Page 1: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

1 Decentralized Online Architecture Network

Photograph is public domain. License info:All photos published on Unsplash are licensed under Creative Commons Zero and Unsplash License which means you can copy, modify, distribute and

use the photos for free, including commercial purposes, without asking permission from or providing attribution to the photographer or Unsplash.CREATIVE COMMONS ZERO: http://creativecommons.org/publicdomain/zero/1.0/

Decentralized Architectural Design Construction Management Network

Page 2: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

2 Decentralized Online Architecture Network

Furthermore, the creative team behind this project, with DARCH Token or "DARCH NETWORK NET, the company plans to introduce different layers of token sales activities that are being sold to any country or any permitted applicable jurisdiction power, admitted as "securities" or "service tokens" sold in such events. This Whitepaper does not offer "securities" (the United States "Securities Act" dated 1933) as a purchase or purchase offer. A formal agreement offer must be connected to the Token Terms & Conditions and Stocks for allocations and other forms of agreement within the scope of agreements. In another case, this document is not represented as a mean of purchase recommendation of any Token proposed for this project. This Whitepaper document is subject to any change, progress and ongoing reviews and reviews by the core team, legal counselors and the creative. Whitepaper, committed to making changes from time to time, is not intended to be complete and may cause future changes. With the exception of accredited investors under the "US Securities Act", the Token Sales event of this project will not accept the offer to purchase gifts from any US company. BY READING AND KEEPING THIS DOCUMENT, YOU AGREE TO ALL TERMS AND CONDITIONS OF THIS LEGAL NOTICE.

The Decentralized Online Project Team has done their best to ensure that the information contained therein is correct and updated on the date it was published while bringing together the realities, numbers, and details of this technical investigation. Any mistake or misrepresentation, the Darch Network Team is not responsible for any conflicts that may arise in this case. The information contained in this white paper is subject to change, update or revision without notice and should not be interpreted as a legal binding between customers and Decentralized Online. This introductory document is for informational purposes only and the Decentralized Online Project has the right to make changes in accordance with the vision and objectives of the company. This Whitepaper contains an overview regarding the Darch Network and its flagship product. If any law prohibits the Darch Network project from executing its plan and performing its services, the Darch Network project is limited to the extent permitted by law. Restrictions: Darch Tokens are submitted to citizens outside the United States in accordance with the provisions of the US Securities Act of 1933. For general information, the publication of this Whitepaper is to recommend the Darch Network Ecosystem and the entire project itself, as well as to invite community comments and to raise awareness of the project.

DİSCLAİMER

Page 3: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

3 Decentralized Online Architecture Network

CONTENTS1. Logo2. DİSCLAİMER3. CONTENTS4. INTRODUCTION5. Current Status and Potential6. Current Status and Potential7. Problems8. Advantages and Solutions for Parties9. System Operation-Abstract

10. Categorical Pools to be Found in the System11. Preparation Pool 12. Design and Project Room13. Design and Project Room14. Design and Project Room15. Engineering Projects Room16. Engineering Projects Room 17. Construction Preparation Pooling18. Construction pooling and delivery process19. Building Inspection Poolings20. Project Scenario Example21. Project Scenario Example22. Token Economy23. Token Economy24. Road Map25.26.

Page 4: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

4 Decentralized Online Architecture Network

INTRODUCTIONIt is an online project network where an unlimited number of architects have the freedom to work on an unlimited number of projects whenever they want, in the preparation, projecting, construction, approval and delivery to the customer process of this project, all specialization areas will provide confidence (… architects, engineers, craftsmen, material firms, logistics, contractors, municipalities, auto desk, design software and anyone who needs it and every other such tool) with smart contracts, ensuring this process by itself, it is also a decentralized online business network where the project can be managed and voted.

Users participate in the platform about the home in their dream, create demand with customer input, and create a project chain. In the platform, a specialist from the project site is appointed by the system from the category pool where the experts are at the preparatory stage and the project passes to the next chain upon preparation stage is made. In this new chain block an experienced architect is appointed as project manager from the category pool based on project needs. The experienced project manager identifies the architects that are needed and enters the expert parts that are needed categorically from the system and the appropriate architects are appointed from the system pool. and chains are managed in this way from the whole sector, including the construction part are managed from here, and it covers all areas such as payment, approval, need, material supply, technical staff requirement, documentation, social part and training contents from this online system until the key is delivered.

