132
Connect part 2: Upload, Connect, Search and Update documents 1. Upload and connect a new document 1.1 Check In document (+ overview of document types) 1.2 Connect new document to Combinations 1.3 Connect/disconnect new document directly to/from articles 2. Manage existing documents 2.1 Search Document 2.2 Document details 2.3 Update document 2.4 Replace (renew) existing document 2.5 Delete document 2.6 Connect/disconnect document directly to/from Article from Document details screen 2.7 Connect/disconnect existing documents to/from combinations

Connect Part 2 Working With Documents

  • Upload
    secuuul

  • View
    20

  • Download
    2

Embed Size (px)

DESCRIPTION

l

Citation preview

Page 1: Connect Part 2 Working With Documents

Connect part 2: Upload, Connect, Search and Update documents

1. Upload and connect a new document1.1 Check In document (+ overview of document types)1.2 Connect new document to Combinations1.3 Connect/disconnect new document directly to/from articles

2. Manage existing documents2.1 Search Document2.2 Document details2.3 Update document2.4 Replace (renew) existing document2.5 Delete document2.6 Connect/disconnect document directly to/from Article

from Document details screen2.7 Connect/disconnect existing documents to/from

combinations

Page 2: Connect Part 2 Working With Documents

1 Upload and connect/disconnect a new

document

Page 3: Connect Part 2 Working With Documents

1.1 Check In document

“Check In” = “Upload file, register and describe”

Page 4: Connect Part 2 Working With Documents
Page 5: Connect Part 2 Working With Documents
Page 6: Connect Part 2 Working With Documents

Select the Document type

Page 7: Connect Part 2 Working With Documents

(Material) Safety Data Sheet

DefinitionDocument with pre-defined structure according to EU legislation, with the list of classified ingredients, safety measures etc, for a chemical product (glue, lacquer, solvents, dyes, additives etc).

IKEA Requirements examplesIOS-MAT-0010 – all chemical products, masterbatches etcIOS-MAT-0066 – paint, lacquersIOS-MAT-0069 – glues, adhesives

Who issues the documentThe producer of chemical product, according to legislation

Page 8: Connect Part 2 Working With Documents

3rd Party Certificate

DefinitionA document that certifies the manufacturers’ quality assurance program (process control, emission levels etc), basically for the formaldehyde requirements in wood-based materials. Or: exemption from certification.

IKEA Requirements examplesIOS-MAT-0003:TPC, CARB P2, Supervision agreementWho issues the documentThe third party certifier for the manufacturer of wood-based materialIn case of CARB exemption: California Air Resources Board

Page 9: Connect Part 2 Working With Documents

Audit report

DefinitionA document issued by the third party (TPC) showing that the board producer still is approved after latest TPC-audit and that a contract of continued auditing between the TPC and the producer exists.

IKEA Requirements examplesSame requirements as for 3rd Party CertificateWho issues the documentSame party as for 3rd Party Certificate

Page 10: Connect Part 2 Working With Documents

Cross section Details JP

DefinitionDocument stating the details for each different Cross-section used in the product prior to manufacturing, applicable for wood-based materials intended for Japanese market.

IKEA Requirements examplesIOS-MAT-0003, section 2.3Who issues the documentIKEA supplier or sub-supplier

Page 11: Connect Part 2 Working With Documents

Process control documents

DefinitionDescription of manufacturing process: process scheme, pictures, process parameters etc. Basically used for formaldehyde requirements in “grey-zone” cases (layer-glued, plywood etc)

IKEA Requirements examplesIOS-MAT-0003 in most casesWho issues the documentManufacturer of the material where the process takes place

Page 12: Connect Part 2 Working With Documents

Self declaration

DefinitionA declaration issued by supplier and/or sub-supplier (e.g. chemical or material supplier) to confirm that a requirement is fulfilled.

IKEA Requirements examplesIOS-MAT-0010, IOS-MAT-0066, IOS-MAT-0054 and many other specificationsWho issues the documentIKEA supplier or material producer

Page 13: Connect Part 2 Working With Documents

Statement of compliance/Decl. of Conformity

Definition1)A letter stating that all processes in wood-based production are controlled according to IOS-MAT-0003 and CARB P2 requirements2)Declaration of conformity for food contact plastic

IKEA Requirements examplesIOS-MAT-0003 for wood-based materialsIOS-PRG-0021 for food contact plasticWho issues the documentIKEA Supplier or sub-supplier

Page 14: Connect Part 2 Working With Documents

Test report

DefinitionDocumented test results from external IKEA-approved (in most cases) laboratory. Basically used for verification or development testing of materials and products.

