COMPLETE RESTROOM DESIGN
CONTRACT #VA255-15-D-0010
FINAL CONSTRUCTION DOCUMENTS
INDEX OF DRAWINGS
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
COVER SHEET / DRAWING INDEX
EHH TLR
GI001
PROJECT SCOPE OF WORK & DESCRIPTION:
PROJECT LOCATION: DALLAS VA CONSOLIDATED MAIL OUTPAIENT PHARMACY (CMOP)
2962 SOUTH LONGHORN DRIVE
LANCASTER, TX 75134
SCOPE OF WORK: THE DALLAS CMOP HAS A PARTIALLY COMPLETED, NEW RESTROOM THAT NEEDS TO BE COMPLETED AND 2 ADJACENT, EXISTING RESTROOMS TO BE RENOVATED.
TOTAL AREA OF WORK IS APPROXIMATELY 1300 S.F.
THE PROJECT WILL BE COMPLETED IN 3 PHASES: 1) COMPLETE NEW CONSTRUCTION OF WOMEN'S RESTROOM
2) RENOVATE EXISTING WOMEN'S RESTROOM TO MALE RESTROOM
3) RENOVATE EXISTING MEN'S RESTROOM & CONSTRUCT NEW HOUSEKEEPING CLOSET & STERILIZATION ROOM.
WORK TO BE INCLUDED BUT NOT LIMITED TO: DEMOLITION OF EXISTING ELEMENTS, INCLUDING: WALL AND FLOOR FINISHES, WALLS, CEILINGS, PLUMBING FIXTURES, & ELECTRICAL COMPONENTS.
CONSTRUCTION AND FINISH OF NEW WOOD STUD PARTITIONS AND CEILING FRAMING; INSTALLATION OF NEW CEILING GRID AND PANELS; INSTALLATION
OF NEW ELECTRICAL COMPONENTS; INSTALLATION OF NEW PLUMBING PIPING AND FIXTURES; RENOVATION OF EXISTING FIRE PROTECTION SYSTEM AND
INSTALLATION OF NEW HVAC SYSTEM TO SERVE THE AREA OF WORK.
ESTIMATED COST OF WORK: $373,256.00
FIRE SPRINKLER STATUS: EXISTING SYSTEM TO BE MODIFIED TO FIT NEW CONDITIONS.
ASBESTOS SURVEY N/A
FIREWALL LOCATIONS AND RATINGS PUMP ROOM (SEE KEY PLAN) / RATING: UNKNOWN
OCCUPANCY SEPARATION: NONE
APPLICABLE CODES AND STATUES: 2015 INTERNATIONAL BUILDING CODE (IBC)
2015 NFPA 101 LIFE SAFETY CODE
2015 INTERNATIONAL PLUMBING CODE
2015 INTERNATIONAL MECHANICAL CODE
2017 INTERNATIONAL ELECTRICAL CODE
2012 TEXAS ACCESSIBILITY STANDARDS
KEY PLAN: Not to Scale
UP
UP
WAREHOUSE
SMOKINGAREA
AREA OF WORK
OFFICES COMP.RM
EMPLOYEE AREABREAKROOM
PRODUCTIONFLOOR
PRODUCTION OFFICES& SERVER ROOM
EMPLOYEEENTRANCE
NATIONALOFFICES UNION
OFFICEMENWOMEN
LOBBYOFFICES
LOGISTICSCONF. RM.
RECPT.
SECURITY
EMPLOYEEENTRANCE
2 STORYMODULAROFFICES
MAINELECT.
PUMP RM.
RAMP
³
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
ARCHITECTURAL ABBREVIATIONS
EHH TLR
GI002
GENERAL CONSTRUCTION NOTES: (NOT ALL NOTES ARE USED WITH THIS PROJECT)
1. UNLESS OTHERWISE NOTED, DIMENSIONS ARE TO COLUMN CENTERLINE; CENTER OF NEW INTERIOR GYPSUM BOARD PARTITIONS; INSIDE FACE OF EXTERIOR WALLS; FACE OF MASONRY WALLS AND FACE OF EXISTING WALLS.
2. ALL WORK TO BE CONSTRUCTED IN COMPLIANCE WITH STATE AND LOCAL CODES AND THE AUTHORITY HAVING JURISDICTION.
3. ALL CUTTING AND PATCHING SHALL BE DONE BY THE CONTRACTOR AS OUTLINED IN THE PROJECT SPECIFICATIONS. PATCHES IN FINISH SURFACES SHALL MATCH THE ADJACENT SURFACES IN MATERIAL, FINISH AND QUALITY AND SHALL EXTEND TO AN INSIDE OR OUTSIDE CORNER AS REQUIRED TO MATCH THE ADJACENT FINISHES.
4. NEW WORK EXTENDING EXISTING CONDITIONS SHALL ALIGN WITH AND MATCH EXISTING WORK EXCEPT WHERE OTHERWISE DIMENSIONED OR DETAILED.
5. ALL SOUND RATED WALLS OR PARTITIONS AND ALL CMU WALLS SHALL EXTEND TO THE UNDERSIDE OF THE STRUCTURE OR DECK ABOVE UNLESS OTHERWISE NOTED. THESE PARTITIONS SHALL BE ENTIRELY SEALED OFF WITH CLOSURE GASKETS AND/OR ACOUSTICAL SEALANT AT BOTTOM, TOP, SIDES AND ANY OTHER ABUTMENT WHERE A SOUND LEAK WOULD OTHERWISE OCCUR. ALL PENETRATIONS SUCH AS PIPING, CONDUITS, DUCTS,ETC., IN SUCH PARTITIONS SHALL BE PACKED AND SEALED ALONG THE PERIMETER OF THE PENETRATION WITH MATERIALS TO PROVIDE THE SPECIFIED STC RATING FOR THE WALL ASSEMBLY.
6. IN THE CASE OF NON-RATED SOUND OR FIRE PARTITIONS, CARRY METAL STUDS AND GYPSUM BOARD TO THE UNDERSIDE OF THE STRUCTURE OR DECK UNLESS OTHERWISE NOTED.
7. IN THE CASE OF NON-RATED SOUND OR FIRE PARTITIONS, CARRY METAL STUDS TO THE UNDERSIDE OF THE CEILING, WITH A CLOSURE GASKET BETWEEN THE TOP OF THE PARTITION AND THE CEILING WHERE NOTED.
8. IN THE CASE OF NON-RATED SOUND OR FIRE PARTITIONS, CARRY METAL STUDS TO THE STRUCTURE ABOVE, AND HOLD THE GYPSUM BOARD TO 4" MINIMUM ABOVE THE FINISHED CEILING WHERE NOTED.
9. CONSTRUCT ALL WALLS BETWEEN PATIENT ROOMS AND BETWEEN PATIENT ROOMS AND CORRIDORS TO A MINIMUM STC RATING OF 45 AND TO A MINIMUM STC RATING OF 50 BETWEEN ANY PATIENT ROOM WALL ADJOINING A SERVICE OR PUBLIC SPACE UNLESS NOTED OTHERWISE.
10. ALL WOOD BLOCKING TO BE FIRE RETARDANT.
11. INSTALL CONTINUOUS 16 GAUGE GALVANIZED METAL STRAPPING WITH A MINIMUM WIDTH OF 6" FOR ALL HANDRAILS, GRAB BARS, OTHER ACCESSORIES, FIXTURES, BRACKETS, OFCI ITEMS AND MISCELLANEOUS SPECIALTIES UNLESS OTHERWISE NOTED.
12. ALL WALLS RECEIVING CABINETS, TV'S AND MONITORS SHALL HAVE GAL. MTL STRAPPING PROVIDED BETWEEN STUDS FOR INSTALLATION. BLOCKING FOR TV'S AND MONITORS SHALL BE 16 GA. METAL STRAPPING, WITH THE CENTERLINE AT 7'-0" ABOVE THE FINISHED FLOOR, UNLESS OTHERWISE NOTED OR DETAILED.
13. DUE TO MANUFACTURER'S VARIATION WITH SIZE OF EQUIPMENT, CASEWORK, PLUMBING FIXTURES, ETC., ALL DIMENSIONS REFERRING TO THE SPACE WHERE SUCH ITEMS ARE BUILT-IN SHALL BE VERIFIED WITH THE ITEM SUPPLIED.
14. ALL WORK SHALL BE BE INSTALLED IN A FIRST CLASS WORKMAN LIKE MANNER.
15. ALL RENOVATION CONSTRUCTION AREAS ARE TO BE ENCLOSED BY APPROVED, TEMPORARY CONSTRUCTION BARRIERS AND WALK OFF MATS TO BE PROVIDED ON BOTH SIDES OF CONSTRUCTION AREA ENTRANCE TO CONTROL DUST.
16. WELDING, SOLDERING AND OTHER SMOKE-PRODUCING CONSTRUCTION ACTIVITIES ARE PERMITTED INSIDE THE BUILDING WHEN APPROVED BY THE OWNER (HOT WORK PERMIT REQUIRED) AND WHEN PROPER MEASURES ARE TAKEN TO PREVENT FUMES FROM CIRCULATING WITHIN THE BUILDING. WHEN WELDING, SOLDERING OR PERFORMING ANY OTHER CONSTRUCTION ACTIVITY WHICH MAY PRODUCE SMOKE OR FUMES WITHIN THEBUILDING, THE CONTRACTOR SHALL UTILIZE A PORTABLE FUME COLLECTOR TO CAPTURE FUMES AT THEIR POINT OF ORIGIN. THE PORTABLE FUME COLLECTOR SHALL BE EQUIVALENT TO DIVERSITECH POLLUTION SOLUTIONS MODEL 'FRED JR.' WHICH IS CAPABLE OF COLLECTING 900 CFM AT 2600 FPM PICK-UP VELOCITY, AT A MINIMUM, AND IS EQUIPPED WITH A CARBON IMPREGNATED POLYESTER GAS ABSORBER AND A 99.97% HEPA FILTER.
