Constructability Problems and Solutions in Ground Improvements: Grand Island Tank Case Study
2
All accidentsare preventable
No repeatoccurrences
SafetyStandards
Job site Daily Task Analysis Meeting to review safety issues
related to the day’s tasks.
All Incidents investigated, corrective actions implemented
and shared in the Weekly Safety Update for awareness.
Safety Standards Document
Goal: Zero Injuries
3
THINK SAFE WORK SAFE GO HOME SAFE
4
Don’t be this guy!
5
Grand Island, NE
6
Grand Island Water Storage Tank• 2,000,000 Gal Storage• 6,000psf required
bearing capacity• 1” Total Allowable
Settlement
7
SoilProfile
8
Soil Profile
• 0’-5’ Surface CL Clay material
• 5’ – 15’ Poorly Graded Sand
• 15’ - 20’ Sandy Clay
9
• Design Depth of 26ft FGS
10
Design Layout
11
Partial Pre-Drill – Vibro Pier
12
13
Modulus Test
• Rounded Rock• 150% Design Load
14
Problems Start
• Red – Less than 12’• Yellow – 14’-18’• Green – 19’ or Greater
15
16
17
18
Problem: Clean Upper Sand Layer
19
Solution
• Compaction Grouting• 9% Area Replacement
below the Stone Column supported area
20
Process - Grout Mix
21
• Aggregate (Soil)
− Sand
− Gravel
− Silt
• Portland Cement
• Water
• Additives and Admixtures (optional)
Typical LMG MaterialsPrimary ingredients include:
22
23
Examples: Extracted Grout Column
24
PAST PROJECT: Dakota Mill & Grain – Presho, SD
25
Dakota Mill & Grain – Presho, SD
26
Dakota Mill & Grain – Presho, SD
27
Dakota Mill & Grain – Presho, SD
28
Dakota Mill & Grain – Presho, SD
29
Dakota Mill & Grain – Presho, SD
30
Dakota Mill & Grain – Presho, SD
31
Dakota Mill & Grain – Presho, SD
32
33
Solution
• Compaction Grouting• 44 locations• + 2 Test Locations
34
Grand Island: Compaction Grouting
• 8cf/ft• 28ft to 16ft FGS• Minimum 200psi CG
35
Results
• Compaction Grout
• Secondary – Test Locations (Dotted Line)
Vibro Zone
36
Lessons Learned• 30% Area
Replacement Ratio• Rounded Rock • Ground improvement
combinations - successful
37