16
CONDUIT BLVD ATLANTIC AVE TO SUTTER AVE Presented to Brooklyn CB 5 Transportation Committee June 6, 2016 1

CONDUIT BLVD

  • Upload
    vankien

  • View
    220

  • Download
    1

Embed Size (px)

Citation preview

Page 1: CONDUIT BLVD

CONDUIT BLVD ATLANTIC AVE TO SUTTER AVE Presented to Brooklyn CB 5 Transportation Committee

June 6, 2016

1

Page 2: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard

PROJECT AREA

2

N

Subway

(A)

Subway (A/C)

Brooklyn-Queens

Boundary Line

City Line

Park

School

School School

Page 3: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard

CRASH HISTORY

3

−Atlantic Ave, Liberty Ave, and Pitkin

Ave are Vision Zero Priority Corridors

−S Conduit Blvd at Liberty Ave and

Euclid Ave is a Vision Zero Priority

Intersection

−Between 2010 and 2014, there were

ten pedestrian KSI, including two

fatalities

City Line

Park

J Z

A C

A

Vision Zero Corridor

Vision Zero Intersection

Pedestrian Fatality (2008-2015) N

Page 4: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard

DOT OUTREACH

4

Online feedback map has

gathered over 80 comments

DOT Ambassadors spent two

days on-site and spoke to

over 160 community members

Page 5: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard 5

EXISTING

CONDITIONS

B

Separated corridor with three moving lanes in each direction leads to highway

like environment

ATLANTIC AVE LOOKING EAST TOWARD S CONDUIT BLVD

N CONDUIT BLVD AND 75th ST LOOKING NORTH

Speed limit is set to 15 MPH above the city-wide limit and vehicles frequently

exceed 40 MPH

At this location, 29% of vehicles were recorded

as 40+ MPH

A

A

B

Page 6: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard 6

EXISTING

CONDITIONS

A

Discontinuous sidewalk leading to City Line Park

Skewed intersections create long crosswalks

S CONDUIT BLVD AND LIBERTY AVE LOOKING NORTH

S CONDUIT BLVD AND GLENMORE AVE LOOKING WEST

A

B

Page 7: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard 7

EXISTING

CONDITIONS

Long distances between crosswalks and signalized

intersections

Frequent midblock crossing

S CONDUIT BLVD AND GRANT AVE

S CONDUIT BLVD AND PINE ST

A

B

Page 8: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard

PROPOSAL KEY

8

N

1

2

3 4

5

6

Proposed Corridor Improvements: - Reduce speed limit to 30 MPH

(Planned for June) - Upgrade all crosswalks to high visibility

Location Specific Changes: 1) Atlantic Ave 2) Liberty Ave 3) Pine St & Crescent St 4) Glenmore Ave & Hemlock St 5) Pitkin Ave 6) Grant Ave

Page 9: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard

1) ATLANTIC AVE

9

1. Reduce eastbound Atlantic Ave from 3 to 2 lanes 2. Reduce S Conduit Ave from 3 to 2 lanes

- Parking lane possible if demand exists

1

2

Page 10: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard

2) LIBERTY AVE

10

1. Build new sidewalk 2. Remove left turn bay, but allow

left turn; build median extension 3. Build sidewalk extension

1

2

3

Page 11: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard 11

1. Install new pedestrian activated signal and crosswalks

2. Build sidewalk across median 3. Install new crosswalks 4. Build median extension

1

2

3

3) PINE ST &

CRESCENT ST

4

3

Page 12: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard 12

1. Remove left turn bay and ban turn - 30 vehicles during PM peak

2. Install new crosswalks 3. Build median extension 4. Build sidewalk extension

1

2 3

4) GLENMORE AVE &

HEMLOCK ST

4

2

Page 13: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard 13

1. Remove left turn bay and ban turn - 40 vehicles during PM peak

2. Install new crosswalk 3. Install westbound left turn bay

1

2

5) PITKIN AVE

6) GRANT AVE

1. Install new signal, ped ramps, sidewalk and crosswalks

1

3

Page 14: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard 14

5) PITKIN AVE DIVERSION

1. Install signs to direct drivers to diversion

1

Page 15: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard 15

SUMMARY AND BENEFITS

SUMMARY • Lower speed limit to 30 MPH

• Remove one through travel lane on EB Atlantic Ave between S Conduit Blvd and Euclid Ave and on

S Conduit between Atlantic Ave and Liberty Ave

• Build new concrete sidewalk along west side of S Conduit Blvd north of Liberty Ave

• Build sidewalk extensions on SE corner of N Conduit Blvd at Liberty Ave and SE corner of S

Conduit Blvd at Hemlock St

• Build concrete neckdowns on NE corner of S Conduit Blvd at Liberty Ave and SW corner of N

Conduit Blvd at Glenmore Ave

• Ban LT from S Conduit Blvd to EB Glenmore Ave and EB Pitkin Ave

• Install new signalized crossings on S Conduit Blvd at Pine St and Grant Ave

• Build new concrete pedestrian ramps and sidewalk S Conduit Blvd at Grant Ave

BENEFITS • Reduce vehicle speeds and calm traffic along corridor

• Increase pedestrian connectivity and accessibility

• Safer, shorter pedestrian crossings

Page 16: CONDUIT BLVD

nycdotfeedbackportals.nyc/conduit-boulevard

Questions?

THANK YOU!

16

NYC DOT NYC DOT nyc_dot NYC DOT