  NATIONAL POWER TRAINING INSTITUTE OF NIGERIA TRANSMISSION 1.0 SYSTEM OPERATIONS 2.0 PROTECTION CONTROL  AND METERING (PC&M) 3.0 ELECTRICAL MAINTENANCE 4.0 SYSTEM COMMUNICATION 5.0 SYSTEM PLANNING 6.0 SUPERVISORY  CONTROL  AND DATA  ACQUISITION (SCADA) 7.0 LINES MAINTENANCE LOG BOOK ON FIELD EXPERIENCE

COMPLETE TRANSMISSION LOG BOOK (1).pdf

Embed Size (px)

Citation preview

  • NATIONALPOWERTRAININGINSTITUTEOFNIGERIA

    TRANSMISSION

    1.0 SYSTEMOPERATIONS2.0 PROTECTIONCONTROLANDMETERING(PC&M)3.0 ELECTRICALMAINTENANCE4.0 SYSTEMCOMMUNICATION5.0 SYSTEMPLANNING6.0 SUPERVISORYCONTROLANDDATAACQUISITION(SCADA)7.0 LINESMAINTENANCE

    LOG BOOK

    ON FIELD

    EXPERIENCE

  • Page|1

    ITEM1.0SYSTEMOPERATIONS

    1.01 IDENTIFICATIONOFPOWERSYSTEMCOMPONENTS1.02 FAMILIARWITHTHESTATIONSETUPANDREPRESENTTHESTATION

    INSINGLELINEDIAGRAM1.03 IDENTIFICATIONOFVARIOUSTYPESOFRELAYSINTHESTATION1.04 IDENTIFICATIONOFMEASURINGANDINDICATINGDEVICES1.05 CARRYINGOUTROUTINEINSPECTION1.06 IDENTIFICATIONANDUSEOFCOMMUNICATIONMEDIA1.07 IDENTIFICATIONOFVARIOUSAUXILIARYEQUIPMENTSE.GBATTERY

    BANKS,CHARGERS,STANDBYGENERATOR,AIRCOMPRESSORSYSTEMETC.

    1.08 UNDERSTANDINGINTERCONNECTEDSYSTEMANDRELATINGWITHN.C.C.

    1.09 HOWTOCOMPREHENSIVELYLOGOPERATIONALEVENTSINTHESTATIONLOGBOOK

    1.10 DETERMINATIONOFFACTORSTHATCOULDAFFECTSYSTEMSTABILITY

  • Page|2

    ITEM2.0

    PROTECTIONCONTROLANDMETERING(PC&M)

    2.01 NEEDFORPROTECTIONINPOWERSYSTEM2.02 BATTERYBANK/CHARGER2.03 USEOFTESTEQUIPMENTS2.04 RELAYFUNCTIONANDUSEINPROTECTION2.05 CIRCUITSANDSCHEMATICDIAGRAMSINFAULTTRACINGAND

    TROUBLESHOOTING.2.06 FAULTCALCULATIONANDPROTECTION2.07 DISTANCEPROTECTIONANDSETTING2.08 PTANDCTINPOWERSYSTEM2.09 TRANSFORMERTYPESANDCONNECTION2.010 POWERTRANSFORMERPROTECTION2.011 LINEPROTECTION2.012 TRANSIENTFAULTANDAUTORECLOSURE2.013 CAUSESOFOVERVOLTAGEINPOWERSYSTEMLIGHTNING

    ARRESTER.2.014 SYSTEMEARTHINGANDEARTHINGTRANSFORMER2.015 DIFFERENTIALPROTECTION

  • Page|3

    ITEM3.0

    ELECTRICALMAINTENANCE

    3.01 DEFINITIONOFSWITCHGEAREQUIPMENT3.02 SPECIFYRATINGS,FUNCTIONS,BREAKINGCAPACITY3.03 SELECTIONOFCIRCUITBREAKER3.04 IDENTIFYINGARCEXTINCTIONMEDIAEMPLOYEDINCIRCUIT BREAKER3.05 INSPECTIONOFOILINCIRCUITBREAKERS3.06 TESTOILINOTHERCHAMBERS(INCIRCUITBREAKER)3.07 MAINTENANCEOFCONTACTSOFCIRCUITBREAKER3.08 ABILITYTOCHECKTHETRIPPING,OPERATINGANDINTERLOCKINGMECHANISM3.09 MAINTENANCEOFSF6INTERRUPTERS3.10 MAINTENANCEOFVACUUMCIRCUITBREAKERS3.11 MAINTENANCEPROCEDUREFOROPERATINGMECHANISM3.12 MAINTENANCEPROCEDUREFOROIL3.13 MAINTENANCEPROCEDUREFORSWITCHGEARAUXILIARIESAND BATTERYBANKS3.14 TRANSFORMERASSEMBLIES.ABILITYTORECOGNIZETHREE MAJORSUBASSEMBLIESASSOCIATEDWITHATRANSFORMER3.15 IDENTIFYWHATMADEUPTHECOOLINGSYSTEMFORAPOWER TRANSFORMERANDRECTIFYFAULTYPARTS.

  • Page|4

    ITEM4.0

    SYSTEMCOMMUNICATION4.01 MAINTENANCEOFCOMMUNICATIONEQUIPMENTS4.02 MAINTENANCEOFCOMMUNICATIONAUXILIARYPOWER SYSTEM4.03 MAINTENANCEOFVOICEANDDATACOMMUNICATION CHANNELS4.04 MAINTENANCEOFCOMMUNICATIONFRONTEND EQUIPMENT4.05 MAINTENANCEOFFIBREOPTICCOMMUNICATIONMEDIUM INSTALLATION4.06 TESTINGTHEINSTALLEDFIBREOPTICCABLE4.07 FIBREOPTICCABLESPLICING4.08 MAINTENANCEOFRADIOANDMICROWAVELINK COMMUNICATIONDEVICES.

  • Page|5

    ITEM5.0

    SYSTEMPLANNING

    5.01 POWERSYSTEMSTUDIES5.02 CONNECTIONSANDEVACUATIONSTUDIES5.03 POLICY,DESIGNANDPROCUREMENT5.04 TRANSMISSIONDEVELOPMENTPLAN

  • Page|6

    ITEM6.0

    SUPERVISORYCONTROLANDDATAACQUISITION(SCADA)

    6.01 INSPECTIONOFSCADAFRONTENDEQUIPMENT6.02 MAINTENANCEOFSCADAAUXILIARYPOWERSUPPLYSYSTEM6.03 CHECKINGOFDATACOMMUNICATIONINTEGRITY6.04 HANDLINGOFSCADAADMINISTRATION6.05 MAINTENANCEOFSCADADATABASE

  • Page|7

    ITEM7.0

    LINESMAINTENANCE

    7.01 IDENTIFICATIONOFTOOLSANDEQUIPMENTFORTHETRADE7.02 IDENTIFICATIONOF132KVAND330KVMATERIALS7.03 PRACTICETIEINGOFKNOTSBENDSANDHITCHES.7.04 PATROLLINESANDWRITINGOFREPORT7.05 USEOFREEVTACKBLOCK7.06 INTRODUCTIONTOMAINTENANCEOFLIVELINE

  • Page|8

    ITEM1.01IDENTIFICATIONOFPOWERSYSTEMCOMPONENTS PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    IdentificationofPowerSystemcomponents:CircuitBreakers,Transformers,Generators,BusBar,BusCoupler,BusSection,Isolators,andtheirfunctions.

    Eachofthecomponentstobeproperlyidentifiedandtheirrespectivefunctionswellexplained1. Thevariouspowersystemcomponentsshouldbewellidentified2. Abletodifferentbetweenthevariouscomponents3. Abletounderstandandexplainthefunctionsofeachofthepowersystemcomponents

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1) Identificationofthevariouspowersystemcomponents:a) CircuitBreakers,b) Transformers,c) Generators,d) BusBar,e) BusCoupler,f) BusSection,g) Isolators,

    2) Understandingoftheirfunctions

  • Page|9

    ITEM1.02FAMILIARWITHTHESTATIONSETUPANDREPRESENTTHESTATIONINSINGLELINEDIAGRAM PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Traineeshouldbeable torepresenta transmissionStation inASingleLinediagramandcorrectly use symbols for various Components e.g. Isolators, Circuit Breakers,Transformers,BusBars,etc.andalsocorrectlyidentifiedthemintheControlRoomPanels.