17. CONTRACTOR SHALL PROVIDE FOR ALL INTERIM LIFE SAFETY CONTROL MEASURES REQUIRED BY THE OWNER DURING CONSTRUCTION IN ADDITION TO ANY AND ALL REQUIREMENTS THAT MAY BE INCLUDED IN THE PROJECT SPECIFICATIONS AND DRAWINGS.
18. REMOVE AND REPLACE ANY ABSORBENT MATERIAL THAT BECOMES WET, THAT CANNOT BE TOTALLY DRIED WITHIN 24 HOURS OF INCIDENT, WITH NEW MATERIALS. ABSORBENT MATERIALS INCLUDE, BUT ARE NOT LIMITED TO, GYPSUM BOARD, INSULATION, CARPET, AND CEILING TILE.
19. THE PREFERRED METHOD FOR REMOVING CONSTRUCTION DEBRIS IS SECURED DEBRIS CARTS. DEBRIS CARTS MUST BE SEALED DURING TRANSPORT THROUGH OCCUPIED AREAS OF THE BUILDING. PERMISSION OF THE OWNER MUST BE OBTAINED BEFORE TRANSPORTING CONSTRUCTION DEBRIS THROUGH OCCUPIED AREAS. DEBRIS MAY ONLY BE TRANSPORTED ON A SPECIFIC ROUTE APPROVED BY THE OWNER AND AT TIMESDESIGNATED BY THE OWNER.
20. ALL CONSTRUCTION ACTIVITIES SHALL COMPLY WITH THE NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, LATEST EDITION, UNLESS A MORE STRINGENT REQUIREMENT IS INCLUDED IN THE LOCAL CODES AND/OR CONTRACT DOCUMENTS.
21. THE NEW OR RENOVATED CONSTRUCTION IS TO BE UNDER POSITIVE PRESSURE RELATIVE TO THE EXTERIOR UPON COMPLETION OF THE WORK, UNLESS OTHERWISE NOTED ELSEWHERE.
FINISH NOTES:
1. IN AREAS REQUIRING NEW WORK AND PATCHING, EXISTING FINISHES SHOWN IN THE FINISH SCHEDULE AND ON THE PLANS ARE TO BE VERIFIED BY THE CONTRACTOR AND ANY DISCREPANCIES IMMEDIATELY CALLED TO THE ARCHITECT'S ATTENTION. ALL NEW FLOOR, BASE, WAINSCOT, WALL AND CEILING FINISHES SHALL MATCH THE EXISTING FINISHES, UNLESS OTHERWISE NOTED.
2. FOR EXISTING CEILING PATCHING, WHERE CEILING IS CUT OUT OR PORTIONS REMOVED FOR REMOVAL OF EXISTING DEVICES OR INSTALLATION OF NEW WORK, THE DISTURBED PORTION SHALL BE PATCHED TO MATCH THE EXISTING CEILING FINISH. UNLESS OTHERWISE NOTED, THE ENTIRE CEILING AREA IS TO BE REPAINTED WHERE CEILINGS ARE GYPSUM BOARD OR PLASTER.
3. ALL FREESTANDING COLUMNS IN A ROOM SHALL RECEIVE THE SAME FINISH AS THE ROOM WALL, UNLESS OTHERWISE NOTED.
4. WHERE NEW FINISHES ARE APPLIED TO EXISTING, THE EXISTING FINISHES SHALL BE REMOVED AND/OR THE EXISTING SURFACES PREPARED AS REQUIRED TO RECEIVE NEW FINISHES, UNLESS OTHERWISE NOTED. WHERE REQUIRED TO ACCOMMODATE THE NEW FINISHES, THE MECHANICAL, PLUMBING AND ELECTRICAL TRADES SHALL DISCONNECT AND REMOVE THEIR RESPECTIVE DEVICES AND ITEMS FROM THE EXISTING WALL, CEILINGAND/OR FLOOR AND RELOCATE TO THEIR FINAL POSITION IN THE NEW CONSTRUCTION. SUCH DEVICES SHALL INCLUDE BUT NOT BE LIMITED TO ELECTRICAL SWITCHES, PANELS, OUTLETS, THERMOSTATS, GRILLS, PLUMBING FIXTURES, MEDICAL GAS OUTLETS ETC. THE RESPECTIVE TRADE SHALL ALSO BE RESPONSIBLE FOR ANY PERMANENT CONNECTIONS OF THOSE ITEMS WHICH ARE RELOCATED.
5. WHERE WALL SURFACES ARE PATCHED TO MATCH THE EXISTING, THE NEW FINISH (PAINT, VINYL WALL FABRIC, ETC.) SHALL BE APPLIED TO THE NEAREST CORNER OR BREAK IN THE WALL PLANE, UNLESS OTHERWISE NOTED.
6. WHERE EXISTING WALLS ARE TO RECEIVE A NEW FINISH, ANY EXISTING PAINTED ITEMS IN OR ON THE WALL (DOORS, DOOR FRAMES, ELECTRICAL PANELS, ETC.) SHALL BE REPAINTED TO MATCH OR COORDINATE WITH THE NEW FINISH, UNLESS OTHERWISE NOTED.
7. IN AREAS THAT HAVE AN EXISTING FLUSH FLOOR FINISH OF QUARRY TILE OR CERAMIC TILE AND ARE NOTED TO RECEIVE A RESILIENT FLOOR TILE, SHEET VINYL OR GLUE DOWN CARPET FINISH, THE CERAMIC/QUARRY TILE SHALL BE REMOVED ALONG WITH ANY LOOSE SETTING BED MATERIAL, AND THE AREA SHALL BE LEVELED WITH SELF LEVELING CEMENT BASED UNDERLAYMENT IN PREPARATION FOR THE NEW FINISH.
8. IN AREAS THAT HAVE AN EXISTING FLOOR FINISH OF RESILIENT FLOOR TILE OR CARPET AND ARE TO RECEIVE A NEW CERAMIC OR QUARRY TILE FLOOR, THE FLOORING AND ADHESIVE SHALL BE REMOVED IN PREPARATION FOR SUCH NEW HARD TILE.
9. PLASTER WALLS IN AN EXISTING BUILDING THAT ARE TO RECEIVE CERAMIC WALL TILE SHALL HAVE THE PLASTER REMOVED FROM EXISTING WALLS TO THE HEIGHT OF THE NEW CERAMIC WALL TILE IN PREPARATION FOR THE NEW SETTING BED AND CEMENT BOARD SHALL BE INSTALLED AND PREPARED IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN INSTRUCTIONS.
10. PLASTER OR GYPSUM WALLBOARD WALLS IN AN EXISTING BUILDING FROM WHICH VINYL WALL FABRIC IS REMOVED, SHALL BE CLEANED OF ALL ADHESIVE AND A SKIM COAT OF PLASTER APPLIED TO RECEIVE THE NEW FINISH.
11. IN ALL ROOMS SCHEDULED TO RECEIVE NEW FINISHES OR MILLWORK THAT IS TO RECEIVE NEW FINISHES, EXISTING FIXTURES, DEVICES, HARDWARE AND ACCESSORIES SHALL BE TEMPORARILY REMOVED AS REQUIRED TO ALLOW THE NEW FINISH TO EXTEND UNDER OR BEHIND THE FIXTURE OR ACCESSORY AND THEN RESET.
12. ALL PENETRATIONS IN EXISTING AND NEWLY CONSTRUCTED WALLS OR BARRIERS TO BE SEALED WITH APPROVED SEALANT.
TEMPORARY PARTITIONS:
1. THE CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS AS REQUIRED TO ISOLATE CONSTRUCTION AREAS FROM AREAS TO REMAIN UNDISTURBED, AND SHALL COORDINATE THEIR EXACT LOCATION WITH CMOP REPRESENTATIVES. ADDITIONAL TEMPORARY PARTITIONS OVER THOSE INDICATED ON THE DRAWINGS SHALL BE INSTALLED AS NECESSARY TO ACCOMMODATE THE CONSTRUCTION PROCESS, AND WHERE APPLICABLE, TOISOLATE DIFFERENT PHASES OF THE WORK. COSTS OF ALL TEMPORARY PARTITIONS AND RELATED WORK ARE TO BE INCLUDED IN THE CONTRACTOR'S CONTRACT.
2. TEMPORARY PARTITIONS SHALL BE OF 1 HOUR MINIMUM FIRE RATED CONSTRUCTION, AND SHALL EXTEND TO THE UNDERSIDE OF STRUCTURE ABOVE, UNLESS THE WORK IS CONFINED TO AN AREA ALREADY ISOLATED FROM OWNER OCCUPIED AREAS BY AN EXISTING UNDISTURBED 1 HOUR WALL. WHEN IN PLACE FOR MORE THAN 14 DAYS, ALL TEMPORARY PARTITIONS SHALL BE PROVIDED WITH RUBBER OR VINYL BASE AND A WASHABLEPAINT OR WALL FABRIC COVERING ON THE SIDE OPPOSITE THE CONSTRUCTION AREA. ADJACENT FINISHES SHALL BE REPAIRED AT THE JUNCTION WITH THE TEMPORARY PARTITIONS.
3. MEANS OF EGRESS SHALL BE MAINTAINED FOR THE PUBLIC, STAFF AND CONTRACTORS EMPLOYEES AT ALL TIMES. REQUIRED EXITS AT THE END OF CORRIDORS WHICH ARE ISOLATED DURING CONSTRUCTION SHALL HAVE AN EGRESS DOOR MAINTAINED AS REQUIRED BY THE BUILDING CODE, AND SHALL HAVE SIGNAGE INDICATING "EMERGENCY EXIT ONLY."