DESIGN AND PROJECTVirtual office where

preliminary design and project planning are

conducted

ENGINEERING PHASE

Virtual office where engineering projects are

prepared.

INSPECTION AND APPROVAL

PHASEArtificial intelligence that filters out the

scope of approval of building inspection

and local authorities, accordance and

mistakes

CONSTRUCTION PHASEThe area where processes such as preparation for construction,

supply of materials for construction and procurement

of technical personnel are managed.

CUSTOMERAnyone who needs

design, project, construction and

technical staff can be customer.

Page 5: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

5 Decentralized Online Architecture Network

MARKET PARTICIPANTSCurrent Status and Potential

Construction works are a form of production carried out by interdisciplinary cooperation, and therefore require the preparation of a number of different projects in all areas of engineering. In order to ensure that the projects are complete and compatible with each other, it is of utmost importance to involve the project stakeholders in every stage from the design to the completion of the implementation projects.

However, it is known that the failure to provide the required coordination in the design process, causes serious mistakes in the project and the implementation phase and disagreement between parties and arbitrariness. This study aimed to investigate the mistakes made in the design process, the reasons for that and the negative reflections of this situation on the construction building. The architects are responsible for the coordination of the other project stakeholders as well as the architectural design of the building.

Page 6: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

6 Decentralized Online Architecture Network

MARKET PARTICIPANTSCurrent Status and PotentialIn construction works, design and construction are realized by cooperation between the project stakeholders. The continuous improvement and change of know-how and the significant increase in the expertise information have been enhancing the complexity and duration of the design process together with the quality. Within the framework of project management, the design process requires the gathering of information from all design professionals involved in a project. According to Walters, the design process is the process of developing and documenting the demands and requirements of employer and preparing them for production. The design team of a project may consist of companies with different occupational and disciplinary groups and these groups can be found in different geographical regions. Furthermore, other project stakeholders like public bodies, supervisory bodies, and local authorities, may also intervene in the project. The biggest challenge during the design process is that multiple disciplines should work together on more than one topic. As can be seen from the above definitions, all of the issues of physical dimension, carrier system, interior equipment etc. which will directly affect the cost, construction period and comfort conditions of the building, are decided in the design process. In order to give the right decision and to ensure that projects to be prepared by different engineers are compatible with each other, good coordination and management of the project planning processare of paramount importance. If this process cannot be managed as expected, many errors and deficiencies are encountered during the implementation phase. Foremost among them, incompatibility between projects, deficiencies and inaccuracies in projects can be seen. These deficiencies and inadequacies have many negative effects on the duration, cost, and quality of the project. One of the most common problems is that manufacturing is required to be done again because of the uncertainty and incompatibilities in the projects.

Another important point is that the architects are not preparing the needs programs that take into account the needs and wishes of the customers in the design process. The results of the study by Mo and Ng on Design & Build showed that; customer opinions, good relations with customers and communication are the most important critical factors in the success of the project. The most effective way to avoid expressed negativity is to act with a conception of engineering in the design process. Researchers, to solve the problems in the construction sector show an increasing interest in improvement of the relationship between project stakeholders, in the issues of feedback and mutual corrections / agreements between design and construction processes.

Page 7: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

7 Decentralized Online Architecture Network

vSectoral ProblemsMonopolization of architecture and contracting areas in the construction sector. The lack of innovative project management and common systems in the sector. Communication problems between partners and difficulties related to payment.

ICareer IssuesThe difficulty of finding a job due to the lack of experience of the newly graduated architects, engineers and similar students studying in the construction industry, and lack of common platforms with information sharing that hosts specific areas.

RPayment ProblemsSlowing down the construction sector due

to check and other forward-term payments

Inability to receive payments of employees

from the project owners or project

managers. The scarcity of secure payment

options.

jIncorrect PlanningFailure to allocate sufficient budgets for

the right planning and for this reason

the emerging high project costs.

