Upload
aidan-leblanc
View
222
Download
5
Embed Size (px)
Citation preview
Comprehensive Review of National Development Strategies
Lesotho
National Planning Framework
• There is currently no national operational document covering the period 2007-2015/20
• However, various national development policy documents exist– Vision 2020– National Goals– Millennium Development Goals + 5 Report– Poverty Reduction Strategy 2004/5-2006/7– Sectoral policy papers (Agriculture, Health, Education
HIV & AIDS etc.)• Process of harmonizing these planning
documents is underway
Ambition: Are the targets aligned with the MDGs?
• National Vision and PRS aligned to MDGs• 9 PRS Priorities – Mapped to MDG targets and
indicators• MDGs give targets and indicators – PRS
articulates priorities and strategies for the achievement of the MDGs
• Overriding development objectives are to:– Create wealth and accelerate economic growth from
an average of 3% to 7% per annum– Reduce poverty
MDG PRS Priority(ies) Indicator MDG indicator
1990
National target 2015
Ambition
GOAL 1Eradicate extreme poverty and hunger
Employment creation and income generationIncrease agriculture and food securityDeveloping infrastructure
Population below Poverty lineUnemployment rateProportion of undernourished people in total population
59%23.4%27%
29%15%14%
EqualEqual
GOAL 2Achieve Universal Primary Education
Improving quality and access to education
Net enrollment rate 76% 100% Equal
GOAL 3Promote Gender Equality and Empower Women
Deepening Democracy, Governance, Safety and Security
Primary education per 100 boysProportion of seats held by women in the National Assembly
1214%
10030%
EqualEqual
GOAL 4Reduce Child Mortality
Improving quality and access to essential health care
Under-five mortality rate per 1000 live births
113 (2000) 37 Equal
GOAL 5Improve Maternal Health
Improving quality and access to essential health care
Maternal mortality rate per 100,000 births
282 (1993) 70 Equal
GOAL 6Combat the Spread of HIV/ AIDS, and TB
Integrating HIV/AIDS, Gender, Youth and Children into sectoral plans (mainstreaming)
Adults (15-49) HIV prevalence
Death rates associated with sputum positive TB
4% (1990),23.2%(2005)10%
17%
6%
GOAL 7Ensure Environmental Sustainability
Managing and conserving the environment
Soil erosion (lost top soil per annum in million tons)Proportion of people without access to safe drinking water
40
36%
20
19% Equal
GOAL 8Develop a Global Partnership for devpt.
Check list Status in Lesotho
Scope All MDGs are included in PRS and other national policy documents
Rigor There is a draft intervention based analysis of the inputs needed to achieve the MDGs which needs to be reviewed and validated
Timeframe Yes (draft). Broken in two 5 year time frame (2006-2010, 2011-2015)
Financing Yes (draft), guided by Millennium Project benchmarks for sub-saharan Africa
M&E To be developed.
National process for MDG-based Planning – Way forward
Milestones Time line Challenges UN support
Political endorsement of proposed process
March RC follows up with minister
Institutional arrangements put in place March Funding, facilitation and donor mobilization
Needs assessment buy in by stakeholders (MDG+5 report - part B)
March-May
Coordination of stakeholders
Funding and technical support
National MDG Indicators and Targets for 2015 reviewed and validated by stakeholders
March-May
Data availability Technical support
Road map for MDG based PRS implementation developed
June Technical support
Review and roll over of MDG-based PRS (2007-2010) – using sectoral plans
May-
November
Stakeholders participation
Harmonization of sectoral plans
Technical support, funding, donor mobilization
Alignment of PRS (2007-2010) and MDG reviewed and validated
May- November
Same as above
Develop M&E framework for MDG Mar-Dec Capacity in the government Technical support