4. ALL TEMPORARY PARTITIONS SHALL BE DUST PROOF AND SEALED AT ALL JUNCTIONS OF DISSIMILAR MATERIALS USING GASKETING MATERIAL. ADEQUATE PRECAUTIONS SHALL ALSO BE TAKEN TO PREVENT DUST AND NOXIOUS VAPORS FROM ENTERING THE RETURN AIR DUCTWORK IN THE CONSTRUCTION AREA.
5. ALL TEMPORARY PARTITIONS SHALL BE SOUND RATED AT A MINIMUM STC RATING OF 45.
TEMPORARY EXTERIOR PASSAGEWAY:
1. EXITING ACCESS MUST BE MAINTAINED DURING CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE A 6'-0" WIDE BY 7'-6" HIGH (CLEAR INSIDE) PASSAGEWAY CAPABLE OF SUPPORTING A MINIMUM LIVE LOAD OF 80 POUNDS PER SQUARE FOOT AND AS REQUIRED BY CONSTRUCTION CONDITIONS. THE WORK SHALL BE CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS (MINIMUM FIRE RETARDANT WOOD). IT SHALL HAVE A ROOF WITH 90POUND MINERAL SURFACED FELT AND 3'-6" HIGH CLOSED SIDES, WITH 4'-0" HIGH OPENING ABOVE THE CLOSED AREA. CONSTRUCTION SHALL BE PHASED AS REQUIRED TO PROVIDE THE EXIT ACCESS AND ALLOW FOR CONSTRUCTION. SEE PLANS FOR LOCATION. THE CONSTRUCTION AND METHOD OF PHASING MUST BE APPROVED BY THE OWNER AND ARCHITECT. THE CONTRACTOR SHALL PROVIDE TEMPORARY LIGHTS AND OTHERDEVICES AS MAY BE REQUIRED IN THE PASSAGEWAY.
DEMOLITION NOTES:
1. ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE ARBITRARY DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH ARE INTENDED TO REMAIN IN USE AND THE ROUTING OF WHICH COULD NOT BE PREDETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROMTHAT INDICATED, CHANGE DIRECTION FROM FLOOR TO FLOOR, ETC. OR ARE UNIDENTIFIED SHALL BE REPORTED TO THE ARCHITECT AND OWNER BEFORE REMOVAL.
2. THE DEMOLITION DRAWINGS GENERALLY INDICATE THE REMOVAL OF ITEMS WHICH ARE IN VIEW OR BELIEVED TO BE CONCEALED (SUCH AS EXISTING COLUMNS CONCEALED WITHIN WALLS, ETC.) THE CONTRACTOR SHALL PROMPTLY NOTIFY THE ARCHITECT AND OWNER, IN WRITING, OF THE FOLLOWING CONDITIONS, BEFORE SUCH CONDITIONS ARE DISTURBED AND BEFORE ANY DELAY OR COST IS INCURRED BY THE CONTRACTOR:A. CONCEALED OR UNKNOWN CONDITIONS ENCOUNTERED WHICH DIFFER MATERIALLY FROM THOSE INDICATED OR REASONABLY IMPLIED BY THE CONTRACT DOCUMENTS.B. CONCEALED PHYSICAL CONDITIONS IN THE EXISTING STRUCTURE OF AN UNUSUAL NATURE.
3. SEE ALL DRAWINGS FOR THE EXTENT OF CUTTING AND PATCHING REQUIREMENTS NECESSITATED BY THAT PORTION OF THE WORK, SUCH AS MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION, STRUCTURAL AND VENDOR EQUIPMENT DRAWINGS ETC.
4. SEE THE FIRE PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL, STRUCTURAL AND VENDOR EQUIPMENT DRAWINGS FOR ADDITIONAL WORK THAT MAY REQUIRE CEILING ACCESS FOR SPECIAL SYSTEMS SUCH AS SMOKE/FIRE ALARM, RANDOM JUNCTION BOXES, ETC. WHICH HAVE NOT BEEN INDICATED ON THE REFLECTED CEILING OR DEMOLITION PLANS. THE CONTRACTOR SHALL INDICATE THIS WORK ON THE COORDINATION DRAWINGS.
5. EXISTING CONSTRUCTION TO BE REMOVED:A. THE CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DESIGNATED AND/OR SHOWN TO BE REMOVED TO RECEIVE NEW WORK AS HEREIN INDICATED COMPLETELY.B. FIRE PROTECTION, PLUMBING, MECHANICAL, AND ELECTRICAL TRADES SHALL REMOVE ALL DEVICES AND ITEMS PERTAINING TO THEIR RESPECTIVE TRADES FROM ALL EXISTING PARTITIONS, CEILINGS, ETC. BEING REMOVED. COORDINATE DEMOLITION WITH CONCURRENT GENERAL DEMOLITION. UNLESS NOTED TO BE ABANDONED, ALL FIRE PROTECTION, PLUMBING, MECHANICAL AND ELECTRICAL WHICH PASS THROUGH OR ARE
AFFECTED BY THE DEMOLITION SHALL BE MAINTAINED IN A COMPLETE AND FULLY OPERATIONAL CONDITION OR, WHERE NOTED, BE APPROPRIATELY CAPPED OFF. PROVIDE TEMPORARY SYSTEMS AS REQUIRED TO MAINTAIN FULL OPERATION OUTSIDE THE AREA OF DEMOLITION FOR ANY AND ALL SYSTEMS.
6. REMOVE PORTIONS OF EXISTING CONSTRUCTION AS DESIGNATED AND/OR SHOWN AND PATCH REMAINING SURFACES TO MATCH THE ADJACENT CONSTRUCTION.
7. THE CONTRACTOR SHALL REFER TO THE ROOM FINISH INFORMATION DRAWINGS AND/OR SCHEDULE FOR ADDITIONAL INFORMATION CONCERNING FINISHES WHICH IMPACT THE WORK.
8. WHEN CARPET IS TO BE REMOVED IT SHALL BE WETTED WITH AN EPA AND OWNER APPROVED GERMICIDAL AGENT PRIOR TO THE REMOVAL OF THE CARPET TO PREVENT THE DISPERSION OF AIRBORNE PARTICLES.
9. WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC. ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, FOUNDATIONS, ETC. AFTER REMOVAL, ANY AFFECTED CONSTRUCTION AND SURFACES SUCH AS FLOORS, WALLS, BASES AND CEILINGS SHALL BE FINISHED TO MATCH ADJACENT SURFACES, UNLESS OTHERWISE NOTED.
10. ALL EQUIPMENT REMOVED, SUCH AS PLUMBING FIXTURES, ELECTRICAL FIXTURES AND EQUIPMENT, MECHANICAL EQUIPMENT, AIR CONDITIONER UNITS, ETC. SHALL BE TURNED OVER TO THE OWNER AND STORED WHERE DIRECTED. ITEMS THE OWNER DOES NOT WANT TO KEEP SHALL BE REMOVED AND PROPERLY DISPOSED BY THE CONTRACTOR.
11. REMOVE EXISTING CABINETWORK AS INDICATED. WHERE THERE IS PLUMBING INVOLVED, SUCH PLUMBING SHALL BE REMOVED TO THE MAXIMUM EXTENT THAT IS PRACTICAL OR AT A MINIMUM SHALL BE CAPPED OFF IN THE WALL OR BELOW THE FLOOR SUCH THAT THE WALL OR FLOOR SURFACE CAN BE PATCHED FLUSH TO MATCH ADJACENT SURFACES OR TO RECEIVE NEW FINISHES SCHEDULED. SEE PLUMBING NOTES FOR MOREINFORMATION.
12. WHERE INDICATED, REMOVE THE EXISTING DOOR AND FRAME AND SEAL THE OPENING WITH WALL CONSTRUCTION TO MATCH THE ADJACENT WALL, UNLESS OTHERWISE NOTED. FINISH THE WALL TO MATCH THE ADJACENT FINISH OR TO RECEIVE THE NEW FINISH AS SCHEDULED.
13. WHERE INDICATED, REMOVE THE EXISTING WINDOW AND SEAL THE OPENING WITH WALL CONSTRUCTION TO MATCH THE ADJACENT WALL, UNLESS NOTED OTHERWISE. FINISH THE WALL TO MATCH THE ADJACENT FINISH OR TO RECEIVE THE NEW FINISH AS SCHEDULED.
14. WHERE INDICATED, REMOVE THE EXISTING WINDOWS AND REPLACE WITH NEW WINDOWS AS SCHEDULED. PATCH AND FINISH THE WALL TO MATCH THE ADJACENT FINISH OR TO RECEIVE THE NEW FINISH AS SCHEDULED.
15. EXISTING AREAS, WHETHER WITHIN OR OUTSIDE THE LIMITS OF THE CONTRACT, SHALL BE REPAIRED WHERE ANY DAMAGE HAS OCCURRED DUE TO CONSTRUCTION.
16. DURING THE DEMOLITION PROCESS, SHOULD THE CONTRACTOR ENCOUNTER ANY MATERIAL IDENTIFIED AS OR SUSPECTED TO CONTAIN ASBESTOS FIBERS OR MOLD, IT SHALL BE IMMEDIATELY REPORTED TO THE ARCHITECT AND THE OWNER. NOTE THAT THE OWNER WILL CONTRACT DIRECTLY WITH A LICENSED ABATEMENT CONTRACTOR FOR THE NECESSARY WORK INVOLVING CONTAINMENT AND/OR REMOVAL OF THE ASBESTOS ORMOLD.