GBusiness Tracking ProblemsThe problems arising from the inability to

follow up on the project documents and

technical works regularly lead to a

prolongation of the project deadlines and a

decrease in efficiency.

SPirated SoftwareThe problem of using pirated software resulting

from the unlicensed use of Autocad,

ArchiCAD, and other related industry software

causes a great loss for software companies.

MARKET PARTICIPANTSProblems

W Marketing ProblemThe scarcity of specific advertising areas for

construction sector suppliers and the use of

advertising budgets in the channels that do

not represent the target audience directly.

EProject Team Problem

Failure to reach the right teams of the people who want to build a construction project. Being obliged to rely on architects, engineers and technical teams without seeing a verified portfolio.

CApproval ProblemsLarge number of applications to local

authorities for projects. Making

confirmations through petitions, spending

long-term work and Lack of innovative

solutions in this field.

Page 8: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

8 Decentralized Online Architecture Network

MARKET PARTICIPANTSAdvantages and Solutions for Parties

From the idea to the turnkey process of the project, presenting an online system with the understanding of B2B (business to

business) in preparation, design, projecting, engineering, construction, labour, material supply etc. the relationship of the

parties in one chain.

Customerskhave the option of being involved in the projects. She/he can exhibit a portfolio in her/his profile and create a profile with the experience

points gained from the projects. She/he has the opportunity to work from anywhere with virtual offices, has possibilities like saving time,

getting rid of office costs, lack of need for staff, difficulty in recruiting, faster and stronger, a sharing community.

ArchitectslHave the options of being included in projects. They can use the options of seeing and listing material prices. They can purchase and

make contracts through intelligent contracts, have the opportunity to control business management. The entire payment system is

managed from here. Not to be affected by exchange differences, at the beginning of work, orders are made to material firms with smart

contracts through the system.

Contractors

VRelated to the technical works of a project, technical teams serving in areas like electricity, plaster, paint, and decoration can reach

projects and join the contractors' teams. The problem of not receiving payment disappears thanks to smart contracts. They obtain the

opportunity of getting more work

Technical Teams

EMunicipalities may upload the current zoning plans to the system, examine the documents related to the projects, create notes on

revisions or approve projects.

Local AdministrationCThey can present their software into service online. Thus, they can prevent the use of pirated software. Reasonable prices at product

prices are reached to a reasonable level in return of reaching more customers, have the opportunity of accessing more customers.

Software Companies (Autodesk, Archicad, BIM, etc.)

SThey ensure to find their ad target group about their product. They escape from unnecessary and non-target advertising expenditures.

Instead of advanced forward payments, such as checks, they can reach agreement through smart contracts. It makes payment

according to use and sales rate in the local lists.

Material Companies

u

Page 9: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

9 Decentralized Online Architecture Network

Decentralized Project Management NetworkSystem Operation-Abstract

Customers

The user, who needs design, projecting

and construction, enters the system and

creates the request. A block chain

consists. The process from the first user

to end user works in each block.

Project Preparation Block 1The system assigns the consultant from a

consultant pool at the location and

competence to the data given by the

customer in the first block and

preparation block operations begin.

Design and PlanningBlock 2The team consisting of architects and other

designers completes their designs for a

project with the features asked by the

customer and designs are approved by the

project manager.

Engineering ProjectsBlock 3Over the project design from the design

and planning pool, engineering operations

are completed by civil engineers and

other engineers

Building Audit Block 4The design and engineering

procedures, the completed project

draft, are approved by the building

inspection teams and sent to the

municipality

Local Government Approval AuthorityBlock 5Municipalities and other relevant

groups check the appropriateness

of the area in which the project is

intended to be implemented in the

zoning plan and specifications.

Approves or turns it back

Construction PreparationBlock 6

All local preparations for

construction are carried out in this

pool. Teams required for technical

studies are created. Material

orders and all other preparatory

works are carried out here.

Construction ManagementBlock 7

All stages of construction are carried

out here. Technical teams and other

project teams upload project notes to

the pool and receive approval.

According to the needs, materials

are provided from the pool where the

material companies are located.

