NATIONALPOWERTRAININGINSTITUTEOFNIGERIA
TRANSMISSION
1.0 SYSTEMOPERATIONS2.0 PROTECTIONCONTROLANDMETERING(PC&M)3.0 ELECTRICALMAINTENANCE4.0 SYSTEMCOMMUNICATION5.0 SYSTEMPLANNING6.0 SUPERVISORYCONTROLANDDATAACQUISITION(SCADA)7.0 LINESMAINTENANCE
LOG BOOK
ON FIELD
EXPERIENCE
Page|1
ITEM1.0SYSTEMOPERATIONS
1.01 IDENTIFICATIONOFPOWERSYSTEMCOMPONENTS1.02 FAMILIARWITHTHESTATIONSETUPANDREPRESENTTHESTATION
INSINGLELINEDIAGRAM1.03 IDENTIFICATIONOFVARIOUSTYPESOFRELAYSINTHESTATION1.04 IDENTIFICATIONOFMEASURINGANDINDICATINGDEVICES1.05 CARRYINGOUTROUTINEINSPECTION1.06 IDENTIFICATIONANDUSEOFCOMMUNICATIONMEDIA1.07 IDENTIFICATIONOFVARIOUSAUXILIARYEQUIPMENTSE.GBATTERY
BANKS,CHARGERS,STANDBYGENERATOR,AIRCOMPRESSORSYSTEMETC.
1.08 UNDERSTANDINGINTERCONNECTEDSYSTEMANDRELATINGWITHN.C.C.
1.09 HOWTOCOMPREHENSIVELYLOGOPERATIONALEVENTSINTHESTATIONLOGBOOK
1.10 DETERMINATIONOFFACTORSTHATCOULDAFFECTSYSTEMSTABILITY
Page|2
ITEM2.0
PROTECTIONCONTROLANDMETERING(PC&M)
2.01 NEEDFORPROTECTIONINPOWERSYSTEM2.02 BATTERYBANK/CHARGER2.03 USEOFTESTEQUIPMENTS2.04 RELAYFUNCTIONANDUSEINPROTECTION2.05 CIRCUITSANDSCHEMATICDIAGRAMSINFAULTTRACINGAND
TROUBLESHOOTING.2.06 FAULTCALCULATIONANDPROTECTION2.07 DISTANCEPROTECTIONANDSETTING2.08 PTANDCTINPOWERSYSTEM2.09 TRANSFORMERTYPESANDCONNECTION2.010 POWERTRANSFORMERPROTECTION2.011 LINEPROTECTION2.012 TRANSIENTFAULTANDAUTORECLOSURE2.013 CAUSESOFOVERVOLTAGEINPOWERSYSTEMLIGHTNING
ARRESTER.2.014 SYSTEMEARTHINGANDEARTHINGTRANSFORMER2.015 DIFFERENTIALPROTECTION
Page|3
ITEM3.0
ELECTRICALMAINTENANCE
3.01 DEFINITIONOFSWITCHGEAREQUIPMENT3.02 SPECIFYRATINGS,FUNCTIONS,BREAKINGCAPACITY3.03 SELECTIONOFCIRCUITBREAKER3.04 IDENTIFYINGARCEXTINCTIONMEDIAEMPLOYEDINCIRCUIT BREAKER3.05 INSPECTIONOFOILINCIRCUITBREAKERS3.06 TESTOILINOTHERCHAMBERS(INCIRCUITBREAKER)3.07 MAINTENANCEOFCONTACTSOFCIRCUITBREAKER3.08 ABILITYTOCHECKTHETRIPPING,OPERATINGANDINTERLOCKINGMECHANISM3.09 MAINTENANCEOFSF6INTERRUPTERS3.10 MAINTENANCEOFVACUUMCIRCUITBREAKERS3.11 MAINTENANCEPROCEDUREFOROPERATINGMECHANISM3.12 MAINTENANCEPROCEDUREFOROIL3.13 MAINTENANCEPROCEDUREFORSWITCHGEARAUXILIARIESAND BATTERYBANKS3.14 TRANSFORMERASSEMBLIES.ABILITYTORECOGNIZETHREE MAJORSUBASSEMBLIESASSOCIATEDWITHATRANSFORMER3.15 IDENTIFYWHATMADEUPTHECOOLINGSYSTEMFORAPOWER TRANSFORMERANDRECTIFYFAULTYPARTS.
Page|4
ITEM4.0
SYSTEMCOMMUNICATION4.01 MAINTENANCEOFCOMMUNICATIONEQUIPMENTS4.02 MAINTENANCEOFCOMMUNICATIONAUXILIARYPOWER SYSTEM4.03 MAINTENANCEOFVOICEANDDATACOMMUNICATION CHANNELS4.04 MAINTENANCEOFCOMMUNICATIONFRONTEND EQUIPMENT4.05 MAINTENANCEOFFIBREOPTICCOMMUNICATIONMEDIUM INSTALLATION4.06 TESTINGTHEINSTALLEDFIBREOPTICCABLE4.07 FIBREOPTICCABLESPLICING4.08 MAINTENANCEOFRADIOANDMICROWAVELINK COMMUNICATIONDEVICES.
Page|5
ITEM5.0
SYSTEMPLANNING
5.01 POWERSYSTEMSTUDIES5.02 CONNECTIONSANDEVACUATIONSTUDIES5.03 POLICY,DESIGNANDPROCUREMENT5.04 TRANSMISSIONDEVELOPMENTPLAN
Page|6
ITEM6.0
SUPERVISORYCONTROLANDDATAACQUISITION(SCADA)
6.01 INSPECTIONOFSCADAFRONTENDEQUIPMENT6.02 MAINTENANCEOFSCADAAUXILIARYPOWERSUPPLYSYSTEM6.03 CHECKINGOFDATACOMMUNICATIONINTEGRITY6.04 HANDLINGOFSCADAADMINISTRATION6.05 MAINTENANCEOFSCADADATABASE
Page|7
ITEM7.0
LINESMAINTENANCE
7.01 IDENTIFICATIONOFTOOLSANDEQUIPMENTFORTHETRADE7.02 IDENTIFICATIONOF132KVAND330KVMATERIALS7.03 PRACTICETIEINGOFKNOTSBENDSANDHITCHES.7.04 PATROLLINESANDWRITINGOFREPORT7.05 USEOFREEVTACKBLOCK7.06 INTRODUCTIONTOMAINTENANCEOFLIVELINE
Page|8
ITEM1.01IDENTIFICATIONOFPOWERSYSTEMCOMPONENTS PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
IdentificationofPowerSystemcomponents:CircuitBreakers,Transformers,Generators,BusBar,BusCoupler,BusSection,Isolators,andtheirfunctions.
Eachofthecomponentstobeproperlyidentifiedandtheirrespectivefunctionswellexplained1. Thevariouspowersystemcomponentsshouldbewellidentified2. Abletodifferentbetweenthevariouscomponents3. Abletounderstandandexplainthefunctionsofeachofthepowersystemcomponents
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1) Identificationofthevariouspowersystemcomponents:a) CircuitBreakers,b) Transformers,c) Generators,d) BusBar,e) BusCoupler,f) BusSection,g) Isolators,
2) Understandingoftheirfunctions
Page|9
ITEM1.02FAMILIARWITHTHESTATIONSETUPANDREPRESENTTHESTATIONINSINGLELINEDIAGRAM PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Traineeshouldbeable torepresenta transmissionStation inASingleLinediagramandcorrectly use symbols for various Components e.g. Isolators, Circuit Breakers,Transformers,BusBars,etc.andalsocorrectlyidentifiedthemintheControlRoomPanels.
1. TheTraineeshouldshowprovenabilitytocorrectlyrepresenthisStationinsinglelinediagram
2. Correctly Use symbols corresponding to various power system components andidentifysameontheControlRoomPanela) SingleLineDiagramCorrectlyDrawnb) SymbolsCorrectlyUsedc) CorrectidentificationofSymbolsontheControlRoomPanels
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. Detailunderstandingofwhatatransmissionstationentails
2. AbilitytorepresentatransmissionstationinasinglelinediagramandcorrectlyusesymbolstorepresentvariouscomponentslikeCircuitBreakers,Transformers,Generators,BusBar,BusCoupler,BusSection,andIsolatorsonthediagram
Page|10
ITEM1.03IDENTIFICATIONOFVARIOUSTYPESOFRELAYSINTHESTATION PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Identification of various types of Relays in the Station and correctly Reset them afteroperation.
