Company_profile Ia Campbell & Associates, Inc

Embed Size (px)

Citation preview

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    1/37

    Address: Unit 604 Cattleya Bldg., 235 SalcedoSt., Legaspi Village, Makati City 1229

    Philippines

    Tel. Nos.: (063-2) 893-4931

    Fax No.: (063-2) 813-1699

    E-mail: [email protected]

    Web Site: http://www.campbell.com.ph

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    2/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Presidents Message

    Todays projects have become larger in scope, are more complex, and involve greater risk than was experienced even a

    decade ago. Success of these projects demands professional expertise and judgment, not only in design and

    construction disciplines, but more so in the management of such ventures.

    I. A. Campbell and Associates, Inc. (IACAI) recognizes this critical role of overal

    coordination and administration of all activities and aspects of a project: from feasibility

    planning, and design through construction, commissioning, and operation.

    As your Project Manager, expect IACAI to integrate your financial targets, goals, and

    schedules while insisting on technical quality, safety, and performance. Expect IACAI to

    anticipate project demands and bring about the best results.

    Thank you for allowing us to present ourselves. IACAI invites you to inquire further and

    discover the many ways your projects can benefit from our experience and expertise!

    Our Story

    I. A. Campbell and Associates, Incorporated (IACAI) is a Project, Construction, and Development Management Firm

    established in 1996 by outstanding professional Australian, Filipino, and American Engineers, Architects, Designers, andCost Planners.

    These individual talents from diverse cultures are molded into a cohesive ensemble that wins rave reviews. IACA

    symbolizes perfect teamwork between people from different cultural, national and linguistic background, all of them

    aiming to deliver the best possible performance.

    The cultural diversity and commitment of IACAI symbolizes Project Management. It represents bringing all talents

    together combining this strength to create an entire team dedicated to innovation and perfection. Because these

    professionals have individually gained extensive experience in a wide variety of project types and disciplines for planning

    and achieving a project, collectively IACAI, form a potent management team, extending services of the highest caliber

    while maintaining a personal and hands-on approach. Values such as Passion, Understanding, Discipline andPerformance are IACAIs tools for its success in management as well as in construction.

    Our work varies in size and complexity, but our commitment remains the same: to exceed our clients expectations and

    satisfaction by delivering on schedule and on project budget.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    3/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    IACAI have demonstrated technical expertise by leadership in many prestigious projects for valued clients such as SunLife of Canada (Sun Life Financial), DHL Worldwide Aviation, International Copra Export Corporation (ICEC), Hong Kong

    Bank (HSBC), Orient Semiconductor Electronics Limited (OSEL), Ayala Land, Incorporated (ALI), Filinvest Corporation

    (FAC), Metropolitan Bank and Trust Company (Metrobank), SM Prime Properties (SM), and Hong Kong Land, Inc.

    Our Mission

    Our mission is to provide our Clients with relevant and innovative Project Management tools and methodologies that

    help them realize their objectives and maximize their success. To achieve our mission, we focus on our vision of being

    the development and project managers OF CHOICE by the recognized leaders in the real estate development and

    construction industries, in both the domestic and international market.

    We commit ourselves to:

    Continually pursue excellence in all that we do by setting new benchmarks and integrating innovation Cultivate a culture of passion, not only in our profession, but also in fulfilling our social responsibility to improve

    the quality of the environment, our clients lives, and the socioeconomic condition of our country of operations

    Empower our team of professionals by harnessing their knowledge, skill, and potential while promoting equalopportunities

    Conduct our corporate affairs with integrity and transparency and our clients affairs with accuracy anddiscretion

    Our Services

    Because IACAI understands that each project differs in terms of developer requirements and objectives, maintains

    flexibility and adaptability in its methods so that our scope of services can be as broad or as specific as you like

    Whatever the commission, you can rely on the commitment to efficiency, confidentiality and communicating in clear

    terms.