Delivery and PreparationBlock 8 In the whole project, construction,

finish and delivery process, the

delivery process starts with the

customer. Deficiencies are

eliminated and cleaning is done.

The key is delivered and a

confirmation is received.

Page 10: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

10

Decentralized Online Architecture Network

Technician Pools

Engineering Pools

Multivariate Architects Pool

Material Companies

Pool

Detailed Operation Stages of the SystemCategorical Pools to be Found in the System

Material Companies Pool

Contractor and Contractor

Company Pool

Engineering Pools Engineering areas such as electricity, machinery, civil engineering will be categorized in related technical engineers pools. As in the architecture pool, it will be divided into various categories according to their abilities and areas of expertise and the same system will also be categorized according to the characteristics of the occupations in the same methods in all available pools.

Material Companies Pool We will create a pool of thousands of materials brands used in the construction industry. The list of materials and quality standards to be used in the construction that we call local list are prepared. Even the brand used is determined in the list of locals. In fact, we're going to mention an important point right here.In the construction sector of 15 trillion dollars, 50-70% is approximately 10 trillion dollars, this market's advertising is generating an amazing advertising budget cost. The target audience is seen as everyone, television commercials are made; however, the architect or technical staff are preparing the list who are using the brand and designing the project. In fact, the target customer group uses what the architect recommends on the local list. We are narrowing the target audience in this section. And we save companies from high marketing costs. Companies asking to be listed in the pool pays commission according to the rate of use in Local list, in this way sales will be guaranteed, and the payment is only paid at the rate of sale.

Contractor and Contractor Company Pool:This pool consists of approved persons who are performing contracting firms and individual contracting, their work is divided into various categorical areas according to their scale, experience and budget. The appropriate contractor is assigned to take over the construction part of the projects coming to the system.

Technician Pools:Special technical personnel pool is categorized into each section related to construction technical areas. The system assigns appropriate contacts from the pool when the need arises for the appropriate division of labour to be categorized such as ability to work coefficient and the average itinerary from the pools consisting of technical personnel in every field of construction such as electrical technician, stucco master, mason, subcontractor, transportation, logistics, plaster, paint etc.

Inspection Firms and Consultants:A pool of companies and experts who supervise projects and conduct audits during the construction process appropriate experts will be appointed in this section and inspections will be performed appropriate for each construction and project.

Local Governments (Municipalities)Municipalities will be entered to the system autonomously in this section and have the opportunity to update their own databases for each land. According to the rule of the land, the project will be inspected and approved quickly or in case of detecting errors will be sent back.

The fields of expertise and parties that are needed in the whole system will have a transition structure by categorizing in such a way. the same person can be a specialist in both hospitals and sketches. If we explain the system from an example;

Local Governments

(Municipalities)

Inspection Firms and

Consultants

logistics

Page 11: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

11

Decentralized Online Architecture Network

Detailed Operation Stages of the SystemPreparation Pool

Customer enters the system and fills the form; usually the nearest consultant is selected locally. The most

appropriate consultant is assigned and a project-specific special chain is formed. He/she tells the consultant

his/her project dream, needed service or project idea through video call via phone or system. He/ She talks about

his/ her budget and desired project. Budget and preparation procedures are performed; all transactions in this

blog are followed by the consultant. He/ She determines the need for appropriate land exploration and staff for

the preliminary project stage and ask from the system. The assignment is made from appropriate categorical

pools and so on until the job in this pool is finished.

Connection of Client and Consultant

1.

The consultant categorically enters the data about all needs of the customer's dream project like square meter,

colour, architectural style to the pool, and processes the data to the system, such as the completion date.

Ensures that all project needs are available.

Designation of the Details2.

Map engineers, building supervisors and other field teams etc. conduct investigations in the field. Notes,

drawings, reports and appropriate documentation process about the investigation are uploaded to the system.

Project Etude3.

The zoning plan, cadastral operations and other regional planning procedures of the region where the project will

be built are carried out, plans are processed into the system.

City and Regional Planning4.

All necessary preparations for the project, data on preparations are uploaded to the system. Once the project

preparation phase has been completed, when appropriate approvals are obtained, is passed to the next block.

