Congratulations on a Great 2007 Summer
Here is an update on work at the MIT Campus and an outline of
urgent needs
H building progress
• Jeff Winston welding the metal beams on the H Building
• Pastor Joel and his crew assembled the main support beam and lifted the cross beams
H Building update
• The Block work on the North side of the building is nearly done
• Next we will put up the beams on the North side
Fall 2007 Security and Safety measures
• It is our goal to completely secure the property by the end of 2007!
• We will do this in four phases.
Phase 1 Metal Fence Construction along
the North Wall
• Priorities:
– Safe and Secure environment
– Open and inviting place for ministry
Phase 1 Metal Fence Construction along
the North Wall
• Each fence section costs $327.00
• All 13 sections cost a total of $4,252 (including material and labor)
Phase 1 Metal Fence Construction along
the North Wall
• The metal fencing will provide the necessary security!
• The metal fencing will allow for a transparent and inviting ministry environment
Phase 2Metal Gate
North Wall main entrance
• The main gate will be built to last!
• Two 15’ wide by 8’ high gates will span the 30’ opening
• 4” steel gate posts,• Solid steel beams• Built to take abuse even
from a 15 passenger van!
Phase 2Metal Gate
North Wall main entrance
• $710 USD• The price for
Materials and Labor for this 30 foot wide double gate!
Phase 3 Finish the Rest of the Block Wall
• We are nearly finished!!!!
• The block parts of the wall are 94% finished!
• We only need 900 more blocks to be done with the block wall FOREVER!!!
Phase 3 Finish the Rest of the Block Wall
• $1066 USD • For materials
and labor• This includes filling in
the block with cement for structural strength and replacing blocks that have fallen out