    Our general summary of the services available to you is categorized into the following phases:

    Phase 1: Feasibility

    Prepare site analysis, developmental appraisal, and Master Schedule Implement Environmental Impact Studies and market/cost surveys Finalize detailed Feasibility Study and make recommendations to our Client

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    4/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Phase 2: Design

    Define selection of and integrate recommended design professionals Prepare development of design program and Master Schedule Maintain control of the Clients design and cost objectives

    Phase 3: Pre-Construction

    Formulate Contract and Procurement Strategy Re-confirm construction budget Re-confirm Master Schedule Evaluate and Shortlist Contractors / Vendors Conduct Bidding, Negotiation, and Award

    Phase 4: Construction

    Initiate Contract Administration procedures Monitor and report Master Schedule performance Ensure Quality Assurance Procedures are implemented Initiate and chair cost management meetings Manage Reporting System on Time, Cost, Quality and Safety

    Phase 5: Post-Construction

    Manage Punch-List and Defects and Liability Period Collate Warranties, Manuals, As-Built Drawings forClose-out Process Final Account and Payment Certificates Negotiate and Award Maintenance Contracts Prepare End-of-Project report for the Client

    Project Management is the effective control of project cost, time, resources, and quality through careful planning,

    organization, and supervision of development activities

    Project Management Construction Management

    Project Manager

    Owners principal / overall representative Overall management of project scope Manager of Time, Cost, & Resources Over-view of Project Quality and Safety

    Construction Manager

    Site representative of the Owner Field Liaison for the Project Manager Supervises Contractors / Suppliers Schedules Detailed Review of Quality of Constructiion

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    5/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Project Management Services Construction Management Services

    Pre-Design

    Master Scheduling Cost / Feasibility Analysis

    Design

    Concept Design/Schematic Design Design Development Construction Documentation

    Pre-Construction

    Strategize Procurement Tender and Award Recommend Value Engineering

    Construction

    Manage Contract Monitor Construction Recommend Value Engineering

    Post-Construction

    Manage Close-out

    Procurement Management

    Scheduling of Contracts (Optional) Negotiation and Purchasing (Optional) Review Technical feasibility

    Construction Supervision & Administration

    Monitor Quality Report to Project Manager on technical issues Maintain construction reports and lugs

    Technical Advisory Services Recommend Value Engineering

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    6/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    7/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Institutional Projects

    Ninoy Aquino Airport International Passenger - Terminal 3

    Situated in a 65-hectare expansion site of the existing airport compound. This international passenger terminal was

    designed to handle at least 13 million passengers per annum which consists of a main terminal building, north and south

    concourses (the center of each boasts a large two-storey skylight shopping atrium), aircraft aprons and airport offices.

    The project includes 4-levels for arrival and departure halls, 1-level basement area for services, and a 5-level structured

    parking garage for 3,000 cars. It features twenty (28) aircraft gates, 138 check-in counters, nine baggage carousels, and

    an impressive contingent of immigration counters with a total of 120.

    IACAI provided Quality Assurance Monitoring during the 14-month Pre-Award Phase and subsequent 36-month

    Construction Period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    8/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    DHL Worldwide Aviation - Manila Hub

    Adjacent the countrys longest building at the NAIA Airport, DHL Worldwide Aviation Manila Hub is their main Hangar and

    Sorting Facility for the Southeast Asian region. The facility comprises of office use and parcel-sorting facility for off-loading as

    many as five aircraft simultaneously. It features a steel frame structural system added to an existing World War II era hangar

    and a facade cladding of metal panels. Amenities include spare parts warehouse, 100% generator back-up, canteen and

    kitchen, flight dispatch office and IT / Data communications room.

    IACAI provided Due Diligence Studies, Architectural and Engineering design Services, Project Management for the fast tracked

    5-month contract period and a 12-months of defects and liability period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    9/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    The Medical City

    As one of the countrys longest operating health care institutions, the Medical City has developed their new home along

    Ortigas Avenue in the Pasig district of Metro Manila. The new facility is comprised of tertiary medical facilities for 500 beds for

    in-patient care. The 14-story initial phase of the hospital can be expanded to accommodate a further 250 beds in the future as

    all services have been designed for this ultimate capacity. The complex also features a 20-story Medical Arts Tower housing

    200 doctors clinics. Amenities include dining facilities, 100% generator back-up, courtyard gardens, emergency helipad, IT/

    communications facilities.

    IACAI provided Project Management and Construction Management for the 12-month design period and current 28-month

    construction period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    10/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    The Mind Museum

    The project consists of a 6,110 square meter museum building which includes exhibit halls, educational centers, retail, outside

    parking to be developed on a site area of about 12,500 square meters.