Transition to Project Room5.

DARCH NETWORK was designed as a project network where all the parties can work online in a single system which started from the idea to the preparation, design, projecting, approval, construction, and delivery process. The parties in this network make membership and their location in specific Pools is listed according to certain variables.Main Users: Architects, Engineers, Technical experts involved in the project, Contractors, Material Firms, Local Administrations, Controlling Supervisors, Construction Technical Personnel, customer(anyone who needs to design and build) interns who will work in customer and occupational groups in this area for early training.

Page 12: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

12

Decentralized Online Architecture Network

Decentralized Project Management NetworkDesign and Project Room

MİMAR HAVUZU-

YETENEK/ALAN Sağlık Yapıları

Dini Yapılar

Konut Yapıları

Sağlık Yapıları

Askeri Yapılar ALAN/PUAN

3D Uzmanı Ali K. Deniz T. Mehmet A. Tugay L. Mustafa T. 92 Puan

Detay Uzmanı Murat Y. Caner H. Yıldırım K. Zehra A. Meryem E. 85 Puan

Eskiz Uzmanı Gülşah S. Kader M. Deniz K. Mehmet Y. İlyas A. 62 Puan

T. Çizim Uzmanı Ferdi B. Sinan K. Derya B. Nuri Z. Zeliha D. 50 Puan

Goes to the project pool section after all the jobs in the project preparation pool are finished. This section contains a pool of categorized project leaders architects and a pool of other architects. In these pools architects will be listed in a multivariate categorical pool

Tugay

Uzmanlık: 3D Uzmanı

Alan: Sağlık Yapıları

Puan: 92

Kader

Uzmanlık: Eskiz Uzmanı

Alan: Dini Yapılar

Puan: 62

Yıldırım

Uzmanlık: Detay Uzmanı

Alan: Konut Yapıları

Puan: 85

Area of ExpertiseHealth structures, educational structures, cultural structures, public buildings, religious buildings, residential, office, mixed, shopping, urban areas, landscape, urban planning, such as specialization areas are determined.Architect's Technical knowledge and skills:According to the variables related to sketching expert, detail specialist, landscape, furniture design, product design, technical drawing capabilities, architects are categorized in this field.Architect's total experience and ability coefficient (ARCH coefficient)The experience and ability coefficient of each architect will be calculated according to his/her finished projects and the years of experience. This is a coefficient that will directly affect the wage rate of the architect in the future. It can also lead to popularity competition among architects. We'll categorize it using a lot of variables such as etc.

Multivariate Architects Pool

Page 13: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

13

Decentralized Online Architecture Network

Decentralized Project Management NetworkDesign and Project Room

XubarTeam leader

John

3D Graphic Specialist

Project contribution:%12

Jack

Traditional architecture

Project contribution:%17

Alexandra

Sketch Expert

Project contribution:%13

Marry Trainee Architect

Project contribution:%19

Page 14: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

14

Decentralized Online Architecture Network

Decentralized Project Management NetworkDesign and Project Room

Team LeadersIt consists of experienced managers who manage the project.

c

Team MembersArchitects, contractors and technical teams.

Y

Student ArchitectA student must be employed in each project.

l

CustomerThe customer follows the project and exchanges ideas.

b

ExperienceA newly graduated architect or engineer is gaining experience from his experienced colleagues and can easily climb the ladder of his career.

J

Remote VisionWorkers can fold video or audio conferences together with Hangout, Skype or Isighand. When he wanted to discuss the project.

S

Work From AnywhereEmployees can now contribute to projects from anywhere. There is no obligation to work in an office or an area.

j

Boiler according to the rate of contributionThe employees of the project perform their tasks in the project and earn as much revenue as they work.

b

Page 15: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

15

Decentralized Online Architecture Network

Decentralized Project Management NetworkEngineering Projects Room

XubarTeam leader

Marry

Construction Engineer

Project Contribution% 22

Damien Electrical engineer

Project Contribution% 8

jamie Construction Technician

Project Contribution% 4

Jamal Intern Engineer

Project Contribution% 4

The team leader is responsible for the task distribution and manages the team

Page 16: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

16

Decentralized Online Architecture Network

Decentralized Project Management NetworkLocal Government Approval Authority Block-5

Municipalities will be entered to the system autonomously in this section and have the opportunity to update their own databases for each land. According to the rule of the land, the project will be inspected and approved quickly or in case of detecting errors will sent back.

