S/N LOCATION FINDING /
COMMENTS
PICTURE DRAWING REFERENCE STQ REMARK SOLUTION
(PDPC)
1.0 Fire water
pipe
Fire Hydrant
construct not as
per AFC drwg
SSGP-05-BU-C-4302
nil To construct pipe
support
2.0 Auxiliary
Building
9 Door inside and
outside Auxiliary
Bldg shall “Air
tight”, door type
not as per AFC
drwg.
SSGP-05-BU-S-1305 (page 5/7) nil Done
Refer
STQ…
PDPC will communicate
with vendor to provide
rubber seal.
7/21/2019 Construct Not as Per AFC Drwg
http://slidepdf.com/reader/full/construct-not-as-per-afc-drwg 2/9
3.0 Fire water
Tank
Fire Water Tank
handrail using
angle steel and
not steel pipe
N/A, only shown in shop drawing. STQ-389
(TSG-
4046)
Ok/
closed
4.0 Auxiliary
Building
Additional
Inergent tank
storage
SSGP-05-BU-S-1305(page 1/7) nil
5.0 All Building
(sample
from
Auxiliary
bldg.)
Bottom of door
not as per AFC
typical Threshold
detail, all door
missing
threshold.
SSGP-05-BU-S-1305 nil
7/21/2019 Construct Not as Per AFC Drwg
http://slidepdf.com/reader/full/construct-not-as-per-afc-drwg 3/9
6.0 Auxiliary
Building
Level of bottom
hoop for Cage
ladder is too
height more than
max
requirement.
SSGP-00-GN-S-0004 nil Info
7.0 Utility Air
Compressor
Cage ladder
location not as
per AFC drawing
SSGP-05-BU-S-3313 nil To check
TQ
7/21/2019 Construct Not as Per AFC Drwg
http://slidepdf.com/reader/full/construct-not-as-per-afc-drwg 4/9
8.0 Utility Air
Compressor
Toe wall not as
per AFC drawing
SSGP-05-BU-S-3313 nil Construct no TQ
9.0 Compressor
Building
A,B,C and D
Non shrink grout
shall be applied
under all majorsteel structure.
SSGP-00-GN-S-0002 nil
10.0 ADMIN
BUILDING.
Missing
10mmx10mm
drip mould at top
of all window
SSGP-05-BU-S-1306 Nil
7/21/2019 Construct Not as Per AFC Drwg
http://slidepdf.com/reader/full/construct-not-as-per-afc-drwg 5/9
11.0 ADMIN
BUILDING.
Door install not
as per AFC
drawing.
If refer AFC drwg
this door shall
have vision
panel.
SSGP-05-BU-S-1306-A1 SHEET 1, 5 AND 6 OF 9
nil STQ for
changing
the size
and
material
of door
refer
STQ/430
7/21/2019 Construct Not as Per AFC Drwg
http://slidepdf.com/reader/full/construct-not-as-per-afc-drwg 6/9
12.0 ADMIN
BUILDING
If refer to the
picture at the
right, we can see
opening with
louvered, but if
check AFC
drawing this
opening not exist
only 400 x 200
cutout in above
false ceiling
(actual on site
this cutout
located on left
side of door)
nil
13.0 VENT STACK
BLOW
DOWN
AREA
Steel plate not as
per spec. (see
picture PDPC
using chequered
plate) and no
blasting before
install
10mm thick plate STQ
change
the
shape
and high
available
nil
Sample from
others
platform.
7/21/2019 Construct Not as Per AFC Drwg
http://slidepdf.com/reader/full/construct-not-as-per-afc-drwg 7/9
14.0 Auxiliary
building
1.Door D17 is
excluded panic
bar but on site
PDPC install
panic bar.
2. No skirting
SSGP-00-GN-S-0004 nil nil
7/21/2019 Construct Not as Per AFC Drwg
http://slidepdf.com/reader/full/construct-not-as-per-afc-drwg 8/9
7/21/2019 Construct Not as Per AFC Drwg
http://slidepdf.com/reader/full/construct-not-as-per-afc-drwg 9/9
17.0 Ditto Not as per AFC
drawing refer
door detail and
schedule
Drawing number same above