    1. TheTraineeshouldshowprovenabilitytocorrectlyrepresenthisStationinsinglelinediagram

    2. Correctly Use symbols corresponding to various power system components andidentifysameontheControlRoomPanela) SingleLineDiagramCorrectlyDrawnb) SymbolsCorrectlyUsedc) CorrectidentificationofSymbolsontheControlRoomPanels

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. Detailunderstandingofwhatatransmissionstationentails

    2. AbilitytorepresentatransmissionstationinasinglelinediagramandcorrectlyusesymbolstorepresentvariouscomponentslikeCircuitBreakers,Transformers,Generators,BusBar,BusCoupler,BusSection,andIsolatorsonthediagram

  • Page|10

    ITEM1.03IDENTIFICATIONOFVARIOUSTYPESOFRELAYSINTHESTATION PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Identification of various types of Relays in the Station and correctly Reset them afteroperation.

    TraineeshouldbeabletoidentifycorrectlydifferenttypesofRelays intheStation,explaintheir corresponding or specific functions and also correctly reset the relays afteroperation.

    1. RelaysCorrectlyidentified2. correspondingFunctions/AreaofApplicationWellExplained3. CouldcorrectlyResetanyoftheRelay

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    Traineeshouldbeableto:a) IdentifycorrectlydifferenttypesofRelaysintheStation,b) Explainthespecificfunctionsofthevarioustypesofrelaysandtheirapplicationsc) Correctlyresettherelaysafteroperation.

  • Page|11

    ITEM1.04IDENTIFICATIONOFMEASURINGANDINDICATINGDEVICES PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Identification of Measuring and indicating Devices and should be able to read themcorrectly.

    Trainees should be able to identify Frequency Meters, Synchroscope, Megawatt Meter,MVAMeter,Ammeter,Voltmeter,etc.Andbeabletoreadthemcorrectly.

    1. IdentifiedthevariousMetersCorrectly2. Understandandexplainthetypeofmeasurementeachmeterisusedfor3. Carry out a simplemeasurementwith variousmeters and correctly read the

    indicatedmeasurementonthemeter

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. Identification of various measuring and indication meters like Frequency Meters,Synchroscope,MegawattMeter,MVAMeter,Ammeter,Voltmeter,

    2. Understandingof how to use thesemeters formeasurement and correctly take theirreadings

  • Page|12

    ITEM1.05CARRYINGOUTROUTINEINSPECTION PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    CarryingoutofRoutingInspectionandreportsameaccurately.

    Ability to identify Minor defects on components during routine Inspection is required.Alsoitisnecessarytobeabletoreportaccuratelytheobserveddefects.1. TheTraineeshowsprovenabilityintheidentificationofMinorDefects.2. CouldCorrectlyreportobserveddefects.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. Identificationofminordefectsoncomponentsduringroutineinspection2. Understandingtheaccuratewaytoreportobserveddefects

  • Page|13

    ITEM1.06IDENTIFICATIONANDUSEOFCOMMUNICATIONMEDIA PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Trainees identify and explain the use of various CommunicationMedia available in theStation.

    The Trainee should understand and be able to explain the importance of having aneffective communication system in an Electricity Industry. Also he should be able toidentify various types that are available in their respective Stations and use themcorrectly.1. ImportanceofanEffectiveCommunicationSystemwellexplained.2. VariousTypesofCommunicationMediawellidentified3. ShowProvenAbilityintheuseofCommunicationMedia.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. IdentificationofvariousCommunicationMediaavailableintheStation2. ExplaintheuseofvariousCommunicationMediaavailableintheStation.

  • Page|14

    ITEM1.07IDENTIFICATIONOFVARIOUSAUXILIARYEQUIPMENTSE.GBATTERYBANKS,CHARGERS,STANDBYGENERATOR,AIRCOMPRESSORSYSTEMETC. PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Identification of various Auxiliary Equipment like Battery Banks, Chargers, StandbyGenerators,AirCompressorSystem,etc.

    TheTraineesshouldbeabletocarryoutroutineinspectionsontheauxiliaryequipmentandalsocorrectlyreportobserveddefects.Theimportanceofeachoftheauxiliaryequipmenttobeproperlyexplained.1. FunctionsofeachoftheAuxiliaryEquipmentwellspellout.2. EachAuxiliaryEquipmentcorrectlyidentified.3. CouldcarryoutRoutineInspectionsoneachAuxiliaryEquipment4. DefectsontheAuxiliaryEquipmentcorrectlyreported.

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. Understandandexplainwhatauxiliaryequipmentisabout2. Identifyvariousauxiliaryequipment3. Explainthefunctionsofeachauxiliaryequipment

  • Page|15

    ITEM1.08UNDERSTANDINGINTERCONNECTEDSYSTEMANDRELATINGWITHN.C.C. PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Showa fullyunderstandingofPHCN InterconnectedSystemand theneed to relatewithNCC(NationalControlCentre)onmattersaffectingtheGridSystem.PreparecorrectlyProtectionGuaranteeCertificateslikeO.F.2,O.F.3.O.F.4

    TheTraineeshouldbeabletoappreciatePHCNInterConnectedSystem;theneedtorelatewithNCC(NationalControlCentre)onmattersaffectingGridSystem.CorrectpreparationofProtectionGuaranteeCertificatelikeO.F.2,O.F.3,O.F.4isalsorequired.1. ShowedgoodunderstandingofPHCNInterConnectedSystem2. RolesofNCCwellstated3. CorrectlyprepareProtectionGuaranteeCertificatelikeO.F.2,O.F.3,O.F.4etc.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. Understand andexplain thePHCN InterConnectedSystemand the importanceofrelatingwithNCC(NationalControlCentre)onmattersaffectingGridSystem.

    2. ExplainhowtoprepareofProtectionGuaranteeCertificatelikeO.F.2,O.F.3,O.F.4isalsorequired.

  • Page|16

    ITEM1.09HOWTOCOMPREHENSIVELYLOGOPERATIONALEVENTSINTHESTATIONLOGBOOK PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    LogcomprehensiblyoperationaleventsintheStationLogBookO.F.56.DeterminefullythedutiesandresponsibilitiesoftheSystemOperators

    AbilitytokeepdetailedrecordsoftheoperationaleventsintheStationLogBookO.F.56isrequired.The Trainee should be able to state satisfactorily the duties and responsibilities of theSystemOperators.1. OperationaleventswellwrittenintheLogBookO.F.56.2. FullyawareofthedutiesandresponsibilitiesoftheSystemOperator.

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. KeepingofdetailedrecordsoftheoperationaleventsintheStationLogBookO.F.562. StatesatisfactorilythedutiesandresponsibilitiesoftheSystemOperators.

  • Page|17

    ITEM1.10DETERMINATIONOFFACTORSTHATCOULDAFFECTSYSTEMSTABILITY PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    DeterminefactorsthatcouldaffectSystemstability.StatesomeOperationalSwitchingthatcancauseinstability.Prepare,checkandmakeeffectivetheProtectionGuaranteeCertificates

    TraineeshouldbeabletoexplainfullyfactorsthatcouldaffectSystemstability.StatecorrectlyoperationalswitchingthatcancauseSysteminstability.Preparation, checking and making effective the Protection Guarantee Certificate, to becorrectlydonebytheTrainees.

    1. CorrectlydeterminefactorsthatcouldaffectSystemStability2. StatecorrectlyoperationalswitchingthatcancauseSysteminstability3. Correctly prepare, check and make effective the Protection Guarantee

    Certificate.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. DetailedunderstandingandexplanationoffactorsthatcouldaffectSystemstability.2. StatecorrectlyoperationalSwitchingthatcancauseSysteminstability3. TraineestocorrectlyPrepare,checkandmakingeffectivetheProtectionGuarantee

    Certificate

  • Page|18

    ITEM2.01NEEDFORPROTECTIONINPOWERSYSTEM PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    UnderstandthereasonswhyProtectionisnecessaryinPowerSystem

    ReasonswhyProtectionisrequiredtobegiventothesatisfactionofassessorwithparticularreferenceto:

    1. Preventingdamagetoequipment2. PreventingSysteminstability3. Minimizingloseofsuppliestothecustomer4. SafetyofthePersonnel/Public5. Isolatingonlyfaultysection

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. KnowledgeofbriefhistoryofdevelopmentofProtectioninPowerSystemisrequired2. UseofFuseasmeansofProtection3. RelayingProtectionVerbaldescriptionwithillustrationonpaper4. GoodunderstandingofdevelopmentofRelayingProtection

  • Page|19

    ITEM2.02BATTERYBANK/CHARGER PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    WhatdoyouunderstandbyBatteryBanks/Charger?GivedetailsofitsimportanceinoverallProtectionSystemintheDistribution.