IKEA Requirements examplesMost of IKEA specifications and Technical descriptionsWho issues the documentTest laboratory according to the order submitted by IKEA, IKEA sub-supplier or material producer

Page 15: Connect Part 2 Working With Documents

Let’s take Test report as an example of Check In Document screen

Page 16: Connect Part 2 Working With Documents

Click “Browse file” to select the file you are going to upload

Page 17: Connect Part 2 Working With Documents

Select any of the files in your folder and click Open

Page 18: Connect Part 2 Working With Documents

The file has been uploaded

Page 19: Connect Part 2 Working With Documents

Enter the Document number which is normally written in the header of the document

Page 20: Connect Part 2 Working With Documents

Instead of the original file name, write the proper Document name how it shall be shown in the system

Page 21: Connect Part 2 Working With Documents

Example of a good name: TR MAT-66 lead in paint.

Page 22: Connect Part 2 Working With Documents

Select the test laboratory.

Page 23: Connect Part 2 Working With Documents

The list of laboratories is the same as it is in TRS system

Page 24: Connect Part 2 Working With Documents

The list of approved test methods appears.Select only relevant ones.

Page 25: Connect Part 2 Working With Documents

Only pre-defined test methods from TRS shall be selected

Page 26: Connect Part 2 Working With Documents

Other Test Methods shall not be used if it’s IKEA approved laboratory! Otherwise type the method name manually

Page 27: Connect Part 2 Working With Documents

Describe what exactly has been tested

Page 28: Connect Part 2 Working With Documents

Specify the test category, e.g. “Chemicals”.

Page 29: Connect Part 2 Working With Documents

Select the Test type – was it a material or the whole product tested?

Page 30: Connect Part 2 Working With Documents

“Active From” is the date when the document was issued!

Page 31: Connect Part 2 Working With Documents

“Active To” is the date until when the document will be valid if nothing changes in production. In most cases it’s in 1 year.

Page 32: Connect Part 2 Working With Documents

“Order date” is the date when the test order form was signed

Page 33: Connect Part 2 Working With Documents

Type the name of the person (recommended) or organization who has ordered the test.

Page 34: Connect Part 2 Working With Documents

Select the Requirement source (the name of specification) or refer to TED.

Page 35: Connect Part 2 Working With Documents

Select the Sub-type (chapter of Specification).

Page 36: Connect Part 2 Working With Documents

Select the Level of compliance, where it’s applicable, or Other

Page 37: Connect Part 2 Working With Documents

Click to add the data to the table of the Document content description as it will be saved.

Page 38: Connect Part 2 Working With Documents

The data has been added, but more rows may be specified as well. Click Save to save the document with it’s details.

Page 39: Connect Part 2 Working With Documents

The new document has been checked in with it’s own Document number. Here you can choose how to connect it.

Page 40: Connect Part 2 Working With Documents

1.2 Connect new document to Combinations

Verification documents which are valid for a Material, Process or Component combination

Page 41: Connect Part 2 Working With Documents

Distributor ProducerMaterialType

MaterialSub-type

(Material Combination)

Materialdesignation

Divided by groups

Document

PDF file + additionalDescription:Document typeTest lab nameActive FromActive ToRequirement sourceEtc…

Article number (from PDOC)

“Supplier Values”“IKEA Values”

Page 42: Connect Part 2 Working With Documents

Component ProducerComponentGeneralType

(Component Combination)

ComponentIdentity

Divided by groups

Document

PDF file + additionalDescription:Document typeTest lab nameActive FromActive ToRequirement sourceEtc…

Article number (from PDOC)

“Supplier Values”“IKEA Values”

Page 43: Connect Part 2 Working With Documents

Process producer(for “external” processes)

Material type in process (for “external” processes)(Process Combination)

Processname

Divided by groups

Document

PDF file + additionalDescription:Document typeTest lab nameActive FromActive ToRequirement sourceEtc…

Article number (from PDOC)

“Supplier Values”“IKEA Values”

Process Type

Page 44: Connect Part 2 Working With Documents

Select: Material combination, Process combination or Component Combination

Select

Page 45: Connect Part 2 Working With Documents

Click Search to search for available combinations

Page 46: Connect Part 2 Working With Documents

Tick the combinations to which you will connect the document.

Page 47: Connect Part 2 Working With Documents

Click Save

Page 48: Connect Part 2 Working With Documents

The document has been connected to combinations.Click Show connections to double-check…

Page 49: Connect Part 2 Working With Documents

Two material combinations appear now in the list of connections

Page 50: Connect Part 2 Working With Documents

For Component combinations and Process combinations it works in

the same way

Page 51: Connect Part 2 Working With Documents

1.3 Connect/disconnect new document directly to/from

articles

VOC tests, Mechanical test, Fire tests of final article etc.