    IACAI provides Project Management services for the 12-month design period and 21-month construction period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    11/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Commercial Projects

    Sheraton Hotel Mongolia

    This 5-star hotel development project is located in Ulaanbaatar, Mongolia on a site area of approximately 30,250 sq.m. To be

    known as the Sheraton Hotel Mongolia, this project will have 16 levels and 300 keys with a gross floor area of about 49,000

    sq.m.

    IACAI provides Project Management services for the 10 month design and 36 month construction periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    12/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    City Marriott Hotel

    The Cebu City Marriott Hotel is undergoing a renovation plan to keep up with Cebu City's rising economy and lifestyle. It is

    poised to modernize its looks and system to keep its no. 1 stature as Cebu City's Hotel of Choice and be known as Cebu City's

    LIFESTYLE HOTEL. The renovation works consist of the 301 guest rooms and public areas with an aggregate floor area of

    about 14, 000 sq.m. spread on a 12-storey floor levels.

    IACAI provides Project Management services for the 12-month design and renovation periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    13/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    PBCOM Tower

    Dominating the Philippine skyline as the countrys tallest building is the 52-story Philippine Bank of Communications (PBCom)

    Tower. Located in

    Makati City, Manilas premier business district, PBCom Tower comprises banking and office space use. It features a composite

    slab structural system and a unitized curtain wall system facade cladding of granite, glass, and aluminum panels and frames

    for finishes. Amenities include, a Health Club, Food Court dining facilities, membership Executive Lounge, and a rooftop

    electronic / telecommunications tower.

    IACAI provided Project Management and Construction Monitoring for the 39-month construction period and a 12 months of

    defects and liability period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    14/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    LKG Tower

    With a striking diagonal silhouette along the skyline of the central business district of Makati, the LKG Tower has 42 floors for

    offices and banking facilities with the tallest atrium in the country acting as the main lobby. The facade is made of unitized

    curtain wall system with lowreflective glazed panels set in aluminum frames. Amenities include a Health Club and Food Court

    dining facilities.

    IACAI provided Construction Advisory services for the 34-month construction period and 3 months of contract close out.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    15/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Globe Telecom Headquarters

    The GLOBE TELECOM HEADQUARTERS (GTHQ) building is located at Seventh Avenue corner 32nd Street on a site area of 3,094

    square meters property within the city center of Bonifacio Global City in Taguig. The project, which will house Globe's several

    office branches all over Metro Manila will have 27 floors and six (6) basement parking and four (4) podium parking floors.

    IACAI provides Project Management for the Schematic Design Stage until Construction Phase for a total period of 37 months.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    16/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Metrobank Card Corporation

    Metrobank, in association with Australian New Zealand Bank, relocated their credit card operation units from their offices in

    GT Tower and AXA to a fully refurbished 13-storey office, with 1 basement to include an expanded services of business

    process outsourcing and call center provider.

    IACAI provided Project and Construction Management services during the fast tracked 60-day planning and 5 months

    construction period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    17/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Philippines - Australia Governance Facility (PAGF)

    Relocated to the 17th Floor of Equitable Bank Tower along Paseo de Roxas, in the central business district of Makati, the

    offices of PAGF now make their new home. This quasi-government organization required a relocation from their prior facility

    and a reconfiguration of strategy in planning for their new facilities to include expansion capacity for 10 additional staff.

    IACAI provided Project and Construction Management and Cost Estimating services during the fast-tracked 60-day planning

    and 90-day construction periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    18/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    AMRO Offices Relocation

    Relocated to the 18th and 19th floors of the LKG Tower along Ayala Avenue in the business district of Makati, the offices of

    ABN AMRO now makes their new home for Investment Banking Facilities.

    The strategic planning of ABN AMRO Philippine operations required a revised strategy of planning for their facilities.

    IACAI provided Project and Construction Management and Cost Estimating services during the extremely ambitious 30-day

    planning and 60-day construction periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    19/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    PBCom Tower Food Court

    Located at the seventh floor of the tallest High-Rise Office Building in the Philippines, at the center of the countrys financial

    district Makati, PBCom Tower Food Court caters to the various culinary needs of the

    towers nearly 5,000 occupants. The series of restaurant outlets are designed to include adjacent Dining Room facilities both

    within the tower and also an Outdoor Dining Area at the adjoining Roof Garden. Kitchen support facilities are conveniently

    central to all individual outlets.

