

including connection to drainage system and water system

including 3/8" Angle valve (type Giacomini or E.A.). All to be

done as per drawings, specifications and the approval of the

Engineer.

No. 29

16.4 S & I stainless steel paper holder type BOBRICK model B-6699

or E.A for single roll fixed to wall with all needed fixing

accessories, all to be done as per drawings, specifications and

the approval of the Engineer.

No. 29

16.5 S & I stainless steel sink for kitchens of size 40x50 cm (single

bowl) like (Rocca or E.A ) of thickness 18/10 Price shall include

connecting to drain of system by 2" HDPE pipes inside sanitary

blocks, also propper fixation to marble, all to be done as per

drawings, specifications and the approval of the Engineer.

No. 9

16.6 S & I chrome plated mixer type Cerlaman (IS) A5396. With steel

wire mesh, and connection to water supply with 3/8" Angle valve

type Giacomini or E.A.), including all the required fittings, all to

be done as per drawings, specifications and the approval of the

Engineer.

No. 9

16.7 Supply and install 316 stainless steel gauge 12 sluice sink

complete with chrome plated swivel - spout mixer type (IS)

A5396 or E.A. with steel wire mesh. Price includes connection to

water supply with 3"/8" angle valve type (Giacomini or E.A.),

including all the required fittings, all to be done as per drawings,

specifications and the approval of the Engineer.

No. 1

40 out of 62

Page 41: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

16.8 Heavy duty soap dispenser type BOBRICK model B2111or EA.

with all fixing accessories needed. All to be done as per

drawings, specifications and the approval of the Engineer.

No 9

16.9 Heavy duty towel paper holder type 304 st st BOBRICK model B-

6699 for single roll to be fixed at wall with all fixing accessories

needed. All to be done as per drawings, specifications and the

approval of the Engineer.

No 4

16.10 S & I Porcelain floor mounted janitor closet type (IS) model

R3852or EA. The rate includes grilled cover, fixing screws,

rubber and all needed fixing accessories. The rate shall include

S & I of 11/2" Flush valve type (IS) and Chrome plated single

tap for cold water. All to be done as per drawings, specifications

and the approval of the Engineer.

No 1

16.11 S & I Chrome plated shower gear mixer type CERADISC (IS)

model A5394 or E.A and for the connecting rod model A3052 or

E.A, compete with hand shower, flexible hose 150mm length,

fixing anchor and all needed accessories, All to be done as per

drawings, specifications and the approval of the Engineer. And

S & I the following:

No 26

16.11.1 Shower syphone heavy duty type Lipski or E.A. with round cover

of 4" size.

No 26

16.11.2 Folding shower seat, padded seat, right hand seat type

BOBRICK model B517 or E.A.

No 5

16.11.3 Single robe/clothes hook with concealed mounting type

BOBRICK model B2116 or E.A.

No 26

16.11.4 Recessed soap dish type BOBRICK model B6607 or E.A. No 26

16.11.5 Horizontal two way grab bar for handicapped shower 914x1372

mm type BOBRICK model B-5837 or E.A. The rate shall include

for fixing the bar at wall using special mortar mix.

No 26

16.12 S & I mirror aluminum frame suitable to be used for hospitals

with different sizes. The rate shall include fixing the mirror to wall

and according to provided drawings.

No 45

Sanitary fixture and their accessories. Carried to

mechanical summery sheet

41 out of 62

Page 42: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

17 Domestic hot and cold water system:

The Contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

17.1 Supply and install galvanized Sch-40 pipes for domestic cold

and hot water. The work includes all fittings, valves, required

flow direction signs, TOLGO type hangers, all required fittings,

connection to existing system and all needed accessories.

17.1.1 1/2" LM 90

17.1.2 3/4" LM 270

17.1.3 1" LM 200

17.1.4 11/4" LM 155

17.1.5 11/2" LM 140

17.1.6 2" LM 105

17.1.7 3" LM 30

17.2 Supply and install 13mm thick insulation for domestic hot water

and circulation pipes type ANAVID or E.A. The work includes

insulating all fittings, valves, non-return valve … etc., and

wrapping with 10cm plastic wrap, also required flow direction

signs,.

17.2.1 1/2" LM 90

17.2.2 3/4" LM 270

17.2.3 1" LM 200

17.2.4 11/4" LM 155

17.2.5 11/2" LM 140

17.2.6 2" LM 105

17.2.7 3" LM 30

17.2.8 Ditto but 6 mm thick insulation for cold water supply pipes

inside the wall. The work includes insulating all fittings, valves,

and wrapping with 10cm plastic wrap.

LM 140

17.3 Supply and install 0.5mm Galvanized sheet cladding for

protection of exposed pipes for hot and air conditioning and

heating systems including all screws and fittings needed. The

work also includes covering all valves, strainer, unions, nipples,

fittings, hangers and all other needed accessories and marks to

protect the pipes along thier paths.

17.3.1 11/4" LM 67

17.3.2 11/2" LM 70

42 out of 62

Page 43: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

17.3.3 2" LM 120

17.3.4 21/2" LM 50

17.3.5 3" LM 110

17.4 Supply and install hot and cold water collectors type GIACOMINI

or E.A. The collectors are installed above the ceiling of

bathroom with all required hangers (type GIACOMINI) and

support, air vents, shut-off valves on the collectors outlets, shut-

off valves on the collectors inlets, record valves, and all required

accessories to complete the job.

17.4.1 3/4" Eye 240

17.4.2 1" Eye 30

17.5 S & I crossed linked PE pipe 16mm pipe with 25 mm sleeve

type Aquapex or E.A. The rate shall include all fittings eg:

copper elbow inside walls (type GIACOMINI), 1/2" male and

female adaptors and all needed accessories for connection

between copper collectors to fixtures.