17. WHEN PATCHING SLABS ON GRADE OR EXTERIOR WALLS REPLACE VAPOR BARRIER, WATER AND OR AIR BARRIERS IF PRESENT TO MATCH THE LOCATION OF THE EXISTING VAPOR, WATER AND OR AIR BARRIERS AND TAPE OR PROVIDE OTHER FASTENERS NECESSARY TO MAKE THE EXISTING AND NEW BARRIER CONSISTENT WITH THE ORIGINAL BARRIER.
18. ALL ABANDONED ELECTRICAL CONDUITS, FITTINGS, AND ENCLOSED SHALL BE REMOVED BACK TO THE NEXT ACTIVE FITTING, JUNCTION BOX, PULL BOX, OR ENCLOSURE. ALL OPEN KNOCKOUTS OR THREADED HUBS SHALL BE CAPPED OR PLUGGED AS APPROPRIATE.
19. ALL ABANDONED ELECTRICAL WIRE AND/ OR CABLES SHALL BE REMOVED BACK TO THE POINT OF ORIGIN.
20. ALL FIRE/ SMOKE WALL OPENINGS SHALL BE CLOSED WITH AN APPROPRIATE FIRE STOPPING SYSTEM. FOR OPENINGS LEFT AS A RESULT OF CONDUIT AND/ OR CABLE REMOVAL, REPAIR AS NECESSARY TO MATCH EXISTING WALL CONSTRUCTION.
21. COMPLETED RUNS OF EMPTY ELECTRICAL CONDUITS DESIGNATED AS "SPARE" SHALL NOT BE REMOVED.
22. CONDUIT STUBS ABANDONED IN PLACE DUE TO THE NATURE OF THE EXISTING STRUCTURAL SHALL BE CAPPED AND/ OR PLUGGED WITH AN APPROPRIATE USED DEVICE OR APPROVED FIRE STOPPING SYSTEM.
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
GENERAL NOTESARCHITECTURAL SYMBOLS
EHH TLR
GI003
EMPLOYEEENTRANCE
EXISTING 2 STORYMODULAR OFFICE
NO WORK IN THIS AREA
EXISTING WOMENSRESTROOM
202
EXISTINGHAC204
EXISTING MENSRESTROOM
203
NEW WOMENSRESTROOM
203
WH
EXISTING WOMENSTOILET RM
202
EXISTINGHAC204
EXISTING MENSTOILET RM
202
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
PHASING PLANDEMOLITION PLANS & NOTES
EHH TLR
AD101
EXIS
TIN
G 2
STO
RY
MO
DU
LAR
OFF
ICE
NO
WO
RK
IN T
HIS
AR
EA
NEW WOMENSRESTROOM
203
JAN.CLT.203A
NEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
NEW WORK FLOOR PLANSDOOR SCHEDULE & DETAILSACCESSORY / EQUIPMENT LIST
EHH TLR
AE101
202A MALE RESTROOM 3'-0" x 7'-0" NA NA NA F1 NA FRAMED OPENING - NO DOOR202B MALE RESTROOM 3'-0" x 7'-0" NA NA NA F1 NA FRAMED OPENING - NO DOOR202C JAN. CLOSET 3'-0" x 7'-0" x 1 34" 1 NA WD F1 HW-5D203A JAN. CLOSET *3'-0" x 7'-0" x 1 34" 1 NA WD F1 HW-5D * VERIFY SIZE OF EXISTING OPENING IN FIELD204 HAC *3'-0" x 7'-0" x 1 34" 1 NA WD F1 HW-5D * UNDERCUT DOOR HEIGHT 12" FOR VENTILATION205 DISHWASHING / STERILIZATION *3'-0" x 7'-0" x 1 34" 1 NA WD F1 HW-5D * UNDERCUT DOOR HEIGHT 12" FOR VENTILATION
OPG NO. ASSOCIATED ROOM OPENING SIZE DOOR GLAZING DOOR FRAME HDWR REMARKS TYPE TYPE MAT'L TYPE SET
DOOR / FRAME / OPENING SCHEDULE
NOTE: NEW DOOR AND FRAME FINISHES TO MATCH EXISTING, FACILITY FINISHES UNLESS APPROVED OTHERWISE BY COR.ALL NEW HARDWARE SETS TO BE KEYED TO MATCH CURRENT FACILITY MASTER KEY SYSTEM.
EMPLOYEEENTRANCE
EXT'G 2 STORYMODULAR OFFICE
NO WORK IN THIS AREANEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
NEW WOMENSRESTROOM
203
-
--
------ -
--------
NEW REFLECTED CEILING PLAN
EHH TLR
AE102
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
EMPLOYEEENTRANCE
EXT'G 2 STORYMODULAR OFFICE
NO WORK IN THIS AREANEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
RESTROOM CEILING / ROOF FRAMING PLAN
EHH TLR
AE103
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
RESTROOM INTERIOR ELEVATIONS
EHH TLR
AE401
℄℄
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
SECTIONS AND DETAILS
EHH TLR
AE501
NEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
JAN.CLT.203A
NEW WOMENSRESTROOM
203
®
Schluter - RENO-RAMP
Existing Substrate
Tile
NEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
JAN.CLT.203A
NEW WOMENSRESTROOM
203
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FINAL CONSTRUCTIONDOCUMENTS
FULLY SPRINKLEREDU.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/ 08 /2019Revisions: Date:
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTION DOCUMENTS
-
--
------ -
--------
FLOOR FINISH PLAN -ALL PHASESWALL FINISH PLAN - ALL PHASESFINISH SCHEDULE
EHH TLR
IN101
FINISH SCHEDULE
SYMBOL MANUFACTURERPRODUCT
NAME/NUMBER FINISH COLOR SIZE REMARKS
ACOUSTICAL CEILING TILE
ACT ARMSTRONG ULTIMA Health Zone WHITE 2' X 4'USE WITH PRELUDE Plus XL;Aluminum 15/16"; Exposed TeeGRID SYSTEM
PORCELAIN FLOOR TILE
FT DALTILE EXQUISITE TBD 24" X 24"
PORCELAIN WALL TILE
WT DALTILE EXQUISITE TBD 12" X 24"
PORCELAIN ACCENT TILE
AT DALTILE EXQUISITE TBD 2" X 4" BRICK -JOINT MOSAIC
PORCELAIN COVE BASE TILE
CBT DALTILE EXQUISITE TBD 6" X 12"
FLOOR TRANSITION STRIP
TS SCHLUTER RENO-RAMP ALUMINUM AS REQUIRED TRANSITION FROM CONCRETETO TILE.
RESILIENT BASE
VB JOHNSONITE TRADITIONAL 6"VINYL WALL BASE TBD 6" HIGH
PAINT
P1 PPG ARCHITECTURALCOATINGS
LOW VOC INTERIORLATEX EGGSHELL TBD
PAINT PRODUCT TO BE LOWVOC, HIGH PERFORMANCE
LAMINATE
PL WILSONART PLASTIC LAMINATEMONTANAWALNUT7110K-78
ALL RESTROOM CASEWORKSUPPORT PANELS, END PANELSAND APRONS
SOLID SURFACE
SS-1 AVONITE SOLID SURFACECOUNTERTOP SATIN TBD 1/2 " THICK
SIZES VARIES RESTROOM COUNTERTOPS.
GENERAL NOTE:
ALL PRODUCTS LISTED ARE BASIS OF DESIGN AND ARE SUBJECT TO PROJECT COR'S APPROVAL
NEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
NEW WOMENSRESTROOM
203
CD FROM RTU-15CD CD
4" S
S4"
SS
(E)FD
(E)FD
(E)FD
WC-1
WC-2
WC-2
UR-1
UR-2
UR-2
WC-2
WC-1
L-1
L-1
L-1
L-1
MS-1WB-1
(E) EEW(E) EWC
FD-1
L-1 L-1 L-1 L-1
WC-1 WC-1
WC-2
WC-2
WC-2
WC-2
WC-2
WC-2
(E)4" VTR
(E)4" SAN. SEWER
(E)4" SAN. SEWER
(E)4" SAN. SEWER
FD-1
FD-1
(E)2" COND. DRAIN OVERHEAD
3"
2"2"
2"V.
2"V.
2"V.
3"V.
3"V.
(E)4" SAN. SEWERSEE RISER DIAGRAM 1 SEE RISER DIAGRAM 2
WCO
NEW FCO
2"W, 2"V
2"W, 2"V
2"W, 2"V
2"W, 2"V
2"W, 2"V 2"W, 2"V 2"W, 2"V 2"W, 2"V
2"W, 2"V
3"W, 2"V
2"W, 2"V3"W, 2"V
(E) 2" CW
NEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
NEW WOMENSRESTROOM
203
WC-1
WC-2
WC-2
UR-1
UR-2
UR-2
WC-2
WC-1
L-1
L-1
L-1
L-1
MS-1VB-1
(E) EEW(E) EWC
L-1 L-1 L-1 L-1
WC-1 WC-1
WC-2
WC-2
WC-2
WC-2
WC-2
WC-2
WH-1SEE DETAIL
CP-1
TMV-1CAP
3/4" HWR
2" CW
EXISTING 2" CW
8
9
9
1-1/2" CW 1-1/4" HW
1" HW
3/4" 3/4"
1"
10
11
10 11
1-1/4" HW(E) 2" CW
3/4" HW
10
11
14
1213
1"
1-1/2" CW
3/4"
SEE RISER DIAGRAM 3 SEE RISER DIAGRAM 4
WH
EXISTING WOMENSTOILET RM
202
EXISTINGHAC204
EXISTING MENSTOILET RM
203
1
2
3
(E) EEW(E) EWC
45
6 6
7
7
7
7
7
7
7
-
--
------ -
--------
PLUMBING PLAN
LB SR
P101
NEW WORK GENERAL NOTES1. REFERENCE PHASING PLAN ON AD101.