TraineeshouldbeabletoidentifycorrectlydifferenttypesofRelays intheStation,explaintheir corresponding or specific functions and also correctly reset the relays afteroperation.
1. RelaysCorrectlyidentified2. correspondingFunctions/AreaofApplicationWellExplained3. CouldcorrectlyResetanyoftheRelay
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Traineeshouldbeableto:a) IdentifycorrectlydifferenttypesofRelaysintheStation,b) Explainthespecificfunctionsofthevarioustypesofrelaysandtheirapplicationsc) Correctlyresettherelaysafteroperation.
Page|11
ITEM1.04IDENTIFICATIONOFMEASURINGANDINDICATINGDEVICES PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Identification of Measuring and indicating Devices and should be able to read themcorrectly.
Trainees should be able to identify Frequency Meters, Synchroscope, Megawatt Meter,MVAMeter,Ammeter,Voltmeter,etc.Andbeabletoreadthemcorrectly.
1. IdentifiedthevariousMetersCorrectly2. Understandandexplainthetypeofmeasurementeachmeterisusedfor3. Carry out a simplemeasurementwith variousmeters and correctly read the
indicatedmeasurementonthemeter
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. Identification of various measuring and indication meters like Frequency Meters,Synchroscope,MegawattMeter,MVAMeter,Ammeter,Voltmeter,
2. Understandingof how to use thesemeters formeasurement and correctly take theirreadings
Page|12
ITEM1.05CARRYINGOUTROUTINEINSPECTION PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
CarryingoutofRoutingInspectionandreportsameaccurately.
Ability to identify Minor defects on components during routine Inspection is required.Alsoitisnecessarytobeabletoreportaccuratelytheobserveddefects.1. TheTraineeshowsprovenabilityintheidentificationofMinorDefects.2. CouldCorrectlyreportobserveddefects.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. Identificationofminordefectsoncomponentsduringroutineinspection2. Understandingtheaccuratewaytoreportobserveddefects
Page|13
ITEM1.06IDENTIFICATIONANDUSEOFCOMMUNICATIONMEDIA PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Trainees identify and explain the use of various CommunicationMedia available in theStation.
The Trainee should understand and be able to explain the importance of having aneffective communication system in an Electricity Industry. Also he should be able toidentify various types that are available in their respective Stations and use themcorrectly.1. ImportanceofanEffectiveCommunicationSystemwellexplained.2. VariousTypesofCommunicationMediawellidentified3. ShowProvenAbilityintheuseofCommunicationMedia.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. IdentificationofvariousCommunicationMediaavailableintheStation2. ExplaintheuseofvariousCommunicationMediaavailableintheStation.
Page|14
ITEM1.07IDENTIFICATIONOFVARIOUSAUXILIARYEQUIPMENTSE.GBATTERYBANKS,CHARGERS,STANDBYGENERATOR,AIRCOMPRESSORSYSTEMETC. PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Identification of various Auxiliary Equipment like Battery Banks, Chargers, StandbyGenerators,AirCompressorSystem,etc.
TheTraineesshouldbeabletocarryoutroutineinspectionsontheauxiliaryequipmentandalsocorrectlyreportobserveddefects.Theimportanceofeachoftheauxiliaryequipmenttobeproperlyexplained.1. FunctionsofeachoftheAuxiliaryEquipmentwellspellout.2. EachAuxiliaryEquipmentcorrectlyidentified.3. CouldcarryoutRoutineInspectionsoneachAuxiliaryEquipment4. DefectsontheAuxiliaryEquipmentcorrectlyreported.
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. Understandandexplainwhatauxiliaryequipmentisabout2. Identifyvariousauxiliaryequipment3. Explainthefunctionsofeachauxiliaryequipment
Page|15
ITEM1.08UNDERSTANDINGINTERCONNECTEDSYSTEMANDRELATINGWITHN.C.C. PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Showa fullyunderstandingofPHCN InterconnectedSystemand theneed to relatewithNCC(NationalControlCentre)onmattersaffectingtheGridSystem.PreparecorrectlyProtectionGuaranteeCertificateslikeO.F.2,O.F.3.O.F.4
TheTraineeshouldbeabletoappreciatePHCNInterConnectedSystem;theneedtorelatewithNCC(NationalControlCentre)onmattersaffectingGridSystem.CorrectpreparationofProtectionGuaranteeCertificatelikeO.F.2,O.F.3,O.F.4isalsorequired.1. ShowedgoodunderstandingofPHCNInterConnectedSystem2. RolesofNCCwellstated3. CorrectlyprepareProtectionGuaranteeCertificatelikeO.F.2,O.F.3,O.F.4etc.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. Understand andexplain thePHCN InterConnectedSystemand the importanceofrelatingwithNCC(NationalControlCentre)onmattersaffectingGridSystem.
2. ExplainhowtoprepareofProtectionGuaranteeCertificatelikeO.F.2,O.F.3,O.F.4isalsorequired.
Page|16
ITEM1.09HOWTOCOMPREHENSIVELYLOGOPERATIONALEVENTSINTHESTATIONLOGBOOK PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
LogcomprehensiblyoperationaleventsintheStationLogBookO.F.56.DeterminefullythedutiesandresponsibilitiesoftheSystemOperators
AbilitytokeepdetailedrecordsoftheoperationaleventsintheStationLogBookO.F.56isrequired.The Trainee should be able to state satisfactorily the duties and responsibilities of theSystemOperators.1. OperationaleventswellwrittenintheLogBookO.F.56.2. FullyawareofthedutiesandresponsibilitiesoftheSystemOperator.
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. KeepingofdetailedrecordsoftheoperationaleventsintheStationLogBookO.F.562. StatesatisfactorilythedutiesandresponsibilitiesoftheSystemOperators.
Page|17
ITEM1.10DETERMINATIONOFFACTORSTHATCOULDAFFECTSYSTEMSTABILITY PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
DeterminefactorsthatcouldaffectSystemstability.StatesomeOperationalSwitchingthatcancauseinstability.Prepare,checkandmakeeffectivetheProtectionGuaranteeCertificates
TraineeshouldbeabletoexplainfullyfactorsthatcouldaffectSystemstability.StatecorrectlyoperationalswitchingthatcancauseSysteminstability.Preparation, checking and making effective the Protection Guarantee Certificate, to becorrectlydonebytheTrainees.
1. CorrectlydeterminefactorsthatcouldaffectSystemStability2. StatecorrectlyoperationalswitchingthatcancauseSysteminstability3. Correctly prepare, check and make effective the Protection Guarantee
Certificate.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. DetailedunderstandingandexplanationoffactorsthatcouldaffectSystemstability.2. StatecorrectlyoperationalSwitchingthatcancauseSysteminstability3. TraineestocorrectlyPrepare,checkandmakingeffectivetheProtectionGuarantee
Certificate
Page|18
ITEM2.01NEEDFORPROTECTIONINPOWERSYSTEM PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
UnderstandthereasonswhyProtectionisnecessaryinPowerSystem
ReasonswhyProtectionisrequiredtobegiventothesatisfactionofassessorwithparticularreferenceto:
1. Preventingdamagetoequipment2. PreventingSysteminstability3. Minimizingloseofsuppliestothecustomer4. SafetyofthePersonnel/Public5. Isolatingonlyfaultysection
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. KnowledgeofbriefhistoryofdevelopmentofProtectioninPowerSystemisrequired2. UseofFuseasmeansofProtection3. RelayingProtectionVerbaldescriptionwithillustrationonpaper4. GoodunderstandingofdevelopmentofRelayingProtection
Page|19
ITEM2.02BATTERYBANK/CHARGER PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
WhatdoyouunderstandbyBatteryBanks/Charger?GivedetailsofitsimportanceinoverallProtectionSystemintheDistribution.