Lm 1300

Domestic hot water system:

17.6 S & I Heat exchanger of copper coil type cap. 180000 Kcal/hr of

manufacturer (zilmat or E.A) price includes all necessary fittings

and all pipes fittings and all control system (including Electrical

Control Board), thermostate and differential (Honeywell or E.A )

and all the required materials and gadgets to complete the job,

according to drawings, specifications, and approval of the

Engineer.

L.S 1

17.7 S & I In line centrifugal water pump (in alternating mode) for

circulating domestic hot water as made by Grundfos, Armstrong

or E.A. The rate includes all fixing accessories , mounting base,

flexible connection , pressure gage at suction and discharge,

strainer, complete insulation, water proof power switch,

aluminum cover to protect the pump from rain, concrete base,

rubber isolators, flow direction signs, supply and return headers

as shown on drawings, electrical controlers and electrical control

boards with all required electrical connections, and all needed

parts to complete the job according to drawings and

specifications and the approval of the Engineer.

17.7.1 Q=8.14L/s , H=16.6m (PUMP- S.P-1) No. 2

17.7.2 Q=6.4L/s , H=21m (PUMP- H.W.P-2) No. 2

17.7.3 Q=3.8L/s , H=20m (PUMP - H.W.R.P-3) No. 2

17.7.4 Q=1.4L/s , H=5m (PUMP - S.P-4) No. 2

43 out of 62

Page 44: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

17.8 S & I expansion vessel of size 400 L, closed vertical diaphragm

type, operating conditions: 10 bar, 110 °C The unit price shall

include isolating, pressure regulating, drain, relief, double check

and automatic air vent valves, pressure gauge, gas filling

connection, base frame and all works and accessories required

to complete the work as shown on the drawings and as per the

supervision engineer's requirements.

L.S 1

17.9 S & I domestic hot water calorifiers, vertical shell & tube storage

type of size 200 L, 8 bar working pressure, hydrostatically tested

for 1-1/2 times the working pressure. The unit price shall include

a thermometer, an ASME rated pressure and temperature relief

valve, isolating valves, drain valves, check valve on cold water

make-up line, automatic air vent, support, insulation with 1-1/2"

foam insulation and protected with 0.7mm GI sheet cladding, all

as required as on drawings and as per supervision engineer's

requirements.

L.S 1

Total of Domestic hot and cold water Carried to Summary

Sheet

44 out of 62

Page 45: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

18 Fire Fighting system:

The contractor shall, when pricing the rates of this bill take

into consideration including and allow for the cost

expenses of all requirements stipulated in the preambles,

drawings and technical specifications of the contract.

Supply, install, and test the following items complete with

necsseray fixing accessories as specified and as shown on

drawings:

18.1 Wall mounted fire cabinet 120x80x30 cm equiped with 1"

swinging hose reel 25 m polystrene hose 1" aluminum nozzle, 1"

ball valve, 12 kg powder extinguisher, 2" linen hose (2 x 15 m)

with quick coupling, 2" nozzle, 2" landing valve, 2" ball valve,

and all required fittings and valves.

No. 5

18.2 6 kg automatic fire extinguisher dry chemical powder to be

installed in existing boiler room at high level with all required

mounting accessories.

No. 5

18.3 Supply and install black steel Sch40 pipes jointed by welding for

diameters above 2" and by threads for 2" pipesand below, all as

made by MODGAL or E.A. The work also include all valves,

strainer, unions, nipples, fittings, hangers and all needed other

accessories including painting with the final red color paint

according to specifications and the approval of the Engineer.

18.3.1 3" LM 20

18.3.2 21/2" LM 13

18.3.3 2" LM 95

Total of Fire Fighting System carried to mechanical

summary sheet

45 out of 62

Page 46: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

19 HVAC system:

The contractor shall, when pricing the rates of this bill take

into consideration including and allow for the cost

expenses of all requirements stipulated in the preambles,

drawings and technical specifications of the contract. Also

the contractor must consider the fact that this project is a

running complex and must be kept as so during the whole

period of construction.

19.1 S & I of an air cooled chiller of capacity 152 Ton as made by

Daikin (Japan), Carrier (France), York (USA) or EA.The chiller is

a heat pump type operating with friendly to nature refrigerant

(R407-C) and runs with hermatic scroll type compressor, leaving

water Temperature = 7.2 C and inlet water Temperature = 12 C,

all in accordance with the prevailing climate conditions of the city

of Tulkarem. The unit shall be equipped with direct drive

condenser propeller, condenser fan motor, heat exchanger, high

and low pressure switch, anti freez sensor, braided flexible

connections, outlet water temperature sensor, return water

temperature sensor, ambient temperature sensor, crank case

heater, supply and return headers as shown on drawings,

double regulating valves, filter drier, sight glass, service valves,

water flow switch and pressure gage (high & low), electrical

controlers and electrical control board with all required electrical

connections,. The work includes but not limited to concrete base

and all requirements for proper installation and operation, all

done according to drawings specifications and approval of the Engi

L.S 1

19.2 S & I fan coil unit with forwad curved fans as made by Daikin

(Japan), Carrier (France), York (USA) or EA. The unit shall be

with a single coil, stainless steel drain pan, and with all parts

such as 3-way valve, inlet & outlet ball valves type GIACOMINI

or E.A, strainer, inlet and outlet rubber flexible connections with

braided steel, test point valves, washable flat filter, multi speed

electric motor and room thermostat with three speed switch (wall

mounted type installed inside lockable protection box). The rate

includes connecting the unit to piping including S & I of the

following:

19.2.1 Cooling Load = 6.55 kw No. 1

19.2.2 Cooling Load = 8.48 kw No. 9

19.2.3 Cooling Load = 10.2 kw No. 4

19.2.4 Cooling Load = 11.7 kw No. 8

19.2.5 Cooling Load = 11.73 kw No. 1

19.2.6 Cooling Load = 12.9 kw No. 9

19.2.7 Cooling Load = 14.8 kw No. 2

19.2.8 Cooling Load = 16.0 kw No. 1

19.2.9 Cooling Load = 18.7 kw No. 5

46 out of 62

Page 47: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

19.3 S&I aluminum supply air ceiling diffusers as made by cooling

industries or E.A, four-way square type with removable core, key

operated opposed-blade volume damper and equalizing grid,

suitable for mounting flush with false ceiling. The unit price shall

include connection to duct with flexible insulated duct of

compatible diameter and of maximum 1 meter in length , and all

accessories and works required to complete the work, all done

according to drawings, specifications and approval of the

Engineer. Size 12"X12"

No. 88

19.4 S&I aluminum supply air wall mounted diffusers (grill type) as

made by cooling industries or E.A, key operated opposed-blade

volume damper and equalizing grid, suitable for mounting flush

with the wall. The unit price shall include connection to duct with

flexible insulated duct of compatible diameter and of maximum 1

meter in length , and all accessories and works required to

complete the work, all done according to drawings,

specifications and approval of the Engineer.

19.4.1 size 10"X6" No. 5

19.4.2 size 10"X8" No. 70

19.5 S & I exhaust air aluminum grills made by cooling industries or

E.A, fixed 45-degree blades, double deflection, 1" thick frame,

3/4" spacing. The unit price shall include connection to duct, and

all accessories and works required to complete the work, alll

done according to drawings specifications and approval of the

Engineer.

19.5.1 6"X6" No. 45

19.5.2 9"X9" No. 14

19.5.3 12"X12" No. 28

19.5.4 16"X8" No. 21

19.5.5 18"X12" No. 2

19.6 Supply and install perforated aluminum ceiling diffusers for the

operating theatres of size 18"X18", ceiling module with neck size

as shown on the drawings, flush face, adjustable 4-way

deflectors, with integral or field fabricated plenum box, key

operated opposed-blade volume damper and equalizing grid

with plazma filter. The unit price shall include connection to duct

via flexible connection not exceeding i meter in length, and all

accessories and works required to complete the work as shown

on the drawings and as per the specifications and supervision

engineer's instructions.

No. 4

47 out of 62

Page 48: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

19.7 S & I modular, weather proof type 100% fresh air packaged unit

constructed from aluminum penta post with double skin panels

and insulated with injected polyurethane 2" thick as made by

Daikin (Japan), Carrier (France), York (USA) or EA of capacity

6.5 Ton. The unit shall be equipped with scroll type

compressor(s) and shall run by friendly to environment

refrigerant. The rate includes built-in electrical heating battery of

18KW capacity made of stainless steel finned tube heating

elements covering all the face area of the air flow and including

all protection gadgets such as air flow switch, automatic and

manual reset thermal cut-outs, and controlled via 4 stages

controller. It should also include a built-in plate heat exchanger

for energy recovery between the return (exhausted) air and the

fresh air supply.

The unit shall be supplied with backward curved propeller fans

(supply and exhaust) suitable for external static pressure of 1.5"

each, installed on vibration isolators, dampers for fresh and

supply air, aluminium washable type pre-filter, V-type bag filter,

and 99.997% HEPA filter. An audiable and visual alarm should

be built-in also for the HEPA filter maintenance purposes, all

including the needed fixing accessories and electrical controlers

and electrical control board with all required power and control

connections to the unit, as well as, air temperature sensors,

where all shall be rendered according to drawings, specifications

and the approval of the Engineer. Packaged Unit: P.R.C/H -

OP.TH

No. 1

19.8 Supply and install minimum two stage cooling and four stage

heating thermostat for the packaged unit made by Honeywell or

EA.

No. 1

19.9 S&I exhaust and fresh air fans as manufactured by Vortice or

E.A, all of sturdy industrial structure, galvanized steel parts and

aluminum impellers, directly driven by IP 65 electric motors,

powered by 380V/3phase/50Hz electric power supply. Price

shall include all materials needed for complete Installation,

electrical controllers and electrical control boards with all

required electrical connections from the main electrical boards,

including cables, wires, cable trays, steel stands and

protections, as well as, weather proof disconnet switch for

maintenance needs, where all shall be done as per detailed

drawings, specifications, and Engineer's instructions.

19.9.1 Exhaust: 600 CFM (model c35/4m) No. 1

19.9.2 Exhaust: 690 CFM (model c35/4m) No. 1

19.9.3 Fresh Air: 690 CFM (model c35/4m) No. 1

19.9.4 Exhaust: 1000 CFM (model c37/4m) No. 3

19.9.5 Exhaust: 1235 CFM (model c40/4m) No. 1

19.9.6 Fresh Air: 1235 CFM for fresh air (model c40/4m) No. 1

19.9.7 Exhaust: 1364 CFM (model c40/4m) No. 1

19.9.8 Fresh Air: 1364 CFM (model c40/4m) No. 1

19.9.9 Exhaust: 1400 CFM (model c40/4m) No. 2

48 out of 62

Page 49: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

19.10 Supply and install single skin galvanized steel duct made

according to SMACNA standard and requirements vis-a-vis

support, sizing, branching, air tightening, jointing, etc, with 2"

thick, 12kg/m3 density glass wool insulation wrapped with

reinforced aluminum foil, which shall be confined in place by

aluminium adhesive tape at the joints and spirally wound

aluminium wire all around and along.The rate shall include all

required hangers, supports, isolators, splitting dampers, canvas

type flexible connections at units inlets and outlets, and all

required accessories needed as shown on drawings, according

to specifications, and to the Engineer's instructions.

M2 940

19.10.1 Ditto, but with 0.6mm galvanized metal sheet cladding for

protection of exposed duct work on roof including all screws and

fittings needed, excluding the spirally wound aluminium wires,

where the job shall be rendered according to SMACNA , all in

accordance with the drawings, specifications and the approval of

the Engineer.

