KUWAIT OIL COMPANY (K.S.C.) NEW DISTRIBUTION NETWORK FOR NORTH KUWAIT ESPs INSPECTION & TEST RECORD-ELECTRICAL ITR No : E-0202A,REV-A INSTALLATION OF CONDUITS (PRE- CABLING) BADER AL MULLA & BROS. CO. W.L.L Contract No: 14050573 Tag No: Project No.: EF/1914 Record No: Layout Drawing No: Rev: Area: Service Connected: From: To: Sl.N o : Checks to be performed Result 1 Check material for any physical damage before installation 2 Supports spaced/secured according to installation drawings. 3 Sizing as per layout drawings. 4 Routing as per layout drawings. 5 Spacing from other conduits/trays in accordance with installation drawings/ specifications. 6 Check expansion fittings & flexible connections are as per layout drawings. 7 Check bending radius and number of bends are as per layout drawing/project specification. 8 Check for installation of seals and fittings in accordance with installation drawings where specified. 9 Verify electrical continuity is maintained where applicable. Remarks: Record Acceptance Construction Engineer(BMB) Quality Engineer (BMB) KOC Representative Name Signature Date Page 1 of 1

Conduit Install ITR E 0202A

Embed Size (px)

DESCRIPTION

ITP

Citation preview

Page 1: Conduit Install ITR E 0202A

KUWAIT OIL COMPANY (K.S.C.)

NEW DISTRIBUTION NETWORK FOR NORTH KUWAIT ESPs

INSPECTION & TEST RECORD-ELECTRICALITR No : E-0202A,REV-A

INSTALLATION OF CONDUITS (PRE-CABLING)

BADER AL MULLA & BROS. CO. W.L.L

Contract No: 14050573 Tag No: Project No.:

EF/1914 Record No:

Layout Drawing No: Rev:

Area: Service Connected:

From: To:

Sl.No: Checks to be performed Result

1 Check material for any physical damage before installation

2 Supports spaced/secured according to installation drawings.

3 Sizing as per layout drawings.

4 Routing as per layout drawings.

5 Spacing from other conduits/trays in accordance with installation drawings/ specifications.

6 Check expansion fittings & flexible connections are as per layout drawings.

7 Check bending radius and number of bends are as per layout drawing/project specification.

8 Check for installation of seals and fittings in accordance with installation drawings where specified.

9 Verify electrical continuity is maintained where applicable.

Remarks:

Record Acceptance Construction Engineer(BMB)

Quality Engineer (BMB) KOC Representative

Name

Signature

DatePage 1 of 1