Construction of Rolling Stock Component Factory
Railway Board, Ministry of Railways, Government of India, approved the proposal for
construction of a ‘Rolling Stock Component Factory‘ for reconditioning /
remanufacturing of rolling stock components, which was initiated by Central Railway.
Central Railway has entrusted Konkan Railway Corporation Limited with the work of
construction and commissioning of the Factory at a Total Approved project Cost of
Rs.402.65 crore.
The Rolling Stock Component Factory (RSCF) is located at Additional Lote, near
Chiplun in Ratnagiri district of Maharashtra. The site is in the Maharashtra Industrial
Development Corporation (MIDC) area. The Campus is on 50 acres of land, off the
Mumbai-Goa National Highway.
Conceptual Layout of Factory:
Important Features:
Relevance for the future:
• Nodal Centre for supply of Critical Safety components as Unit exchange spares
for freight wagons and coaches of Mail Express trains
• Hub for supply of Cartridge bearings after automated overhaul for freight wagons
for railway zones in Central and Western India.
• Major Railway Unit for Bogie Overhaul for LHB coaches to meet requirements of
Mail Express trains of Central Railway etc.
• The Factory will kick-start Railway rolling stock Industry’s presence in the Konkan
region
• Creation of a Railway led Eco-system around RSCF for skills, employment,
economic development and setting up of medium to small-scale industrial units in
the future
Factory Design:
• All weather PEB Sheds, elevated design of Shop-floor level for monsoons
• Gated Complex with 24X& CCTV surveillance
• Modular Cluster design of Sheds – Adaptability as per change in Product mix
• Focus of Energy Management and Automation
• Ergonomic design of Work Centre design as per IS: 6385
• 5-S Workplace Management System principles
• ‘Divyang’ friendly Complex
Green Initiatives:
• IGBC certified Factory, Building, Interiors, Landscape • Energy Management System (EMS) & Super Category as per ECBC • Water Management- Drip & Sprinkler Irrigation, Water bodies • Rain Water Harvesting, Recycling of Water • Solar Energy – Panels over Sheds & Parkings, Street Lights , Pumps • Wind Mills - Turbines to power Rest House • Waste Management initiatives – Waste segregation, Organic Waste
Converter.etc • Use of Battery Operated Vehicles & Material Handling Equipment.
Automation:
• Automatic Bogie Cleaning Plant for LHB Bogies
• Automatic Manipulators &Turntables for LHB Bogies
• Automatic Wheel Profile & Brake Disc Measurement System
• Automatic Shot Blasting Plant
• Robotic Painting of Bogies
• Automatic Bearing Cleaning Plant for Cartridge Roller Bearings
• Automated Guided Vehicles – Movement and Handling in Wheel Shop, Brake Cylinders etc.
• Motorized Conveyors for handling
• Augmented Reality Training Simulator, PC Based Training
• SCADA ,IBMS and EMS
Amenities:
• Health Unit, Cardiac Ambulance
• Crèche, Bank / ATM, Shopping Complex
• Community Complex – Auditorium, Amphitheatre, Conference Halls
• Sports Complex - Outdoor and Indoor Sports, Playgrounds
• Club, Rest Houses, Trainee Hostel
• Canteen & Cafeterias
Health & Safety:
• Factory as per OSHAS systems & principles
• Fire Detection & Alarm System integrated with Public Address System
• Fire Hydrant and Sprinkler Systems
• CCTV Based Surveillance integrated with Vehicle Management System
Components to be handled at RSCF:
Sr.No Major Component Average Quantity per Month (Nos.)
1 LHB bogie &sub assemblies 200
2 LHB wheel 800
3 LHB springs 2400
4 Damper (LHB) 1800
5 CTRB (freight) 5600
6 Roller Bearing (ICF) 2800
7 CTBU (LHB) 800
8 Roller Bearing (EMU) 2000
9 Shock absorber (ICF) 1400
10 Shock absorber (EMU) 2000
11 Draft Gear (LHB) 1000
12 Schaku coupler (EMU) 500
13 Draw gear (ICF) 700
14 Distributor Valve (freight) 700
15 Distributor Valve (ICF) 350
16 Distributor Valve with panel (LHB) 500
17 Brake cylinder ( freight) 700
18 Brake cylinder ( ICF) 1400
19 Brake caliper unit (LHB) 800
20 Brake cylinder ( EMU) 2000
Site at Additional Lote - 2016 Survey at Additional Lote - 2016
Terrain map indicating RSCF Campus site
(Source: Google Maps) Road Map of RSCF Campus site (Source:
Google Maps)
Bhoomi Pujan by Hon’ble Shri. Suresh Prabhu, Minister of Railways – Dec’16
Tree Plantation after Land development of factory shed complex by Shri. Sanjay Gupta,
CMD Konkan Railway Jan’19
Planning Development of site -2017 Detailing the Construction activity -2018
Land Development in Progress -2018 Rerouting of Power Line -2018
Boundary Wall Works - 2019 On-site Project Monitoring & Review -2019