    IACAI provided Project Management, Construction Management and Cost Estimating services for the 5-month design and 5

    months construction period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    20/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Sun Life Financial Asia-Pacific Headquarters

    Located at the crossing of two of the most important roads in the countrys financial district Makati, Sun Life Financial makes

    their home on Floors 10th to 16th of the Enterprise Center, Tower 2. These offices house the Asia-Pacific Headquarters for

    offices of the Canadian Insurance brokerage and mutual fund firm. Design features include well-furnished work stations,

    training facilities, boardroom, conference / meeting rooms, staff dining facilities, kitchen, and computer IT /data

    communication rooms.

    IACAI provided Project Management and Construction Management for the 5 month design and 120 days construction period

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    21/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Ayala Corporation Boardroom

    Located at the 35th floor penthouse within Ayala Tower One, the Ayala Corporation Boardroom completes the executive

    offices of one of the countrys blue-chip, listed companies. Above the second tallest atrium in the country as the main

    entrance to these facilities, this sophisticated conferencing facility is equipped with a state-of-the-art audio system, fully

    integrated with computers and wide screen video display.

    IACAI provided Project and Construction Management services for the 8 month design period and 5 month construction

    period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    22/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    MAKRO Philippines Headquarters and Store 4

    Located along the South Superhighway at the Sucat Avenue exit, in the city of Paraaque, the MAKRO Store #4 and

    Headquarters for the Philippine arm of the international membership retail chain maintains offices adjacent to their shopping

    facility. The store has a large, warehouse-style, open shopping area under one roof, containing one of the largest commercial

    outlets in the Philippines. Other features include dining facilities, branch banks, and offices.

    IACAI provided Project and Construction Management services for the 7 month-design and - month construction periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    23/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    SM City Marilao

    Located along the MacArthur Highway in the Municipality of Marilao, Bulacan, this new addition to the Shoemart retail

    shopping chain will open in 2004. These 2 story shopping facilities will become the regional anchor for the Municipality of

    Marilao, typical of the philosophy of the largest commercial retailer in the Philippines. Features include restaurants and food

    court dining facilities, branch banks, cinemas, and parking for 1,200 motor vehicles.

    IACAI provided Project and Construction Management services for the 6-month design and 15-month construction periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    24/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    SM Supercenter Valenzuela

    This 4-storey shopping center is located in Karuhatan,Valenzuela that features food chains and restaurant facilities, branch

    banks, cinemas and parking spaces.

    IACAI currently provides Project and Construction Management services for the 12 month construction period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    25/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Industrial Projects

    Orient Semiconductor Electronics Plant

    Located at the suburban community of Calamba, at Laguna Techno- Park Industrial Estate, this 4-story semiconductor

    manufacturing plant with enameled steel cladding panels and metal curtain wall extending over 150 meters in length. The

    plant is sited on a 40,000 square meter lot and contains a floor area of over 50,000 square meters. It features a composite slab

    structural system with heavy floor loading for industrial applications of each of its four independent semiconductor factories.

    Amenities include staff dining facilities, Executive Lounge, and full back-up power generator plant in a adjoining building.

    IACAI provided Project Management and Construction Monitoring for the 28-month construction period and a 12 months of

    defects and liability period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    26/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Industrial Galvanizers Philippines Pole Factory

    Located in Trece Martires, Cavite, this compound of four single story pole manufacturing and galvanizing plant buildings are

    sited on 8 hectares property. The longest buildings extends 140 meters in length. The structure is a specially treated steel

    frame system with fiberglass resin panels at all corrosive areas. Amenities include main office spaces, staff dining, and full

    back-up generation.

    IACAI provided Design services for the 4-month design period and Advisory services during the 6-month construction period.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    27/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Residential Projects

    The Capital Towers

    Conveniently located in one of Quezon Citys business districts, The Capital Towers offers a carefully master planned

    residential community with commercial outlets to enjoy the comforts of urban living. The project consists of three towers of

    18-storeys each with seven levels of podium amenities.

