    Raw material survey:-

    Raw material R s. in cr.

    Cement 1.50

    Bricks 1.50

    Sand 1

    Rods 1

    Concrete 1

    Labor .50

    Water facility .5

  • 8/9/2019 Construction of an International School

    4/12

    Contd..

    Tiles and glass (imported) 3

    Transport facility .25

    Plot price 10

    Electricity .10

    Government tax duties .25

    Machines on rent (crane, etc.) .50

    Total 20.20

    Amount Left 4.80 c r

  • 8/9/2019 Construction of an International School

    5/12

    As we know the due to high demand ofinternational school in the jalhander aspeople prefer to educate their children in the

    English medium with the high standards likeDPS and lots more and people were readytwo pay the highest amount for theirchildren.so I have decided to open aninternational school in Jalandhar sector and aspeople were ready to pay demand soundsgood. And the whole project cost round 25 cr.

    Capacity of students:-

    The capacity of the students was 8,000thousand at a time.

  • 8/9/2019 Construction of an International School

    6/12

    The prices both include theprevailing domestic andinternational price trends, and the

    tax and duties which are beingimposed by the government onexport and import of good.as the

    school should be according to theinternational standard so somegoods like tiles, glass, wereimported from different country.

  • 8/9/2019 Construction of an International School

    7/12

    As according to the Jalandharproperty dealers the plot of theschool cost 10 cr. as Model

    town is the hub place ofJalandhar .and the place is socostly over there .

  • 8/9/2019 Construction of an International School

    8/12

    Product pattern:-

    The demand survey for the construction of internationalschool the raw material survey confirm adequatematerial will be available to support the project

    .because the supplier of goods were nearby and thego down are close.

    Process of selection:-[technology analysis]

    Choice of technology is being taken from the Britisharch. designer who has design the blueprint of

    international school and the contract is being given toAstra Group of company which spec.in constructionof international school in India in different city.

    Appropriation of technology:-

    As the in the same technology or blue print is being usedin the construction of international school .the sameblue print is being taken into the consideration

  • 8/9/2019 Construction of an International School

    9/12

    Process Selection:- As I collected the data from the senior

    egg of the project. On the spot the

    phases is being divides in the 3phases in which the work is beingcompeted as soon as possiblebecause time is money.

    Raw Material Requirements:- As according to the spot survey report

    raw material is being organized underthe same contractor in which cementis being

  • 8/9/2019 Construction of an International School

    10/12

    As according to the spot surveyreport raw material is beingorganized under the same

    contractor in which cement is beingtransported form a go down in theouter area of the jalandhar as the

    cement is come in from thehimachal acc factory. And the thebricks and concrete is being takenfrom phagwara and Ludhiana localcontractors.

  • 8/9/2019 Construction of an International School

    11/12

    As according to the source data about theplace where all the required facility arenear by.in that road marketing andtransporting facility is good as its in thenational highway NH-1 Delhi, source andavaviblity of water facility is near to thesport and as the place in the city areathere is no nay problem of power supplyand availability of skilled labor andmanpower is there from the near villageslike khambra, lambra and other places,and from other states on contractorbasis. And the availability of drainage anddisposal.

    Facility is there along with that the project is

  • 8/9/2019 Construction of an International School

    12/12