Page 17: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

17

Decentralized Online Architecture Network

Decentralized Project Management NetworkConstruction Preparation Pooling

Creation of price list of building materials for construction materials

Establishment of intelligent contracts for construction markets and materials in the system

All stages of preparation, such as the management and tracking of material stocks, take place in this phase.

Creation of construction materials lists required for construction

Determination of technical teams to work in the project

Assignment of a contractor or contracting firm to the project

Page 18: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

18

Decentralized Online Architecture Network

Decentralized Project Management NetworkConstruction pooling and delivery process

Logging the notes regarding construction phase to system by technical teams

Logging the reports of the building inspection companies in the project to system

Inspection of works carried out by technical teams

Obtaining approval of the project manager regarding the completion of the project

Installing the list of materials that were used and expenses to system

It is ensured that the management of construction is carried out in the system, such as obtaining approval from the customer regarding completion of the project.

Installing all the documents and papers related to the project to the system

Page 19: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

19

Decentralized Online Architecture Network

Decentralized Project Management NetworkBuilding Inspection Poolings

Controlling the values such as Floor-Area Ratio (FAR) and Building Coverage Ratio (BCR) of the project design

Controlling the site investigation reports and checking their compatibility with the project

Inspecting the compliance of the project to earthquake conditions

All works such as the inspection of the materials to be used in the project, are assigned to the firms in the building inspection pool and they conducts all control and inspection works of the projects.

Inspecting the compatibility of the project design with the existing zoning plan

Page 20: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

20

Decentralized Online Architecture Network

Decentralized Project Management NetworkProject Scenario ExampleProject Scenario Example:________________________________________Project Location: Abu Dhabi, United Arab EmiratesProject Type: Single House / VillaProject Type Group: HousingProject Cost: $ 1 millionTotal Construction Area: 800 m2👪 :Customer

Our customer, a family of three, enters the system and fills in the system with the project application section. The appropriate advisor is assigned to the nearest supervisor according to position, scale and type of project. Or the system propose to 5 people who are idle in the pool, the most appropriate is assigned. In this way, the project will meet the customer online in the preparation pool section. Proper communication is ensured and the project preparation process begins. In order to enter data into the algorithm of the system, information is obtained from the customer through the consultant in the project preparation section. Appropriate discoveries are made. If there are things to do, asks consultant like map engineer for analysis and exploration from the pool of technical staff and is assigned by the system. All preparatory discovery jobs at this pool are managed by the leader of the consultant. Appropriate elements are requested from the system and assignment is made. For example, for location-based work for this project, people from Abu Dhabi are usually assigned. If there is a need for drone and shooting for the discovery, the system is assigned by the consultant and the consultant enters all the data into the system. The work, all categorized and planned, goes into the projecting phase.Thanks to the data entered in the system, an experienced leader is assigned from the project pool and the leader pool. This leader examines the project, provides the data in the preparation process and contact the consultant obtains the latest information and asks to meet the client, if required, and determines the areas of expertise required for this project. At least one architect who worked in villa projects needs 5 people including sketch expert and technical drawing specialist, 3D specialist and intern and 6 people with him will work on this project. He/ She entered the appropriate data and requested. The appropriate persons agreed and appointed by the system. The team has been formed and the team of 6 people is ready. With what kind of system will the team of 6 architects, gathered in an online office in different locations, work? The system will have two screens in everyone, including private and general screens.