M2 40

19.11 Supply and install galvanized steel duct for exhaust system

made according to SMACNA. The rate shall include all required

hangers, supports, plitting dampers, canvas flexible connections

and all required accessories made as shown drawings,

according to specifications, and to the approval of the Engineer.

M2 380

19.12 Supply and install black steel Sch.40 pipes for the A/C network

with 19mm insulation and nylon wrapping. The work also

includes all unions, nipples, tees, elbows, hangers, required flow

direction signs, and all other needed accessories to lay the pipe

along its path, all done according to drawings specifications and

approval of the Engineer.

19.12.1 3" LM 26

19.12.2 21/2" LM 117

19.12.3 2" LM 100

19.12.4 11/2" LM 110

19.12.5 11/4" LM 45

19.12.6 1" LM 125

19.12.7 3/4" LM 45

19.13 Supply and install isolation ball type valves as made by

Giacomini for the A/C piping network, as follows:

19.13.1 3" No. 4

19.13.2 21/2" No. 6

19.13.3 2" No. 6

19.13.4 11/2" No. 6

19.13.5 11/4" No. 6

49 out of 62

Page 50: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

19.13.6 1" No. 8

19.13.7 3/4" No. 10

19.14 S & I circulating chilled water pumps (in alternating mode) as

made by Grundfos, Armstrong or E.A. The rate includes all fixing

accessories , concrete mounting base and neoprene pads,

flexible connections at inlets and outlets, pressure gages at

inlets and outlests, strainers at inlets, Globe valves at inlets and

outlets, complete insulation for the related fittings, galvanized

sheet metal shelter to protect the pumps from rain, flow direction

signs. The price shall include also the electrical controlers and

electrical power and control sub-board where needed, with all

required electrical connections including cable, wires, cable

trays, and all needed parts to complete the job according to

drawings, specifications and the approval of the Engineer.

19.14.1 Q=8.7L/s , H=16m (NORTH N.C.H.P.-1 PUMP ) No. 2

19.14.2 Q=9.7L/s , H=16m (SOUTH S.C.H.P.-2 PUMP ) No. 2

19.14.3 Q=0.695L/s , H=7m (HITING P.R.H.P.-3 PUMP ) No. 2

19.15 S & I 8" diameter headers at the pumps inlets & outlets as

shown on drawings. The headers shall include all needed

outlets (with 2" extra clogged outlets on each for future

expasion), ball valves (Giacomini or equivalent), pressure

gauges, thermometers, convexed abd end caps, 24kg/m3

fiberglass insulation, 0.7 galvanized metal steel sheet claddings,

and steel supports.

No. 2

19.16 S & I and connect motor starter panel with all necessary MCC

breakers, starter controllers, protective deivces for pumps,

chillers, air handling units, and all the equipment on the roof.

The price shall include (power cables control wires - galvanized

cable tray, flexible connections ... etc.) from panels to equipment

and all electrical connections for fresh and extract fans on roof,

all done according to drawings specifications and approval of

the Engineer.

L.S 1

19.17 S & I and connect all needed power and control gadgets into the

existing electrical panel in boiler room to serve the proposed

boiler. Price shall include MCCB's, relays, power cables, control

wires, indication lights,protective and safety devices, … etc.

L.S 1

Total of HVAC System carried to Mechanical Summary

Sheet

50 out of 62

Page 51: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

20 Medical Systems:

20.1 Supply and Installation of Medical gas copper piping as per

HTM02.01:

20.1 Degreased medical oxygen compatible seam-less copper pipes

type L. The pipes must be cleaned and treated for medical gas

usage including capping the ends of each pipe at ex-works, to

ensure that no foreign bodies, dust or vapors infiltrate the the

pipes during transpiortation, handling, and installation. The

copper pipes must meet the international standard of

ASTM B-819 and to be cleaned for medical usage (degreased)

in accordance with CE 0473.

Each pipe must be pre-factory marked continuously with:_

OXY/MED ASTM B-819

Pipeline network must be welded and hanged according to the

latest welding and hanging methods of health care technical

memorandum HTM 02.01, ASTM B819 and G-01

Price includes proper isolation for piping under plastering and

wall penetrations , hangers, brackets, fasteners, etc.., as well

as, the various fittings and accessories needed to complete the

works as shown on drawings and as per the set specifications.

Price also includes proper flushing of the entire piping network

prior to commissioning the Works, using purified Nitrogen or

Medical Compressed Air.

20.1.1 1/2” inch O.D. LM 385

20.1.2 5/8” inch O.D. LM 435

20.1.3 7/8” inch O.D. LM 305

20.1.4 1 1/8” inch O.D. LM 80

20.1.5 1 3/8” inch O.D. LM 100

20.1.6 1 5/8” inch O.D. LM 100

20.1.7 2 1/8” inch O.D. LM 95

51 out of 62

Page 52: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

20.2 Supply and Installation of Area Valves Control Boxes as per

Silbermann or E.A:

20.2.1 Recessed area valve control box for medical oxygen and

vacuum, including 2 full-port 3-parts NIBCO shut off valves

which controls the supply of gases or vacuum through the

pipelines, and line pressure and vacuum gauges. The valves

diameter varies between 15 up to 35 mm, as per drawings.

The area valves control boxes should also include an

emergency external supply port, equipped with disk and clutch

mechanism for quick plug-in connection of the emergency

external supply source.

As per SILBERMANN model 7210-000 or EA. The front should

be made of labeled transparent polycarbonate flexible

unbreakable cover for easy access in emergency cases.