Page 52: Connect Part 2 Working With Documents

Document

PDF file + additionalDescription:Document typeTest lab nameActive FromActive ToRequirement sourceEtc…

Article number (from PDOC) Supplier number

Page 53: Connect Part 2 Working With Documents

Click Direct to Article

Page 54: Connect Part 2 Working With Documents

In the Article No field enter “%” to see all valid articles

Page 55: Connect Part 2 Working With Documents

Click Search to see the article list.To see more articles (not only Valid), tick on Search All Articles

Page 56: Connect Part 2 Working With Documents

Use the tickbox and select articles which you are going to connect to the document.

Page 57: Connect Part 2 Working With Documents

Scroll down the list if necessary

Page 58: Connect Part 2 Working With Documents

Click Save to create the connection between the document and the articles

Page 59: Connect Part 2 Working With Documents

The documents are connected! Click Show connections to verify which articles are connected to the document.

Page 60: Connect Part 2 Working With Documents

Here is the list of connected articles. You can also untick them in case you need to disconnect the articles (e.g. correct a mistake)

Page 61: Connect Part 2 Working With Documents

In case you need to disconnect those articles, click Save to update the connections

Page 62: Connect Part 2 Working With Documents

An article can be disconnected from a document only within 30 days

after it was connected

Page 63: Connect Part 2 Working With Documents

2 Manage existing documents

Page 64: Connect Part 2 Working With Documents

2.1 Search Document

Page 65: Connect Part 2 Working With Documents
Page 66: Connect Part 2 Working With Documents

Click Search Document

Page 67: Connect Part 2 Working With Documents

The Document type may be specified if possible

Page 68: Connect Part 2 Working With Documents

…for example: Test report

Page 69: Connect Part 2 Working With Documents

In case you do not know the exact Document number, type «%» in this field

Page 70: Connect Part 2 Working With Documents

In case you know to which Article number the document is connected

Page 71: Connect Part 2 Working With Documents

Filter out the time interval during which the documents in your search result shall be Valid

Page 72: Connect Part 2 Working With Documents

Requirement source (e.g. Specification name) may be specified if you know where the requirement is stated

Page 73: Connect Part 2 Working With Documents

When all parameters are specified, click Search to see which document fulfil your search criteria.

Page 74: Connect Part 2 Working With Documents

The more you know about the document you are searching, the more parameters you have to specify

The more parameters you specify in the Search screen, the faster and more concrete result you will get.

In most cases Document name is not a reliable criteria for Search

Page 75: Connect Part 2 Working With Documents

Click on “+” -> to show the full list of connected ArticlesClick on icon -> to download the document pdf fileClick on Document number -> to show the Document details

Page 76: Connect Part 2 Working With Documents

2.2 Document details

Page 77: Connect Part 2 Working With Documents

The Document details screen appears when you click on a Document number (as hyperlink) on any other screen

Page 78: Connect Part 2 Working With Documents

…but if you click on the Document number on this screen, it will download the document PDF file.

Page 79: Connect Part 2 Working With Documents

Click Show Article Connections to see the full list of articles connected to the document (directly or through Combinations)

Page 80: Connect Part 2 Working With Documents

Dir means “connected directly”Mtrl, Comp, Proc means “connected through combination”

Page 81: Connect Part 2 Working With Documents

Click Show combination connections to see the list of Combinations connected to this document

Page 82: Connect Part 2 Working With Documents

In this example the document is connected 2 articles (through Material combination) and three combinations (two material and one process)

Page 83: Connect Part 2 Working With Documents

2.3 Update document

This may be done on two purposes:1) Correct mistakes of Document details within 30 days

after Check In2) Change the Active To date of a document

Page 84: Connect Part 2 Working With Documents

Reach this Document details screen by clicking on a Document number as a hyperlink from any other screen (e.g. Doc search results)

Page 85: Connect Part 2 Working With Documents
Page 86: Connect Part 2 Working With Documents

Edit those fields which you would like to correct. If a document is older than 30 days, it’s possible to update only Active To date.

Page 87: Connect Part 2 Working With Documents

Save the changes

Page 88: Connect Part 2 Working With Documents

2.4 Replace (renew) existing document

This shall be done when a new document has to be uploaded and connected instead of the previous similar

one

Page 89: Connect Part 2 Working With Documents

Reach this Document details screen by clicking on a Document number as a hyperlink from any other screen (e.g. Doc search results)

Page 90: Connect Part 2 Working With Documents
Page 91: Connect Part 2 Working With Documents

The Replace Document screen is very similar to Check In document screen (see 1.1 for details), with one extra field…

Page 92: Connect Part 2 Working With Documents

This screen has a new field called Replaced Doc End Date.It means the new Active To date of the predecessor (old) document

Page 93: Connect Part 2 Working With Documents

2.5 Delete document

This works only within 30 days after Check In

Page 94: Connect Part 2 Working With Documents

Reach this Document details screen by clicking on a Document number as a hyperlink from any other screen (e.g. Doc search results)

Page 95: Connect Part 2 Working With Documents

Click DeleteIt will work only within 30 days after Check In

Page 96: Connect Part 2 Working With Documents

2.6 Connect/Disconnect document directly to/from

Article from Document details screen

This shall be done to connect an existing document in any time after Check In

Applicable only for documents which are valid for the whole articles: mechanical tests, VOC etc.

