Construction Industry Advancement Program
John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design
New Jersey Turnpike Authority
Working with New Jersey Turnpike Authority
Highway and Building Projects
November 19, 2009
HIGHWAYS / BUILDINGS - DESIGN
CONSTRUCTION AWARDS
YEAR CONTRACT AWARDS 2008 $ 122 Million (Actual)
2009 $ 235 Million (Actual)
2010 $ 338 Million (Projected)
2011 $ 649 Million (Projected)
2009 – Contracts AwardedHighways / Buildings – Design Section
NUMBERCONTRACTS
5
4
3
2
3
1
CONTRACT DESCRIPTION
PAVEMENT RESTORATION
FACILITY IMPROVEMENTS
SIGN SYSTEM IMPROVEMENTS
ROADWAY IMPROVEMENTS
ROADWAY RECONSTRUCTION
INTERCHANGE IMPROVEMENTS
CONSTRUCTIONAWARDED
$ 35M
$ 15M
$ 32M
$ 22M
$ 128M
$ 3M
TOTALS = $ 235M
2010 –Contracts to be AwardedHighways / Buildings – Design Section
AWARDSCHEDULE
1ST QTR
1ST & 4TH QTR
1ST & 4TH QTR
1ST & 3RD QTR
3RD & 4TH QTR
4TH QTR
4TH QTR
3RD & 4TH QTR
NUMBERCONTRACTS
3
6
6
4
2
3
2
6
CONTRACT DESCRIPTION
PAVEMENT RESTORATION
FACILITY IMPROVEMENTS
SIGN SYSTEM IMPROVEMENTS
ROADWAY IMPROVEMENTS
ENVIRONMENTAL MITIGATION
UTILITY RELOCATION
ROADWAY RECONSTRUCTION
INTERCHANGE IMPROVEMENTS
CONSTRUCTIONESTIMATE
$ 20M
$ 29M
$ 49M
$ 23M
$ 7M
$ 30M
$ 120M
$ 60M
TOTALS = $ 338M
2011 –Contracts to be AwardedHighways / Buildings – Design Section
AWARDSCHEDULE
1ST QTR
2nd & 3rd QTR
2nd & 3rd QTR
1ST & 2nd QTR
2nd & 3rd QTR
2nd & 3rd QTR
NUMBERCONTRACTS
3
7
6
8
6
5
CONTRACT DESCRIPTION
PAVEMENT RESTORATION
FACILITY IMPROVEMENTS
SIGN SYSTEM IMPROVEMENTS
ROADWAY IMPROVEMENTS
ROADWAY RECONSTRUCTION
INTERCHANGE IMPROVEMENTS
CONSTRUCTIONESTIMATE
$ 20M
$ 62M
$ 81M
$ 21M
$ 315M
$ 150M
TOTALS = $ 649M
Pavement Restoration$25M in Annual Resurfacing Contracts
(3 – 5 Contracts Ranging from $5M - $8M)
Turnpike Resurfacing • Milepost 0 to 74 (South)• Milepost 74 to 122 (North)
GSP Pavement Restoration• MP 0 to MP 75 (Southern)• MP 75 to MP 146 (Central)• MP 127 to MP 172 (Northern)
Facility Improvements
Contracts to be Awarded in 2010 / 2011• P500.155 – NJSP Vehicle Maintenance Facility • P500.158B – PNC Bank Arts Center Amphitheater Improve.• A500.TBD – Authority Maint. Bldg. Improve. (5 Contracts)• T500.TBD – Turnpike Toll Bldg. Improve. (2 - 4 Contracts)• P500.TBD – Parkway Toll Area Improve. (3 Contracts)
Sign System ImprovementsContracts to be Awarded in 2010 / 2011• T600.156 – Turnpike Sign Panel Replacement – 0 to 48.7 • A600.102A – Install VMS on Turnpike and Parkway• A600.157 – Advance Sign Structure Fab. (2 Contracts)• A600.102(BC&D) – Install VMS/VSLS on TPK (3 Contracts)• A600.102(E&F) – Install VMS on GSP (2 Contracts)• A600.TBD – Guide Sign Improve on TPK & GSP (North)• T600.TBD – Guide Sign Improve on TPK (South)• P600.TBD – Guide Sign Improve on GSP (South)
Roadway ImprovementsContracts to be Awarded in 2010 / 2011• P200.127 – Parkway Guide Rail Improvements – 0 to 126 • P200.159 – Advance Clearing for GSP Widening – 48 to 63• P200.140 – GSP – Grading & Drainage Improve – 30 - 48• P200.TBD – Install Raised Pavement Markers on GSP• P200.171 – GSP Drainage Improvements – 0 to 140• T200.TBD – Turnpike Median Barrier Repairs – 0 to 122• T200.TBD – TPK Local Pier & Abutment Protection Impr.• P200.TBD – GSP Local Pier & Abutment Protection Impr.
Environmental Mitigation
Contracts to be Awarded in 2010 / 2011• P900.121 – Great Bay Boulevard Bulkhead Improvements • T700.TBD – Piles Creek Wetland Mitigation
Utility RelocationContracts to be Awarded in 2010 / 2011• P900.TBD – Relocation of Overhead Utilities – MP 63 to 80 • P900.TBD – Force Main Relocation – MP 10 to 12• P900.TBD – Advance Utility Relocation – MP 48 to 63
Roadway ReconstructionContracts to be Awarded in 2010 / 2011• P100.132 – Widen & Rehab Patcong Creek Bridge – MP 31 • P200.TBD – Grade Separation Improve at Int. 9, 10 & 11• P200.136 – Widening of the GSP – MP 58 to 63• P200.135 – Widening of the GSP – MP 52.5 to 58• P200.134 – Widening of the GSP – MP 48 to 52.5• P200.TBD – GSP Shoulder Reconstruction – MP 93.5 - 99.5• P200.TBD – GSP Shoulder Reconstruction – MP 88.5 - 93.5• P200.TBD – GSP Shoulder Reconstruction – MP 83.5 - 88.5
Interchange ImprovementsContracts to be Awarded in 2010 / 2011• P300.172 – Improvements to GSP Interchanges 141 & 150 • T300.188 – Turnpike Interchange 10 Improvements• P300.TBD – Operational & Access Improvements to Int. 145• T300.176 – Turnpike Interchange 9 Improvements• P300.TBD – Improvements to GSP Int. 153 & 154/155P• T300.TBD – Turnpike Int. 15W & Int. 16W Improvements• P300.TBD – Improvements at GSP Interchange 157• T100.023 – Tremley Point Connector Road• P300.TBD – GSP Interchange 88 Improvements• T300.TBD – Turnpike Interchange 8A Improvements• P300.TBD – GSP Interchange 91 Improvements