2. COORDINATE DEMOLITION OF EXISTING FIXTURES WITH OWNER (DISPOSE OF OR RETURNTO OWNER AS DIRECTED).
SYMBOLS LEGEND
PLUMBING KEYNOTES1. REMOVE EXISTING WATER HEATER AND ALL PIPING, ACCESSORIES, ELECTRICAL, ETC.
2. REMOVE EXISTING POT SINK AND MOP SINK BELOW. REMOVE ALL ASSOCIATED PIPINGWITHIN WALLS AND ABOVE CEILING, PLUG WASTE LINE BELOW FLOOR.
3. REMOVE OR RELOCATE AS DIRECTED BY OWNER. REMOVE ALL ASSOCIATED PIPING.
4. CAREFULLY DISCONNECT UTILITIES FROM EXISTING ELECTRIC WATER COOLER (EWC) ANDPREPARE TO RELOCATE.
5. CAREFULLY DISCONNECT UTILITIES FROM EXISTING EMERGENCY EYE WASH (EEW) ANDPREPARE TO RELOCATE.
6. REMOVE EXISTING LAVATORY AND ALL ASSOCIATED PIPING. PLUG WASTE LINE BELOWFLOOR.
7. REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. THE EXISTING 4" VTRSHALL REMAIN AND BE REUSED. THE EXISTING 4" WASTE LINE SHALL REMAIN AND BEREUSED.
8. 2" CW DOWN IN WALL WITH 1" TO EACH WATER CLOSET.
9. 1-1/2" CW DOWN IN WALL WITH 1" TO EACH WATER CLOSET AND 3/4" TO EACH URINAL.COORDINATE PIPING WITH PHASING.
10. 3/4" CW DOWN IN WALL WITH 1/2" TO EACH LAVATORY.
11. HW LOOP (SIZE AS INDICATED) ROUTED DOWN IN WALL, THEN HORIZONTALLY BEHIND EACHFIXTURE TO COMPLY WITH 2015 IECC 'MAXIMUM PIPING LENGTH'. BRANCH 1/2" HW TO EACHFAUCET, THEN ROUTE HW LOOP BACK UP TO ABOVE CEILING AND EXTEND AS INDICATED.
12. 1/2" CW AND 1/2" HW DOWN IN WALL TO NEW MOP SINK.
13. ROUTE 3/4" HW DOWN IN WALL TO WASHER BOX; REDUCE TO 1/2" AT BOX CONNECTION.PROVIDE STAINLESS STEEL SUPPLY HOSE FROM HW VALVE TO DISHWASHER.
14. 1" CW DOWN IN WALL WITH 1" TO RELOCATED EMERGENCY EYE WASH; EXTEND 1/2" CWWITHIN WALL TO RELOCATED ELECTRIC WATER COOLER.
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FULLY SPRINKLEREDU.S. Departmentof Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECTArchitect:
STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/08/2019Revisions: Date:
Atriax, PLLC102 3rd Avenue, NEHickory, NC 28601828.315.9962atriaxgroup.com
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTIONDOCUMENTS
FINAL CONSTRUCTION DOCUMENTS
COLD WATER CAP END OF LINE
HOT WATER (110°F HW) RISER DOWN
HOT WATER RETURN RISER UP
PLUG CLEANOUT
WASTE (SANITARY SEWER) DIRECTION OF FLOW
CONDENSATE DRAIN
VENT (SANITARY SEWER)
FLOOR DRAIN
BALL VALVE
NEW TO EXISTING CONNECTION
EWC ELECTRIC WATER COOLER
VTR VENT THRU ROOF
EXISTING UTILITY
CD
V
DEMOLITION
(E) EXISTING
EEW EMERGENCY EYE WASH
SS
WCO WALL CLEAN OUT
FCO FLOOR CLEAN OUT
03/07/2019
-
--
------ -
--------
PLUMBING SCHEDULES
LB SR
P201
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FULLY SPRINKLEREDU.S. Departmentof Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECTArchitect:
STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/08/2019Revisions: Date:
Atriax, PLLC102 3rd Avenue, NEHickory, NC 28601828.315.9962atriaxgroup.com
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTIONDOCUMENTS
FINAL CONSTRUCTION DOCUMENTS
DESCRIPTION
VALVE BOX FOR DISHWASHERVB-1 - 2" 2"
FIXTURETAG
PLUMBING FIXTURE SCHEDULEH C W V
GUY GRAY #MWB-15, WHITE POWDER COATED METAL WASHING MACHING BOX, CENTER 2" DRAIN,1/4 TURN WATER VALVES, VERIFY CONNECTION TYPE. (COLD WATER VALVE IS NOT USED.)
WC-1 - 1" 4" 2" FURNISHED BY OWNER, INSTALLED BY CONTRACTOR. TOP OF SEAT SHALL BE 17'-19" A.F.F.WATER CLOSET, FLOOR SET,SENSOR OPERATED FLUSH VALVE,REAR OUTLET, ACCESSIBLE
WC-2 - 1" 4" 2" FURNISHED BY OWNER, INSTALLED BY CONTRACTOR. TOP OF SEAT APPROXIMATELY 16" A.F.F.WATER CLOSET, FLOOR SET,SENSOR OPERATED FLUSH VALVE,REAR OUTLET, STANDARD HEIGHT
- 3/4" 2" 2" FURNISHED BY OWNER, INSTALLED BY CONTRACTOR. RIM SHALL BE MOUNTED 15-1/4" A.F.F.URINAL, WALL HUNG, SENSOROPERATED FLUSH VALVE,ACCESSIBLE HEIGHT
UR-1
- 3/4" 2" 2" FURNISHED BY OWNER, INSTALLED BY CONTRACTOR. RIM SHALL BE MOUNTED 24" A.F.F.URINAL, WALL HUNG, SENSOROPERATED FLUSH VALVE,STANDARD HEIGHT
UR-2
L-1 1/2" 1/2" 2" 2"LAVATORY, COUNTERTOP,SENSOR OPERATED FAUCET,ACCESSIBLE
AMERICAN STANDARD #0476.028. VITREOUS CHINA COUNTERTOP LAVATORY, FAUCET HOLES ON 4" CENTERS.AMERICAN STANDARD #6055.205 ELECTRONIC PROXIMITY FAUCET, 0.5 GPM, DC LITHIUM BATTERY POWERED.PROVIDE AND INSTALL GRID STRAINER, P-TRAP AND ADA INSULATION PACKAGE.
FD-1 FLOOR DRAIN, ROUND
MS-1 MOP SINK, SQUARE,
- - 2"
1/2"1/2" 3" 2"FLOOR MOUNTED, TERRAZZOFIAT #TSB-200 MOP BASIN. TERRAZZO 24"x24"x12" HIGH WITH PLAIN CURBS, 3" DRAIN. PROVIDE FIAT #830-AAFAUCET; #832-AA HOSE BRACKET & HOSE; #889-CC MOP HANGER.
WATTS FD-100-A COATED CAST IRON WITH ADJUSTABLE ROUND NICKEL BRONZE STRAINER.FLOOR DRAIN SHALL HAVE NO HUB CONNECTION AND PROSET TRAP GUARD.3"
NOTES:1. ALL FIXTURES SHALL MEET LOW WATER CONSUMPTION REQUIREMENTS.2. PROVIDE STOPS AT ALL FIXTURES.3. PROVIDE AND INSTALL A PROSET TRAP GUARD FOR EACH NEW FLOOR DRAIN AS REQUIRED BY LOCAL CODE.4. ACCESSIBLE FIXTURES SHALL BE MOUNTED AND INSTALLED PER TAS.5. PROVIDE FLOOR MOUNTED CARRIERS FOR ALL WALL MOUNTED FIXTURES.6. PROVIDE TRUE-BRO 'LAV-GUARD' INSULATION KIT FOR EXPOSED PIPING AT ALL ACCESSIBLE AND LAVATORIES.
1. FURNISH AND INSTALL ALL MATERIALS AND LABOR REQUIRED TO PROVIDE A COMPLETE AND OPERABLE PLUMBINGSYSTEM, WITH ALL ITEMS AND APPURTENANCES NECESSARY.
2. ALL LABOR AND MATERIALS SHALL BE INSTALLED BY A LICENSED CONTRACTOR.
3. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES ANDORDINANCES. IN CASE OF CONFLICT BETWEEN THE DRAWINGS/SPECIFICATIONS AND THE CODES AND ORDINANCES,THE HIGHEST STANDARD SHALL APPLY. THE PLUMBING CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS AMINIMUM STANDARD WITHOUT ANY EXTRA COST TO THE OWNER.
4. CROSS-CONNECTIONS OF ANY FIXTURE, DEVICE OR CONSTRUCTION WHICH WILL PERMIT BACKFLOW CONNECTIONSBETWEEN A WATER DISTRIBUTION SYSTEM AND ANY PART OF THE DRAINAGE SYSTEM SHALL NOT BE INSTALLED.
5. PLUMBING FIXTURES SHALL BE AS SCHEDULED. ALL HANDICAP FIXTURE INSTALLATIONS SHALL BE IN COMPLIANCEWITH ADA AND TAS (TEXAS ACCESSIBILITY STANDARDS). CONFIRM EXACT LOCATIONS OF ALL PLUMBING FIXTURESWITH ARCHITECT PRIOR TO INSTALLATION. ALL FIXTURES SHALL BE COMPLETE WITH ALL NECESSARY TRIM. ALLEXPOSED METAL PARTS SHALL BE CHROME PLATED BRASS.
6. CONFIRM ROUGH-IN REQUIREMENTS FOR ALL EQUIPMENT PRIOR TO INSTALLATION.
7. COORDINATE EXACT ROUTING OF ALL PIPING WITH ALL OTHER TRADES PRIOR TO INSTALLATION.
8. PROVIDE TRAP GUARDS FOR ALL FLOOR DRAINS, EXCEPT FOR THOSE AREAS NOT REQUIRED BY THE CITY OF FORTWORTH.
9. PROVIDE FACTORY MANUFACTURED WATER HAMMER ARRESTORS WHERE REQUIRED AND/OR INDICATED ON THEDRAWINGS.
10. INSTALL PLUMBING VENTS THROUGH ROOF TO BE A MINIMUM OF 10'-0" FROM ALL RTU AND OTHER OUTSIDE AIRINTAKES. COORDINATE WITH MECHANICAL.
11. ALL WATER PIPING PASSING THROUGH CONCRETE FLOOR SLABS SHALL BE COMPLETELY ISOLATED FROM THECONCRETE BY ENCASEMENT IN 1/2" THICK FLEXIBLE FOAM PLASTIC INSULATION, WRAPPED WITH 2 PLYS OF 15# FELTTO ISOLATE THE PIPE FROM THE CONCRETE. WHERE WATER PIPE EXTENDS THROUGH CONCRETE GRADE BEAMSBELOW GRADE, IT SHALL BE ENCASED IN 3/8" THICK FLEXIBLE FOAM PLASTIC INSULATION. PIPING BELOW SLABSHALL BE TYPE "M" SOFT TEMPER COPPER WITHOUT JOINTS.
12. ALL EXPOSED PIPING PASSING THROUGH FLOORS, CEILINGS OR WALLS SHALL BE PROVIDED WITH APPROVEDPLATES OF SUFFICIENT DIAMETER TO COVER THE SLEEVE OPENING AND FIT SNUGLY AROUND THE PIPE.
13. WATER AND SEWER LINES SHALL BE LAID IN SEPARATE TRENCHES WITH A MINIMUM HORIZONTAL SPACING ASREQUIRED BY CODE.
14. THIS CONTRACTOR SHALL FURNISH ALL PIPE SUPPORTS REQUIRED FOR PLUMBING EQUIPMENT AND MATERIALS.ALL HORIZONTAL RUNS OF PIPING SHALL BE SUPPORTED BY PIPE HANGERS SPACED NOT MORE THAN 10 FEETAPART FOR PIPES 1-1/4" AND LARGER, AND 8' FOR PIPES SMALLER THAN 1-1/4", AND AT EACH JOINT. ADDITIONALSUPPORTS SHALL BE PROVIDED WHERE REQUIRED TO PREVENT SAGGING. PROVIDE PIPE SADDLES FOR INSULATEDPIPING.
15. CLEANOUTS SHALL BE PROVIDED WHERE INDICATED ON THE DRAWINGS, OR WHERE REQUIRED, TO PROVIDEACCESS TO ALL LINES AND AT HORIZONTAL RUN AT INTERVALS NOT EXCEEDING 80 FEET IN ALL SOIL, WASTE ANDDRAIN LINES. CLEANOUTS SHALL BE SAME AS PIPE EXCEPT CLEANOUTS LARGER THAN 4" WILL NOT BE REQUIRED.
16. DO NOT INSTALL PVC PIPING IN ANY RETURN AIR PLENUMS.
17. ALL WASTE AND VENT PIPING SHALL BE STANDARD WEIGHT CAST IRON OR SCHEDULE 40 PVC. HORIZONTAL SOIL &WASTE PIPES SHALL BE GIVEN A GRADE OF 1/4 INCH PER FOOT WHERE POSSIBLE, BUT IN NO CASE LESS THAN 1/8INCH PER FOOT. ALL PVC PIPING INSTALLATION SHALL CONFORM TO ASTM D 2321 LATEST EDITION "UNDERGROUNDINSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS" IN ALL RESPECTS.MINIMUM TRENCH WIDTH SHALL BE THE PIPE DIAMETER PLUS 16". ALL BEDDING MATERIAL SHALL MEET 1A OR 1BCRITERIA.
18. ALL NEW DOMESTIC WATER PIPING ABOVE GRADE SHALL BE TYPE "L" COPPER WITH WROUGHT COPPER FITTINGS.PEX CROSS-LINKED POLYETHYLENE (PEX) TUBING IS ALLOWED IN CONCEALED LOCATIONS AS APPROVED BY THEOWNER. PEX PIPING SHALL COMPLY WITH ASTM F876, F 877 OR AWWA C904, AND THE FOLLOWING:
a. PIPING SHALL BE MADE WITH BRASS INSERT AND CRIMP FITTINGS MEETING ASTM F 1870. NOCONNECTIONS ARE PERMITTED UNDERNEATH THE SLAB.
b. PROVIDE PEX TUBING WITH A RED OUTER SHEATH FOR DOMESTIC HOT WATER LINES AND T&P RELIEFLINES OR ANY OTHER POTENTIALLY HAZARDOUS SERVICE, AND A BLUE OUTER SHEATH FOR ALLDOMESTIC COLD WATER LINES AND CONDENSATE DRAIN LINES.
c. PROVIDE SLEEVES WHERE PEX TUBING PENETRATES WALLS, CEILINGS OR SLABS.
19. INSULATE ALL COPPER DOMESTIC WATER PIPING WITH 1" THICK FIBERGLASS PIPE INSULATION WITH ALL SERVICEJACKET. INSULATE ALL PEX DOMESTIC WATER PIPING WITH 1" THICK CONTINUOUS FOAM INSULATION.
PLUMBING GENERAL NOTES:
3/4" T&P RELIEF DRAIN
6" HIGH GALV.DRAIN PAN
3/4" DRAIN TOMOP SINK WITH6" AIR GAP
PLYWOOD DECKABOVE RESTROOMS
WH-1
EXPANSION TANK
UNION (TYP.)
THERMOMETER (TYP.)
CHECK VALVE
BALANCING VALVE3/4" HOTWATERRETURN
CP-1
HWR
AQUASTAT
POWER SUPPLYMIXING VALVE TMV-1
110°
BALL VALVE (TYP.)
1-1/4" DOMESTICHOT WATER(110° HW)
1-1/4" DOMESTICCOLD WATER (CW)
SET TANKTEMP TO 140°F
TMV-1 THERMOSTATIC MIXING VALVE -1" - POWERS #LFLM492, LEAD FREE THERMOSTATIC MIXING VALVE, 0.5-15 GPM AT 20 PSI PRESSURE DROP.VALVE SHALL BE ASSE 1017 CERTIFIED. VERIFY CONNECTION TYPE AND COMPATIBILITY.
1"
TANK STORAGE
CHARACTERISTICS
ELECTRIC WATER HEATER SCHEDULE
DOMESTIC HOT WATER CIRCULATING PUMP SCHEDULE
WATER HEATER WH-1CP-1
TAG
25
FEETFLOW
5 1/12
HP
1750
RPMHEAD INGPM MOTOR MOTOR
LOCATION
WH-1
TAG KW INPUT GALLONS
GRUNDFOS UP-26-96BF A/T115V, 1 PHASE
& MODEL No.ELECTRICAL MANUFACTURER REMARKS
INTEGRAL TIMER
MANUFACTURER & MODEL No.
GPH @ 80°RISE (140° OUT) REMARKS
NOTES:1. PROVIDE SHUTOFF VALVE ON HOT & COLD WATER LINE.2. PROVIDE AND INSTALL EXPANSION TANK, SIZED BY MANUFACTURER.3. SEE DETAIL FOR ADDITIONAL REQUIREMENTS.
NOTES:1. PROVIDE PUMP WITH AN INTEGRAL, PROGRAMMABLE TIMER FOR SCHEDULING PER IECC.
DECK ABOVE RESTROOMS
SERVICE
4.5 / 4.5 40 23 A.O. SMITH DEL-40 WIRE ELEMENTS NON-SIMULTANEOUS
VOLTS / PHASE
208/1
1/2"
FD-1
(E) 4" VTR
FLOOR
(E) 4" SAN. SEWER
4" 4" 4"
2"2"
2"
WC-1
UR-2
3"4" 4"3"
WCO
2"
2"
2"2"
2"
2"
WC-1 WC-2 WC-2
UR-2 UR-1
WC-2FD-1 2" 2"
2"
2"
4" 3"4" 3"
FD-1FLOOR
(E) 4" SAN. SEWER
4" 4" 4"
2"2"
2"
WC-1
3"4"
3"
2" 2"2"
2"
2"
WC-1 WC-2 WC-2 WC-2FD-1
2"
3"
WC-2 WC-2 WC-2
4" 4"
2"3" 2"
2"
WC-1 WC-1 WC-2 WC-2 WC-2
SHOCK ABSORBER C'
1"1"1"1"
2"
1-1/2"FLOOR
WC-1
UR-2
WC-1 WC-2 WC-2
UR-2 UR-1
WC-2
SHOCK ABSORBER 'B'
3/4" 3/4"1"
3/4"1"1"1"
1-1/2"
1-1/2" 1-1/2"FLOOR
1" 1" 1"
WC-2 WC-2 WC-2
2"2"
03/07/2019
EMPLOYEEENTRANCE
EXT'G 2 STORYMODULAR OFFICE
NO WORK IN THIS AREA
NEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
NEW WOMENSRESTROOM
203
EF-1 EF-2
FCU-1(ON PLATFORMABOVE CEILING)EF-3 EF-4
S1 50
S2 170
1
14/14
S2 170
S2 140
S2 140
S2 130
10/1010/10
14/14
10/10
2
(E) EXHAUST DUCTUP THRU ROOF
10"Ø 10"Ø
8"Ø 8"Ø
8"Ø
8"Ø
8"Ø
6"ØHP-1(ON ROOF)
R1 - R1 -
12"Ø
10"Ø10"Ø
12"Ø
EF-5
6"Ø
UNDERCUT DOOR1/2" FOR AIRFLOW
WH
EXISTING WOMENSTOILET RM
202
EXISTINGHAC204
EXISTING MENSTOILET RM
203
(E) EXHAUST DUCT UPTHRU ROOF TO REMAIN
REMOVE EXISTING ROUNDSUPPLY DUCT AND ALL HANGERS
(E) SUPPLY DUCTDROP FROM RTU-15
CAP OPENING INSUPPLY DUCT
(E) SUPPLY PLENUMSHALL REMAIN
REMOVE EXISTINGROUND SUPPLY DUCT
REMOVE EXISTINGAIR DEVICES ANDDUCTWORK
REMOVE EXISTINGAIR DEVICES ANDDUCTWORK
REMOVE EXISTINGROUND SUPPLY DUCT
-
--
------ -
--------
MECHANICAL PLAN
LB SR
M101
NEW WORK GENERAL NOTES1. REFERENCE PHASING PLAN ON AD101.
