    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 1

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Electrical Transient Analyzer Program

    Load Flow Analysis

    Number of Buses:

    Swing V-Control Load Total

    Number of Branches:

    XFMR2 Reactor Line/Cable Impedance Tie PDXFMR3 Total

    1 0 3 4

    2 0 0 2 0 0 4

    Loading Category (1): Design

    Generation Category (1): Design

    Load Diversity Factor: None

    Maximum No. of Iteration: 99

    System Frequency: 50 Hz

    Unit System: English

    Project Filename: 1-03121004071

    Output Filename: E:\Kuliah\Prak. DSTL\Prkt. Load Flow\1-03121004071\Loadflow1.lfr

    Precision of Solution: 0.0001000

    Method of Solution: Newton-Raphson Method

  • 7/23/2019 Complete Report Fl 1

    2/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 2

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Adjustments

    Transformer Impedance:

    Reactor Impedance:

    Adjustments

    Apply

    /Global

    Individual

    PercentTolerance

    Overload Heater Resistance:

    Transmission Line Length:

    Cable Length:

    Temperature Correction

    Transmission Line Resistance:

    Cable Resistance:

    Apply

    Adjustments

    Individual

    /Global Degree C

    Individual

    Individual

    Individual

    Individual

    Yes

    Yes

    No

    No

    No

    Yes

    Yes

  • 7/23/2019 Complete Report Fl 1

    3/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 3

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Bus Input Data

    Sub-sys

    GenericConstant IConstant ZConstant kVAInitial VoltageBus

    MvarMWMvarMWMvarMWMvarMWAng.% Mag.kVID

    Load

    20.000Bus1 1 100.0 150.0

    70.000Bus2 1 100.0 0.0

    70.000Bus3 1 100.0 0.0

    33.000 62.00020.000Bus4 1 100.0 0.0

    62.0000.000 33.000Total Number of Buses: 4 0.000 0.000 0.000 0.000 0.000

    ID kV

    Generation Bus

    Sub-sysType

    Voltage

    % Mag. Angle MW Mvar Max Min

    Generation Mvar Limits

    % PF

    Bus1 120.000 Swing 100.0 150.0

    0.000 0.000

  • 7/23/2019 Complete Report Fl 1

    4/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 4

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Line/Cable Input Data

    ID Library Size T (C)

    Line/Cable

    Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)

    Adj. (ft) #/Phase% Tol.

    Length

    YR X

    Line1 98425.2 1 0.060960 0.030480750.0

    Line2 98425.2 1 0.060960 0.030480750.0

    Line / Cable resistances are listed at the specified temperatures.

  • 7/23/2019 Complete Report Fl 1

    5/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 5

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    2-Winding Transformer Input Data

    ID MVA Prim. kV Sec. kV % Z X/R Prim. Sec.

    Transformer % Tap Setting

    % Tol.

    Rating Z Variation

    + 5% - 5%

    Phase Shift

    Type Angle% Z

    Adjusted

    T1 100.000 20.000 70.000 12.50 34.10 0 000 0 Std Pos. Seq. 0.00012.5000

    T2 100.000 70.000 20.000 12.50 34.10 0 000 0 Std Pos. Seq. 0.00012.5000

    2-Winding Transformer Load Tap Changer (LTC) Settings

    ID Secondary Bus IDPrimary Bus ID Tap % Step Regulated Bus ID

    Transformer Connected Buses ("*" LTC Side)

    Tap % V kV

    Transformer Load Tap Changer Setting

    % Min. % Max.

  • 7/23/2019 Complete Report Fl 1

    6/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 6

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Branch Connections

    ID From Bus To Bus R X ZType

    CKT/Branch % Impedance, Pos. Seq., 100 MVA BaseConnected Bus ID

    Y

    T1 Bus1 0.37 12.49 12.50Bus22W XFMR

    T2 Bus3 0.37 12.49 12.50Bus42W XFMR

    Line1 Bus2 12.24 6.12 13.69Bus3Line

    Line2 Bus2 12.24 6.12 13.69Bus3Line

  • 7/23/2019 Complete Report Fl 1

    7/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 7

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    LOAD FLOW REPORT

    Bus

    ID kV

    Voltage

    Ang.% Mag.

    Generation

    MW Mvar

    Load

    MW Mvar

    Load Flow

    MW Mvar AmpID % PF

    XFMR

    % Tap

    Bus1* 20.000 150.0100.000 52.87825.367 Bus2 25.367 52.878 1693.0 43.30 0

    Bus2 70.000 148.293.348 Bus3 12.621 24.290 241.9 46.10 0 0 0

    Bus3 12.621 24.290 241.9 46.1

    Bus1 -25.241 -48.580 483.7 46.1

    Bus3 70.000 149.790.130 Bus2 -11.568 -23.764 241.9 43.80 0 0 0

    Bus2 -11.568 -23.764 241.9 43.8

    Bus4 23.135 47.527 483.7 43.8

    Bus4 20.000 147.683.502 43.23023.009 Bus3 -23.009 -43.230 1693.0 47.00 0

    * Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

    # Indicates a bus with a load mismatch of more than 0.1 MVA

  • 7/23/2019 Complete Report Fl 1

    8/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 8

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Bus Loading Summary Report

    ID

    Bus

    kV

    Directly Connected Load

    MW Mvar MVA % PF AmpRated Amp LoadingMW Mvar MW Mvar

    Constant kVA Constant Z Constant IPercent

    Generic

    MW Mvar

    Total Bus Load

    Bus1 20.000 58.648 1693.043.30 0 0 0 0 0 0 0

    Bus2 70.000 54.746 483.746.10 0 0 0 0 0 0 0

    Bus3 70.000 52.859 483.743.80 0 0 0 0 0 0 0

    Bus4 20.000 48.972 1693.047.00 0 23.009 43.230 0 0 0 0

    *Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

    #Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).

  • 7/23/2019 Complete Report Fl 1

    9/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 9

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Branch Loading Summary Report

    ID Type

    Loading

    Amp %

    Capability

    (MVA) MVA %

    Loading (output)

    CKT / Branch Cable & Reactor

    Transformer

    Loading (input)

    %MVA

    Ampacity

    (Amp)

    T1 Transformer 100.000 58.648 58.6 54.746 54.7

    T2 Transformer 100.000 52.859 52.9 48.972 49.0

    * Indicates a branch with operating load exceeding the branch capability.

  • 7/23/2019 Complete Report Fl 1

    10/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 10

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Branch Losses Summary Report

    ID MW Mvar MW Mvar kW kvar From To

    CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage% Drop

    Vd

    in Vmag

    25.367 52.878 -25.241 -48.580 126.0 4297.6 100.0 93.3 6.65T1

    12.621 24.290 -11.568 -23.764 1052.9 526.5 93.3 90.1 3.22Line1

    12.621 24.290 -11.568 -23.764 1052.9 526.5 93.3 90.1 3.22Line2

    23.135 47.527 -23.009 -43.230 126.0 4297.6 90.1 83.5 6.63T2

    2357.9 9648.0

  • 7/23/2019 Complete Report Fl 1

    11/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 11

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    Alert Summary Report

    Cable 95.0100.0

    Bus

    MarginalCritical

    95.0100.0

    Loading

    % Alert Settings

    95.0100.095.0100.0

    95.0100.0

    LineTransformer

    Reactor

    Panel

    95.0100.0

    95.0 98.0

    102.0105.0

    95.0100.0

    95.0100.0

    95.0100.0

    100.0

    Generator Excitation

    Bus Voltage

    UnderExcited (Q Min.)

    OverExcited (Q Max.)

    UnderVoltage

    OverVoltage

    Protective Device

    Generator

    Critical Report

    Device ID Type Rating/LimitCondition Unit Operating % Operating Phase Type

    70.000 kV 65.343 93.3 3-PhaseUnder VoltageBus2 Bus

    Bus3 70.000 kV 63.091 90.1 3-PhaseUnder VoltageBus

    Bus4 20.000 kV 16.700 83.5 3-PhaseUnder VoltageBus

    Gen1 41.964 Mvar 52.878 126.0 3-PhaseOver ExcitedGenerator

  • 7/23/2019 Complete Report Fl 1

    12/12

    Location: Lab. DSTL

    Engineer: Ahmad Okky SaputraStudy Case: LF

    7.0.0

    Page: 12

    SN: 12345678

    Filename: 1-03121004071

    Project: Load Flow 1ETAP

    Contract: 03121004071

    Date: 09-17-2015

    Revision: Base

    Config.: Normal

    0.0000.0000.000

    0.0000.0000.000

    Lagging46.9848.972

    Total Generic Load:

    Total Constant I Load:

    0.0000.000

    9.6482.358

    Number of Iterations: 3

    System Mismatch:

    Apparent Losses:

    SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

    0.000

    Lagging

    Lagging

    43.23023.009

    0.0000.000

    43.2558.64852.87825.367

    0.0000.0000.000

    43.2558.64852.87825.367

    % PFMVAMvarMW

    Total Static Load:

    Total Motor Load:

    Total Demand:

    Source (Non-Swing Buses):

    Source (Swing Buses):