TheassessorissatisfiedwiththePupilEngineersiftheycancorrectlyexplan:1. ThesourceofD.Csupply2. TheneedforD.Csupply3. MaintenanceofD.Csupply
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. FullunderstandingofsourceofD.Csupply2. MaintenanceoftheStationbattery3. Fullunderstandingoftherectifyingcircuitsofthecharger4. UseofD.Cforalarmandindication5. UseofD.C.fortripping6. WhatdeterminetheAmperehourratingoftheD.C.sourceinastation7. OtherusesofD.C.supplyinProtectionScheme.
Page|20
ITEM2.03USEOFTESTEQUIPMENTS PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
DemonstratehoweachoftheTestingequipmentinPC&MDepartmentcanbeusedonthefieldandgivevariousapplication(s)ofeachoftheequipment.
1. CorrectlylistedequipmentsintheDepartment2. Showedgoodunderstandingoftheuseofeachequipment3. CancorrectlyconnecttheavailableequipmentforTesting
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
TheTraineeshouldstateanddemonstratehowconnectionsaremadeforvarioususes(s)ofeachoftheequipment.Alsonecessaryprecautionstobetakenshouldbewellstated.
Page|21
ITEM2.04RELAYFUNCTIONANDUSEINPROTECTION PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
EXPLAINTHEFUNCTIONOFRELAYINPROTECTIONOFFAULTINPOWERCIRCUITKNOWLEDGEOFBASICCIRCUIT.THESENSING,COMPARISONANDCONTROLSHOWRELAYCOILCONTROLLINGTHEBREAKERTRIPCIRCUIT.
1. SATISFACTORILYEXPLAINED.RELAYFUNCTIONANDIDENTIFIEDTHERELAY,CBANDRELATIONINFAULTCLEARING.
2. DESCRIBEDTHEBASICTRIPUNIT.3. 3BASICELEMENTANDTYPESOFRELAYIDENTIFIED
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. IDENTIFYRELAYANDITSFUNCTION2. KNOWLEDGEOFTHERELAYCIRCUIT,THESENSINGUNIT,COMPARATORWITHSETANDCONTROL
SIGNALTOCBTRIPUNIT.3. UNDERSTANDINGTHEDCCIRCUITOFTHECBANDITSRELATIONSHIPWITHTHECBTRIPUNIT4. TYPEOFRELAYS(O/C,E/FDISTANCE)ANDBASICFUNCTION5. IDENTIFYDEVICENOINRELAYSCHEMATICDIAGRAM(51,86)ETC
Page|22
ITEM2.05CIRCUITSANDSCHEMATICDIAGRAMSINFAULTTRACINGANDTROUBLESHOOTING. PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
DEMONSTRATEWITHTHEUSEOFSTATIONLINEDIAGRAMANDSCHEMATICDIAGRAMANDUSEOFBASICSEQUIPMENTINFAULTYCIRCUITMAINTENANCE.
1. KNOWLEDGEOFLINEANDSCHEMATICDIAGRAMOFTHESTATION2. PRACTICALILLUSTRATIONONHOWTOCLEARFAULTUSINGNECESSARYEQUIPMENT3. EXAMPLEILLUSTRATEDBYTHETRAINEETOBEASSESSED.
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. KNOWLEDGEOFINSTRUMENTUSEDFORFAULTTRACINGINPOWERCIRCUIT2. EXPLANATIONOFATRIPOFARELAYANDHOWTHEFAULTCANBETRACEDUSINGTHEDIAGRAM.
ALSO,EQUIPMENTTOBEUSED3. CASESTUDYONONESUCHJOBTOBEDEMONSTRATED
Page|23
ITEM2.06FAULTCALCULATIONANDPROTECTION PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
STATETHEDIFFERENTTYPESOFFAULTINPOWERSYSTEM.ANALYSESHORTCIRCUITFAULTANDCALCULATIONTHATISTAKENINTOCONSIDERATIONINRELAYSETTING.I.ETRANSIENTFAULT.
1. UNDERSTOODCAUSESOFFAULT(SWITCHING,LIGHTNING,INSULATIONFAILUREOFEQUIPMENTANDAPPARATUS,LINECUTETC)ANDTYPEOFPROTECTIVEDEVICEUSED
2. ESTIMATEOFCOMPARATIVEFREQUENCYWHICHFAULTOCCURINVARIOUSCIRCUITINPOWERSYSTEMCIRCUIT
3. KNOWLEDGEOFSHORTCIRCUITFAULT(L.E,LLE,LLLE)ANDSIMPLEFAULTCALCULATION
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. KNOWLEDGEOFCAUSESOFFAULTINPOWERSYSTEM.(GEN,TRANSMISSIONANDDISTRIBUTION)
2. REMEDYOFPOWERSYSTEMFAULTBYPROTECTIONANDMETHODEMPLOYED3. DEMONSTRATIONOFTYPESOFPROTECTIONAPPLICATIONINTHEMAJORPOWERSYSTEM
COMPONENTS.(O/C.E/FDIFFENTIALETC)
Page|24
ITEM2.07DISTANCEPROTECTIONANDSETTING PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
COMPUTATIONOFASIMPLEO/CCOORDINATIONOFASIMPLERADIALSYSTEMUSINGFOURBUSEXAMPLES,REPRESENTATIONUSINGONELINEDIAGRAM.
1. PRODUCEDSETTINGSFORDISTANCERELAY2. CONVERTEDBUSRADIALDIAGRAMTOLINEDIAGRAMFOROVERCURRENTRELAYCOORDINATION
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. SHOWEXAMPLEOFADISTANCERELAYSETTING2. ONELINEDIAGRAMOFTHESYSTEMREPRESENTEDBYPU.3. STUDENTPROVESABILITYTOCOMPUTESETTINGFORPROTECTIVERELAY(USINGLINEPROTECTION)
Page|25
ITEM2.08PTANDCTINPOWERSYSTEMPERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
1) UNDERSTANDINGOFPTANDCTASITISUSEDINPOWERSYSTEMCONTROL,METERINGANDPROTECTION.FACTOROFDESIGN(I.E)=BURDEN,CLASS/ACCURACYE.G5P,10PETC.
2) CTUSEDINAMMETER,WATTMETER,WATTHOURMETERANDPROTECTIVERELAYS.(TYPICAL5A/PRIMARY)
3) PTUSEDINVOLTMETER,WATTMETER,WATTHOURMETER)ANDRELAYS.(TYPICALVSEC110).
1. DEMONSTRATIONOFPRACTICAL(PRACTICAL).IDENTIFICATIONOFPT,CTANDVARIOUSVOLTAGELEVELINPOWERSYSTEMINSTALLATIONINCLUDINGINSWITCHGEARS.
2. EXPLANATIONOFBURDENANDCLASS/ACCURACYTURNRATIO.3. CTSECONDARYMUSTBESHORTCIRCUITEDB/COFLOWLOADIMPEDANCE(BURDEN)
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. DESCRIPTIONOF(PTORVT)ANDCTANDTHEIRAPPLICATIONINPOWERSYSTEMMETERING,PROTECTIONANDCONTROL.
2. SIMPLEDEMONSTRATIONOFTRANSFORMATIONRATIOCALCULATION.3. KNOWLEDGEOFTERMSLIKEBURDEN,CLASS/ACCURACYOFINSTRUMENTTRANSFORMER4. IDENTIFICATIONOFVT/CTINVARIOUSVOLTAGELEVELSOFPOWERSYSTEM(INCLUDING132KV
AND330KVVOLTAGELEVEL.
Page|26
ITEM2.09TRANSFORMERTYPESANDCONNECTIONPERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
FAMILIARWITHPOWERTRANSFORMERTYPESANDCONNECTION,DIFFERENTTYPESOFINSULATING/COOLINGOIL,METHODSOFTESTINGTRANSFORMERANDEQUIPMENTTOBEUSEDINEACHPROGRAMMEMAINTENANCE.