Page 97: Connect Part 2 Working With Documents

Reach this Document details screen by clicking on a Document number as a hyperlink from any other screen (e.g. Doc search results)

Page 98: Connect Part 2 Working With Documents

Click Connect to Article

Page 99: Connect Part 2 Working With Documents

Select option Article

Page 100: Connect Part 2 Working With Documents

Click Go

Page 101: Connect Part 2 Working With Documents

Now you get the Connect to article screen and follow all the same steps as described in section 1.3 for a new document.

Page 102: Connect Part 2 Working With Documents

2.7 Connect/Disconnect document to/from

Combinations

Two alternatives how to access this function in Connect:1) From Document details screen (2.7.1)

2) From combination search screen (2.7.2)

Then the document will be connected to combination or disconnected from combination on one screen called

“Connect combination to document” (2.7.3)

Page 103: Connect Part 2 Working With Documents

2.7.1 Reach the “Connect combination to document” screen from the “Document

details”

This is alternative 1

Page 104: Connect Part 2 Working With Documents

Reach this Document details screen by clicking on a Document number as a hyperlink from any other screen (e.g. Doc search results)

Page 105: Connect Part 2 Working With Documents

Click to choose type of combination to which the document shall be connected.

Page 106: Connect Part 2 Working With Documents

In this example it will be Process combination

Page 107: Connect Part 2 Working With Documents

Click Go to proceed to the connection

Page 108: Connect Part 2 Working With Documents

Click Search to see available active combinations list

Page 109: Connect Part 2 Working With Documents

Click on the icon “Connect to Doc” next to the combination you would like to connect

Page 110: Connect Part 2 Working With Documents

The screen “Connect combination to document” appears, see section 2.7.3 how to proceed from this screen.

Page 111: Connect Part 2 Working With Documents

2.7.2 Reach the “Connect combination to document”

screen from list of Combinations (“Combination

search” screen)

This is alternative 2

Page 112: Connect Part 2 Working With Documents

Click on Combination.

Page 113: Connect Part 2 Working With Documents

Select the type of combination which you are going to connect to a document – Material, Component or a process.

Page 114: Connect Part 2 Working With Documents

In this example it will be Component combination. Click View/Modify.

Page 115: Connect Part 2 Working With Documents

Click Search to see the list of active combinations

Page 116: Connect Part 2 Working With Documents

Click on the icon “Connect to Doc” next to the combination you would like to connect

Page 117: Connect Part 2 Working With Documents

The screen “Connect combination to document” appears

Page 118: Connect Part 2 Working With Documents

2.7.3 Connect a document to a combination or disconnect a

document from a combination

A document can be connected to combination or disconnected from combination on one screen called

“Connect combination to document”

Page 119: Connect Part 2 Working With Documents

See 2.7.1 or 2.7.2 for two alternative ways how to reach this screen. In this example it will be Process combination.

Page 120: Connect Part 2 Working With Documents

The Document number is already entered, we only have to click Search

Page 121: Connect Part 2 Working With Documents

Only one document appears in search result. Tick it On and click Save

Page 122: Connect Part 2 Working With Documents
Page 123: Connect Part 2 Working With Documents

Connection has been created. Click Show Connection to double-check

Page 124: Connect Part 2 Working With Documents

Now the document is present in the list of this combination’s connections

Page 125: Connect Part 2 Working With Documents

2.7.4 Complete (“approve”) a combination

When all necessary documents have been connection to a combination (Material, component or process), it shall

be marked as “Completed”

Page 126: Connect Part 2 Working With Documents

After the last necessary document has been connected, click Combination Connection Completed button

Page 127: Connect Part 2 Working With Documents
Page 128: Connect Part 2 Working With Documents
Page 129: Connect Part 2 Working With Documents

Now go back to the list of combianations (Material, Component or Process) to check the new “Completed” status

Page 130: Connect Part 2 Working With Documents
Page 131: Connect Part 2 Working With Documents

Now the combinations is shown as Completed status YES in the list of Acive combinations. This value is for info only.

Page 132: Connect Part 2 Working With Documents

Summary of the rules:A document may be Renewed/Replaced in any time period after

its Check In date, with use of Replace buttonThe Active To date of a document may be changed in any time

period after Check In date, with use of Update buttonA document may be connected to articles or combinations in any

period after Check In date

BUT following changes are restricted with 30 days:

Other document details (excluding Active To dates) may be changed only within 30 days after Check In

Document may be deleted completely only within 30 days after Check In

Document may be disconnected from article or combination only within 30 days after the day of connection