    IACAI provides Construction Management services for the 10-month design and 30-month construction periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    28/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Bay Gardens Condominium

    Having a spectacular view of Manila Bays famous sunsets, the Bay Gardens Condominium is located along Roxas Boulevard in

    the Metropolitan Park area of Pasay City. The complex has three Towers of 18 floors each and a total of 360 condominium

    units. The facade contains open balconies that allow unit owners to take advantage of the frequent breezes coming from the

    waters edge nearby. Amenities include a Fitness Center, Social Hall, Badminton Court, both indoor and outdoor swimming

    pools, and parking for 500 motor vehicles.

    IACAI provided both Project and Construction Management services for the 8-month design and 24-month construction

    periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    29/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Oriental Gardens Makati

    The Oriental Gardens Makati Condominium. Located along Chino Roces Avenue in Makati, will have two towers of 30 floors

    and a total of 683 condominium units, with 560 parking spaces. Amenities include a health club, swimming pool, and ground

    floor shopping arcade facilities.

    IACAI provided both Project and Construction Management services for the 8-month design and 26-month construction

    periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    30/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    One Roxas Tower

    With a clean, ultra-modern styling, the One Roxas Triangle Tower Condominium is located at the premier address in Makati

    City. The Towers 50 floors include a total of 168 condominium units. The facade is made of unitized curtain wall system with

    low reflective laminated glass window. Amenities include a health club, tennis court, swimming pool and social hall facilities.

    IACAI provided Construction Management services for the 9-month design and 28-month construction periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    31/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Baguio Vacation House

    Along a sloping site near South Drive in Baguio City, the Baguio Vacation House is a multi-level design as a modern adaptation

    of the indigenous architecture found in the Cordillera region of the Philippines. Through the roof line form linked pavilions,

    and facade are characteristics of local style with extensive use of natural materials and openness. Other amenities include

    outdoor viewing terraces, wood burning fireplaces, and a gymnasium.

    IACAI provided Project and Construction Management services for the 6-month design and 20-month construction periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    32/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Calatagan Residences

    On a gently sloping site in the resort area of Calatagan, Batangas Province, the two-level Mediterranean-designed Calatagan

    Residence contains an atrium court. Within minutes of the seaside, the Calatagan residence becomes an elegant retreat.

    IACAI provided Project and Construction Management services during the 9-month design and 18-month construction

    periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    33/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Casa de Nipa

    On a lushly planted site located in the historic Yulo Sugar Plantation estate in Canlubang, Laguna Province, the Casa de Nipa is

    being restored to its original turn of the century design in one of the largest scale restoration projects in the country. The

    gardens surrounding Casa de Nipa are also being restored and embellished with gazebos and pools.

    IACAI provided Project and Construction Management services during the 6-month design and 24-month construction

    periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    34/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Forbes Park Residence 1

    On a gently sloping site in the exclusive area of Forbes Park Village, Makati City, the split-level design of this Residence

    surrounds a garden court formed with the adjoining guest house.

    IACAI provided Project and Construction Management services during the 8-month design and 18-month construction

    periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    35/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Forbes Park Residence 2

    On a gently sloping site in the secluded community of Forbes Park in Makati, the three-level, Northern-Italian inspired Forbes

    Residence contains a monumental stair and a terrace overlooking the yards. While located near the central business district of

    Makati, the Forbes Park Residences-2 is an elegant home that becomes a welcome departure from city life.

    IACAI provided Project and Construction Management services during the 8-month design and 18-month construction

    periods.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    36/37

    Unit 604 Cattleya Bldg., 235 Salcedo St. Legaspi Village, Makati City Philippines

    Tel. no: (632) 893-4931 | Fax no: (632) 813-1699

    Email: [email protected]

    Punta Fuego Residence

    On a sea-side site with spectacular panoramic coastal views in the resort area of Punta Fuego, Batangas, this two-level Spanish

    Hacienda contains a great living area, terraces surrounding all sides, and swimming pool.

  • 7/27/2019 Company_profile Ia Campbell & Associates, Inc.

    37/37

    Dasmarias Residence

    Located in the posh village of Dasmarias Makati, this two-storey residential project sits on a 677 square meter lot with a tota

    floor area of approximately 670 square meters.