    TheassessorissatisfiedwiththePupilEngineersiftheycancorrectlyexplan:1. ThesourceofD.Csupply2. TheneedforD.Csupply3. MaintenanceofD.Csupply

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. FullunderstandingofsourceofD.Csupply2. MaintenanceoftheStationbattery3. Fullunderstandingoftherectifyingcircuitsofthecharger4. UseofD.Cforalarmandindication5. UseofD.C.fortripping6. WhatdeterminetheAmperehourratingoftheD.C.sourceinastation7. OtherusesofD.C.supplyinProtectionScheme.

  • Page|20

    ITEM2.03USEOFTESTEQUIPMENTS PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    DemonstratehoweachoftheTestingequipmentinPC&MDepartmentcanbeusedonthefieldandgivevariousapplication(s)ofeachoftheequipment.

    1. CorrectlylistedequipmentsintheDepartment2. Showedgoodunderstandingoftheuseofeachequipment3. CancorrectlyconnecttheavailableequipmentforTesting

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    TheTraineeshouldstateanddemonstratehowconnectionsaremadeforvarioususes(s)ofeachoftheequipment.Alsonecessaryprecautionstobetakenshouldbewellstated.

  • Page|21

    ITEM2.04RELAYFUNCTIONANDUSEINPROTECTION PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    EXPLAINTHEFUNCTIONOFRELAYINPROTECTIONOFFAULTINPOWERCIRCUITKNOWLEDGEOFBASICCIRCUIT.THESENSING,COMPARISONANDCONTROLSHOWRELAYCOILCONTROLLINGTHEBREAKERTRIPCIRCUIT.

    1. SATISFACTORILYEXPLAINED.RELAYFUNCTIONANDIDENTIFIEDTHERELAY,CBANDRELATIONINFAULTCLEARING.

    2. DESCRIBEDTHEBASICTRIPUNIT.3. 3BASICELEMENTANDTYPESOFRELAYIDENTIFIED

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. IDENTIFYRELAYANDITSFUNCTION2. KNOWLEDGEOFTHERELAYCIRCUIT,THESENSINGUNIT,COMPARATORWITHSETANDCONTROL

    SIGNALTOCBTRIPUNIT.3. UNDERSTANDINGTHEDCCIRCUITOFTHECBANDITSRELATIONSHIPWITHTHECBTRIPUNIT4. TYPEOFRELAYS(O/C,E/FDISTANCE)ANDBASICFUNCTION5. IDENTIFYDEVICENOINRELAYSCHEMATICDIAGRAM(51,86)ETC

  • Page|22

    ITEM2.05CIRCUITSANDSCHEMATICDIAGRAMSINFAULTTRACINGANDTROUBLESHOOTING. PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    DEMONSTRATEWITHTHEUSEOFSTATIONLINEDIAGRAMANDSCHEMATICDIAGRAMANDUSEOFBASICSEQUIPMENTINFAULTYCIRCUITMAINTENANCE.

    1. KNOWLEDGEOFLINEANDSCHEMATICDIAGRAMOFTHESTATION2. PRACTICALILLUSTRATIONONHOWTOCLEARFAULTUSINGNECESSARYEQUIPMENT3. EXAMPLEILLUSTRATEDBYTHETRAINEETOBEASSESSED.

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. KNOWLEDGEOFINSTRUMENTUSEDFORFAULTTRACINGINPOWERCIRCUIT2. EXPLANATIONOFATRIPOFARELAYANDHOWTHEFAULTCANBETRACEDUSINGTHEDIAGRAM.

    ALSO,EQUIPMENTTOBEUSED3. CASESTUDYONONESUCHJOBTOBEDEMONSTRATED

  • Page|23

    ITEM2.06FAULTCALCULATIONANDPROTECTION PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    STATETHEDIFFERENTTYPESOFFAULTINPOWERSYSTEM.ANALYSESHORTCIRCUITFAULTANDCALCULATIONTHATISTAKENINTOCONSIDERATIONINRELAYSETTING.I.ETRANSIENTFAULT.

    1. UNDERSTOODCAUSESOFFAULT(SWITCHING,LIGHTNING,INSULATIONFAILUREOFEQUIPMENTANDAPPARATUS,LINECUTETC)ANDTYPEOFPROTECTIVEDEVICEUSED

    2. ESTIMATEOFCOMPARATIVEFREQUENCYWHICHFAULTOCCURINVARIOUSCIRCUITINPOWERSYSTEMCIRCUIT

    3. KNOWLEDGEOFSHORTCIRCUITFAULT(L.E,LLE,LLLE)ANDSIMPLEFAULTCALCULATION

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. KNOWLEDGEOFCAUSESOFFAULTINPOWERSYSTEM.(GEN,TRANSMISSIONANDDISTRIBUTION)

    2. REMEDYOFPOWERSYSTEMFAULTBYPROTECTIONANDMETHODEMPLOYED3. DEMONSTRATIONOFTYPESOFPROTECTIONAPPLICATIONINTHEMAJORPOWERSYSTEM

    COMPONENTS.(O/C.E/FDIFFENTIALETC)

  • Page|24

    ITEM2.07DISTANCEPROTECTIONANDSETTING PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    COMPUTATIONOFASIMPLEO/CCOORDINATIONOFASIMPLERADIALSYSTEMUSINGFOURBUSEXAMPLES,REPRESENTATIONUSINGONELINEDIAGRAM.

    1. PRODUCEDSETTINGSFORDISTANCERELAY2. CONVERTEDBUSRADIALDIAGRAMTOLINEDIAGRAMFOROVERCURRENTRELAYCOORDINATION

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. SHOWEXAMPLEOFADISTANCERELAYSETTING2. ONELINEDIAGRAMOFTHESYSTEMREPRESENTEDBYPU.3. STUDENTPROVESABILITYTOCOMPUTESETTINGFORPROTECTIVERELAY(USINGLINEPROTECTION)

  • Page|25

    ITEM2.08PTANDCTINPOWERSYSTEMPERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    1) UNDERSTANDINGOFPTANDCTASITISUSEDINPOWERSYSTEMCONTROL,METERINGANDPROTECTION.FACTOROFDESIGN(I.E)=BURDEN,CLASS/ACCURACYE.G5P,10PETC.

    2) CTUSEDINAMMETER,WATTMETER,WATTHOURMETERANDPROTECTIVERELAYS.(TYPICAL5A/PRIMARY)

    3) PTUSEDINVOLTMETER,WATTMETER,WATTHOURMETER)ANDRELAYS.(TYPICALVSEC110).

    1. DEMONSTRATIONOFPRACTICAL(PRACTICAL).IDENTIFICATIONOFPT,CTANDVARIOUSVOLTAGELEVELINPOWERSYSTEMINSTALLATIONINCLUDINGINSWITCHGEARS.

    2. EXPLANATIONOFBURDENANDCLASS/ACCURACYTURNRATIO.3. CTSECONDARYMUSTBESHORTCIRCUITEDB/COFLOWLOADIMPEDANCE(BURDEN)

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. DESCRIPTIONOF(PTORVT)ANDCTANDTHEIRAPPLICATIONINPOWERSYSTEMMETERING,PROTECTIONANDCONTROL.

    2. SIMPLEDEMONSTRATIONOFTRANSFORMATIONRATIOCALCULATION.3. KNOWLEDGEOFTERMSLIKEBURDEN,CLASS/ACCURACYOFINSTRUMENTTRANSFORMER4. IDENTIFICATIONOFVT/CTINVARIOUSVOLTAGELEVELSOFPOWERSYSTEM(INCLUDING132KV

    AND330KVVOLTAGELEVEL.

