    Conductor Stabilization Solution (CSS)

    Oceaneering Presentation Template - Rev 21.02.2011

  • 8/13/2019 Conductor Stabilization Solution

    2/20

    Challenge:

    Wave induced damage

    Presentation of CSS

    Conductor & Caisson Damage

    Conductor Guide Fracturing

    Conductor Guide Fatigue

    Decreased Guide Stability

    Offshore installation, North Sea 2007

  • 8/13/2019 Conductor Stabilization Solution

    3/20

    Challenge:

    Wave induced damage

    Presentation of CSS

    Safety Concerns

    Production Stop

    Vibrations migrating to structure

    Costly repair

    Oseberg feltsenter 2006

  • 8/13/2019 Conductor Stabilization Solution

    4/20

    4 CSS INSTALLED TOPSIDE

    New and better solution:

    Conductor Stabilization

    SolutionCSS

  • 8/13/2019 Conductor Stabilization Solution

    5/20

    New & Better Solution

    5

    Presentation of CSS

    CSS

    A elastic and stress-absorbing compound calledElasturan is cast into the entire length and

    diameter of the conductor/caisson guide.CSS entirely replace the traditional need forcentering and chocking solutions.

    CSS extend the life of conductors & caissons.

    CSS allow vertical movement ofconductor/caisson

  • 8/13/2019 Conductor Stabilization Solution

    6/20

    Traditional vs. CSS

    Traditional Methods

    Steel against steel solutions

    Need to perfectly align centering guide

    Chocking solution

    Require maintenance

    CSS

    Steel against stress-absorbent material No need for centering guide

    Do not require maintenance

    Easy, efficient and safe installation

    6

    Presentation of CSS

  • 8/13/2019 Conductor Stabilization Solution

    7/20

    Traditional vs. CSS

    Traditional Methods

    Not applied to entire conductor guide

    Requires corrosion protection

    Customized solution

    CSS

    Uses 100% of conductor guide

    Applicable material data & specifications

    Adaptable & scalable solution

    Eliminating point stress loads.

    7

    Presentation of CSS

  • 8/13/2019 Conductor Stabilization Solution

    8/20

    First installed in 1999, at the Sleipner platform. No maintenance has beenrequired on this CSS installation.

    Easy & safe installation. Equipment for installation can be used in classified

    areas. Dynamic loads are reduced,

    Stress loads are distributed over a wider area, thus point stress loads areeliminated.

    Installation is performed with use of rope access technique, no need forscaffold.

    Subsea application available. Performed 100 % with ROV. No divers.

    Presentation of CSS

    Advantages with the CSS:

    8

  • 8/13/2019 Conductor Stabilization Solution

    9/20

    Topside installation of CSS are performed with rope access technique,hence no scaffold is required. The Oceaneering personnel have thenecessary experience and knowledge for anchor point rigging and settingbarriers.

    Removal of steel centralizers are performed by experienced rope accesstechnicians.

    Presentation of CSS

    3 step installation process

    9

  • 8/13/2019 Conductor Stabilization Solution

    10/20

    10

    1. Lower conductor tube

    Wax the lower part of the guide Mount the waxed cast form Fill up the cast with Elasturan

  • 8/13/2019 Conductor Stabilization Solution

    11/20

    11

    2. Middle conductor tube

    Fill the middle with Elasturan Remove the steel centering

  • 8/13/2019 Conductor Stabilization Solution

    12/20

    12

    3. Top conductor tube

    Wax the upper part of the guide Fill the top with Elasturan Remove the cast form

  • 8/13/2019 Conductor Stabilization Solution

    13/20

    CSS Subsea

    Presentation of CSS

    CSS packed and seafastened on ROVvessel, during transport to offshoreinstallation

    8 x CSS element subsea basket

  • 8/13/2019 Conductor Stabilization Solution

    14/20

    CSS Subsea

    Presentation of CSS

    CSS being installed in subsea with ROV

  • 8/13/2019 Conductor Stabilization Solution

    15/20

    CSS Subsea

    Presentation of CSS

    CSS installed and locking mechanisms engaged

    TAG plate

    Locking mechanisms

  • 8/13/2019 Conductor Stabilization Solution

    16/20

    CSS Subsea

    Presentation of CSS

    CSS installed in subsea guide CSS installed in subsea guide

  • 8/13/2019 Conductor Stabilization Solution

    17/20

    First CSS installed on Statoil installation in the North Sea Performed in y.1999

    Presentation of method for Hydro Performed in y.2006

    Test of material at sub-supplier in Sweden Performed in y.2006

    MSDS and chemicals in CSS approved for use Performed in y.2006

    Building full scale conductor/guide mock-up Performed in y.2006

    Full scale test on CSS in conductor/guide mock-up Performed in y.2006

    BP Valhall Casting of 9 conductor guides Per fo rmed in y.2009

    Statoil Grane Casting of 19 conductor guides Per fo rmed in y.2010

    Statoil Oseberg East Casting of 30 conductor guides Per fo rmed in y.2010

    Statoil Oseberg C Casting of 11 conductor guides Per fo rmed in y.2010

    BP Valhall - Casting of 15 conductor guides Performed in y.2011

    Statoil Oseberg Felt Senter Casting of 80 conductor guides Per fo rmed in y.2011/12/13

    Statoil Brage Installation of 2 x Subsea CSS Per fo rmed in y.2011

    Statoil Grane - Installation of 37 x Subsea CSS Per fo rmed in y.2012

    Statoil Grane Casting of 12 conductor guides Per fo rmed in y.2012

    Presentation of CSS

    References

    17

  • 8/13/2019 Conductor Stabilization Solution

    18/20

    www.css.no

    http://www.youtube.com/watch?v=tSQx2tri180

    http://www.youtube.com/watch?v=UHHHDDa_bZE

    Presentation of CSS

    Further reading and info:

    18

    http://www.css.no/http://www.youtube.com/watch?v=tSQx2tri180http://www.youtube.com/watch?v=tSQx2tri180http://www.youtube.com/watch?v=UHHHDDa_bZEhttp://www.youtube.com/watch?v=UHHHDDa_bZEhttp://www.youtube.com/watch?v=UHHHDDa_bZEhttp://www.youtube.com/watch?v=tSQx2tri180http://www.youtube.com/watch?v=tSQx2tri180http://www.youtube.com/watch?v=tSQx2tri180http://www.youtube.com/watch?v=tSQx2tri180http://www.css.no/
  • 8/13/2019 Conductor Stabilization Solution

    19/20

    Oceaneering Asset Integrity AS - Norway

    19

    Kjell Bjrnar Strksen

    Dep. Manager Video Inspection and CSS