There will be your own work on a private screen, on a private screen there will be all works done by 6 people. Everyone will work on the same platform online instantly as puzzle pieces. Communication systems such as chat system, voice call, video call, and Skype will be integrated to make a live connection with the team. There will be an integrated system with architectural project software. It will be integrated with technical detail systems for architects such as Autodesk, Archicad and Bim systems. We will make software architects, many parties and structures in the same system work together.Thousands of different projects will be realized in the same system by creating projects in the form of chains in the whole system. There will be thousands of project rooms and different project chains. If required others will be able to follow these chains. For example, an intern architect can monitor and learn a hospital under construction in the project room. He/ She can request to make a contribution to the project. If the project leader gives approval, he / she will solve the roof systems in the project. The contribution time and rate of the project is calculated. When the job is done, payment is made to the account. In this way, a pricing system will be established and everyone receives payment according to the contribution coefficient. After the project is ended, the contribution is distributed according to this rate. Because there are different projects in many rooms at the same time, there will be inter-room transitions. Many architects can follow the desired project and contribute, and work at any time work flexible and receive payment based on this rate. This project will have flexible time and telecommuting working conditions. Architects will have the chance to do unlimited work without worrying about finding a job. As the architects will have the freedom to work on the projects they want, the projects will be high quality and fully efficient. In this system, independent employees and the team in the form of office will take part in the project. Let's give an example from the EEA ARCHITECT. Emre Arolat is a famous architect in the world with a high working coefficient and with hundreds of employees. These are registered in the form of an office system and can be assigned to large-scale or appropriate projects. Emre AROLAT doesn't have to employ 100 people constantly. He can employ a large number of employees, in some

Page 21: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

21

Decentralized Online Architecture Network

He can employ a large number of employees, in some periods 50, sometimes 30, sometimes up to 200 employees from the unlimited pool of architects. In this way, large-scale projects can be carried out by highly professional teams and also other people who have finished their work on the team can also switch to other projects instantly. That way, everyone gets paid according to work done. Office costs and fixed expenses end. Or we can look at from this point; Emre Arolat is a highly experienced architect and has 120 projects at the same time. He is following the projects and one of the leaders of a small project invites himself into the project room. Emre Arolat gives advice and idea for half an hour from the system. Under normal circumstances, this is very difficult. In this way, the ideas of big architects can be applied to all projects and be defined to the payment system. For example, 30 minutes contribution to the system as a contribution margin is 400 dollars. In this way, if there are 10 highly experienced architects, they can contribute to all projects. In this way, it will be possible to work with those people. The area of architecture will become highly professionalized. Let's think for a single project, A total of 20 people, including small jobs and large jobs, have made contributions to the process. An index will be created as a project contribution. It will be expressed as percentages like % 2 Emre Arolat contributions to X project, % 4 jack.... etc. A joint project occurs where everyone has a private profile. And in this way their personal coefficients rise. To give an example, everyone owns a profile as follows EMRE AROLAT:Contributed project indexes:Zorlu center : 30% Sancaklar Mosque: 18%Quasar: 23%Ahmet Güneştekin cultural centre: 19%Worked Project Type: Distribution over 100% Public: 10%Education: 20Culture: 30HOUSING: 25Mixed: 15Architecture Style:Modern Architecture: 35%Islamic architecture: 15%Bauhaus: 24%Neoclassical: 16%Renaissance: 15%Gothic: 5%

Descriptive coefficients for many architects will be used. Everyone will have a social profile. This social platform will be the content sharing area. The contents, training, videos, articles, and photographs related to the projects of the architects, create both social and educational field in this way. These indexes will start to be valuable as it progresses because it will define the brand value. Everyone will be able to see you from there, and what you do will be in a transparent way.You will not be able to do anything like tricking the system and in-system studies will generate this data. Initial entries outside the system, if proven, can be passed and reflected upon approval. That part will be valid until all architects enter the system. After the entry, system users should make contributions to create this data. And this social part applies not only to architects but also to all construction sector parties. In the same way, everyone will have a category and an identity. In this way, popularity is gained and competition and business volume rise. Requisitioners can work in this system with an anonymously. When the projecting process is over the engineers move to their rooms and work exclusively in these areas as in architecture. One who finishes the job goes to the next layer. in this way, the project is passed to the approval of the municipality after the approval of the inspection. Here, either it is confirmed or return specifying the deficiencies instantly. Congratulations, the project part is over.What will happen now? If this project is to be constructed, construction preparation begins. Another preparation process starts with the customer. To be prepared for the construction a new expert consultant is assigned and necessary plans are made. All preparatory works are met from the pools according to the desired area of expertise, and when the preparation process is finished, it passes to the construction pool. In this part, all the parties involved in the construction will work together. There will be construction management panel. All the controls, business reports, failures, things to do is executed instantly from the system. To give an example, Plaster works will be done in the area numbered 233/4. The area and the material to be used are clear. The appropriate master is appointed, does the job and loads the system with photos. The administrator sees it instantly and checks. He finds it incomplete and loads it into the system. When it comes to another master the shares are divided according to the working rate. In this way, there will be a construction management network and all processes will be carried out through a single platform until project delivery. With these details, we don't want to strangle you anymore. Gradually we will launch our project. We aim to gain our users gradually.

Page 22: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

22 Decentralized Online Architecture

Network

Decentralized Project Management NetworkToken Economy

Public Sale Starts

75,000,000 DARCH

1 ETH=15.000 DARCH20th March 2019 12:00 GMT

Second Round

75,000,000 DARCH

1 ETH=12.000 DARCH10th April 2019 12:00 GMT

Third Round

75,000,000 DARCH

1 ETH=10.000 DARCH 1th May 2019 12:00 GMT

Last Round

75,000,000 DARCH

1 ETH=7.500 DARCH20th May 2019 12:00 GMT

Public Sale Ends

10th Jun 2019

Page 23: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

23 Decentralized Online Architecture

Network

Decentralized Project Management NetworkToken Economy

Page 24: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

24 Decentralized Online Architecture

Network

IdeaResearch on first problem

detection, project idea stage

and solutions

2017Q3

2019Q1

2019Q2

Decentralized Project Management NetworkRoad Map

2019Q3

• WEB version draft and interface of the

DARCH platform will be shared.

•The DARCH will be used instead of the

Ethereum from the DDMP platform

• Expanding the team of developers and

consultants

2019Q4

2020Q1

• Decentralized Architectural Design & Construction Management Network (DARCH)Publishing the beta version• DARCH Project The partnership agreements with the construction sector, testing and prototyping phase with the parties in the sector.• Studies for the sale of physical products of the DARCH file sales system

• (DARCH) launch of the first Product MVP • DARCH testing with the parties in the sector • Conducting the first tests for the sale of physical products of DDMP file sales to be tested for some users • DARCH studies on the stable coin, and their efforts to enter the traditional markets as a bridge.

2020Q2

2020Q3

• (DARCH) Dealing with a local administration as a pilot city and designing the project approval systems • DARCH, testing the project management system with architects in the sector • DARCH test process with contractor firm and construction workers

• It will be the foundation of the DARCH project in partnership with a team of developers. • Founders and core team, the feasibility and opportunities for the platform and ecosystem were determined. • Special Sales, Launch of the website for Pre-ICO and Crowdsale• Presenting ideas to WHITEPAPER and other technical documentation

• Recruitment of additional developers and key people. Proof of the DARCH concept,. conceptualization and development of designs. • Early partners for the DARCH Project, • Negotiations and partnerships with customers, test professionals and investors• The announcement of Airdrop, Whitelisting, and Bounty program. • The beta version of the DARCH DDMP system will be shared.• The user interface of the DARCH APP mobile application will be shared.

• Live version of DDMP system will be published.• It will be listed on 3 different crypto exchange platforms. • Recruitment of additional developers and key people. • DARCH APP will start working for the mvp of mobile application and the process will start running through the github.

Page 25: Construction Management Network · 1 Decentralized Online Architecture Network Photograph is public domain. License info: All photos published on Unsplash are licensed under Creative

25 Decentralized Online Architecture

Network

Social ProMembership fee

Monthly membership package

fees from individual or corporate

members.

Employee Commissions

The commission rate to be

charged on the revenues of each

user involved in the projects in the

system.

ProjectCommissions

The commission rate to be taken from

projects uploaded to the system. It is

taken as a percentage of the total cost

of the project.

Material Companies Usage Rates Commission

Usage rates of the brands listed in

the Material Pool and the

commission rates taken in

proportion to the contribution of the

system to the sale

Decentralized Project Management NetworkOur Revenue Models