  • Page|26

    ITEM2.09TRANSFORMERTYPESANDCONNECTIONPERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    FAMILIARWITHPOWERTRANSFORMERTYPESANDCONNECTION,DIFFERENTTYPESOFINSULATING/COOLINGOIL,METHODSOFTESTINGTRANSFORMERANDEQUIPMENTTOBEUSEDINEACHPROGRAMMEMAINTENANCE.

    1. UNDERSTANDINGOFUSEOFTRANSFORMERINSUPPLYCHAINOFPOWERSYSTEMANDCONNECTION.

    2. TYPEOFCOOLING(OIL,AIRANDWATER)3. BASICMAINTENANCESCHEDULEOFTRANSFORMER.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. SKETCHWITHLINEDIAGRAM,THEPOWERTRANSFORMERSTATIONTRANSFORMER,AUXILIARYTRANSFORMERANDVOLTAGERANGEASUSEDINPOWERSYSTEM.ILLUSTRATETHEUSEOFPOWERTRANSFORMERINATYPICALA. POWERSTATIONB. TRANSMISSIONSUBSTATIONC. Y,ANDYYCONNECTION/SYMBOLH1X1

    2. ILLUSTRATIONOFTHEUSEOFTRANSFORMEROILFILTERINGM/C.INSULATIONREADINGFORDIFFERENTVOLTAGELEVELOFTRANSFORMER

    3. MAINTENANCESCHEDULEOFTRANSFORMERANDEQUIPMENTUSEDINCARRYINGOUTTESTONTRANSFORMER

  • Page|27

    ITEM2.10POWERTRANSFORMERPROTECTIONPERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    KNOWLEDGEOFTRANSFORMERPROTECTION,IDENTIFICATIONOFTYPESOFFAULTONPOWERTRANFORMERANDTYPESOFPROTECTIONFORTHEFAULTS

    1. WHETHERPOWERTRANSFORMERFAULTSAREKNOWN2. WHETHERFAULTSABOVECANBEMATCHEDWITHEXISTINGPROTECTIONSCHEMESSUITABLEFOR

    CLEARINGITFROMTHESYSTEM.3. ILLUSTRATIONOFRELATIONSHIPBETWEENPROTECTIVERELAYANDCIRCUITBREAKER(DIAGRAM)

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. ENUMERATEDIFFERENTKINDSOFFAULTSINPOWERTRANSFORMER:A. WINDINGANDTERMINALB. COREC. TANKSD. ONLOADTAPCHARGERE. EXTERNALF. OVERLOADETC.

    2. DESCRIPTIONOFTHEPROTECTIONFORTHEFAULTSABOVE.3. DEMONSTRATIONOFCONNECTIONOFEACHPROTECTIVESCHEMETOTHENETWORKTHROUGH

    INSTRUMENTTRANSFORMER,FUNCTIONOFBULCHOZRELAY,(GROUPINGBYPHASEANGLEDISPLACEMENT).

  • Page|28

    ITEM2.11LINEPROTECTION PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    TOHAVEUNDERSTANDINGTHATFAULTOCCURSINLINESMORETHANOTHERPOWERSYSTEMCOMPONENTSSUCHASGENERATOR,TRANSFORMERANDSWITCHGEAR.KNOWLEDGEOFLINEPROTECTIONREQUIREMENTS:

    A. CBCLOSESTOSHORTCIRCUITSHOULDOPENALLOTHERSCLOSEDB. IFNEARESTCBDIDNOTOPEN,BACKUPCBSHOULDOPENC. RELAYOPERATIONALTIMESHOULDBESHORTTOALLOWSYSTEMSTABILITYD. THEMETHODOFLINEPROT.ARE(TIMEGRADEDO/C,DIFFERENTPROT.ANDDISTANCEPROT.

    1. UNDERSTANDINGOFNONUNITANDUNITLINEPROTECTION2. PRODUCEPROTECTIONSCHEMEFORTHEPROTECTION3. SHOWHOWLINEFAULTAREMOREFREQUENT,THEFREQUENCY,ANDHOWITISMOREDIFFICULT

    TOHANDLETHANOTHERCOMPONENTOFPOWERSYSTEMS,

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. PRACTICEOFNONUNITLINEPROT=TIMEGRADEDO/C,CURRENTGRADEDO/C(DISTANCEPROTORIMPEDANCE)PRACTICEOFUNITLINEPROT=PILOTWIREDIFFERENTIALPROTECTIONANDCARRIER.PROT,BASEDONPHASECOMPARISON.

    2. ILLUSTRATIONOFABOVESCHEMEUSINGDIAGRAM3. SIMPLECALCULATIONOFDISTANCEPROTECTIONANDCARRIERSPHASECOMPARISONSCHEMATIC

  • Page|29

    ITEM2.12TRANSIENTFAULTANDAUTORECLOSURE PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    1. SHOWTHEAPPLICATIONOFAUTORECLOSINGOFATRIPPEDCIRCUITANDADVANTAGES.SHOWTHELIMITATIONONTHEAPPLICATION.

    2. UNDERSTANDINGTHETRANSIENTFAULTINHVLINESDUETOLIGHTING,BIRDS,ANDTREEBRANCHES.THESEFAULTSCANDISAPPEARASSOONASTHEYAPPEAR.RECLOSUREOFTHECIRCUITISNECESSARYBYCBCLOSINGANDALLOWINGTHEFEEDERTOCONTINUEANDSTABILIZETHESYSTEM.

    3. THEYAREUSEDIFCBOPENSWHENTHEFAULTFAILSTODISAPPEAR.ITREMAINSOPENUNTILMANUALRESETUSED..ITISMOSTLYUSEDINUNATTENDEDSUBSTATIONANDRURALDISTRIBUTIONSCHEME.ITMINIMIZESOUTAGES.

    1. FULLUNDERSTANDINGOFCBINFAULTCLEARINGANDOVERLOADANDEARTHFAULTRELAYOPERATIONINLINEPROTECTION.

    2. THEBENEFITOFLINESECURITYBYMINIMIZATIONOFLINEOUTAGESDUETOFAULT,MAINLYTRANSIENTFAULTS.

    3. DIAGRAMOFAUTORECLOSURECIRCUIT.SHOULDBEDRAWN.

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. WHETHERTHEREASONFORAUTORECLOSUREISUNDERSTOODTHROUGHEXPLANATION2. THEADVANTAGESANDDISADVANTAGESHASTOBEILLUSTRATED3. PRACTICALKNOWLEDGEOFWHENTOUSEIT.

  • Page|30

    ITEM2.13CAUSESOFOVERVOLTAGEINPOWERSYSTEMLIGHTNINGARRESTER. PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    CAUSESOFOVERVOLTAGEINPOWERSYSTEMENUMERATED,SURGEPROTECTIONEXPLAINED,THELIGHTENINGARRESTORPRINCIPLEANDPRACTICALUSE.BILTHEOVERALLDANGERINEQUIPMENTANDINSTALLATIONIDENTIFIED.

    1. PROVEOFDIFFERENTKINDOFOVERVOLTAGEANDCAUSES2. ILLUSTRATIONOFPROTECTIONOFOVERVOLTAGEINPOWERSTATION,SUBSTATIONLINESAND

    DISTRIBUTIONLINES.

    COMMENT/SCORESINPERCENTAGESigned:Name:Date:

    1. KNOWLEDGEOFINTERNALANDEXTERNALOVERVOLTAGECAUSESIDENTIFIED.2. INTERNALOVERVOLTAGELEVELABOUT2OR3TIMES.PHASETOEARTHLEVEL.EXTERNAL(EG

    LIGHTENINGETC)3. PROTECTIONOFPOWERSTATIONANDSUBSTATIONFROMDIRECTLIGHTENINGARRESTORA. NODIRECTSHEILDB. SHEILDINGAGAINSTDIRECTLIGHTENINGSTRIKEC. WITHPROTECTIVETUBE0.8KMFROMSTATIONPROTECTIVESCHEME.

  • Page|31

    ITEM2.14SYSTEMEARTHINGANDEARTHINGTRANSFORMERPERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    STATETHEOBJECTSOFEARTHINGPOWERSYSTEMEQUIPMENTANDINSTALLATION:A. TOPREVENTSHOCKBYALLOWINGFAULTYCURRENTREMAINATZEROPOTENTIALB. PROTECTPERSONNELFROMSURGESANDLIGHTENINGSTRIKEBYPROVIDINGDISCHARGED

    PARTFORARRESTERSETCC. PROVIDINGGROUNDCONNECTIONFORNUETRALEARTHING.

