1 Construction Cost Impacts Construction Cost Impacts Florida DOT Experience Florida DOT Experience Greg Davis Greg Davis State Estimates Engineer State Estimates Engineer Florida Department of Transportation Florida Department of Transportation 20 20 th th Annual TEA Conference – 2007 Annual TEA Conference – 2007 St. Louis, Missouri St. Louis, Missouri October 5, 2007 October 5, 2007

Construction Cost Impacts Florida DOT Experience

  • Upload
    jatin

  • View
    39

  • Download
    0

Embed Size (px)

DESCRIPTION

Construction Cost Impacts Florida DOT Experience. 20 th Annual TEA Conference – 2007 St. Louis, Missouri October 5, 2007. Greg Davis State Estimates Engineer Florida Department of Transportation. OVERVIEW. Material Prices Work Program (STIP) Bidder Competition Lake Belt Mining Issue - PowerPoint PPT Presentation

Citation preview

Page 1: Construction Cost Impacts Florida DOT Experience

1

Construction Cost Construction Cost ImpactsImpactsFlorida DOT ExperienceFlorida DOT Experience

Greg DavisGreg DavisState Estimates EngineerState Estimates EngineerFlorida Department of TransportationFlorida Department of Transportation

2020thth Annual TEA Conference – 2007 Annual TEA Conference – 2007St. Louis, Missouri St. Louis, Missouri

October 5, 2007October 5, 2007

Page 2: Construction Cost Impacts Florida DOT Experience

2

OVERVIEW Material Prices Work Program (STIP) Bidder Competition Lake Belt Mining Issue FDOT Strategies

Page 3: Construction Cost Impacts Florida DOT Experience

3

MATERIAL PRICES

Page 4: Construction Cost Impacts Florida DOT Experience

4

Earthwork

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Ave

rage

per

Cub

ic Y

ard

Fiscal Year – Statewide (thru August 2007)

Page 5: Construction Cost Impacts Florida DOT Experience

5

Asphalt

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Ave

rage

per

Ton

Fiscal Year – Statewide (thru August 2007)

(Structural/Friction Course Items only)

Page 6: Construction Cost Impacts Florida DOT Experience

6

Structural Concrete

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Ave

rage

per

Cub

ic Y

ard

Fiscal Year – Statewide (thru August 2007)

Page 7: Construction Cost Impacts Florida DOT Experience

7

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Structural SteelA

vera

ge p

er p

ound

Fiscal Year – Statewide (thru August 2007)

Page 8: Construction Cost Impacts Florida DOT Experience

8

Reinforcing Steel

NOTE: Lump Sum, Design/Build Contracts not included in this graph

Ave

rage

per

pou

nd

Fiscal Year – Statewide (thru August 2007)

Page 9: Construction Cost Impacts Florida DOT Experience

9

SummaryStatewide Weighted Average Prices (Fiscal Year)

Pay Item Pay Item GroupGroup UnitUnit FY05FY05 FY06FY06 ChangeChange

FY06/FY05FY06/FY05 FY07FY07 ChangeChangeFY07/FY06FY07/FY06 FY08FY08 ChangeChange

FY08/FY07FY08/FY07

Earthwork CY $5.66 $7.93 +40.1% $8.42 +6.2% $5.55 -34.1%

Asphalt TN $68.49 $90.75 +32.5% $104.44 +15.1% $97.04 -7.1%

Structural Concrete CY $653.43 $892.89 +36.6% $913.49 +2.3% $630.02 -31.0%

Structural Steel LB $1.34 $1.68 +25.4% $2.07 +23.2% $2.16 +4.4%

Reinforcing Steel LB $0.86 $0.96 +11.6% $0.99 +3.1% $.90 -9.1%

Page 10: Construction Cost Impacts Florida DOT Experience

10

WORK PROGRAM (STIP)

Page 11: Construction Cost Impacts Florida DOT Experience

11

(Projects rejected and deferred to 05/06 have been removed)

Page 12: Construction Cost Impacts Florida DOT Experience

12

Page 13: Construction Cost Impacts Florida DOT Experience

13

Page 14: Construction Cost Impacts Florida DOT Experience

14

Page 15: Construction Cost Impacts Florida DOT Experience

15

First impact occurred in FY05/06 Rejected 71 contracts because of high

bids These were advertised at $600M and bids

came in at $977M 28 of these were re-let. 43 contracts were rolled into FY 06/07 or

deleted.

IMPACTS TO FLORIDA’S PROGRAM

Page 16: Construction Cost Impacts Florida DOT Experience

16

FY06/07 Impact Rejected 11 contracts because of high bids

These were advertised at $23.1M and bids came in at $37.3M

2 of these were re-let. 9 projects were deferred to 07/08 or

deleted. FY07/08 – 1 rejected contracts to date

IMPACTS TO FLORIDA’S PROGRAM

Page 17: Construction Cost Impacts Florida DOT Experience

17

BID COMPETITION

Page 18: Construction Cost Impacts Florida DOT Experience

18

Page 19: Construction Cost Impacts Florida DOT Experience

19

Page 20: Construction Cost Impacts Florida DOT Experience

20

LAKE BELT MINING ISSUE

Page 21: Construction Cost Impacts Florida DOT Experience

21

Large mining area in South Florida Home to four of Florida’s largest mines Supplies 1/4 of State’s Limestone Supplies 1/2 of Aggregate for Asphalt

Ruling in late July 2007 Immediately stopped 1/3 of all mining Ruling is being appealed

LAKE BELT MINING ISSUE

Page 22: Construction Cost Impacts Florida DOT Experience

22

Ruling Affect on Material Cost Concrete suppliers are not immediately

affected Limerock up $5/ton - Aug 1st Asphalt Aggregate up $5-$10/ton – Aug 1st

Initially, cost increases are expected in southern half of the state only.

Statewide impact expected in Jan 2008

LAKE BELT MINING ISSUE

Page 23: Construction Cost Impacts Florida DOT Experience

23

FDOT STRATEGIES

Page 24: Construction Cost Impacts Florida DOT Experience

24

Alternative Contracting Methods Bid Alternates Bid Options Scope Alternates

FDOT STRATEGIES

Page 25: Construction Cost Impacts Florida DOT Experience

25

Bid Maximum Specification

Bid Maximum Report

Producer Price Index

FDOT STRATEGIES

Page 26: Construction Cost Impacts Florida DOT Experience

26

Not require everything to Federal-aid Standards Only 25% of Florida’s Construction

Program is funded by federal-aid dollars Flexible Design and Engineering

We need to “Design what can be built easily” rather than “Build what can be designed easily”

FDOT STRATEGIES

Page 27: Construction Cost Impacts Florida DOT Experience

27

Increase Competition Even during this volatility, contracts with 3 or

more bids came in closer to our estimate Waive bonds on smaller contracts to develop

next generation of Primes Simplify contract administration (inspection and

testing) on smaller contracts “Remove restrictions that do not add value”

initiative. Procure and permit sites for temporary asphalt

plants for contractors to use

FDOT STRATEGIES

Page 28: Construction Cost Impacts Florida DOT Experience

28

CONTACT INFORMATION

Greg Davis, P.E.State Estimates [email protected]

(850) 414-4170

Page 29: Construction Cost Impacts Florida DOT Experience

29

Thank You and Any Questions!

Page 30: Construction Cost Impacts Florida DOT Experience

30

How ‘bout them Gators!

Page 31: Construction Cost Impacts Florida DOT Experience

31