22
Construction Department Site Survey Checklist RB26124.doc www..red-bag.com Client Location Title of Project Job No. Date By

Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

Embed Size (px)

Citation preview

Page 1: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

Construction Department

Site Survey Checklist

RB26124.doc www..red-bag.com

Client

Location

Title of Project

Job No.

Date

By

Page 2: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

2 of 22

DOC.NO.

Table of Contents

1. Construction Facilities............................................................................................... 4

1.1 Water ................................................................................................................................4

1.2 Electricity ..........................................................................................................................4

1.3 Communications ...............................................................................................................4

1.4 Air .....................................................................................................................................5

1.5 Steam ...............................................................................................................................5

1.6 Fuel Gas ...........................................................................................................................5

2. Hot Work ................................................................................................................... 5

3. Fences ...................................................................................................................... 5

4. Tie-Ins ....................................................................................................................... 6

5. Site Conditions .......................................................................................................... 6

5.1 Site ...................................................................................................................................6

5.2 Underground .....................................................................................................................6

5.3 Above Ground...................................................................................................................7

6. Terrain....................................................................................................................... 7

6.1 Level ______________ Slope ______________ Rough _____________ ..............7

6.2 Spoil Disposal ...................................................................................................................7

6.3 Borrow...............................................................................................................................7

6.4 Soil Characteristics............................................................................................................7

7. Environmental Considerations .................................................................................. 8

8. Civil Aeronautics ....................................................................................................... 8

9. Waste Disposal ......................................................................................................... 8

9.1 Disposal of Construction Debris.........................................................................................8

9.2 Disposal of Concrete .........................................................................................................8

10. Fire Protection......................................................................................................... 9

11. Safety Regulations .................................................................................................. 9

12. Medical Facilities..................................................................................................... 9

13. Construction Office................................................................................................ 10

13.1 Parking and Storage......................................................................................................10

14. Security ................................................................................................................. 11

15. Access to Site........................................................................................................ 11

15.1 Railroads.......................................................................................................................11

15.2 Trucks ...........................................................................................................................11

15.3 Dock Facilities...............................................................................................................12

15.4 Air .................................................................................................................................12

Page 3: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

3 of 22

DOC.NO.

16. Weather ................................................................................................................ 12

16.1 Temperature..................................................................................................................12

16.2 Prevailing Wind.............................................................................................................12

16.3 Precipitation ..................................................................................................................13

17. Labor Climate........................................................................................................ 13

17.1 Labor.............................................................................................................................13

17.2 Transportation to Job.....................................................................................................14

17.3 Training.........................................................................................................................14

17.4 Construction Activities...................................................................................................14

17.5 Labor Productivity .........................................................................................................15

18. Subcontractors ...................................................................................................... 16

19. Construction Materials .......................................................................................... 17

19.1 Concrete, aggregate, etc. ..............................................................................................17

19.2 Machine Shops..............................................................................................................17

19.3 Testing Facilities ...........................................................................................................17

20. Construction Equipment ........................................................................................ 17

20.1 Deadman for Guys ........................................................................................................17

20.2 Rental Agency...............................................................................................................17

20.3 Equipment Availability...................................................................................................18

21. Foreign Additions .................................................................................................. 18

21.1 Income Taxes................................................................................................................18

21.2 Living Conditions...........................................................................................................18

21.3 Financial .......................................................................................................................19

21.4 Social (General) ............................................................................................................20

21.5 What are obligations of employer to employee pertaining to the following? ...................21

22. Immigration............................................................................................................ 21

22.1 Work Permits ................................................................................................................21

22.2 Visitors Visas.................................................................................................................22

23. General ................................................................................................................. 22

23.1 What is terrain of country? ............................................................................................22

23.2 What is availability of small tools, supplies, and other expenditures? ............................22

23.3 What are units of measure? ..........................................................................................22

23.4 What are general insurance requirements and name of reputable broker?.....................22

23.5 What are general regulations pertaining to corporate operations (and obtain copy of government regulations)?......................................................................................................22

24. Notes and Sketches .............................................................................................. 22

Page 4: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

4 of 22

DOC.NO.

1. Construction Facilities

1.1 Water

Client Company

If Company, source

Quantity Pressure

Location

Quality: Drinking Testing

1.2 Electricity

Client Company

If Company, source

Volts Phase

Cycle KW

Location

1.3 Communications

Telephone

Client Company

Telefax

Client Company

Source

Remarks: (obtain copy of local telephone directory-yellow pages)

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

Page 5: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

5 of 22

DOC.NO.

1.4 Air

Client Company

Quantity

Pressure

Tap available

Location

1.5 Steam

Client Company

Bar

Tap available

Location

1.6 Fuel Gas

Client Company

Bar

Tap available

Location

2. Hot Work

Regulations and Restrictions

Welding and cutting

Smoking

Other

3. Fences

Client Company

Temporary Permanent

Type and ± lineal meters required:

Page 6: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

6 of 22

DOC.NO.