    1. PRACTICALDEMONSTRATIONANDORALEXPLANATIONNEUTRAL/SYSTEMEARTHINGINVARIOUSINSTALLATION

    2. EARTHELECTRODE,EARTHMATANDEARTHRESISTANCE,TESTINGKNOWLEDGE3. TESTINGEQUIPMENTANDMATERIALSFORTESTINGLISTED

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. ABLETOILLUSTRATESKETCHESOFEQUIPMENTEARTHCONNECTIONANDSYSTEMNUETRALEARTHINGANDEARTHINGTRANSFORMER

    2. STATIONSUSEEARTHMATMADEOFFLATIRONWHICHDISTRIBUTESPOTENTIALGRADIENTASTHERESISTANCEOFTHEIRONISDISTRIBUTEDANDTHEPOTENTIALBEINGSAFETOHUMANINTOUCH(HAND)ANDSTEP(FEET)POTENTIAL.

    3. PERFORMEARTHRESISTANCETEST,UNDERSTANDPERMISSIBLEEARTHRESISTANCEOFA. LARGERPOWERSTATION0.5OHMSB. MAJORPOWERSTATION1.0OHMSC. SMALLSUBSTATION2.0OHMSD. TERMSLIKEEARTHELECTRODEANDEARTHLEADDEFINITIONEXPLAINEDE. SOILRESISTIVITYTESTDESCRIBED

  • Page|32

    ITEM2.15DIFFERENTIALPROTECTION PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    STATETHEIMPORTANCEOFDIFFERENTIALPROTECTIONRELAYSINPOWERSYSTEMPROTECTIONANDPRACTICALDEMONSTRATION.

    1. SKETCHESOFDIFFERENTIALRELAYSINPOWERSYSTEMCHAINPROPERLYDRAWNCURRENTFLOWINDICATED

    2. IMPORTANCEOFDIFFERENTIALRELAYWELLEXPLAINED3. PRACTICALWIRINGSUCCESSFULLYDONEANDSTIMULATED

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. SKETCHDIFFERENTIALRELAYASAPPLIEDTOGENERATORTRANSFORMERUNIT,TRANSFORMERFEEDER,TRANSMISSIONLINES,LARGEMOTORSANDBUSBARS

    2. ILLUSTRATESIMPLEDIAGRAMANDCURRENTFLOWILLUSTRATIONA. CURRENTDIFFERENTIALRELAYSFOREXTERNALLOADORFAULTB. CURRENTDIFFERENTIALRELAYSFORINTERNALFAULTC. VOLTAGEBALANCEDIFFERENTIALRELAYFORFEEDERTHROUGHPILOTWIRED. PRACTICALWIRINGANDDEMONSTRATION

  • Page|33

    ITEM3.01DEFINITIONOFSWITCHGEAREQUIPMENTANDISOLATIONINPOWERSYSTEMINCLUDINGCONSUMERCONTROLGEAR PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    TrainingshoulddefineComponentsofSwitchgearinPowerSystemasusedinPowerGenerationTransmissionandDistributionincludingConsumerControlgear

    1. TheTraineehaslistedtheswitchgearsincategories:2. Hehasexplainedthefunctionofeachcategory3. Hehasillustratedswitchgearcomponentsasusedforindoorandoutdoorfacilities.4. TheArcquenchingandoperatingmediumofacircuitbreakerisexplained

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. TheTraineeshouldlistallEquipmentofSwitchgear(HINT)SwitchgearsEquipmentfallintoCategories:(A)Isolator(b)LoadBreakSwitches(C)EarthSwitchesCircuitBreakers

    2. Heshouldexplainthefunctionofeachcategorye.g.CircuitBreaker,isolatoretc.3. ShouldbetaughtbothIndoorandOutdoorswitchesSystem.UsingSketchesand

    DiagramsincludingsinglelineDiagrams.Toillustratethedifference

  • Page|34

    ITEM3.02SPECIFYRATINGS,FUNCTIONS,BREAKINGCAPACITY PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    BriefrevisionofIsolators,EarthSwitches,particularlyinOutdoorSwitchingisrequired.FullStudyandUnderstandingofCircuitBreakers:(a) Functions(b)Rating(c)BreakingCapacity(Types(e)Interruption(f)Busarrangement

    1. Assesthetraineeonpracticaldemonstrationofhistheoreticalknowledgeofacircuitbreaker

    2. HeshouldproducereportofhowthestationCBIISmaintainedusingthestationcasestudy

    3. Illustratehisknowledgeofratedcurrentandbreakingcurrentofacircuitbreaker.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. ThemostimportantcomponentofSwitchgeariscircuitbreakertraineeshouldbeexposedwithmanualsanddiagramsandliteraturesofallkindsofCBinthestation

    2. ShouldstudyallkindsofmaintenancerequiredforCB3. Demonstratetherelationshipbetweenprotectiverelaysandcircuitbreaker4. KnowledgeofdangerinopeningIsolatoronload,toopenacircuitCBfirst

  • Page|35

    ITEM3.03SELECTIONOFCIRCUITBREAKERPERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    TheTraineeshouldbeabletoselectappropriatecircuitbreakerforaspecifiedlocation.

    1. Factorinfluencingtheselectionofcircuitbreakerwellstated

    2. Correctlycalculatedtheappropriateratingofthecircuitbreaker

    3. Accuratelydeterminetherupturingcapacityofthecapacityofthecircuitbreaker

    4. Correctlyselectedappropriatetype

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    1. Beabletostateclearlythefactorstobeconsideredforselectingcircuitbreakerforaparticularlocation

    2. Accuratelyabletocalculatetheratingbasedontheloadforthecircuitbreaker3. Goodknowledgeonhowtocalculatethebreakingcapacityofthecircuitbreaker,

    accuratelycalculatethemagnitudeofthefaultcurrentforasymmetrical3phasefault4. Selectappropriatetype

  • Page|36

    ITEM3.04IDENTIFYINGARCEXTINCTIONMEDIAEMPLOYEDINCIRCUITBREAKER PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    TheTraineeshouldbeabletolistvariousArcExtinctionMediaemployedinCircuitbreaker

    ThetraineewithoutreferringtohislogbooklistthefollowingArcExtinctionmedia,theirfunctions,advantage/disadvantages

    (1) AirAtmosphericAir/CompressedAir(2) DielectricOil(TransformerOil)(3) SulphurHexafluoride(SF6)Gas(4) Vacuum

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    TheTraineeisabletoexplaintheimportantofArcExtinctionmediaemployedincircuitbreakersandgiveadvantagesanddisadvantagesofeachofthem

  • Page|37

    ITEM3.05INSPECTIONOFOILINCIRCUITBREAKERS PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Thetraineeshouldbeabletodrawoffwetordirtyoilfromthebottomofcircuitbreakerandcarryoutbreakdowntestontheoil.

    (a) TraineecorrectlySpecifywhatisregardedasnormaldutyandwhatisregardedasheavydutyasfarasfrequencyofoperation

    (b) Couldcarryoutsampletest(c) Showedprovenabilityonhowtoreconditiontheoiltoimproveonbreakdownvoltage

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) Traineetoknowthatfornormalduty,theinspectionshouldbedoneevery12monthswhileforheavydutyitshouldbedonemonthly.

    (b) AbletocarryoutTestonthesampletoBS.148(c) Knowwhattodoifbreakdownoccursbelow22KV(d) Mustknowtheleastbreakdownvoltageacceptable

  • Page|38

    ITEM3.06TESTOILINOTHERCHAMBERS(INCIRCUITBREAKER) PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    TestOilinotherchambersofthecircuitbreaker

    (a) CorrectlySpecifyperiodbetweeninspection(b) Correctlycarryoutsampletest(c) Fullyunderstandsituationforcompleterenewifnecessary.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) AbletospecifyperiodbetweeninspectionsfornormaldutyandforheavydutyforoilinotherChambersoftheCircuitbreaker

    (b) Couldcarryoutsampletestonthesampleoilin(a)above(c) Similarlycouldcarryoutreconditioningprocedureifitbecomesnecessaryfromthe

    valueofbreakdownvoltageobtained.