SYMBOLS LEGEND
MECHANICAL KEYNOTES1. CONNECT NEW 10/10 SUPPLY DUCT TO EXISTING SUPPLY PLENUM, BALANCE FOR 400 CFM.
2. 10"Ø OUTSIDE AIR DUCT UP THROUGH ROOF WITH RAIN CAP, BALANCE FOR 250 CFM.
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FULLY SPRINKLEREDU.S. Departmentof Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECTArchitect:
STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/08/2019Revisions: Date:
Atriax, PLLC102 3rd Avenue, NEHickory, NC 28601828.315.9962atriaxgroup.com
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTIONDOCUMENTS
FINAL CONSTRUCTION DOCUMENTS
EXISTING TO REMAIN
NEW SUPPLY AIR DIFFUSER
NEW RETURN AIR GRILLE
NEW EXHAUST GRILLE
ROUND FLEXIBLE DUCTWORK
THERMOSTAT (MOUNT 4'-0" ABOVE FLOOR)
VOLUME DAMPER
INDICATES 12" x 8" INS. DIM. NET (1ST FIGURE = SIDESHOWN, 2ND FIGURE = SIDE NOT SHOWN)
DIFFUSER OR GRILLE DESIGNATION
T
12/8
TYPE CFMA 150
DEMOLITION
NEW DUCTWORK
03/07/2019
-
--
------ -
--------
MECHANICAL SCHEDULES
LB SR
M201
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FULLY SPRINKLEREDU.S. Departmentof Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECTArchitect:
STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/08/2019Revisions: Date:
Atriax, PLLC102 3rd Avenue, NEHickory, NC 28601828.315.9962atriaxgroup.com
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTIONDOCUMENTS
FINAL CONSTRUCTION DOCUMENTS
HVAC GENERAL NOTES: 1. FURNISH AND INSTALL ALL MATERIALS AND LABOR REQUIRED TO PROVIDE COMPLETE AND
OPERABLE HVAC SYSTEMS WITH ALL ITEMS AND APPURTENANCES NECESSARY EVENTHOUGH NOT SPECIFICALLY IDENTIFIED.
2. ALL WORK AND/OR MATERIALS SHALL BE INSTALLED BY A LICENSED CONTRACTOR ANDSHALL CONFORM TO ALL APPLICABLE NATIONAL AND LOCAL BUILDING AND MECHANICALCODES.
3. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH SMACNASTANDARDS. INSTALL TURNING VANES IN ALL DUCTWORK ELBOWS.
4. WHERE DUCTWORK IS INDICATED TO BE EXPOSED TO VIEW IN OCCUPIED SPACES, PROVIDEMATERIALS THAT ARE FREE FROM VISUAL IMPERFECTIONS INCLUDING PITTING, SEAMMARKS, ROLLER MARKS, AND STAINS AND DISCOLORATIONS, AND OTHER IMPERFECTIONS,INCLUDING THOSE THAT WOULD IMPAIR PAINTING.
5. ALL INTERIOR DUCTS SHALL BE CONSTRUCTED WITH G-60 OR BETTER GALVANIZED STEEL(ASTM A 653/A 653M) LFQ, CHEM TREAT.
6. COORDINATE EXACT ROUTING OF ALL WORK WITH ALL OTHER TRADES PRIOR TOINSTALLATION.
7. MECHANICAL CONTRACTOR SHALL COORDINATE EXACT LOCATION OF ALL AIR DEVICES WITHREFLECTED CEILING PLANS, ELECTRICAL LIGHTING AND ALL OTHER DEVICES.
8. ALL SUPPLY AND RETURN AIR DUCTWORK SHALL BE INSULATED WITH 2" THICK, 0.75 LB/CF(MINIMUM) FSK WRAP INSULATION (MINIMUM INSTALLED R-VALUE = R-6).
9. FLEXIBLE DUCTWORK RUNOUTS SHALL BE LIMITED TO 6'-0" EXTENDED LENGTH. FLEXIBLEDUCTWORK SHALL BE EQUAL TO ATCO #036. FLEXIBLE DUCTS, BOTH SUPPLY AND RETURN,SHALL HAVE INSULATION WITH A MINIMUM R-VALUE OF 6.0, PER IECC. DUCT SHALL HAVE ACONTINUOUS FLEXIBLE FIBERGLASS SHEATH WITH UL APPROVED METALIZED POLYESTERBARRIER JACKET.
10. INSTALL FLEXIBLE DUCTWORK CONNECTIONS AT ALL DUCT CONNECTIONS TO AC UNITS ANDFANS.
11. ALL DUCT DIMENSIONS SHOWN ARE NET CLEAR INSIDE DIMENSIONS.
12. PROVIDE A NEW TOUCH SCREEN, 7-DAY PROGRAMMABLE THERMOSTAT FOR THE NEW AIRHANDLING UNIT. MOUNT THERMOSTAT 4'-0" ABOVE FLOOR.
13. DO NOT ROUTE ANY DUCTWORK OVER ELECTRICAL PANELS OR IT SERVERS.
14. THE MECHANICAL CONTRACTOR SHALL TEST AND BALANCE THE HVAC SYSTEM. ALL AIRDEVICES SHALL BE BALANCED TO +/- 10% OF DESIGN REQUIREMENTS. THE CONTRACTORSHALL PROVIDE TWO (2) COPIES OF THE FINAL TAB REPORT TO THE OWNER.
FAN SCHEDULEFAN NUMBER
SERVICE
TYPE
CFM
EXT. SP. (IN.)
RPM
MAX SONES
MOTOR POWER
DRIVE
VOLTAGE/PHASE
MANUFACTURER
MODEL NUMBER
CONTROL
REMARKS
NOTES:
1. SP INCLUDES GRILLES, DUCTWORK AND DAMPERS.2. PROVIDE ALL EXHAUST FANS WITH A BACKDRAFT DAMPER.3. PROVIDE ALL EXHAUST FANS WITH A SOLID STATE SPEED CONTROLLER.4. INTERLOCK FAN WITH RESPECTIVE ROOM LIGHT SWITCH.5. PROVIDE WALL MOUNTED ON/OFF SWITCH TO CONTROL FAN - SEE ELECTRICAL.
EF-1,2,3,4
RR EXHAUST
CEILING MOUNTED
280
0.5"
980
3.0
DIRECT
120/1
GREENHECK
SP-A410
NOTE 4
NOTES 2,3
121 WATTS
6" M
IN.
HEAT PUMP UNIT
ROOF DECK
LAG SCREW WITH NEOPRENEWASHER, SECURE UNIT TO WOODNAILER AT ALL FOUR CORNERS
PRE-MANUFACTURED 18 GA. STEELEQUIPMENT RAIL WITH WOOD NAILER ANDGALVANIZED CAP EQUAL TO RPS MODEL ER-2A
WATERPROOF FLASHING BYROOFING CONTRACTOR
24"x12" HEAVY DUTYSIDEWALL RETURN GRILLE,
45° DEFLECTION BLADES
NOTES:
1. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
2. ALL AIR DEVICES INSTALLED IN GYP BOARD, PLASTER, OR OTHER HARD CEILINGS SHALL HAVE ASEPARATE MOUNTING FRAME.
OPPOSED BLADEDAMPER
AIR DEVICE SCHEDULETYPE DESCRIPTION FINISH PRICE MODEL NO.
91NOR1 WHITEENAMEL
24"x24" SQ. PLAQUE FACECEILING DIFFUSER, 8"Ø NECK
WHITEENAMEL SPDYESS2
12"x12" SQ. PLAQUE FACECEILING DIFFUSER, 6"Ø NECK
WHITEENAMEL SPDYESS1
SA
FCU
OA DUCT UP THRUROOF WITH RAIN CAP
FLEX CONNECTION
RA PLENUM FULL SIZEOF UNIT CONNECTION
DRAIN PAN WITH SECONDARYFLOAT SWITCH TO SHUT DOWNUNIT IF PAN FILLS WITH WATER
REFRIG. LINESTO/FROM HP-1
MMOTORIZED DAMPER TOCLOSE WHEN UNIT IS OFF
FILTER RACK
MANUAL BALANCE DAMPER
ROUTE CONDENSATE DRAINLINE TO MOP SINK
VENTEDP-TRAP
ELECTRIC HEATER
PLYWOOD DECKABOVE RESTROOMS
TOTAL COOLING (MBH)
MANUFACTURER
MODEL NUMBER
SUPPLY AIR CFM
OUTSIDE AIR CFM
OUTDOOR UNIT
INDOOR FURNACE / COIL UNIT
VOLTAGE / PHASE
SPLIT SYSTEM SCHEDULE
NOTES:1. FURNISH UNIT WITH A NEW 7-DAY, TOUCH SCREEN, PROGRAMMABLE THERMOSTAT.2. PROVIDE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S RECOMMENDATIONS.3. COOLING CAPACITIES BASED ON 80°DB, 67°WB ENTERING COIL, 105°F AMBIENT.4. PROVIDE EXPANDED METAL HAILGUARDS FOR OUTDOOR HEAT PUMP UNIT.
