Congestion
FTR’s
ISO Charges
Congestion
FTR’s
ISO Charges
Performance Monitoring is Essential for Harmonizing Reliability and Markets
DistributedGeneration
Dynamic VoltageSupport, Remedial
Action Schemes, Flow Control Devices
Ancillary Services –Generation, Storage,
Demand
Micro-Grids
Storage
Real TimePerformance Monitoring
CompetitiveState
RegulatedFERC
Regulated Utility Owned ISO Controlled State Sited
Customers
DemandManagement
Generation Transmission Distribution End Use
Information Management Requirements: Integration Across Multiple Business
Systems, Companies & Control Areas Information Security, Timeliness,
Accuracy, Accessibility
Wide Area Reliability Monitoring Must Be Integrated with Real Time Control Data
• 10 NERC Reliability Regions
• 18 Reliability Coordinators
• 8 ISOs/RTOs/ IMO Operating – Additional Planned
• 135 Control Areas
Generation Companies
Distribution Utilities
Transmission Companies
ISOs/RTOs/IMO – Grid Operations and Management
Reliability Coordinators – Wide Area Reliability Monitoring
Grid-3P ACE-Frequency Application for Wide Area Monitoring
NERC Web Server
123 CONTROL AREASSEND 1-MINUTE DATA THROUGH SECURE
NERC-NET
NERC Secure Ethernet (Princeton)
Wide-Area, Multi-View, Geo-GraphicControl Area DispatchersFor Real-Time Monitoring of
Abnormal Interconnection Frequencyand For Root Cause Identification
Automatic EarlyAbnormal Frequency
Notification and Alarms
NERCDatabaseServer
ACE-AIE KEY DATABROADCAST OVER WEB TO
RELIABILITY COORDINATORSEVERY MINUTE
• ACE-Frequency Data Collection• Data Validation• Data Processing
• Abnormal Frequency Notification• Frequency Alarms
• Real-Time Monitoring and Tracking by Control Area or Region• Root Cause Identification for Dispatchers
Tower box
Tower box
A
B
C
Grid-3P Wide Area Security Constrained Dispatch Performance Monitoring
5 Minute R
eal Time
-
Units
Control Zones
2 Hours for Tracking
Regulation
Control Areas
Contingency Analysis –
Real Tim
e Predictive
Set points
Price
Spinning Reserve
Unit Status
Zones
Control Areas Pathway
20 Minutes for study cases
PERFORMANCEVISUALIZATIONTIME WINDOWS
Owners
PJM – UDSPERFORMANCE METRICS
COMPONENT
PJM – UDSJURISDICTIONAL
COMPONENT
1 Minute R
eal Time
5 Minute R
eal Time
-
Units
Control Zones
2 Hours for Tracking
Regulation
Control Areas
Contingency Analysis –
Real Tim
e Predictive
Set points
Price
Spinning Reserve
Unit Status
Zones
Control Areas Pathway
20 Minutes for study cases
PERFORMANCEVISUALIZATIONTIME WINDOWS
Owners
PJM – UDSPERFORMANCE METRICS
COMPONENT
PJM – UDSJURISDICTIONAL
COMPONENT
1 Minute R
eal Time
Visualization Solution
Design Parameters