4. Tie-Ins

Process Piping: Client Company Others

Electrical: Client Company Others

5. Site Conditions

5.1 Site

Clear Brush Trees Other (describe)

Remarks:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

5.2 Underground

Water table Meters below grade

Possibility of unknown obstructions:

Yes No

Type Location

Abandoned footings

Foundations

Sewers

Other (describe)

Remarks:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

Page 7: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

7 of 22

DOC.NO.

5.3 Above Ground

Obstructions to movement of construction or plant equipment:

Yes No

Type Location

Pipeways

Structures

Power Lines

Other (describe)

Remarks:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

6. Terrain

6.1 Level ______________ Slope ______________ Rough _____________

Obtain data for estimate of earth moving job.

6.2 Spoil Disposal

Method

Distance

6.3 Borrow

Method

Distance

Cost per m3

6.4 Soil Characteristics

Rock Sand Clay

Vehicle travel: As is prepared roads required

Page 8: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

8 of 22

DOC.NO.

Remarks:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

7. Environmental Considerations

Clear water run off

Contaminated water run off

8. Civil Aeronautics

Is height of any construction equipment sufficient to demand aircraft warning lights?

Yes No

Which authority must be consulted?

9. Waste Disposal

9.1 Disposal of Construction Debris

Location

Distance

Method

9.2 Disposal of Concrete

Location

Distance

Method

Other

Page 9: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

9 of 22

DOC.NO.

10. Fire Protection

Client Company

Type: Fire Water Extinguishers Mobile Equipment

Location

Number

Type

11. Safety Regulations

Client Company

If Client, obtain copy

What are government safety regulations (and obtain copy)?

12. Medical Facilities

Client Company

If Client

Location

Doctors: Full time Part time

Nurses: Number

Hours

Ambulance: Yes No

Location

Hospital: Yes No

Location

If Company

Distance to: Hospital

Ambulance

Doctor

Page 10: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

10 of 22

DOC.NO.

13. Construction Office

Construction Field Office: Client Company

Are office trailers available? Yes No

Are prefab buildings available? Yes No

Construction warehousing available? Yes No

Remarks:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

Cost:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

13.1 Parking and Storage

Client Company

Adequate parking space for construction crew:

Yes No

Distance from jobsite

Time to allow for workmen to get to jobsite

Remarks:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

Is unloading or storage area for equipment available adjacent to jobsite?

Yes No

If not, where located?

Page 11: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

11 of 22

DOC.NO.

14. Security

Client Company

Type Yes No Remarks

Uniformed

Armed

Professional

Watchmen

Estimated number required

Separate gate for construction Client Company

15. Access to Site

15.1 Railroads

What railroad serves the site?

Where unloading spur with respect to storage area and new construction area?

New spur or other facilities by

Client Company Other

What is largest piece of equipment that can be shipped?

Length

Overhead clearance

Side clearance: At maximum length mtrs.

At 15 meters mtrs.

15.2 Trucks

Maximum allowable length

Maximum allowable width

Maximum allowable weight

Permit for special shipment: Yes No

Condition of roads

Condition of bridges

Page 12: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

12 of 22

DOC.NO.

Comments:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

15.3 Dock Facilities

Client Company Other

Unloading capacity

Distance from site

Storage facilities

Ramp for roll on/roll off loading

Restrictions (weight, size, water depth, etc.)

15.4 Air

Airlines that serve the country

Ports of entry

Distance from jobsite to nearest airport

Distance from jobsite to nearest international airport

Is air taxi service available? Yes No

Can landing strip be built at jobsite? Yes No

16. Weather

16.1 Temperature

Winter Summer

High Low High Low

Mean average Mean average

16.2 Prevailing Wind

Direction: Average Velocity:

Page 13: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

13 of 22

DOC.NO.

16.3 Precipitation

Yearly Average/Centimeters Record Centimeters

Rain

Snow

Special seasonal conditions affecting construction:

(Freezing, thaw, rainy season, wind storms, etc.)

Remarks on general and/or unusual atmospheric conditions:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

17. Labor Climate

Yes No Remarks

Jurisdictional disputes commonplace?

Strikes a continuing threat?

Exclusive referral systems used by union locals?

Right-to-work state?

17.1 Labor

Is construction labor*: Union Non-union Both

What are restrictions in importation of labor?

Supervisory

Trades

* Obtain copies of government and/or union regulations.

Will the following be required?:

Item Yes* No Remarks

Labor camp

Change house(s)

Food facilities

* Amplify “Yes” answers as appropriate

Page 14: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

14 of 22

DOC.NO.

17.2 Transportation to Job

Expatriate

Local

17.3 Training

Item Yes* No Remarks

Training programs craft

Language

* Amplify “Yes” answers as appropriate

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

17.4 Construction Activities

Projected construction activity of the area involving the above crafts?

Heavy Medium Light

What outside contractors working area now?

What outside contractors scheduled to start?

What outside contractors last worked area?

Page 15: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

15 of 22

DOC.NO.

17.5 Labor Productivity

Craft Productivity Source of Information

Asbestos Workers

Boilermakers

Bricklayers

Carpenters

Cement Finishers

Electricians

Ironworkers

Laborers

Millwrights

Operating Engineers

Painters

Pipefitters

Others

Page 16: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

16 of 22

DOC.NO.

18. Subcontractors

Are good subcontractors available locally for the following:

Yes No Remarks

Electrical

Insulation

Roofing

Paving

Painting

Glazing

Fencing

Earthmoving

Plant Security

Heating & Ventilation

Rigging

Machinery Setting

Concrete

Cement Finishing

Reinforcing Placements

Piping

Plumbing

Haulage

Stevedoring

Commonly used types of subcontractors units which contractors are accustomed to bidding-amount of detailed breakdown required.

Page 17: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

17 of 22

DOC.NO.

19. Construction Materials

19.1 Concrete, aggregate, etc.

What are the availability and costs at jobsite on the following?:

Readymix concrete

Lumber

Aggregate (type)

Other materials

19.2 Machine Shops

Are machine shops available for anchor bolts, etc.?

Yes No

Approximate cost per # for anchor bolts

Approximate cost per # for rebar

Approximate cost per # for straights

Approximate cost per # for bent

19.3 Testing Facilities

What is the availability and cost of testing facilities?

Concrete

Welding

X-Ray

Other

20. Construction Equipment

20.1 Deadman for Guys

Can deadman for guys be located outside battery limits?

Yes No How far?

20.2 Rental Agency

Location of recommended equipment rental agency(s)

Page 18: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

18 of 22

DOC.NO.

20.3 Equipment Availability

What equipment is available?

Type Size Approximate Monthly Rates

Operated and Maintained? Yes No

Tools: Client Company

21. Foreign Additions

21.1 Income Taxes

21.1.1 Personal Income Tax and Related Problems

Local employees

Expatriate employees

Are there reciprocal agreements between this country and other countries. If yes, which:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

21.2 Living Conditions

21.2.1 General

Distance, remarks, rates, etc.

Houses (rental)

Apartments

Schools

Recreation

Shopping

Public transportation

Churches

Page 19: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

19 of 22

DOC.NO.

Cost of living index: Current (Base 19 ________ = 100)

21.2.2 Automobiles

Availability Makes Cost on Road

New

Used

Rental

Trucks

New

Used

Rental

21.2.3 Newspapers

Ownership

Name Address Government Private

21.2.4 Recreational Facilities

Expatriate

Local

21.3 Financial

21.3.1 Currency and Exchange

National unit of exchange (USD, pesos, etc.)?

Official rate of exchange in NLG and/or USD?

Actual rate of exchange in NLG and/or USD?

Foreign exchange regulations?

Page 20: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

20 of 22

DOC.NO.

21.3.2 Customs

Will import duties apply to plant equipment? Yes No

Will import duties apply to construction equipment?

Yes No

Will import duties apply to construction materials?

Yes No

If so, at what rates?

If not, what is procedure to get exemption?

Names of reputable customs broker

Custom clearance costs to jobsite

Negative (black) lists? Yes (obtain copies) No

Products

Companies

Other

Other restrictions?

21.4 Social (General)

What is predominant religion of country?

Is it recognized as official? Yes No

Are there any restrictions? Yes No

What are social conditions and customs of the country?

What is the official language of the country?

What languages are generally spoken in the area?

From personal observation, what is attitude of locals toward expatriates?

Page 21: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

21 of 22

DOC.NO.

How far to city of 50,000 or more? What city?

Are any special types of clothing required?

Nearest Dutch and US Embassy:

What is availability of alcoholic beverages?

What are regulations and/or restrictions for expatriates re:

Automobile registration

Driving licenses:

a. Automobile

b. Pick-up

21.5 What are obligations of employer to employee pertaining to the following?

Compensation

Health benefits

Leave time

Social security

Termination requirements

Workmen’s compensation

What method of payment? Cash Check

21.5.1 What are recommended ratios of supervisors?

Local to crafts

Expatriate to locals

22. Immigration

22.1 Work Permits

Requirements?

How obtained?

When obtained? Before entry After entry

Term renewable?

Page 22: Construction Department Site Survey Checklist - … Department Site Survey Checklist RB26124.doc

RB26124.doc www.red-bag.com

ISSUE

SHEET

22 of 22

DOC.NO.

22.2 Visitors Visas

Issued for business trips? Yes No

Duration

Frequency

Issued for pleasure trips? Yes No

Duration

Frequency

23. General

23.1 What is terrain of country?

Plains

Mountains

Jungle

23.2 What is availability of small tools, supplies, and other expenditures?

_________________________________________________________________________

_________________________________________________________________________

23.3 What are units of measure?

Lineal

Weight

Temperature

23.4 What are general insurance requirements and name of reputable broker?

_________________________________________________________________________

_________________________________________________________________________

23.5 What are general regulations pertaining to corporate operations (and obtain copy of government regulations)?

_________________________________________________________________________

_________________________________________________________________________

24. Notes and Sketches