MAX. OVERLOAD PROTECTION
MIN. CIRCUIT AMPS
FCU-1
HP-1
MANUFACTURER
MODEL NUMBER
MIN. SEER RATING
SYSTEM NOMINAL TONS
EXT. S.P. (IN. WC.)
VOLTAGE / PHASE
MOTOR HP (ECM)
SENSIBLE COOLING (MBH)
TOTAL COOLING (MBH)
ELECTRIC HEAT INPUT (KW)
MAX. OVERLOAD PROTECTION
MIN. CIRCUIT AMPS
CARRIER
3
CARRIER
208/1
208/1
1200
0.5"
250
1/2
26,500
32,900
7.5 KW
15.0
21.6
35
25HCC536A
58.5
60
FX4DNB037
33,000
HEAT PUMP CAPACITY AT 17° (MBH) 20,800
RETURN GRILLE ON 2 SIDES(TYPE R1)
COORDINATE EXACT LOCATION WITH EXISTINGSTRUCTURE; RAILS TO SPAN A MINIMUM OF 2 JOISTS
EF-5
HAC 104
CEILING MOUNTED
75
0.4"
775
1.5
DIRECT
120/1
GREENHECK
SP-B110
NOTE 5
NOTES 2,3
80 WATTS
03/07/2019
EMPLOYEEENTRANCE
EXT'G 2 STORYMODULAR OFFICE
NO WORK IN THIS AREA
NEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
NEW WOMENSRESTROOM
203
EF-1
EF-2 FCU-1(ON PLATFORMABOVE CEILING)EF-3
EF-4
HP-1(ON ROOF)
1
1
1
1
1
1
11
2
3
4
3
4
3
3
4
4
2
1
1
1 1
1
5
5
(E)PANEL LFR
LFR-7
LFR-9
LFR-6
LFR-3LFR-8
LFR-4
6
(ON) LFR-15
(ON) LFR-15
7
7
7
7
CP-1WH-1
LFR-11,13WITH #10
(ON) LFR-2
(ON) LFR-2
60/2/35/3R
LFR-10,12WITH 2#10 &1#10G., 3/4"C
60/2
9
EF-5
(ON) LFR-2
10
6
1111
M
(ON) LFR-2
WH
EXISTING WOMENSTOILET RM
202
EXISTINGHAC204
EXISTING MENSTOILET RM
203
EXISTING 2 STORYMODULAR OFFICE
XX
X
X
X
X
X
XX
XX X
XX
X
X X
X
XX
X X
X
X
X
X
X
X
X
(E) PANEL LFA
(E) PANEL LF
(E)TRANSFORMER
E
(E)PANEL LFR
X
X
X X
-
--
------ -
--------
ELECTRICAL PLANS
PM
E101
NEW WORK GENERAL NOTES1. REFERENCE PHASING PLAN ON AD1012. FIRE ALARM DEVICES INDICATED ON THE PLAN ARE A MINIMUM. A LICENSED FIRE ALARM
CONTRACTOR IS RESPONSIBLE FOR DESIGNING AND INSTALLING THE SYSTEM TOCOMPLY WITH ALL ADA, TAS, NEC, AND NFPA CODES AND THE REQUIREMENTS OF THELOCAL AUTHORITY HAVING JURISDICTION. COORDINATE FIRE ALARM INSTALLATIONWITH SPRINKLER SYSTEM INSTALLATION AND PERFORM ALL WORK IN ACCORDANCEWITH DIVISION 28 SPECS.
SYMBOLS LEGEND
ELECTRICAL KEYNOTES1. JUNCTION BOX FOR LOW VOLTAGE CONNECTION TO TOILETS.2. JUNCTION BOX FOR POWER TO TRANSFORMER FOR POWERED TOILETS.3. JUNCTION BOX FOR POWER TO ELECTRIC HAND DRYER.4. JUNCTION BOX FOR POWER TO PAPER TOWEL DISPENSER.5. CONNECT TO EXISTING DEDICATED CIRCUIT MADE AVAILABLE BY DEMOLITION.6. CONNECT TO EXISTING CIRCUIT MADE AVAILABLE BY DEMOLTION.7. TO SWITCHED LIGHTING CIRCUIT IN THIS ROOM.8. PROVIDE 60A/2P CIRCUIT BREAKER IN THIS PANEL TO MATCH EXISTING. LOCATE BREAKER IN
PANEL SO AS TO BALANCE LOAD ON PHASES IN PANEL WHEN NEW LOADS ARE ADDED.9. EXTEND 2#4 & 1#10G., 1"C TO NEW 60A/2P CIRCUIT BREAKER IN PANEL LFA.10. REPLACE EXISTING CIRCUIT BREAKER FOR THIS CIRCUIT WITH 20A/1P GFCI CIRCUIT
BREAKER TO MATCH EXISTING.11. PROVIDE JUNCTION BOX ABOVE WALL FOR POWER TO OWNER PHONE EQUIPMENT.
CONFIRM EXACT REQUIREMENTS WITH OWNER.
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FULLY SPRINKLEREDU.S. Departmentof Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECTArchitect:
STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/08/2019Revisions: Date:
Atriax, PLLC102 3rd Avenue, NEHickory, NC 28601828.315.9962atriaxgroup.com
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTIONDOCUMENTS
FINAL CONSTRUCTION DOCUMENTS
E
30/3/25/3R
GFI
J
F
EXISTING LIGHT FIXTURE
EXIT LIGHT FIXTURE
EMERGENCY LIGHT FIXTURE
SINGLE POLE SWITCH
208/120 V PANELBOARD
X
CONDUIT AND HOMERUN TO PANEL WITH ONE PHASE & ONE NEUTRAL & ONE GROUND
CONDUIT W/ ONE PHASE & ONE NEUTRAL & ONE GROUND
MOTOR
NON -FUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
DISCONNECT SIZE / POLES / FUSE SIZE/ENCLOSURE NEMA RATING
GROUND FAULT CIRCUIT INTERRUPTING
DUPLEX RECEPTACLE
GFI RECEPTACLE
JUNCTION BOX
FIRE ALARM STROBE ONLY
INDICATES EXISTING DEVICE OR EQUIPMENT TO REMAIN
INDICATES EXISTING DEVICE OR EQUIPMENT TO BE REMOVED
TWO POLE SWITCH
M MOTORIZED DAMPER BY OTHERS
3/7/2019
EMPLOYEEENTRANCE
EXT'G 2 STORYMODULAR OFFICE
NO WORK IN THIS AREA
NEW MENSRESTROOM
202A
NEWHAC204
NEW DW /STERILIZATION
205
NEW MENSRESTROOM
202B
JAN.CLT.202C
NEW WOMENSRESTROOM
203
LFR-1
11
1
1
A
A
A
A
A A
EX
A
A
A
A
A
A
B
B
B
B
B
B
B
B
B
B
B
B
B
B
BB
B
2 2
-
--
------ -
--------
LIGHTING PLAN
PM
E102
NEW WORK GENERAL NOTES1. REFERENCE PHASING PLAN ON AD101.
SYMBOLS LEGEND
ELECTRICAL KEYNOTES1. TO EXHAUST FAN.2. REFER TO DETAIL 2/E102 FOR CONTROL WIRING DETAIL FOR THIS ROOM.
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FULLY SPRINKLEREDU.S. Departmentof Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECTArchitect:
STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/08/2019Revisions: Date:
Atriax, PLLC102 3rd Avenue, NEHickory, NC 28601828.315.9962atriaxgroup.com
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTIONDOCUMENTS
FINAL CONSTRUCTION DOCUMENTS
LIGHT FIXTURE - LETTER ADJACENT TO FIXTURE DENOTESFIXTURE TYPE. REFER TO LIGHT FIXTURE SCHEDULE.
PP
EXIT LIGHT FIXTURE
OS
LOW VOLTAGE SWITCH
OCCUPANCY SENSOR SWITCH - WATT STOPPER #LMDW-101-W
VACANCY SENSOR SWITCH - WATT STOPPER #LMDW-101-W
POWER PACK
CEILING MOUNTED OCCUPANCY SENSOR
CONDUIT WITH ONE PHASE, ONE NEUTRAL & ONE GROUND
CONDUIT AND HOMERUN TO PANEL WITH ONE PHASE, ONE NEUTRAL & ONE GROUND
WATT STOPPER OCCUPANCY SENSORLDMC-100 OR APPROVED EQUIVALENT
LINE VOLTAGELOW VOLTAGEWIRE (CAT5E)
0-10V CONTROLWIRING
FIXTURES AS NOTED
LOW VOLTAGEWIRE (CAT5E)
WATT STOPPER ROOM CONTROLLER LMRC-101WITH 1 RELAY OR APPROVED EQUIVALENT
WATT STOPPER SWITCHLMSW-101-W ORAPPROVED EQUIVALENT
3/7/2019
-
--
------ -
--------
ELECTRICAL SCHEDULES
PM
E201
Contract Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
FULLY SPRINKLEREDU.S. Departmentof Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECTArchitect:
STAMPENGINEERING CONSULTANT
321 4 5 6 7 8 9 10
COMPLETE RESTROOM DESIGN
Lancaster, TX
VA255-15-D-0010
CMOPProject Director
03/08/2019Revisions: Date:
Atriax, PLLC102 3rd Avenue, NEHickory, NC 28601828.315.9962atriaxgroup.com
MEP:Baird, Hampton & Brown6300 Ridglea Place, Suite 700Fort Worth, TX 76116817.338.1277bhbinc.com
FINAL CONSTRUCTIONDOCUMENTS
FINAL CONSTRUCTION DOCUMENTS
11
3/7/2019