1. UNDERSTANDINGOFUSEOFTRANSFORMERINSUPPLYCHAINOFPOWERSYSTEMANDCONNECTION.
2. TYPEOFCOOLING(OIL,AIRANDWATER)3. BASICMAINTENANCESCHEDULEOFTRANSFORMER.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. SKETCHWITHLINEDIAGRAM,THEPOWERTRANSFORMERSTATIONTRANSFORMER,AUXILIARYTRANSFORMERANDVOLTAGERANGEASUSEDINPOWERSYSTEM.ILLUSTRATETHEUSEOFPOWERTRANSFORMERINATYPICALA. POWERSTATIONB. TRANSMISSIONSUBSTATIONC. Y,ANDYYCONNECTION/SYMBOLH1X1
2. ILLUSTRATIONOFTHEUSEOFTRANSFORMEROILFILTERINGM/C.INSULATIONREADINGFORDIFFERENTVOLTAGELEVELOFTRANSFORMER
3. MAINTENANCESCHEDULEOFTRANSFORMERANDEQUIPMENTUSEDINCARRYINGOUTTESTONTRANSFORMER
Page|27
ITEM2.10POWERTRANSFORMERPROTECTIONPERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
KNOWLEDGEOFTRANSFORMERPROTECTION,IDENTIFICATIONOFTYPESOFFAULTONPOWERTRANFORMERANDTYPESOFPROTECTIONFORTHEFAULTS
1. WHETHERPOWERTRANSFORMERFAULTSAREKNOWN2. WHETHERFAULTSABOVECANBEMATCHEDWITHEXISTINGPROTECTIONSCHEMESSUITABLEFOR
CLEARINGITFROMTHESYSTEM.3. ILLUSTRATIONOFRELATIONSHIPBETWEENPROTECTIVERELAYANDCIRCUITBREAKER(DIAGRAM)
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. ENUMERATEDIFFERENTKINDSOFFAULTSINPOWERTRANSFORMER:A. WINDINGANDTERMINALB. COREC. TANKSD. ONLOADTAPCHARGERE. EXTERNALF. OVERLOADETC.
2. DESCRIPTIONOFTHEPROTECTIONFORTHEFAULTSABOVE.3. DEMONSTRATIONOFCONNECTIONOFEACHPROTECTIVESCHEMETOTHENETWORKTHROUGH
INSTRUMENTTRANSFORMER,FUNCTIONOFBULCHOZRELAY,(GROUPINGBYPHASEANGLEDISPLACEMENT).
Page|28
ITEM2.11LINEPROTECTION PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
TOHAVEUNDERSTANDINGTHATFAULTOCCURSINLINESMORETHANOTHERPOWERSYSTEMCOMPONENTSSUCHASGENERATOR,TRANSFORMERANDSWITCHGEAR.KNOWLEDGEOFLINEPROTECTIONREQUIREMENTS:
A. CBCLOSESTOSHORTCIRCUITSHOULDOPENALLOTHERSCLOSEDB. IFNEARESTCBDIDNOTOPEN,BACKUPCBSHOULDOPENC. RELAYOPERATIONALTIMESHOULDBESHORTTOALLOWSYSTEMSTABILITYD. THEMETHODOFLINEPROT.ARE(TIMEGRADEDO/C,DIFFERENTPROT.ANDDISTANCEPROT.
1. UNDERSTANDINGOFNONUNITANDUNITLINEPROTECTION2. PRODUCEPROTECTIONSCHEMEFORTHEPROTECTION3. SHOWHOWLINEFAULTAREMOREFREQUENT,THEFREQUENCY,ANDHOWITISMOREDIFFICULT
TOHANDLETHANOTHERCOMPONENTOFPOWERSYSTEMS,
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. PRACTICEOFNONUNITLINEPROT=TIMEGRADEDO/C,CURRENTGRADEDO/C(DISTANCEPROTORIMPEDANCE)PRACTICEOFUNITLINEPROT=PILOTWIREDIFFERENTIALPROTECTIONANDCARRIER.PROT,BASEDONPHASECOMPARISON.
2. ILLUSTRATIONOFABOVESCHEMEUSINGDIAGRAM3. SIMPLECALCULATIONOFDISTANCEPROTECTIONANDCARRIERSPHASECOMPARISONSCHEMATIC
Page|29
ITEM2.12TRANSIENTFAULTANDAUTORECLOSURE PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
1. SHOWTHEAPPLICATIONOFAUTORECLOSINGOFATRIPPEDCIRCUITANDADVANTAGES.SHOWTHELIMITATIONONTHEAPPLICATION.
2. UNDERSTANDINGTHETRANSIENTFAULTINHVLINESDUETOLIGHTING,BIRDS,ANDTREEBRANCHES.THESEFAULTSCANDISAPPEARASSOONASTHEYAPPEAR.RECLOSUREOFTHECIRCUITISNECESSARYBYCBCLOSINGANDALLOWINGTHEFEEDERTOCONTINUEANDSTABILIZETHESYSTEM.
3. THEYAREUSEDIFCBOPENSWHENTHEFAULTFAILSTODISAPPEAR.ITREMAINSOPENUNTILMANUALRESETUSED..ITISMOSTLYUSEDINUNATTENDEDSUBSTATIONANDRURALDISTRIBUTIONSCHEME.ITMINIMIZESOUTAGES.
1. FULLUNDERSTANDINGOFCBINFAULTCLEARINGANDOVERLOADANDEARTHFAULTRELAYOPERATIONINLINEPROTECTION.
2. THEBENEFITOFLINESECURITYBYMINIMIZATIONOFLINEOUTAGESDUETOFAULT,MAINLYTRANSIENTFAULTS.
3. DIAGRAMOFAUTORECLOSURECIRCUIT.SHOULDBEDRAWN.
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. WHETHERTHEREASONFORAUTORECLOSUREISUNDERSTOODTHROUGHEXPLANATION2. THEADVANTAGESANDDISADVANTAGESHASTOBEILLUSTRATED3. PRACTICALKNOWLEDGEOFWHENTOUSEIT.
Page|30
ITEM2.13CAUSESOFOVERVOLTAGEINPOWERSYSTEMLIGHTNINGARRESTER. PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
CAUSESOFOVERVOLTAGEINPOWERSYSTEMENUMERATED,SURGEPROTECTIONEXPLAINED,THELIGHTENINGARRESTORPRINCIPLEANDPRACTICALUSE.BILTHEOVERALLDANGERINEQUIPMENTANDINSTALLATIONIDENTIFIED.
1. PROVEOFDIFFERENTKINDOFOVERVOLTAGEANDCAUSES2. ILLUSTRATIONOFPROTECTIONOFOVERVOLTAGEINPOWERSTATION,SUBSTATIONLINESAND
DISTRIBUTIONLINES.
COMMENT/SCORESINPERCENTAGESigned:Name:Date:
1. KNOWLEDGEOFINTERNALANDEXTERNALOVERVOLTAGECAUSESIDENTIFIED.2. INTERNALOVERVOLTAGELEVELABOUT2OR3TIMES.PHASETOEARTHLEVEL.EXTERNAL(EG
LIGHTENINGETC)3. PROTECTIONOFPOWERSTATIONANDSUBSTATIONFROMDIRECTLIGHTENINGARRESTORA. NODIRECTSHEILDB. SHEILDINGAGAINSTDIRECTLIGHTENINGSTRIKEC. WITHPROTECTIVETUBE0.8KMFROMSTATIONPROTECTIVESCHEME.
Page|31
ITEM2.14SYSTEMEARTHINGANDEARTHINGTRANSFORMERPERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
STATETHEOBJECTSOFEARTHINGPOWERSYSTEMEQUIPMENTANDINSTALLATION:A. TOPREVENTSHOCKBYALLOWINGFAULTYCURRENTREMAINATZEROPOTENTIALB. PROTECTPERSONNELFROMSURGESANDLIGHTENINGSTRIKEBYPROVIDINGDISCHARGED
PARTFORARRESTERSETCC. PROVIDINGGROUNDCONNECTIONFORNUETRALEARTHING.