  • Page|39

    ITEM3.07MAINTENANCEOFCONTACTSOFCIRCUITBREAKER PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Maintenanceofcontactsofcircuitbreaker

    (a) PeriodofInspectionforheavydutyandfornormaldutyconditionforeachcontactwellstated.

    (b) Showedgoodunderstandingformethodofcleaningandhowtocarryoutothermaintenanceprocedure.

    (c) Clearlystatednecessaryprecautions

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) Thetraineetorecognizedifferenttypesofcontacts(b) PeriodofInspectionforheavydutyandnormaldutyforvarioustypesifcontacts

    Contacts(Plainfingertypesforoilcircuitbreaker) Contacts(rodandsocketorcontactorbutttypewitharccontrolchambersforoil

    circuitbreaker Contacts(Silverplatedplatedorsilverinsert) ArcChutes(Aircircuitbreaker)

    (c) Traineetobefamiliarwithmethodofcleaningandothermaintenanceprocedureforvarioustypes.

    (d) Necessaryprecautionsshouldbewellunderstood

  • Page|40

    ITEM3.08ABILITYTOCHECKTHETRIPPING,OPERATINGAND INTERLOCKINGMECHANISM PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Abilitytocheckthetripping,operating,andinterlockingmechanism

    (a) ThetraineewellexplainedthePrinciplesofoperationofthetripping,operating,andinterlockingmechanisms

    (b) Practicallyfollowedup,checkedandoperatedtripping,operatingandinterlockingmechanismbythemethodsprovidedtoensurethatallareinorder

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) Goodunderstandingoftheworkingprinciplesoftripping,operatingandinterlockingmechanisms

    (b) Abilitytochecktripping,operating,andinterlockingmechanismsbyrecognizedstandardmethods.

  • Page|41

    ITEM3.09MAINTENANCEOFSF6INTERRUPTERS PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    MaintenanceofSF6interrupters

    (a) ThetrainingclearlystatedtheadvantagesofSF6gasinacircuitbreaker(b) Traineetogivereasonwhythepressuremustbemaintainandtoshowunderstanding

    onhowtorefillthegas(c) ThetraineewellexplainedthePrinciplesofoperationofthetripping,operating,and

    interlockingmechanisms(d) Showedgoodunderstandingoftheoperatingmechanism

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) TheTraineeiswellfamiliarwiththeadvantagesofSF6gasinacircuitbreakerinstallation

    (b) Thetraineeunderstandsthefactthatitisnonflammable,fireriskseliminated(c) Producesnocarbonduringarcinterruption,sodielectricintegrityisnotimpairedby

    shortcircuitoperation.(d) Thetraineeisawarethatnooxidationofcontactsorcorrosionofcomponentsbecause

    SF6isaninertgas

  • Page|42

    ITEM3.10MAINTENANCEOFVACUUMCIRCUITBREAKERS PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    Maintenanceofvacuumcircuitbreaker

    (a) Traineewellstated,theadvantagesofvacuumcircuitbreaker(b) Capableofreadingtheoperationcounter,controlwearcheckandpredictionofthe

    operationallifeoftheequipmenttobeformulated.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) Abilitytostatetheadvantagesofvacuumcircuitbreakers(b) Awareofthefactthatlimitofcontactwearisreachedinnotlessthan50,000

    operations(c) UnderstandthatVacuumInterrupterscannotbemaintainedbutcanbereplacedafter

    limitofcontactwearsisreached

  • Page|43

    ITEM3.11MAINTENANCEPROCEDUREFOROPERATINGMECHANISM PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    MaintenanceProceduresforOperatingMechanisms

    (a) Traineecorrectlystatedthefunctionsofoperatingmechanism(b) Statedcorrectlyvarioustypesofoperatingmechanism(c) Listedmaintenancechecklistandshowedgoodunderstandingonhowtocarryout

    eachofthem.

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) Abilitytostatethefunctionsofoperatingmechanism(b) Abilitytostatevarioustypesofoperatingmechanism(c) Listmaintenancechecklistfortheoperatingmechanism

  • Page|44

    ITEM3.12MAINTENANCEPROCEDUREFOROILPERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    MaintenanceProceduresforoil

    (a) TraineecorrectlystatedthefunctionsofoilinElectricalSwitchgear(b) Traineestatedwellthepropertiesofoilinelectricalswitchgear(c) Showedgoodunderstandingofcharacteristicsandtheirlimitvalue

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) TraineecanexplainthefunctionsofoilinElectricalswitchgear(b) TraineecanstatecorrectlyPropertiesofoilusedinelectricalswitchgear(c) Explainwellwhyperiodicalpurificationisnecessary(d) Listofcharacteristicsandthelimitacceptable:e.gsludgevalue,Acidityafteroxidation,

    FlashPoint,pourpoint,viscosityetc.

  • Page|45

    ITEM3.13MAINTENANCEPROCEDUREFORSWITCHGEARAUXILIARIESANDBATTERYBANKS PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    MaintenanceProceduresforswitchgearAuxiliariesandbatterybanks

    (a) Traineeshowedgoodunderstatingofwhatastoragebatteryis(b) Traineeshowedgoodunderstandingofbatteryofcharger(c) Traineeshowedabilitytoworkonthestationswitchgearauxiliariesandbatterybank

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) Goodunderstandingofwhatastoragebatteryis.(b) Goodunderstandingofbatterychargers(c) AutomaticConstantPotentialChargerSpecifiedpracticallyforallstationcharger

    implicationsandgoodunderstatingofthefeaturesofthischarger.(d) Beabletoexplainfactorsaffectingbatterylife,effectofdeteriorationonbattering

    components,indicationsofbatterydeterioration.(e) Responsibilitiesofstationoperator

  • Page|46

    ITEM3.14TRANSFORMERASSEMBLIES.ABILITYTORECOGNIZETHREEMAJORSUBASSEMBLIESASSOCIATEDWITHATRANSFORMER PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    TransformerAssemblies.Abilitytorecognizethreemajorsubassembliesassociatedwithatransformerthatmustbeconsideredwhenafaultconditionisreportedonaunit.

    (a) TheTraineesuccessfullyidentifiedthecore,theelectricalcircuit(currentcarryingconductor)andthecoolingsystem

    (b) Traineecorrectlylistedtheproblemsthecoreissusceptibleto(c) Correctlydetermineinsulationbreakdownbetweenwindingandbetweenwindings

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    a) Thetraineeshouldbefamiliarwiththefollowing:(i) MagneticCircuit:Core(ii) Electricalcircuit:Currentcarrying,conductoranddevices(iii) CoolingSystem

    b) Traineeshouldknowproblemsthecoreissusceptibletoc) AbilitytodetermineInsulationtogroundandbetweenwindingsd) Familiarwithsignsandresultsoffailureofinsulatione) Faultsthatcurrentcarryingconductorsinthetransformeraresusceptibleto:

  • Page|47

    ITEM3.15IDENTIFYWHATMADEUPTHECOOLINGSYSTEMFORAPOWER TRANSFORMERANDRECTIFYFAULTYPARTS. PERFORMANCE

    CONDITIONS OF ASSESSMENT

    CRITERIA FOR ASSESSMENT

    TRAINING OBJECTIVE SATISFACTORILY COMPLETED

    ITEM1.01

    IdentifywhatmadeupthecoolingsystemforaPowertransformerandrectifyfaultypart.

    (a) Traineecorrectlylistedwhatthecoolingsystemconsistof(b) Traineecorrectlyexplainedthefactorsthataffectcoolingsystem(c) Traineecouldidentifyfaultsthatcancausefailureofacoolingsystemandrectify

    accordingly

    COMMENT/SCORESINPERCENTAGE Signed:Name:Date:

    (a) Traineewellfamiliarwithwhatmadeupthecoolingsysteminthepowertransformerinthestation.

    (b) FactorsthatcanaffectthecoolingsystemiswellknowntobeTrainee(c) Traineeknowstherelationshipbetweenthetransformersratedcapacityandthe

    coolingsystem.(d) Abilitytodetectallthecircumstancesurroundingthefailureofacoolingsystemand

    rectify.

