28
Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March 2011

Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Embed Size (px)

Citation preview

Page 1: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Confidence building in transboundary river basin

management context

Michal NekvasilEU Delegation to Georgia

Water seminar

Dead Sea, Jordan

21-24 March 2011

Page 2: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Context in Georgia

Ultra liberal policy of GoG „Our policy is to have no policy, our strategy is to have no

strategy“ As little legislation and regulation as possible Poor country + consequences of the conflict with Russia of

2008 = EU has a big leverage Very different history as compared to ENPI South countries SPSP used since 2007 (PFM, Criminal justice, vocational

education and training, regional development…) Institutional instability Environment not a priority

Page 3: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Environmental sector in Georgia till 2007

No data, no environmental policy/strategy, no action plan, no co-ordination, mutually contradicting legislation, etc.

Donors’ assistance to the environmental sector (incl. EU) – surface water and drinking water only

The support disproportionate to real needs (hardly any support to waste water treatment, solid waste management, air protection, biodiversity...)

Overlapping projects No co-ordination Mostly regional projects (S. Caucasus or even broader, not

always matching interests of individual countries)

Page 4: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Environmental sector in Georgia now

State of the Environment report National Environmental Action Plan Draft Environmental code EU assistance in all env. sub-sectors Government-donors co-ordination in the env. sector

functions well (driven by the government) Co-ordintation as for drinking water & waste water

treatment – a breakthough in the beginning of March, the first meeting next week

Page 5: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Water sector in Georgia

No policy/strategy as for water Competences regarding water spread among several

ministries (environment, regional development and infrastructure, agricultue...) – very unclear

Water management companies constantly changing Unclear situation as for the ownership of water pipelines No universal tariff system – most people still get water for

(almost) free Enormous wasting of water (constantly running in many

households) No single functioning WWTP with secondary or tertiary

treatment in Georgia

Page 6: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU support to water sector in Georgia / Southern Caucasus

Recent water projects:

Transboundary Kura river basin management - phase I Enabling environment fo integrated management of the Kura-Aras

Transboundary river basin Transboundary Kura river basin management - phase II Supply of water monitoring equipment Water governance Improving of water infrastructure in 27 Georgian municipalities (NIF) Waste water treatment in Adjaria (NIF)

i.e. almost all regional projects, very limited bilateral support All together very limited amount of money

Page 7: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Other donors involved in the water sector

ADBEIBEBRDKfWUSAIDUNDP

Page 8: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Kura – Aras rivers basin

Page 9: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Two case studies

Creation of Enabling environment for integrated management of the Kura-Aras Transboundary river basin

Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Page 10: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Creation of Enabling environment for integrated management of the Kura-Aras Transboundary river basin

Regional Project

Beneficiary Countries: Armenia, Georgia, Azerbaijan

Managed by the REC Caucasus

Start date: July 2007

Duration: extended till end 2010

Budget: EUR 400.000

Page 11: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Creation of Enabling environment for integrated management of the Kura-Aras Transboundary river basin

Specific objectives as per the original proposal

Specific objectives as per amended proposal

Gain a consensus-based agreement between the three South Caucasus countries, donor organisations and other concerned parties on further steps towards improved and sustainable cooperation and coordination for integrated management of the Kura-Aras trans-boundary rivers basin, including a need for establishment of a Regional Coordination Body and development of the Convention and further establishment of the Regional Governmental Commission on Integrated Management of the Kura-Aras Trans-boundary Rivers Basin

Gain a consensus-based agreement between the three South Caucasus countries, donor organisations and other concerned parties on further steps towards a creation of a basis for sustainable cooperation and coordination through establishment of regional institutional mechanisms for major participating countries of the Caucasus, including governments, supporting control and coordination of projects (including donor ones) for integrated management of the Kura-Aras trans-boundary rivers basin

Facilitate drafting of the Convention, its ratification by the countries concerned, and establishment of the Regional Governmental Commission

Adoption of Road Maps for assessment of progress in sustainable management of the Kura-Aras trans-boundary rivers basin with view to introduction of the EU Water Framework Directive

Page 12: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Creation of Enabling environment for integrated management of the Kura-Aras Transboundary river basin

Background

The necessity to improve the existing situation with protection and use of trans-boundary river basins is recognised by all three governments

Challenges

For the project time period development and ratification of the Convention on the protection of the Kura-Aras river basin and establishment of a regional governmental commission was impossible due to the political situation.

Assumptions

The projects’ coordination should not be led by donor organisations / NGOs but by the governments of the Caucasus countries

The project focus should be “redirected” towards creating realistic mechanisms for cooperation tkaing into consideration the specific context of the Caucasian region

Page 13: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Creation of Enabling environment for integrated management of the Kura-Aras Transboundary river basin

Final outcome

Progress achieved and objectives to a large extent met not only on the level of individual countries but also regional co-ordination mechanisms established (on technical level)

Page 14: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Regional Project

Beneficiary Countries: Armenia, Georgia, Azerbaijan

Consultant: EPTISA & Grontmij-CarlBro Consortium

Start: June 2008

Duration: extended until Dec 2011

Budget: EUR 3,175,000

Page 15: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Project purpose:

To help Georgia, Armenia and Azerbaijan improve river water quality in the Kura river basin through transboundary cooperation and adoption of the river basin management approach

To improve capabilities of environmental authorities and monitoring establishments in Georgia, Armenia and Azerbaijan

Page 16: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Project Partners:

Georgia: Ministry of Environmental Protection and Natural Resources National Environment Agency

Armenia: Ministry of Nature Protection Water Resources Management Agency Environmental Impact Monitoring Centre

Azerbaijan Ministry of Ecology and Natural Resources National Hydrometeorology Department Environmental Monitoring Department

Page 17: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Key Activities:

Pilot projects: Draft river basin management plans (RBMP) for 5 pilot river basins using EU Water Framework Directive methodology

Joint Transboundary River Monitoring Programme to harmonise sampling and analysis procedures between the countries

Improvements in the data structures and information flows to facilitate decision making (Water Cadastre MoE AZ, Water Database MoE GE, Canals Database MoE AM)

Training and technical guidelines including EU Study Tour for the beneficiaries’ staff from the project countries

Public awareness activities of the priority transboundary water issues in the Kura-Aras River basin (video film, booklets, TV coverage, website)

Page 18: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

The following key documents translated to Georgian, Armenian and Azeri, printed, distributed amongst the beneficiaries and explained to them in detail at the project workshops:

EU Water Framework Directive

EU Floods Directive

WFD Technical Guidance: Identification of Water Bodies

WFD Technical Guidance: Analysis of Pressures and Impacts

Introduction to Biological Monitoring of Water Quality

(available at: www.kuraarasbasin.net )

Page 19: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Joint Monitoring Programme in Kura River basin

Selected parameters

Temperature C Transparency Dissolved oxygen Oxygen saturation pH Conductivity Total suspended/Total dissolved solids BOD5 COD-CrAmmoniaNitrates Phosphates

Copper Zink Iron Manganese Cadmium Nickel Lead ArsenicMolybdenum Petroleum products Phenols

River flow discharges River flow discharges in m3/s in m3/s (Alazani-(Alazani-Shakriani (GE), Alazani-Agrichai Shakriani (GE), Alazani-Agrichai (AZ) and Debed-Ayrum HS (AM)(AZ) and Debed-Ayrum HS (AM)))

Page 20: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Joint Monitoring Programme in Kura River basin

Independent verification

Inter-laboratory testing Standard test samples prepared by the EU National Reference Laboratory in Slovakia, for selected parameters:

Nutrients (PO4, NH4, NO3), and six heavy metals (As, Cd, Cu, Ni, Pb and Zn).

Page 21: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Page 22: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Page 23: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Page 24: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Page 25: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Page 26: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

Page 27: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Conclusions / lessons learnt

Government driven co-ordination as a precondition for avoiding overlapping projects, for creating synergic effects, and for enhancing the ownership of the government

Establishment of a common ground (EU directives and common sampling methods) is a necessary basis for building trust

In politically difficult environment: establishment of a co-operation on technical level first; it can be later “institutionalised” and extended to the political level

« Intergovernmental NGOs » may help facilitate the transition of technical co-operation to a political dialogue…

EU level – regional and bilateral projects – Eastern Partnership helped

Commission + EU Member states = more leverage

Page 28: Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan 21-24 March

Thank you for your kind attention

You may ask any question now...

... and I may reply if I feel like…