Unit 5

20.2.2 Same as Item No. 20.2.1 but for medical oxygen, medical

compressed air and vacuum. As per SILBERMANN

model 7214-000 or E.A

Unit 1

20.2.3 Same as Item No. 20.2.1 but for medical oxygen, nitrous-oxide,

medical compressed air and vacuum. As per SILBERMANN

model 7204-000 or E.A

Unit 2

20.3 Supply and installation of Local Area Pressure and Vacuum

Alarm Boxes as per Silbermann or E.A:

20.3.1 Local audio-visual pressure alarm box for medical oxygen and

vacuum to indicate pressure and vacuum failures by means of

green LED, red LED, audio buzzer and pressure or vacuum

gauge for each gas, as well as shut-off valves for each gas or

vacuum, operated by means of one central PC card

(microprocessor card) and pressure/vacuum switches for each

gas, recessed type with anodized aluminum panel.

As per SILBERMANN model 7176-110 or E.A

Unit 5

20.3.2 Same as .Item No. 20.3.1 but for medical oxygen, medical

compressed air and vacuum As per SILBERMANN model 7177-

1100 or E.A

Unit 1

20.3.3 Same as Item No. 20.3.1 but for medical oxygen, nitrous-oxide,

medical compressed air and vacuum as per SILBERMANN

model 7178-110 or E.A

Unit 2

52 out of 62

Page 53: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

20.5 Supply and Installation of Fully-automatic Electronically

controlled Oxygen local Back-Up stations, According to CE-

0473, EN-46001, ISO-9001 as per Silbermann or E.A:

20.5.1 Fully automatic electronically controlled gaseous medical oxygen

local Back-Up station consisting of 4 high pressure oxygen

manifolds with high pressure valves, stainless steel pigtails, and

common regulators with in/out gauges, connected to the

automatic control switch-over cabinet of 80 CMH capacity.

Automatic control cabinet for continuous supply and smooth

automatic bank switchover by means of pneumatic shuttle valve,

complete with line pressure regulators, line pressure gauges

and indicators, with by-pass valves for manual operation in case

of malfunction with stand-by working pressure regulator with by-

pass, and electronic microprocessor control board, complete

with alarm panel with pilot lamps indicating reserve in-use and

low-press. Main supply, with mutable alarm for local alarm, with

mute switch and lamp test switch, with facility for displaying

alarms on two separate remote alarm panels and data loggers

for stage computer interface to connect between the automatic

change over unit indication and the distance alarm from one

side and with the BMS computer system from the

other side as per SILBERMANN model LEO-EM 7086-815

Unit 0

20.6 Supply and installation of diamond service wall outlets for

oxygen and vacuum as per Silbermann or E.A:

20.6.1 Recessed type, chrome plated, color and pin coded die-cast

front assembly, primary check inlet/outlet valve with decorative

frame for two different codes of Oxygen and Vacuum, a hanging

slide for 2 liters vacuum collecting bottle must be included as per

SILBERMANN model 3236016 or E.A

Unit 8

20.6.2 Same as Item No. 20.6.1 but for Oxygen, Nitrous Oxide,

Compressed Air and Vacuum as per SILBERMANN model

3236019 or E.A

Unit 1

53 out of 62

Page 54: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

20.7 Supply and Installation of :

Factory-preassembled Bed head unit for one bed,

according to CE-0473, EN-46001, ISO 9001 as per

Silbermann or E.A:

20.7.1 Encompassing extruded aluminum duct system, with four

cavities, three of which are directly accessed using snap-on

covers. Supplying electrical and lighting service, as well as

medical gas service. The gas outlets should be installed in a

separate compartment. The number of electrical circuits, apart

of the low voltage circuit, should be three : main line power

circuit, UPS power circuit, and lighting circuit, each connected to

a separate terminal at the main special electrical connection

compound in the bed-head unit.

The bed head unit is equipped with the following services :

• One oxygen outlet

• One compressed air outlet

• One vacuum outlet

• 2 electrical sockets, Main line

• 2 electrical sockets, coded-UPS line

• one potential grounding socket

• indirect light

• direct light (2 PL BIAX lamps)

• cut-off switch for direct / indirect lights

• one telephone socket

• preparation for nurse call socket

The Price should include complete interior wiring, cabling,

piping, insulating, etc , for complete installation.

Unit 34

20.7.2 Same as Item No. 20.7.1 but for two beds Unit 4

20.7.3 Same as Item No. 20.7.1 but for three beds Unit 3

20.7.4 Same as Item No. 20.7.1 but for four beds

As per SILBERMANN modular system model 2000-000, or EA.

Unit 5

54 out of 62

Page 55: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

20.8 Supply and Installation of Vital Life Support Column for one

Emergency bed, according to EN-793 and EN-60601-1-2 as

per Silbermann or E.A:

20.8.1 Vertical column surface made of medical high pressure laminate

decorative Trespa, electro-polished anodized 2000 mm x 600

mm x 250 mm. Aluminum. structure

Horizontal hanging rail and vertical anodized Aluminum tracks

provides three-dimensional hanging of various type of

equipment, complete with two medical oxygen outlets, two

medical compressed air outlets, two vacuum outlets, four

essential electrical sockets and four UPS coded sockets, each

socket is equipped with built-in normal-power on LED indication

connected to independent electrical circuit and marked terminals

for each socket, with two potential equalization grounding

sockets connected to main grounding line by two separate

grounding bridges

as per SILBERMANN model FreeStand 2000 or E.A

Unit 6

20.9 Supply and installation of AGSS outlet as per silbermann

or E.A:

20.9.1 Anesthesia gas scavenging system with on-off switching

indicator, to remove surplus anesthetic gas and explosive gas

mixtures from operating theatres and anesthesia rooms,

recessed type, with 22 mm. evacuation port to DIN standard as

per SILBERMANN model 3212700

Unit 6

20.10 Integrated Combinational Ceiling-suspended System for

the Operating Theatre as per KLS MARTIN or E.A:

20.10.1 Central Ceiling-suspended system for the OR, comprising

prismatic cool operating light, with 130,000 lux light intensity at

1m distance, with day-light color temperature of 4,300 K, with

automatic switch-over standby lamp, electronic intensity and

focus control, with power module and emergency relay, as per

Martin-Germany marLux H5 Plus, and tandem ceiling pendant

with double boom arms, drop tube, modular service head, and

medical rail with pneumatic control, including : two medical

oxygen outlets, two medical compressed air outlets, two nitrous-

oxide outlets, two vacuum outlets, one AGSS outlet, one air

motor outlet, with four electrical sockets for main power wired to

two separate electrical circuits, with two electrical sockets for

UPS power wired to a separate electrical circuit, and two

potential equalization sockets, as per Martin-Germany

Independant 300, both suspended from central ceiling flange,

interface plate, and ceiling canopy, all in accordance with

93/42/EEC conformity.

Unit 1

55 out of 62

Page 56: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

20.11 Delivery, Labor, Preparation Room Lights as per KLS

MARTIN or E.A:

20.11.1 Ceiling-mounted Labor, Preparation, and Examination Rooms

Lights as per Martin - Germany ML301D KLS MARTIN

examination light for ceiling mounting, of 300 mm diameter with

40,000. lux intensity at 1m distance, complies with Protection

class I according to IEC The hermetically sealed aluminum light

housing is dust- and fracture-proof. The light housing has been

plastic-coated for fast and easy cleaning.

The powerful halogen lighting system ensures the optimum

illumination of the operating field. Special filter components

guarantee cool, white light free from any deep shadows. The

high-quality reflector technology ensures a uniform light field and

first-rate color rendering properties.

The light exit surface consists of hardened safety glass that is

highly resistant to mechanical and chemical influences, with

spring regulated arm for easy height adjustment.

Unit 3

20.12 Baby Bath Tubs as per SOEMA or E.A:

20.12.1 Baby Bath Tub as per Soema model Lido Baby/01 and shall

comprise of:

• Acrylic Ceramic

• Bath tub & washing sink

• Hand shower

• Electronic water tab

• Thermostatic water mixer

• Transformer

Unit 3

20.13 Electronic hand washing scrub sinks, SOEMA or E.A:

20.13.1 Stain-less steel suspended electronic hand washing units with

channel type tank and paneling under basin, two electronic taps,

one electronic soap dispenser and thermostatic mixer.

Made of AISI 316 stainless steel , size 120x55x110 cm.

overflow-proof tank (35 cm deep) with rounded inner edges and

inclined front part to prevent water from spraying outside

Cat. No. # C618MXSR

Unit 1

20.14 Supply and installation of Ceiling Column, rigid, according

to EN 737, 793, 12218 as per Silbermann or E.A:

20.14.1 Ceiling column surface is made of Trespa, polished anodized or

painted Aluminum.

Horizontal hanging rail and vertical anodized Aluminum tracks

provide for hanging various type of equipment, complete with

two medical oxygen outlets, two medical compressed air outlets,

two nitrous-oxide outlets, two vacuum outlets, one AGSS

outlets, one air motor outlet, four electrical sockets for mains

power, connected in two separate electrical circuits, and two

electrical sockets for UPS power, connected in a separate

electrical circuit, with two potential equalization sockets.

Unit 1

Total of Medical Systems carried to summary sheet

56 out of 62

Page 57: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

21 Lifts:

The contractor shall, when pricing the rates of this bill take

into consideration including and allow for the cost

expenses of all requirements stipulated in the preambles,

bill of quantities, drawings and technical specifications of

the contract.The described work shall include moving all the parts from

the existing machine room to the new location.

Additionally, price of installation shall include, but not

limited to the following essential parts, workmanship,

erection equipment and tools, labor, as well as any

required accessories, metal cutting and paint:

Detailed description of required parts and materials is as

follows:- PIT CABLE FOR LSP ELEVATORS.

- TRAVEL CABLE 24x0.75

- DHG -161 PCB - (Di+Si) NO AEG02C376.

- MICRO PUSH BOTTON NO.2R23914- VANDAL.

- HALL INDICATOR (VID-M422, Di) NO.AEN38C231*N.

- HALL PUSH BUTTON PANEL 2 P/B+2 IND TYPE "VID-M422T"

NO.: 3W09884.

- Narrow land door frame1300mm st.st.h.l-DAV.

- Land door panel side 1300 st.st.h.l.DAV.

- Land door hanger side opening 1300 DAV.

- Land door sill side opening 1300 DAV.

- STEEL CABLES 13MM- WITH FIBER CORE .

- LIFT ROPING CABLE 8MM- WITH FIBER CORE.

- DANGER LIFE HALL PLATE 100X100.

- INFORMATION PLATE UP THE CAR 100X100MM "ARABIC".

- SHELTER PLATE NO.3R69234A.

- BRACKET FOR RAIL 70 - 120x100x250 NO.2.

- GUIDE RAIL BRAKETS FOR R90*75*16 DIM (260*150*6MM L,

SHAPE FOR WALL).

- RAIL CLIPS M-12 FOR GUID RAIL 70.

- GUIDE RAIL(18K) - 144x89x16 NO.AEA10C613*C.

- SOFTWARE.

- GUIDE RAIL(7K)- 96x88x19 NO.3R52870C.

- GUIDE RAIL 125#82#16.

- GUIDE RAIL(18K) - 144x89x16 NO.AEA10C613*C.

- GUIDE RAIL BRAKETS FOR R90*75*16 DIM (260*150*6MM L,

SHAPE FOR WALL).

- ELECTRIC JUNCTION WIRE 3.25 MM .

- SHELTER PLATE NO.3R69234A.

Price shall include also the following accessories:

- FIRE EXTINGUISHERS 6 KG.

- Trash Can.

- RECHARGEABLE LIGHT - 20W DURATION 10 HOURS.

- COMPLETE NEON LAMP-DOUBLE 36 W.

- SOCKET FOR INSPECTION BOX.

- LAMP 230V - 75W.

- CABLE 5x1.5 .

- GLOBE NORMAL LAMP.

- SOLID ELECTRIC TUBES 3#4.

- PET SWITCH .

- LADDER.

- BEAM LENGTH 3M.

- PROPER LIQUID BABBIT METAL 1KG- NO.: 8GT10030.

- BRACKET FOR RAIL 70 - 120x100x250 NO.2.

57 out of 62

Page 58: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

- EXTERNAL BOX -24 SAFTY KEYS.

21.1 Remove all the parts of the elevators from the existing machine

rooms to new locations as shown on drawing including the

electric switchboard and all electrical and mechanical works

needed (and labor). The price should include also all iron

structure(material and labor) needed to complete and fix the

new location in the room as per drawings, specifications and the

approval of the Engineer.

L.S. 1

21.2 Supply and install stainless steel sheet 2 mm thick door posts

same as the existing, complete with side and up panels and all

the required electrical and mechanical works needed to

complete the job as per the preamble drawings, specifications

and the approval of the Engineer.

Unit 3

21.3 Supply and install all the required parts inside the elevator shaft

that are needed to complete the extension process to the next

floor. Price includes all the required electrical and mechanical

works needed to complete the job as per the preamble

drawings, specifications and the approval of the Engineer.

Unit 3

Total of Lifts carried to summary sheet

58 out of 62

Page 59: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

22 Removing Existing HVAC Equipment and Accessories to

New Roof:

The contractor shall, when pricing the rates of this bill, take

into consideration including and allow for the cost

expenses of all requirements stipulated in the preambles,

drawings and technical specifications of the contract.

Before the removal of the existing parts, the contractor

shall submit a detailed report about the quantity of the

parts, units and machines that have to be relocated on the

future roof. The contractor afterwards shall examine and

present a detailed report about the status and the

conditions of all the parts, units, machines, and inform of

any damaged existing part or machine, prior to

disassembling the system.

The contractor then has to submit his methodology for

relocating all the existing units to the future roof, and sould

take into consideration that in all stages work shall be done

in conjunction with the various work activities on site. This

implies propper planning with UNDP and MoH authorized

personel, to ensure smooth relocation of equipment and

minimal HVAC interruption time inside the hospital

building. When disassembling, the contractor has to

maintain all the disassembled parts in good condition and

take full responsibility for the intactness of all the

disassembled parts.

Damaged or broken parts on the existing system should be

noted prior to disassembling the system and shall be paid

for upon replacement according to the offered unit rate.

Any damage done to the parts during the relocation shall

be covered by the contractor.The price shall include Dismantling all existing electrical

installations, panel boards and all accessories from

existing mechanical A.C. room on the roof and reinstalling

and reconnecting all electrical needs in the new mechanical

room and changing all cables if required. The contractor

must protect the panel boards and all accessories to install

them in the new mechanical room on the roof as per the

engineers instructions.

22.1 Removing all existing vent caps at roof and re-instalation on

future roof where required as shown in drawings. The work shall

include all piping works, openings in concrete for the existing

slab, and all required labor, materials and fitting equipment

according to the instruction of engineer. Price also includes the

replacement of any of the following damaged parts with new

(same in size, capacity and quality) part:

No. 18

22.1.1 Vent Cap as existing. No. 1

22.1.2 Vent Pipes 4" Cast Iron as existing. LM 10

22.1.3 Vent Pipes 4" PVC as existing. LM 10

59 out of 62

Page 60: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

22.2 Removing all existing domestic hot and cold water units and

pipes at roof and re-instalation on future roof as shown in

drawings. The work shall include all piping from main riser to the

units, pumps, valves, strainers, and galvanized ducts, booster

pumps, openings in concrete for the existing slab, electrical

panel and all required labor, materials and fitting equipment

according to the instruction of engineer. Price also includes the

replacement of any of the following damaged parts with new

(same in size, capacity and quality) part:

LS 1

22.2.1 Insulated 3" Sch-40 galvanized steel pipe as existing. LM 10

22.2.2 Insulated 21/2" Sch-40 galvanized steel pipe as existing. LM 10

22.2.3 Insulated 2" Sch-40 galvanized steel pipe as existing. LM 10

22.2.4 Insulated 1" Sch-40 galvanized steel pipe as existing. LM 10

22.2.5 Shut-off valve 3" as existing. No 1

22.2.6 Shut-off valve 21/2" as existing. No 1

22.2.7 Shut-off valve 2" as existing. No 1

22.2.8 Shut-off valve 1" as existing. No 1

22.2.9 3" flange as existing. No 1

22.3 Removing all existing AHUs at roof and re-instalation on future

roof as shown in drawings. The work shall include all piping from

main riser to the units, pumps, valves, strainers, and galvanized

ducts, openings in concrete for the existing slab, electrical panel

and all required labor, materials, conduits and electrical wiring

and fitting equipment according to the instruction of engineer.

Price also includes the replacement of any of the following

damaged parts with new (same in size, capacity and quality)

part:

No. 7

22.3.1 Insulated 4" Sch-40 black steel pipe as existing. LM 10

22.3.2 Insulated 3" Sch-40 black steel pipe as existing. LM 10

22.3.3 Insulated 21/2" Sch-40 black steel pipe as existing. LM 10

22.3.4 Insulated 2" Sch-40 black steel pipe as existing. LM 10

22.3.5 Butterfly valve 4" as existing. No 1

22.3.6 Butterflyvalve 3" as existing. No 1

22.3.7 Butterfly valve 21/2" as existing. No 1

22.3.8 4" flange as existing. No 1

22.3.9 3" flange as existing. No 1

22.3.10 21/2" flange as existing. No 1

22.3.11 4" strainer as existing. No 1

22.3.12 3" strainer as existing. No 1

60 out of 62

Page 61: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

22.3.13 Flow switch as existing. No 1

22.3.14 Temperature gauge as existing. No 1

22.3.15 Pressure gauge as existing. No 1

22.3.16 4" flexible connection as existing. No 1

22.3.17 3" flexible connection as existing. No 1

22.3.18 4" non-return valve as existing. No 1

22.3.19 3" non-return valve as existing. No 1

22.3.20 Duct Works as existing. M2 10

22.3.21 Metal Stand as existing No 1

22.3.22 Double Regulating valve 4" as existing. No 1

22.3.23 Double Regulating valve 3" as existing. No 1

22.3.24 Double Regulating valve 21/2" as existing. No 1

22.4 Removing all existing exhaust fans at roof and re-instalation on

future top roof as shown in drawings. The work shall include

galvanized ducts, PVC piping, openings in concrete for the

existing slab, connection to existing electrical panel and all

required labor, conduits and electrical wiring, materials and

lifting equipment all made according to the instruction of the

engineer. Price also includes the replacement of any of the

following damaged parts with new (same in size, capacity and

quality) part:

No 8

22.4.1 Duct Works as existing. M2 100

22.4.2 Metal Stand as existing No 1

22.5 Removing all existing chillers at roof and re-instalation on future

roof as shown in drawings. The work shall include piping

connections, pumps, heat exchanger, valves, foundation

isolation, all existing equipment, electrical connections and all

required labor, conduits and electrical wiring, materials and

lifting equipment, all must be made according to the instruction

of the engineer. Price also includes the replacement of any of

the following damaged parts with new (same in size, capacity

and quality) part:

No 2

22.5.1 Insulated 4" Sch-40 black steel pipe as existing. LM 10

22.5.2 Insulated 3" Sch-40 black steel pipe as existing. LM 10

22.5.3 Insulated 21/2" Sch-40 black steel pipe as existing. LM 10

22.5.4 Insulated 2" Sch-40 black steel pipe as existing. LM 10

22.5.5 Butterfly valve 4" as existing. No 1

22.5.6 Butterfly valve 3" as existing. No 1

22.5.7 Butterfly valve 21/2" as existing. No 1

61 out of 62

Page 62: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Tulkarem Hospital

-BOQ-

Section Description Unit QTY Unit Rate Total

22.5.8 4" flange as existing. No 1

22.5.9 3" flange as existing. No 1

22.5.10 21/2" flange as existing. No 1

22.5.11 4" strainer as existing. No 1

22.5.12 3" strainer as existing. No 1

22.5.13 Flow switch as existing. No 1

22.5.14 Temperature gauge as existing. No 1

22.5.15 Pressure gauge as existing. No 1

22.5.16 4" flexible connection as existing. No 1

22.5.17 3" flexible connection as existing. No 1

22.5.18 4" non-return valve as existing. No 1

22.5.19 3" non-return valve as existing. No 1

22.5.20 Duct Works as existing. M2 10

22.5.21 Metal Stand as existing No 1

22.5.22 Double Regulating valve 4" as existing. No 1

22.5.23 Double Regulating valve 3" as existing. No 1

22.5.24 Double Regulating valve 21/2" as existing. No 1

Total of Removing Existing HVAC Equipment and

Accessories to New Roof carried to mechanical summary

sheet

62 out of 62

Page 63: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Project: Tulkarem Hospital

Sec. Description Amount

1 1) Total of Preliminary Works

2 2) Total of Concrete Works

3 3) Total of Stone Works

4 4) Total of Block Works

5 5) Total of Plastering Works

6 6) Total of Flooring and Covering Works

7 7) Total of Water Proofing Works

8 8) Total of Carpentry Works

9 9) Total of Suspended Ceiling Works

10 10) Total of Painting Works

11 11) Total of Metal Works

12 12) Total of Other Works

Total of the Civil Works..carried to main summary

Civil works Summary

Page 64: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Project: Tulkarem Hospital

Sec. Description Amount

13.1 Total for Sec. 13.1) - Electrical Points.

13.2 Total for Sec.13.2) Conduit, piping, and excavations

13.3 Total for Sec.13.3) Cables

13.4 Total for Sec.13.4) Structural elelement cabinet

13.5 Total for Sec.13.5) Grounding

13.6 Total for Sec.13.6) Electrical Switchboards

13.7 Total for Sec.13.7 ) Lumenaire supply and Installation.

13.8 Total for Sec.13.8) Nurse call System

13.9 Total for Sec.13.9) Fire alarm system.

13.10 Total for Sec.13.10) Intercome system.

13.11 Total for Sec.13.11) Public adress system

13.12 Total for Sec.13.12 ) Telephone system

13.13 Total for Sec.13.13 ) LV Boxes

13.14 Total for Sec.13.14 ) UPS System

Bill 13 Total for Electrical Works..carried to main summary

Electrical Summary

Page 65: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Sec. Description Amount

14Total of waste and drainage works:

15Total of roof drain works:

16Total of Sanitary fixtures and their accessories works:

17Total of Domestic Cold and Hot Water system works:

18Total of Fire Fighting system works:

19Total of HVAC System works:

20Total of Medical Systems works:

21Total of Lifts works

22 Total of Removing Existing HVAC Equipment and Accessories to New Roof

works:

Total of the Mechanical works ..carried to main summary

Project: Tulkarem Hospital

Mechanical works Summary

Page 66: Construction of the third floor in Tulkarem Hospital … · Construction of the third floor in Tulkarem Hospital-BOQ-1 ... 1.3 Demolish concrete slabs of the existing staircases,

Bill No. Description Total

Bill # 1 Civil Works Summary

Bill # 2 Electrical Works Summary

Bill # 3 Mechanical Works Summary

Total of All Works

Percentage % discount or addition

Amount of discount or addition

Net Grand Total

Contractor:

Signature:

Date:

The sum of ________________________________________

Project: Tulkarem Hospital

Main Summary