  • Page|48

    ITEM4.01MAINTENANCEOFCOMMUNICATIONEQUIPMENTSPERFORMANCETraineeswillhaveagoodunderstandingoftheoperationsandcommunicationequipmentsinthestations.Carryoutmaintenanceofcommunicationequipments

    CONDITIONSFORASSESSMENTa) TheTraineeshouldfamiliarizeselfwithalltheCommunicationEquipmentsinthe

    Station.b) AbilitytoshowgoodunderstandingofeachoftheCommunicationEquipmentinthe

    Station.c) FollowupMaintenancerequirementforeachoftheCommunicationEquipment.CRITERIAFORASSESSMENTa) TheTraineeexhibitedgoodunderstandingofeachoftheCommunication

    Equipment.

    b) ConversantwithMaintenanceproceduresforeachCommunicationEquipment.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|49

    ITEM4.02MAINTENANCEOFCOMMUNICATIONAUXILIARYPOWERSYSTEMPERFORMANCETraineeswillhaveagoodunderstandingoftheoperationsandcommunicationauxiliarypowersysteminthestations.CarryoutmaintenanceofcommunicationauxiliarypowersystemCONDITIONSFORASSESSMENTa) TraineetofamiliarizewiththeCommunicationauxiliaryPowerSysteminthe

    Stationb) TraineetospellouttheneedtomaintainCommunicationauxiliaryPowerSystem.c) AnalysethefaultsthatarecommonwiththeCommunicationauxiliaryPower

    System.d) ToshowabilitytoclearfaultsintheCommunicationauxiliaryPowerSysteminthe

    Station.CRITERIAFORASSESSMENTa) TraineeexplainedindetailstheneedtomaintainCommunicationauxiliaryPower

    Systemb) TraineewasabletoanalysecommonfaultsinCommunicationauxiliaryPower

    System.c) CancompletelyclearfaultsintheCommunicationauxiliaryPowerSystem.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|50

    ITEM4.03MAINTENANCEOFVOICEANDDATACOMMUNICATIONCHANNELSPERFORMANCETraineeswillhaveagoodunderstandingandusageofvariousvoiceanddatacommunicationchannels.carryoutmaintenanceofvoiceanddatacommunicationchannelsCONDITIONSFORASSESSMENTa) TraineetobeabletousealltheavailablevoiceandDataCommunicationChannels.b) GoodunderstandingoftheworkingprincipleofthevoiceanddataCommunication

    Channels.c) HowtotracefaultsinafaultyChannel;andclearthesame.CRITERIAFORASSESSMENTa) TheTraineefullyexplainedtheworkingprinciplesofthevoiceandData

    CommunicationChannels.b) TraineeshowedprovenabilitytoclearfaultinvoiceandDataCommunication

    Channels.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|51

    ITEM4.04MAINTENANCEOFCOMMUNICATIONFRONTENDEQUIPMENTPERFORMANCETraineeswillunderstandandanalysethevarioustypesofproblemassociatedwithfrontendCommunicationEquipmentandcarryoutMaintenanceonsucheequipmentCONDITIONSFORASSESSMENTa) TraineetoidentifyCommunicationfrontendEquipment.b) AnalysethetypeofproblemsassociatedwithCommunicationfrontend

    Equipmenta) ProceduretofollowtoclearfaultsinCommunicationfrontendEquipment.CRITERIAFORASSESSMENTa) CorrectlyidentifiedCommunicationfrontendEquipmentb) CorrectlystatedproblemsassociatedwithCommunicationfrontendEquipment.c) ShowedprovenabilitytoworkontheCommunicationfrontendEquipment.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|52

    ITEM4.05MAINTENANCEOFFIBREOPTICCOMMUNICATIONMEDIUM:INSTALLATIONPERFORMANCEMaintenanceofFibreOpticCommunicationmedium:INSTALLATIONCONDITIONSFORASSESSMENTa) TheTraineeshouldknowthatOpticalFibreCablesaremadeindifferentforms

    dependingon: Numberoffibres Howandwhereitwillbeinstalled Willthecablesbeexposedtochemicals Doesithavetowithstandawidetemperaturerange Willtheybeattackedbyrodents?

    b) RecognizethemainfunctionoftheCablec) Recognizethefeaturesofthetwobasiccabledesigns.CRITERIAFORASSESSMENTa) Correctlynamedthetwotypesofthecablesused.b) Correctlystatedthefeaturesofeachofthecable.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|53

    ITEM4.06TESTINGTHEINSTALLEDFIBREOPTICCABLEPERFORMANCETestingtheinstalledFibreOpticCableCONDITIONSFORASSESSMENTThetraineetobeusedtothefollowingtestinstalment:

    a) Continuitytestingtodeterminethatthefibreroutingand/orPolarizationiscorrectanddocumentationisproper.

    b) Endtoendinsertionloss.CRITERIAFORASSESSMENTa) Trainingcouldcorrectlycarryoutcontinuitytestb) Traineecancorrectlydeterminetheendtoendinsertionloss.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|54

    ITEM4.07COMMENTS/SCORESINPERCENTAGEPERFORMANCEFibreOpticCable:SPLICINGCONDITIONSFORASSESSMENTa) Definewhatsplicingisb) Knowthattheyaretwomainsplicingtechniquesc) Recognizesplicingtypes

    Mechanical Fusion

    d) Conditionsforgoodsplicinge) PracticalprocedureforsplicingCRITERIAFORASSESSMENTa) Traineecorrectlydefinesplicingb) Correctlylisttwomainsplicingtechniquec) Statedwellconditionsforgoodsplicingd) Wastrainedpracticalprocedureforsplicingandthetraineediditwell.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|55

    ITEM4.08MAINTENANCEOFRADIOANDMICROWAVELINKCOMMUNICATIONDEVICES.PERFORMANCEMaintenanceofRadioandMicrowavelinkCommunicationdevices.CONDITIONSFORASSESSMENTa) TraineetobefamiliarwithRadioandMicrowavelinkCommunicationdevicesinthe

    Station.b) FullunderstandingoftheRadioandMicrowavelinkCommunicationdevicesand

    possiblemaintenancethatmightberequired.CRITERIAFORASSESSMENTa) TheTraineeshowedgoodunderstandingoftheradioandMicrowavelink

    CommunicationdevicesintheStation.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|56

    ITEM5.01POWERSYSTEMSTUDIESPERFORMANCEIntroductiontopowersystemstudy.Understandinganduseofvariousstudytools.Datacollectionconceptandtypesofstudies

    CONDITIONSFORASSESSMENTTheTraineesshowunderstandthefollowing:

    a) IntroductiontoPowerSystemStudiesb) PowerSystemstudytoolsc) Useofthestudytools.d) Comparativeadvantagesofthevarioustypesoftools.e) Datacollectionconceptf) Typeofstudies.

    CRITERIAFORASSESSMENTa) ThetraineeshouldspelloutthetoolsusedinpowerSystemStudiesb) TheTraineeshouldshowcompetencyinusingthetoolsin(a)above.c) Beabletomakecomparativeadvantagesofthevarioustypesoftoolsd) Verygoodunderstandingofpowerflowstudies,transientstudiesandshortcircuit

    studies.TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|57

    ITEM5.02CONNECTIONANDEVACUATIONSTUDIESPERFORMANCECONNECTIONANDEVACUATIONSTUDIESCONDITIONSFORASSESSMENTa) AgoodunderstandingofPowerplantconnectionandEvacuationStudiesb) DealingwithsamplesofconnectionandEvacuationstudiesReportc) Wellgroundedbasicconceptofconnectionandevacuationstudiesd) Goodknowledgeoffeasibilitystudiesconcept

    Dealingwithsamplesoffeasibilitystudyreport Howtoproducefeasibilitystudiesreport

    e) LocationStudiesConcept Samplesoflocationreport Howtoproducelocationstudiesreport

    f) Independentpowerplants(IPP) CommittedIPPs ProposedIPPs

    CRITERIAFORASSESSMENT

    a) TheTraineecancompletelydealwithSamplesofconnectionandevacuationStudiesReport.

    b) TraineecouldproducefeasibilityStudiesReportc) TraineecouldproducelocationstudiesReport

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|58

    ITEM5.03POLICY,DESIGNANDPROCUREMENTPERFORMANCEPolicy,DesignAndProcurementCONDITIONSFORASSESSMENTa) TrainingfamiliarwithPolicyandStandardaswellasDesignandEngineering.b) IntroductiontoProcurementProcedures

    Engineering,ProcurementandConstruction(EPC) ProjectConsultants(PC) DifferencebetweenPCandEPC SimilaritiesthatexistwithPCandEPC

    CRITERIAFORASSESSMENTa) GoodunderstandingofBasicConceptandresponsibilitiesinEngineering

    ProcurementandConstruction(EPC)b) StatedclearlythedifferencesbetweenPCandEPCc) CorrectlyexplainedthesimilaritiesthatexistwithPCandEPC

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|59

    ITEM5.04TRANSMISSIONDEVELOPMENTPLANPERFORMANCETransmissionDevelopmentPlan

    CONDITIONSFORASSESSMENTa) Assessto10and15yearsDevelopmentplan.b) TCN2011Realistictargetmadeavailablec) GoodknowledgeofTCNinterfaceAgenciesd) RehabilitationinTransmissionSubstation

    CRITERIAFORASSESSMENTa) TraineegavegoodreasonsforhavingsuchlongtermDevelopmentPlanb) FamiliarwithprocessesinmakingthePlan.c) ShowedcompetencyinhowPlanismadeforRehabilitation.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|60

    ITEM6.01INSPECTIONOFSCADAFRONTENDEQUIPMENTPERFORMANCEInspectionOfSCADAFrontEndEquipment

    CONDITIONSFORASSESSMENTa) TraineewellinformedoftheimportanceofSCADAinPowerSystemNetwork.b) VariousadvantagesofeffectiveSCADASysteminaPowerNetwork.c) ExposedforSCADAfrontendEquipmentintheStation.

    CRITERIAFORASSESSMENTa) TraineecouldtelltheimportanceofSCADAinPowerSystemNetwork.b) TraineecorrectlystatedtheadvantagesofeffectiveSCADASysteminaPower

    Network.c) ShowedgoodworkingknowledgeinSCADAfrontendEquipmentintheStation.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|61

    ITEM6.02MAINTENANCEOFSCADAAUXILIARYPOWERSUPPLYSYSTEMPERFORMANCEMaintenanceofSCADAauxiliaryPowerSupplySystem

    CONDITIONSFORASSESSMENTa) TraineetoFamiliarizewithSCADAauxiliaryPowerSupplySystemIntheStation.b) TraineetospellouttheneedtomaintainSCADAauxiliarysupplysystem.c) AnalysevariousfaultsSCADAauxiliarysupplycanbesubjectedto.d) AbilitytoclearfaultsinSCADAauxiliarysupply.

    CRITERIAFORASSESSMENT

    a) CorrectlystatedthereasontomaintainSCADAauxiliarysupplysystemb) AnalysevariousfaultsSCADAauxiliarysupplysystemcanbesubjectedto.c) ShowedprovenabilitytoclearfaultinSCADAauxiliarysupply.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|62

    ITEM6.03CHECKINGOFDATACOMMUNICATIONINTEGRITYPERFORMANCECheckingOfDataCommunicationIntegrity

    CONDITIONSFORASSESSMENTa) WhatismeantbydataCommunicationIntegrity?b) ProcedureforcheckingdataCommunicationintegrity.

    CRITERIAFORASSESSMENT

    a) CorrectlyexplaineddataCommunicationintegrityb) CouldfollowupprocedureforcheckingDataCommunicationintegrity

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|63

    ITEM6.04HANDLINGOFSCADAADMINISTRATIONPERFORMANCEHandlingOfSCADAAdministration

    CONDITIONSFORASSESSMENTa) ExplainwhatismeantbySCADAAdministrationb) TraineetofollowupprocedureforhandlingSCADAAdministration.

    CRITERIAFORASSESSMENTa) TraineegavegoodexplanationonSCADAAdministrationb) TraineecouldcompletelyhandleSCADAAdministrationc) TraineecouldcompetentlyhandleSCADAAdministration

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|64

    ITEM6.05MAINTENANCEOFSCADADATABASEPERFORMANCEMaintenanceOfSCADADatabase

    CONDITIONSFORASSESSMENTa) TraineetofollowupprocedureformaintenanceofSCADADatabaseb) DetailsofwaysinwhichSCADAisusedintheNetworkc) ItemstocheckduringthemaintenanceofSCADADatabase

    CRITERIAFORASSESSMENTa) TrainingshowedgoodknowledgeoftheprocedureformaintenanceofSCADA

    Databaseb) OverallknowledgeinSCADAisgood.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|65

    ITEM7.01IDENTIFICATIONOFTOOLSANDEQUIPMENTFORTHETRADEPERFORMANCEIdentificationofToolsandEquipmentfortheTrade

    CONDITIONSFORASSESSMENTa) ToolsintheDepartmentismadeavailabletotheTraineeb) Traineepreviouslytaughtnamesofeachtoolc) Theuseofeachtoolandthetechniquesofapplyingthetooltobetaughttothe

    Trainees.

    CRITERIAFORASSESSMENT1. Traineecouldgivethenamesofeachtool2. Traineeknowswhateachtoolisusedforandhowtouseit.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|66

    ITEM7.02IDENTIFICATIONOF132KVAND330KVMATERIALSPERFORMANCEIdentificationof132kvand330kvmaterials

    CONDITIONSFORASSESSMENTa) TheTraineeisshownthematerialsfor132kvand330kvb) Thenamesofeachmaterialandtherespectivefunctionaremadeavailabletothe

    trainingc) Traineeistaughthowtofixsomeofthematerials

    CRITERIAFORASSESSMENTa) Traineecouldcorrectlyidentifymaterialsfor132kvand330kvb) TheTraineecouldgivethenameofthematerialsandtheirrespectivefunctions.c) Goodknowledgeonhowtofixsomeofthematerialswasshown

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|67

    ITEM7.03PRACTICETIEINGOFKNOTS,BENDSANDHITCHESPERFORMANCEPracticeTieingOfKnots,BendsAndHitches

    CONDITIONSFORASSESSMENTa) ThesupervisorshowedtheTraineehowtotieknots,BendsandHitchesb) TraineemadeseveralPractices:CloveHitch,SinglehalfHitch,DoublehalfHitch,

    Figuresknot,SingleBowline,DoubleBowline,longSplice,backSplice,EyeSplice,SingleSheetBendsetc

    CRITERIAFORASSESSMENTTraineeshowedcompetencyintieingvarioustypesofknots,BendsandHitches

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|68

    ITEM7.04PATROLLINESANDWRITEREPORTPERFORMANCEPatrolLinesandWriteReport

    CONDITIONSFORASSESSMENTa) TheTraineeismadetoknowsomeofthethingstoobservecriticallywhenpatrolling

    theline. BrokenSuspensioninsulator Theskywire TheTower MechanicalStrength NoErosion

    b) Somechallengesthelinesmenmeetwhilepatrollingthelineintheforestc) WritingofReportafterPatrolling.

    CRITERIAFORASSESSMENTa) Traineeshowedcompetencyinidentifyingfaultypartsintheline.b) Awareofsomechallengesintheforestandhowtoovercomethem.c) Couldcompetentlywriteagoodreportafterpatrolling.

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|69

    ITEM7.05USEOFREEVTACKBLOCKSPERFORMANCEUseOfReevTackBlocks

    CONDITIONSFORASSESSMENTa) LiftingofmaterialsupusingReevTackBlockb) TrainingtopracticeandmastertheuseofReevTackBlocks.

    CRITERIAFORASSESSMENTa) TraineesatisfactorilyshowedcompetencyintheuseofReevTackBlockb)

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date:

  • Page|70

    ITEM7.06INTRODUCTIONTOMAINTENANCEOFLIVELINESPERFORMANCEIntroductiontoMaintenanceofLiveLines

    CONDITIONSFORASSESSMENTa) TraineeexposedtolivelineEquipmentb) SoundunderstandingoftheprinciplebehindthelivelineEquipmentc) AtthisstagetheTraineemaynotbeexpertinlivelinemaintenancebutshouldbe

    wellexposedtorudimentsoflivelinemaintenance.

    CRITERIAFORASSESSMENTa) Traineeshowedsoundunderstandingoftheprinciplebehindtheliveline

    Equipmentb) Correctlyexplainedthemethodsthelivelinemencarryouttheirfunctionasateam

    TRAININGOBJECTIVESATISFACTORILYCOMPLETEDCOMMENT/SCORESINPERCENTAGE Signed:Name:Date: