Concrete Dry Quantitiesexamples in class
Week 3
Dry Mix Quantities – Review
Above for 1.0m³ of concrete
• 3m³ Concrete at 4:2:1 mix.• shrinkage, use 1.4m³ dry for
1.0m³ fluid concrete.• 4+2+1 = 7 parts total• 1.4 x 4 = 0.8m³ 7 1.4 x 2 = 0.4m³ 7 1.4 x 1 = 0.2m³ 7
• Therefore for 3.0m³ of concrete
• 0.8 x 3 = 2.4m³ aggregate• 0.4 x 3 = 1.2m³ sand• 0.2 x 3 = 0.6m³ cement
Quantities Continued• 4.8m³ Concrete at 5:2:1
mix.• shrinkage, use 1.4m³ dry
for 1.0m³ fluid concrete.• 5+2+1 = 8 parts total• 1.4 x 5 = 0.875m³ 8 1.4 x 2 = 0.350m³ 8 1.4 x 1 = 0.175m³ 8
• Therefore for 3.0m³ of concrete
• 0.875 x 4.8 = 4.2m³ aggregate
• 0.350 x 4.8 = 1.680m³ sand
• 0.175 x 4.8 = 0.840m³ cement
Above for 1.0m³ of concrete
Quantities Continued• 2.5m³ Concrete at 4:2:1
mix. shrinkage, use 1.4m³ dry
for 1.0m³ fluid concrete.• 4+2+1 = 7 parts total• 1.4 x 4 = 0.8m³ 7 1.4 x 2 = 0.4m³ 7 1.4 x 1 = 0.2m³ 7
• Therefore for 2.5m³ of concrete
• 0.8 x 2.5 = 2.0m³ aggregate
• 0.4 x 2.5 = 1.0m³ sand• 0.2 x 2.5 = 0.5m³
cement
Above for 1.0m³ of concrete