21
Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Embed Size (px)

Citation preview

Page 1: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Construction Charter

Portfolio Committee

Briefing

By Co-Chairs

James Ngobeni and Mike Wylie

Page 2: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

BACKGROUND• Despite progress since 1994 S.A.still face

economic inequalities;

• The constitution of R.S.A underlines the importance of redressing inequalities;

• Government introduced various pieces of legislation;

• The Broad Based Black Economic Empowerment Act 53 (2003) provides cohesions and guidance for the gazetting of Transformation Charters;

Page 3: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

STATUS QUO

• Business, Labour and Government embarked on a process during 2004;

• Objectives:– Define scope– Ensure participation of ;

• National Business Organisations including Women;• Labour unions;• Government Department

– Create Integrated Management Committee and other committees to facilitate participation

Page 4: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

STATUS QUO• Business:

– ASAQS (The Association of South African Quantity Surveyors)– ABA (African Builders Association)– MBSA (Master Builders South Africa)– NABCAT (National Association of Black Contractors and Allied Trades)– NAFBI (National Federation for the Building Industry)– SAACE (The South African Association of Consulting Engineers)– SABTACO (South African Black Technical and Allied Careers Organisation)– SAFCEC (South African Federation of Civil Engineering Contractors)– SAIA (South African Institute of Architects)– SAISC (South African Institute of Steel Construction)– SAWIC (South African Women in Construction)– Women for Housing

• Labour:– NUM– BCAWU

• Government:– National Department of Public Works (Leading Department)

Page 5: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

STAKEHOLDER FORUM

LABOUR BUSINESS GOVERNMENT

BUSINESS CAUCUS

LABOUR CAUCUS

GOVERNMENT CAUCUS

INTEGRATED MANAGEMENT COMMITTEE

SECRETARIAT

DRAFTING TEAM

TECHNICAL TEAMS

COMMUNICATIONS

COMMITTEE

Page 6: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Charter

Page 7: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Overview and Challenges• The industry is skewed in terms of race and gender• Over the past two decades the sector experienced declining

investment and demand volatility. The prospect of increased investment goes hand in hand with increasing capacity and output.

• There is a depleted skills base partly due to the sectors lack of appeal and factors such as workplace training, mentorship and recognition of prior learning will need urgent attention.

• There is insufficient penetration and lack of sustainable growth of black companies.

• Preferential procurement policies is being applied on a subjective basis leading to legal uncertainty.

• The industry is fragmented.

Page 8: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Objectives of the Charter• Transformation, growth, competitiveness and efficiency • Enhance entrepreneurial development and sustainable

growth of BEE companies through strategic partnerships.

• Address skills development with a particular focus on women.

• Achieve a substantial change in the racial and gender composition of ownership, control and management.

• Bring to an end the malpractice of fronting.• Lay the foundation for the integration of the construction

sector to provide a single access point.

Page 9: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Application and Reporting• Charter is applicable to all companies involved in

the creation and/or maintenance of fixed assets related to residential or non-residential buildings, infrastructure, or any form of construction works in South Africa.

• Annual reporting/auditing will be promoted.• Once in operation the charter will be reviewed

periodically.• The charter will take into account the size and

nature of participants.• There will be an oversight structure to implement

and monitor.

Page 10: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

STEPS TO FIN

• Complete the template which defines the indicators of the elements of the scorecard. This work is virtually complete and shown on the following slides.

• Populate the indicators with the relevant information on the existing situation in the industry. This info is available from a very thorough situational analysis which has been completed over the past 18 months in conjunction with CETA. We anticipate that this will be competed by the end of this week.

• Finally the weightings and targets. There are discrepancies between industry, government and labour and compromises will be sought through a thorough discussion of the facts. We are hoping to complete this process by the end of June.

• The qualitative part of the charter is complete and when the quantitative side (scorecard) is complete our work will be done.

Page 11: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

SCORECARD TEMPLATE

Page 12: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

OwnershipVOTING RIGHTS Voting Rights in the Enterprise in the

hands of black people

Voting rights in the hands of black women

Voting rights in the hand of broad-based groups

ECONOMIC INTEREST Economic interest to which black people are entitled

Economic interest to which black women are entitled

Economic interest to which broad-based groups are entitled

Unrestricted economic interest - full value transfer

Page 13: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Control

BOARD Members of the Board who are black people as a % of the board

Members of the Board who are black women as a % of the board

EXECUTIVEMANAGEMENT

Executive Management who are black people as % of Executive Management

Executive Management who are black women as % of Executive Management

Page 14: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Employment EquitySENIOR MANAGEMENT

Black senior management as percentage of total senior management

Black women in senior management as percentage of senior management

MIDDLE MANAGEMENT

Black middle management as percentage of total middle management

Black women in middle management as percentage of middle management

JUNIOR MANAGEMENT

Black Junior management as percentage of total junior management

Black women in junior management as percentage of junior management

Page 15: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Skills DevelopmentTRAINING COSTS Direct training cost as a percentage of

payroll

Percentage of above spent on black people

Percentage of above spent on black women

Percentage of above spent on black management

Percentage of above spent on black women management

LEARNERSHIP Learnerships as a percentage of employees

Black learnerships positions as a % of total learnerships

Black women learnerships as a % of total learnerships

Youth learnerships as a % of total learnerships

BURSARIES Bursary expenditure on black students, as % of payroll

MENTORSHIP Implementation of an approved and verified mentorship programme

Page 16: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Preferential ProcurementTotal procurement on BBBEE accredited companies measured as per the the various levels as a % of total procurement.

 Total score of 100% and above

Total score of 80% and above

Total score of 65% to 79.9% or small and micro enterprises

Total score of 55% to 64.9%

Total score of 40% to 44.9%

Total score of 20% to 39.9%

Page 17: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Enterprise DevelopmentMeasurement by considering improvements in turnover, profitability, asset base, number of employees, ownership for designated groups, credit worthiness.

 

Number ratio: BEPs turnoverMedium (3m-36m)Large a (37m-59.9m)Large b (60m-119.9m)Large c (120m-200m)Large d (>200m)

Number ratio: Contractors turnoverMedium (12m-60m)Large a (61m-500m)Large b (501m-1000m)Large c (1001m-2000m)Large d (>2000m)

Page 18: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

ResidualDEVELOPMENT Development imperatives

(still to be identified)

CSI CSI as a percentage of annual profit after tax (all), orCSI as a percentage of payroll (BEPs only) andCSI as a percentage of turnover (Contractors only)(Measurement mechanism requires further discussion)

Page 19: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Regulation and Scorecard

• A scorecard will be implemented to measure progress in broad based black economic empowerment.

• The charter and scorecard will be issued as a Code of Good Practice according to which companies will be evaluated when tendering for work.

• This charter and scorecard will be finalised in accordance with the requirements of the Codes on Charter issued by DTI.

Page 20: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

WAY FORWARD & CLOSURE

Page 21: Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie

Thank You

For further information:

CTCG Secretariat: 011-455 1700

www.ctcg.co.za