1. PRACTICALDEMONSTRATIONANDORALEXPLANATIONNEUTRAL/SYSTEMEARTHINGINVARIOUSINSTALLATION
2. EARTHELECTRODE,EARTHMATANDEARTHRESISTANCE,TESTINGKNOWLEDGE3. TESTINGEQUIPMENTANDMATERIALSFORTESTINGLISTED
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. ABLETOILLUSTRATESKETCHESOFEQUIPMENTEARTHCONNECTIONANDSYSTEMNUETRALEARTHINGANDEARTHINGTRANSFORMER
2. STATIONSUSEEARTHMATMADEOFFLATIRONWHICHDISTRIBUTESPOTENTIALGRADIENTASTHERESISTANCEOFTHEIRONISDISTRIBUTEDANDTHEPOTENTIALBEINGSAFETOHUMANINTOUCH(HAND)ANDSTEP(FEET)POTENTIAL.
3. PERFORMEARTHRESISTANCETEST,UNDERSTANDPERMISSIBLEEARTHRESISTANCEOFA. LARGERPOWERSTATION0.5OHMSB. MAJORPOWERSTATION1.0OHMSC. SMALLSUBSTATION2.0OHMSD. TERMSLIKEEARTHELECTRODEANDEARTHLEADDEFINITIONEXPLAINEDE. SOILRESISTIVITYTESTDESCRIBED
Page|32
ITEM2.15DIFFERENTIALPROTECTION PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
STATETHEIMPORTANCEOFDIFFERENTIALPROTECTIONRELAYSINPOWERSYSTEMPROTECTIONANDPRACTICALDEMONSTRATION.
1. SKETCHESOFDIFFERENTIALRELAYSINPOWERSYSTEMCHAINPROPERLYDRAWNCURRENTFLOWINDICATED
2. IMPORTANCEOFDIFFERENTIALRELAYWELLEXPLAINED3. PRACTICALWIRINGSUCCESSFULLYDONEANDSTIMULATED
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. SKETCHDIFFERENTIALRELAYASAPPLIEDTOGENERATORTRANSFORMERUNIT,TRANSFORMERFEEDER,TRANSMISSIONLINES,LARGEMOTORSANDBUSBARS
2. ILLUSTRATESIMPLEDIAGRAMANDCURRENTFLOWILLUSTRATIONA. CURRENTDIFFERENTIALRELAYSFOREXTERNALLOADORFAULTB. CURRENTDIFFERENTIALRELAYSFORINTERNALFAULTC. VOLTAGEBALANCEDIFFERENTIALRELAYFORFEEDERTHROUGHPILOTWIRED. PRACTICALWIRINGANDDEMONSTRATION
Page|33
ITEM3.01DEFINITIONOFSWITCHGEAREQUIPMENTANDISOLATIONINPOWERSYSTEMINCLUDINGCONSUMERCONTROLGEAR PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
TrainingshoulddefineComponentsofSwitchgearinPowerSystemasusedinPowerGenerationTransmissionandDistributionincludingConsumerControlgear
1. TheTraineehaslistedtheswitchgearsincategories:2. Hehasexplainedthefunctionofeachcategory3. Hehasillustratedswitchgearcomponentsasusedforindoorandoutdoorfacilities.4. TheArcquenchingandoperatingmediumofacircuitbreakerisexplained
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. TheTraineeshouldlistallEquipmentofSwitchgear(HINT)SwitchgearsEquipmentfallintoCategories:(A)Isolator(b)LoadBreakSwitches(C)EarthSwitchesCircuitBreakers
2. Heshouldexplainthefunctionofeachcategorye.g.CircuitBreaker,isolatoretc.3. ShouldbetaughtbothIndoorandOutdoorswitchesSystem.UsingSketchesand
DiagramsincludingsinglelineDiagrams.Toillustratethedifference
Page|34
ITEM3.02SPECIFYRATINGS,FUNCTIONS,BREAKINGCAPACITY PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
BriefrevisionofIsolators,EarthSwitches,particularlyinOutdoorSwitchingisrequired.FullStudyandUnderstandingofCircuitBreakers:(a) Functions(b)Rating(c)BreakingCapacity(Types(e)Interruption(f)Busarrangement
1. Assesthetraineeonpracticaldemonstrationofhistheoreticalknowledgeofacircuitbreaker
2. HeshouldproducereportofhowthestationCBIISmaintainedusingthestationcasestudy
3. Illustratehisknowledgeofratedcurrentandbreakingcurrentofacircuitbreaker.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. ThemostimportantcomponentofSwitchgeariscircuitbreakertraineeshouldbeexposedwithmanualsanddiagramsandliteraturesofallkindsofCBinthestation
2. ShouldstudyallkindsofmaintenancerequiredforCB3. Demonstratetherelationshipbetweenprotectiverelaysandcircuitbreaker4. KnowledgeofdangerinopeningIsolatoronload,toopenacircuitCBfirst
Page|35
ITEM3.03SELECTIONOFCIRCUITBREAKERPERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
TheTraineeshouldbeabletoselectappropriatecircuitbreakerforaspecifiedlocation.
1. Factorinfluencingtheselectionofcircuitbreakerwellstated
2. Correctlycalculatedtheappropriateratingofthecircuitbreaker
3. Accuratelydeterminetherupturingcapacityofthecapacityofthecircuitbreaker
4. Correctlyselectedappropriatetype
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
1. Beabletostateclearlythefactorstobeconsideredforselectingcircuitbreakerforaparticularlocation
2. Accuratelyabletocalculatetheratingbasedontheloadforthecircuitbreaker3. Goodknowledgeonhowtocalculatethebreakingcapacityofthecircuitbreaker,
accuratelycalculatethemagnitudeofthefaultcurrentforasymmetrical3phasefault4. Selectappropriatetype
Page|36
ITEM3.04IDENTIFYINGARCEXTINCTIONMEDIAEMPLOYEDINCIRCUITBREAKER PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
TheTraineeshouldbeabletolistvariousArcExtinctionMediaemployedinCircuitbreaker
ThetraineewithoutreferringtohislogbooklistthefollowingArcExtinctionmedia,theirfunctions,advantage/disadvantages
(1) AirAtmosphericAir/CompressedAir(2) DielectricOil(TransformerOil)(3) SulphurHexafluoride(SF6)Gas(4) Vacuum
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
TheTraineeisabletoexplaintheimportantofArcExtinctionmediaemployedincircuitbreakersandgiveadvantagesanddisadvantagesofeachofthem
Page|37
ITEM3.05INSPECTIONOFOILINCIRCUITBREAKERS PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Thetraineeshouldbeabletodrawoffwetordirtyoilfromthebottomofcircuitbreakerandcarryoutbreakdowntestontheoil.
(a) TraineecorrectlySpecifywhatisregardedasnormaldutyandwhatisregardedasheavydutyasfarasfrequencyofoperation
(b) Couldcarryoutsampletest(c) Showedprovenabilityonhowtoreconditiontheoiltoimproveonbreakdownvoltage
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) Traineetoknowthatfornormalduty,theinspectionshouldbedoneevery12monthswhileforheavydutyitshouldbedonemonthly.
(b) AbletocarryoutTestonthesampletoBS.148(c) Knowwhattodoifbreakdownoccursbelow22KV(d) Mustknowtheleastbreakdownvoltageacceptable
Page|38
ITEM3.06TESTOILINOTHERCHAMBERS(INCIRCUITBREAKER) PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
TestOilinotherchambersofthecircuitbreaker
(a) CorrectlySpecifyperiodbetweeninspection(b) Correctlycarryoutsampletest(c) Fullyunderstandsituationforcompleterenewifnecessary.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) AbletospecifyperiodbetweeninspectionsfornormaldutyandforheavydutyforoilinotherChambersoftheCircuitbreaker
(b) Couldcarryoutsampletestonthesampleoilin(a)above(c) Similarlycouldcarryoutreconditioningprocedureifitbecomesnecessaryfromthe
valueofbreakdownvoltageobtained.
Page|39
ITEM3.07MAINTENANCEOFCONTACTSOFCIRCUITBREAKER PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Maintenanceofcontactsofcircuitbreaker
(a) PeriodofInspectionforheavydutyandfornormaldutyconditionforeachcontactwellstated.
(b) Showedgoodunderstandingformethodofcleaningandhowtocarryoutothermaintenanceprocedure.
(c) Clearlystatednecessaryprecautions
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) Thetraineetorecognizedifferenttypesofcontacts(b) PeriodofInspectionforheavydutyandnormaldutyforvarioustypesifcontacts
Contacts(Plainfingertypesforoilcircuitbreaker) Contacts(rodandsocketorcontactorbutttypewitharccontrolchambersforoil
circuitbreaker Contacts(Silverplatedplatedorsilverinsert) ArcChutes(Aircircuitbreaker)
(c) Traineetobefamiliarwithmethodofcleaningandothermaintenanceprocedureforvarioustypes.
(d) Necessaryprecautionsshouldbewellunderstood
Page|40
ITEM3.08ABILITYTOCHECKTHETRIPPING,OPERATINGAND INTERLOCKINGMECHANISM PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Abilitytocheckthetripping,operating,andinterlockingmechanism
(a) ThetraineewellexplainedthePrinciplesofoperationofthetripping,operating,andinterlockingmechanisms
(b) Practicallyfollowedup,checkedandoperatedtripping,operatingandinterlockingmechanismbythemethodsprovidedtoensurethatallareinorder
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) Goodunderstandingoftheworkingprinciplesoftripping,operatingandinterlockingmechanisms
(b) Abilitytochecktripping,operating,andinterlockingmechanismsbyrecognizedstandardmethods.
Page|41
ITEM3.09MAINTENANCEOFSF6INTERRUPTERS PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
MaintenanceofSF6interrupters
(a) ThetrainingclearlystatedtheadvantagesofSF6gasinacircuitbreaker(b) Traineetogivereasonwhythepressuremustbemaintainandtoshowunderstanding
onhowtorefillthegas(c) ThetraineewellexplainedthePrinciplesofoperationofthetripping,operating,and
interlockingmechanisms(d) Showedgoodunderstandingoftheoperatingmechanism
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) TheTraineeiswellfamiliarwiththeadvantagesofSF6gasinacircuitbreakerinstallation
(b) Thetraineeunderstandsthefactthatitisnonflammable,fireriskseliminated(c) Producesnocarbonduringarcinterruption,sodielectricintegrityisnotimpairedby
shortcircuitoperation.(d) Thetraineeisawarethatnooxidationofcontactsorcorrosionofcomponentsbecause
SF6isaninertgas
Page|42
ITEM3.10MAINTENANCEOFVACUUMCIRCUITBREAKERS PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
Maintenanceofvacuumcircuitbreaker
(a) Traineewellstated,theadvantagesofvacuumcircuitbreaker(b) Capableofreadingtheoperationcounter,controlwearcheckandpredictionofthe
operationallifeoftheequipmenttobeformulated.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) Abilitytostatetheadvantagesofvacuumcircuitbreakers(b) Awareofthefactthatlimitofcontactwearisreachedinnotlessthan50,000
operations(c) UnderstandthatVacuumInterrupterscannotbemaintainedbutcanbereplacedafter
limitofcontactwearsisreached
Page|43
ITEM3.11MAINTENANCEPROCEDUREFOROPERATINGMECHANISM PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
MaintenanceProceduresforOperatingMechanisms
(a) Traineecorrectlystatedthefunctionsofoperatingmechanism(b) Statedcorrectlyvarioustypesofoperatingmechanism(c) Listedmaintenancechecklistandshowedgoodunderstandingonhowtocarryout
eachofthem.
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) Abilitytostatethefunctionsofoperatingmechanism(b) Abilitytostatevarioustypesofoperatingmechanism(c) Listmaintenancechecklistfortheoperatingmechanism
Page|44
ITEM3.12MAINTENANCEPROCEDUREFOROILPERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
MaintenanceProceduresforoil
(a) TraineecorrectlystatedthefunctionsofoilinElectricalSwitchgear(b) Traineestatedwellthepropertiesofoilinelectricalswitchgear(c) Showedgoodunderstandingofcharacteristicsandtheirlimitvalue
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) TraineecanexplainthefunctionsofoilinElectricalswitchgear(b) TraineecanstatecorrectlyPropertiesofoilusedinelectricalswitchgear(c) Explainwellwhyperiodicalpurificationisnecessary(d) Listofcharacteristicsandthelimitacceptable:e.gsludgevalue,Acidityafteroxidation,
FlashPoint,pourpoint,viscosityetc.
Page|45
ITEM3.13MAINTENANCEPROCEDUREFORSWITCHGEARAUXILIARIESANDBATTERYBANKS PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
MaintenanceProceduresforswitchgearAuxiliariesandbatterybanks
(a) Traineeshowedgoodunderstatingofwhatastoragebatteryis(b) Traineeshowedgoodunderstandingofbatteryofcharger(c) Traineeshowedabilitytoworkonthestationswitchgearauxiliariesandbatterybank
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) Goodunderstandingofwhatastoragebatteryis.(b) Goodunderstandingofbatterychargers(c) AutomaticConstantPotentialChargerSpecifiedpracticallyforallstationcharger
implicationsandgoodunderstatingofthefeaturesofthischarger.(d) Beabletoexplainfactorsaffectingbatterylife,effectofdeteriorationonbattering
components,indicationsofbatterydeterioration.(e) Responsibilitiesofstationoperator
Page|46
ITEM3.14TRANSFORMERASSEMBLIES.ABILITYTORECOGNIZETHREEMAJORSUBASSEMBLIESASSOCIATEDWITHATRANSFORMER PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
TransformerAssemblies.Abilitytorecognizethreemajorsubassembliesassociatedwithatransformerthatmustbeconsideredwhenafaultconditionisreportedonaunit.
(a) TheTraineesuccessfullyidentifiedthecore,theelectricalcircuit(currentcarryingconductor)andthecoolingsystem
(b) Traineecorrectlylistedtheproblemsthecoreissusceptibleto(c) Correctlydetermineinsulationbreakdownbetweenwindingandbetweenwindings
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
a) Thetraineeshouldbefamiliarwiththefollowing:(i) MagneticCircuit:Core(ii) Electricalcircuit:Currentcarrying,conductoranddevices(iii) CoolingSystem
b) Traineeshouldknowproblemsthecoreissusceptibletoc) AbilitytodetermineInsulationtogroundandbetweenwindingsd) Familiarwithsignsandresultsoffailureofinsulatione) Faultsthatcurrentcarryingconductorsinthetransformeraresusceptibleto:
Page|47
ITEM3.15IDENTIFYWHATMADEUPTHECOOLINGSYSTEMFORAPOWER TRANSFORMERANDRECTIFYFAULTYPARTS. PERFORMANCE
CONDITIONS OF ASSESSMENT
CRITERIA FOR ASSESSMENT
TRAINING OBJECTIVE SATISFACTORILY COMPLETED
ITEM1.01
IdentifywhatmadeupthecoolingsystemforaPowertransformerandrectifyfaultypart.
(a) Traineecorrectlylistedwhatthecoolingsystemconsistof(b) Traineecorrectlyexplainedthefactorsthataffectcoolingsystem(c) Traineecouldidentifyfaultsthatcancausefailureofacoolingsystemandrectify
accordingly
COMMENT/SCORESINPERCENTAGE Signed:Name:Date:
(a) Traineewellfamiliarwithwhatmadeupthecoolingsysteminthepowertransformerinthestation.
(b) FactorsthatcanaffectthecoolingsystemiswellknowntobeTrainee(c) Traineeknowstherelationshipbetweenthetransformersratedcapacityandthe
coolingsystem.(d) Abilitytodetectallthecircumstancesurroundingthefailureofacoolingsystemand
rectify.
Page|48
ITEM4.01MAINTENANCEOFCOMMUNICATIONEQUIPMENTSPERFORMANCETraineeswillhaveagoodunderstandingoftheoperationsandcommunicationequipmentsinthestations.Carryoutmaintenanceofcommunicationequipments
CONDITIONSFORASSESSMENTa) TheTraineeshouldfamiliarizeselfwithalltheCommunicationEquipmentsinthe
Station.b) AbilitytoshowgoodunderstandingofeachoftheCommunicationEquipmentinthe
Station.c) FollowupMaintenancerequirementforeachoftheCommunicationEquipment.CRITERIAFORASSESSMENTa) TheTraineeexhibitedgoodunderstandingofeachoftheCommunication
Equipment.
b) ConversantwithMaintenanceproceduresforeachCommunicationEquipment.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|49
ITEM4.02MAINTENANCEOFCOMMUNICATIONAUXILIARYPOWERSYSTEMPERFORMANCETraineeswillhaveagoodunderstandingoftheoperationsandcommunicationauxiliarypowersysteminthestations.CarryoutmaintenanceofcommunicationauxiliarypowersystemCONDITIONSFORASSESSMENTa) TraineetofamiliarizewiththeCommunicationauxiliaryPowerSysteminthe
Stationb) TraineetospellouttheneedtomaintainCommunicationauxiliaryPowerSystem.c) AnalysethefaultsthatarecommonwiththeCommunicationauxiliaryPower
System.d) ToshowabilitytoclearfaultsintheCommunicationauxiliaryPowerSysteminthe
Station.CRITERIAFORASSESSMENTa) TraineeexplainedindetailstheneedtomaintainCommunicationauxiliaryPower
Systemb) TraineewasabletoanalysecommonfaultsinCommunicationauxiliaryPower
System.c) CancompletelyclearfaultsintheCommunicationauxiliaryPowerSystem.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|50
ITEM4.03MAINTENANCEOFVOICEANDDATACOMMUNICATIONCHANNELSPERFORMANCETraineeswillhaveagoodunderstandingandusageofvariousvoiceanddatacommunicationchannels.carryoutmaintenanceofvoiceanddatacommunicationchannelsCONDITIONSFORASSESSMENTa) TraineetobeabletousealltheavailablevoiceandDataCommunicationChannels.b) GoodunderstandingoftheworkingprincipleofthevoiceanddataCommunication
Channels.c) HowtotracefaultsinafaultyChannel;andclearthesame.CRITERIAFORASSESSMENTa) TheTraineefullyexplainedtheworkingprinciplesofthevoiceandData
CommunicationChannels.b) TraineeshowedprovenabilitytoclearfaultinvoiceandDataCommunication
Channels.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|51
ITEM4.04MAINTENANCEOFCOMMUNICATIONFRONTENDEQUIPMENTPERFORMANCETraineeswillunderstandandanalysethevarioustypesofproblemassociatedwithfrontendCommunicationEquipmentandcarryoutMaintenanceonsucheequipmentCONDITIONSFORASSESSMENTa) TraineetoidentifyCommunicationfrontendEquipment.b) AnalysethetypeofproblemsassociatedwithCommunicationfrontend
Equipmenta) ProceduretofollowtoclearfaultsinCommunicationfrontendEquipment.CRITERIAFORASSESSMENTa) CorrectlyidentifiedCommunicationfrontendEquipmentb) CorrectlystatedproblemsassociatedwithCommunicationfrontendEquipment.c) ShowedprovenabilitytoworkontheCommunicationfrontendEquipment.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|52
ITEM4.05MAINTENANCEOFFIBREOPTICCOMMUNICATIONMEDIUM:INSTALLATIONPERFORMANCEMaintenanceofFibreOpticCommunicationmedium:INSTALLATIONCONDITIONSFORASSESSMENTa) TheTraineeshouldknowthatOpticalFibreCablesaremadeindifferentforms
dependingon: Numberoffibres Howandwhereitwillbeinstalled Willthecablesbeexposedtochemicals Doesithavetowithstandawidetemperaturerange Willtheybeattackedbyrodents?
b) RecognizethemainfunctionoftheCablec) Recognizethefeaturesofthetwobasiccabledesigns.CRITERIAFORASSESSMENTa) Correctlynamedthetwotypesofthecablesused.b) Correctlystatedthefeaturesofeachofthecable.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|53
ITEM4.06TESTINGTHEINSTALLEDFIBREOPTICCABLEPERFORMANCETestingtheinstalledFibreOpticCableCONDITIONSFORASSESSMENTThetraineetobeusedtothefollowingtestinstalment:
a) Continuitytestingtodeterminethatthefibreroutingand/orPolarizationiscorrectanddocumentationisproper.
b) Endtoendinsertionloss.CRITERIAFORASSESSMENTa) Trainingcouldcorrectlycarryoutcontinuitytestb) Traineecancorrectlydeterminetheendtoendinsertionloss.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|54
ITEM4.07COMMENTS/SCORESINPERCENTAGEPERFORMANCEFibreOpticCable:SPLICINGCONDITIONSFORASSESSMENTa) Definewhatsplicingisb) Knowthattheyaretwomainsplicingtechniquesc) Recognizesplicingtypes
Mechanical Fusion
d) Conditionsforgoodsplicinge) PracticalprocedureforsplicingCRITERIAFORASSESSMENTa) Traineecorrectlydefinesplicingb) Correctlylisttwomainsplicingtechniquec) Statedwellconditionsforgoodsplicingd) Wastrainedpracticalprocedureforsplicingandthetraineediditwell.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|55
ITEM4.08MAINTENANCEOFRADIOANDMICROWAVELINKCOMMUNICATIONDEVICES.PERFORMANCEMaintenanceofRadioandMicrowavelinkCommunicationdevices.CONDITIONSFORASSESSMENTa) TraineetobefamiliarwithRadioandMicrowavelinkCommunicationdevicesinthe
Station.b) FullunderstandingoftheRadioandMicrowavelinkCommunicationdevicesand
possiblemaintenancethatmightberequired.CRITERIAFORASSESSMENTa) TheTraineeshowedgoodunderstandingoftheradioandMicrowavelink
CommunicationdevicesintheStation.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|56
ITEM5.01POWERSYSTEMSTUDIESPERFORMANCEIntroductiontopowersystemstudy.Understandinganduseofvariousstudytools.Datacollectionconceptandtypesofstudies
CONDITIONSFORASSESSMENTTheTraineesshowunderstandthefollowing:
a) IntroductiontoPowerSystemStudiesb) PowerSystemstudytoolsc) Useofthestudytools.d) Comparativeadvantagesofthevarioustypesoftools.e) Datacollectionconceptf) Typeofstudies.
CRITERIAFORASSESSMENTa) ThetraineeshouldspelloutthetoolsusedinpowerSystemStudiesb) TheTraineeshouldshowcompetencyinusingthetoolsin(a)above.c) Beabletomakecomparativeadvantagesofthevarioustypesoftoolsd) Verygoodunderstandingofpowerflowstudies,transientstudiesandshortcircuit
studies.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|57
ITEM5.02CONNECTIONANDEVACUATIONSTUDIESPERFORMANCECONNECTIONANDEVACUATIONSTUDIESCONDITIONSFORASSESSMENTa) AgoodunderstandingofPowerplantconnectionandEvacuationStudiesb) DealingwithsamplesofconnectionandEvacuationstudiesReportc) Wellgroundedbasicconceptofconnectionandevacuationstudiesd) Goodknowledgeoffeasibilitystudiesconcept
Dealingwithsamplesoffeasibilitystudyreport Howtoproducefeasibilitystudiesreport
e) LocationStudiesConcept Samplesoflocationreport Howtoproducelocationstudiesreport
f) Independentpowerplants(IPP) CommittedIPPs ProposedIPPs
CRITERIAFORASSESSMENT
a) TheTraineecancompletelydealwithSamplesofconnectionandevacuationStudiesReport.
b) TraineecouldproducefeasibilityStudiesReportc) TraineecouldproducelocationstudiesReport
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|58
ITEM5.03POLICY,DESIGNANDPROCUREMENTPERFORMANCEPolicy,DesignAndProcurementCONDITIONSFORASSESSMENTa) TrainingfamiliarwithPolicyandStandardaswellasDesignandEngineering.b) IntroductiontoProcurementProcedures
Engineering,ProcurementandConstruction(EPC) ProjectConsultants(PC) DifferencebetweenPCandEPC SimilaritiesthatexistwithPCandEPC
CRITERIAFORASSESSMENTa) GoodunderstandingofBasicConceptandresponsibilitiesinEngineering
ProcurementandConstruction(EPC)b) StatedclearlythedifferencesbetweenPCandEPCc) CorrectlyexplainedthesimilaritiesthatexistwithPCandEPC
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|59
ITEM5.04TRANSMISSIONDEVELOPMENTPLANPERFORMANCETransmissionDevelopmentPlan
CONDITIONSFORASSESSMENTa) Assessto10and15yearsDevelopmentplan.b) TCN2011Realistictargetmadeavailablec) GoodknowledgeofTCNinterfaceAgenciesd) RehabilitationinTransmissionSubstation
CRITERIAFORASSESSMENTa) TraineegavegoodreasonsforhavingsuchlongtermDevelopmentPlanb) FamiliarwithprocessesinmakingthePlan.c) ShowedcompetencyinhowPlanismadeforRehabilitation.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|60
ITEM6.01INSPECTIONOFSCADAFRONTENDEQUIPMENTPERFORMANCEInspectionOfSCADAFrontEndEquipment
CONDITIONSFORASSESSMENTa) TraineewellinformedoftheimportanceofSCADAinPowerSystemNetwork.b) VariousadvantagesofeffectiveSCADASysteminaPowerNetwork.c) ExposedforSCADAfrontendEquipmentintheStation.
CRITERIAFORASSESSMENTa) TraineecouldtelltheimportanceofSCADAinPowerSystemNetwork.b) TraineecorrectlystatedtheadvantagesofeffectiveSCADASysteminaPower
Network.c) ShowedgoodworkingknowledgeinSCADAfrontendEquipmentintheStation.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|61
ITEM6.02MAINTENANCEOFSCADAAUXILIARYPOWERSUPPLYSYSTEMPERFORMANCEMaintenanceofSCADAauxiliaryPowerSupplySystem
CONDITIONSFORASSESSMENTa) TraineetoFamiliarizewithSCADAauxiliaryPowerSupplySystemIntheStation.b) TraineetospellouttheneedtomaintainSCADAauxiliarysupplysystem.c) AnalysevariousfaultsSCADAauxiliarysupplycanbesubjectedto.d) AbilitytoclearfaultsinSCADAauxiliarysupply.
CRITERIAFORASSESSMENT
a) CorrectlystatedthereasontomaintainSCADAauxiliarysupplysystemb) AnalysevariousfaultsSCADAauxiliarysupplysystemcanbesubjectedto.c) ShowedprovenabilitytoclearfaultinSCADAauxiliarysupply.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|62
ITEM6.03CHECKINGOFDATACOMMUNICATIONINTEGRITYPERFORMANCECheckingOfDataCommunicationIntegrity
CONDITIONSFORASSESSMENTa) WhatismeantbydataCommunicationIntegrity?b) ProcedureforcheckingdataCommunicationintegrity.
CRITERIAFORASSESSMENT
a) CorrectlyexplaineddataCommunicationintegrityb) CouldfollowupprocedureforcheckingDataCommunicationintegrity
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|63
ITEM6.04HANDLINGOFSCADAADMINISTRATIONPERFORMANCEHandlingOfSCADAAdministration
CONDITIONSFORASSESSMENTa) ExplainwhatismeantbySCADAAdministrationb) TraineetofollowupprocedureforhandlingSCADAAdministration.
CRITERIAFORASSESSMENTa) TraineegavegoodexplanationonSCADAAdministrationb) TraineecouldcompletelyhandleSCADAAdministrationc) TraineecouldcompetentlyhandleSCADAAdministration
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|64
ITEM6.05MAINTENANCEOFSCADADATABASEPERFORMANCEMaintenanceOfSCADADatabase
CONDITIONSFORASSESSMENTa) TraineetofollowupprocedureformaintenanceofSCADADatabaseb) DetailsofwaysinwhichSCADAisusedintheNetworkc) ItemstocheckduringthemaintenanceofSCADADatabase
CRITERIAFORASSESSMENTa) TrainingshowedgoodknowledgeoftheprocedureformaintenanceofSCADA
Databaseb) OverallknowledgeinSCADAisgood.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|65
ITEM7.01IDENTIFICATIONOFTOOLSANDEQUIPMENTFORTHETRADEPERFORMANCEIdentificationofToolsandEquipmentfortheTrade
CONDITIONSFORASSESSMENTa) ToolsintheDepartmentismadeavailabletotheTraineeb) Traineepreviouslytaughtnamesofeachtoolc) Theuseofeachtoolandthetechniquesofapplyingthetooltobetaughttothe
Trainees.
CRITERIAFORASSESSMENT1. Traineecouldgivethenamesofeachtool2. Traineeknowswhateachtoolisusedforandhowtouseit.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|66
ITEM7.02IDENTIFICATIONOF132KVAND330KVMATERIALSPERFORMANCEIdentificationof132kvand330kvmaterials
CONDITIONSFORASSESSMENTa) TheTraineeisshownthematerialsfor132kvand330kvb) Thenamesofeachmaterialandtherespectivefunctionaremadeavailabletothe
trainingc) Traineeistaughthowtofixsomeofthematerials
CRITERIAFORASSESSMENTa) Traineecouldcorrectlyidentifymaterialsfor132kvand330kvb) TheTraineecouldgivethenameofthematerialsandtheirrespectivefunctions.c) Goodknowledgeonhowtofixsomeofthematerialswasshown
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|67
ITEM7.03PRACTICETIEINGOFKNOTS,BENDSANDHITCHESPERFORMANCEPracticeTieingOfKnots,BendsAndHitches
CONDITIONSFORASSESSMENTa) ThesupervisorshowedtheTraineehowtotieknots,BendsandHitchesb) TraineemadeseveralPractices:CloveHitch,SinglehalfHitch,DoublehalfHitch,
Figuresknot,SingleBowline,DoubleBowline,longSplice,backSplice,EyeSplice,SingleSheetBendsetc
CRITERIAFORASSESSMENTTraineeshowedcompetencyintieingvarioustypesofknots,BendsandHitches
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|68
ITEM7.04PATROLLINESANDWRITEREPORTPERFORMANCEPatrolLinesandWriteReport
CONDITIONSFORASSESSMENTa) TheTraineeismadetoknowsomeofthethingstoobservecriticallywhenpatrolling
theline. BrokenSuspensioninsulator Theskywire TheTower MechanicalStrength NoErosion
b) Somechallengesthelinesmenmeetwhilepatrollingthelineintheforestc) WritingofReportafterPatrolling.
CRITERIAFORASSESSMENTa) Traineeshowedcompetencyinidentifyingfaultypartsintheline.b) Awareofsomechallengesintheforestandhowtoovercomethem.c) Couldcompetentlywriteagoodreportafterpatrolling.
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|69
ITEM7.05USEOFREEVTACKBLOCKSPERFORMANCEUseOfReevTackBlocks
CONDITIONSFORASSESSMENTa) LiftingofmaterialsupusingReevTackBlockb) TrainingtopracticeandmastertheuseofReevTackBlocks.
CRITERIAFORASSESSMENTa) TraineesatisfactorilyshowedcompetencyintheuseofReevTackBlockb)
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:
Page|70
ITEM7.06INTRODUCTIONTOMAINTENANCEOFLIVELINESPERFORMANCEIntroductiontoMaintenanceofLiveLines
CONDITIONSFORASSESSMENTa) TraineeexposedtolivelineEquipmentb) SoundunderstandingoftheprinciplebehindthelivelineEquipmentc) AtthisstagetheTraineemaynotbeexpertinlivelinemaintenancebutshouldbe
wellexposedtorudimentsoflivelinemaintenance.
CRITERIAFORASSESSMENTa) Traineeshowedsoundunderstandingoftheprinciplebehindtheliveline
Equipmentb) Correctlyexplainedthemethodsthelivelinemencarryouttheirfunctionasateam
TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date: