19
COMPANY PROFILE PT WASKITA KARYA (PERSERO) TBK

COMPANY PROFILE - Waskita

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMPANY PROFILE - Waskita

COMPANY PROFILEPT WASKITA KARYA (PERSERO) TBK

Page 2: COMPANY PROFILE - Waskita

COMPANIES OVERVIEW

Page 3: COMPANY PROFILE - Waskita

CORPORATE MANAGEMENT STRUCTURE

Page 4: COMPANY PROFILE - Waskita

BUSINESS LINE

Page 5: COMPANY PROFILE - Waskita

6

WASKITA GROUP CORPORATE STRUCTURE

59,99%

PT Waskita Beton Precast Tbk

99,99%

PT Waskita Karya Realty

80,56%

PT Waskita Toll Road

20,00%

PT Prima Multi Terminal

90,00%

PT Cimanggis Cibitung Tollways

PT Cinere Serpong Jaya

25,00%

PT Citra Waspphutowa

94,70%

PT Waskita Sangir Energi

PT Waskita Karya Infrastruktur

99,99%

PT Waskita WadoEnergi

99,99%

77,69%99,99%

PT Pejagan Pemalang Tol Road

99,99%

PT Semesta Marga Raya

PT Trans-Jawa Paspro Jalan-Tol

22,31%

39,50%

60,00%

PT PemalangBatang

Tol Road

PT Trans Jabar Tol

99,99%

PT Waskita Bumi Wira

99,90%98,18%

PT Waskita Sriwijaya Tol

60,00%

PT Tol TelukBalikpapan

75,00%

PT Waskita Bali

Mandara

55,00%

PT CibitungTanjung PriokPort Tollways

99,70%

PT Kresna Kusuma

Dyandra Marga

PT Waskita ModernRealti

60,00%

30.00%

PT Jasa MargaKualanamu Toll

35,00%

PT Jasamarga Semarang Batang

40,00% 30.00%

PT HutamaMarga Waskita

PT Citra KaryaJabar Tol

15,00%

PT Waskita FimPerkasa Realti

60,00%

PT Hotel KaryaIndonesia

25,00%

PT PP SinergiBanjaratma

20,00%

Pemerintah

66,04%

PT Waskita Karya (Persero) Tbk

Masyarakat

33,96%

Page 6: COMPANY PROFILE - Waskita

OPERATING AREAS & EXPERTISE

Page 7: COMPANY PROFILE - Waskita

Cimanggis - Cibitung Toll Road

EPC PORTFOLIO

Page 8: COMPANY PROFILE - Waskita

Owner PT PLN (Persero)Project Location Papua, IndonesiaProject Value Rp. 231.397.521.640,- (Excl.VAT)Contract Value (Incld.Addendum) Rp. 487.420.463.423,- (Excl.VAT)Contract Scheme Lump Sum Fixed PriceDuration as Contract 24 November 2008 – 30 December 2015Actual Duration (Incld.Addendum) 24 November 2008 – 23 December 2015

Scope Of Works

1. Design, Drawing and Documentation2. Civil Works Weir & River Intake De-sedimentation Basin &

HeadraceCulvert Tunnel Inlet Portal Tunnel Construction Valve House Portal

Penstock Civil Works Powerhouse and Tailrace Access Road & Bridge 20 KV Local Supply Line Reservoir Clearance

3. Plant, Equipment and Mandatory Spare parts

8

PROJECT EXPERIENCE

Genyem Hydro Power Project 2x10 MW

Page 9: COMPANY PROFILE - Waskita

Owner PT Waskita Sangir EnergyProject Location Sangir, Sumatra Barat, IndonesiaProject Value Rp. 166.766.903,- (Excl.VAT)Contract Value (Incld.Addendum) Rp. 265.826.618.105,- (Excl.VAT)

Contract Scheme Lump Sum Fixed PriceDuration as Contract 29 November 2013 – 22 February 2015Actual Duration(Incld.Addendum) 29 November 2013 – 18 November 2016

Scope Of Works

1. DED2. Main Works Coffering & Dewatering Intake, Main Dam, Transition Tunnel Sandtrap Waterway Syphon Head Pond & Emergency

Inspection Road & Side Ditch Civil Work / Saddle

Supportfor Penstock Powerhouse & Tailrace Metal Work Generating Equipments

9

PROJECT EXPERIENCE

EPC Construction of Sangir Mini Hydro Power Plant 2 x 5 MW

Page 10: COMPANY PROFILE - Waskita

Owner PT. Bayu Daya Perkasa

Project Location Banten, Indonesia

Project Value Rp 91.286.967.000,- (Excl.VAT)

Contract Value (Incld.Addendum) Rp. 126.251.021.000,- (Excl.VAT)

Contract Scheme Lump Sum Fixed Price

Duration as Contract 20 June 2014 – 13 September 2015

Actual Duration(Incld.Addendum)

20 June 2014 – 25 January 2017

Scope Of Works

1. General Work2. Access Road3. Diversion Weir & IntakeStructure4. Waterway5. Waterway & Related Structure

6. Head Pond7. Penstock8. PowerHouse9. Hydromechanical10. Miscellaneous Works

10

PROJECT EXPERIENCE

Lebak Tundun Mini Hydro Power Plant 2 X 4 MW

Page 11: COMPANY PROFILE - Waskita

Owner PT PLN (Persero)

Project Location Kalimantan Timur, Indonesia

Project Value Rp. 151.578.435.800,- (Excl.VAT)

Contract Value (Incld.Addendum)

Rp. 280.448.151.569,– (Excl.VAT)

Contract Scheme Lump Sum Fixed Price

Duration as Contract 15 December 2010 – 14 October 2012

Actual Duration(Incld.Addendum)

15 December 2010 – 20 September 2020

Scope Of Works

1. Land Preparation2. Design3. Building Construction (Turbine & Boiler House)4. Colling tower System5. Mechanical, Electrical & Process6. Coal Handling Facility (Conveyor System)7. Commissioning & COD

11

PROJECT EXPERIENCE

EPC Construction of Malinau Coal Fired Power Plant 2x3 MW

Page 12: COMPANY PROFILE - Waskita

Owner PT. Sinoma Engineering Indonesia

Location Citeureup, West Java, IndonesiaProject Value Rp 192.053.400.000,- (Incl.VAT)Contract Value (Incld.Addendum) Rp 235.004.737.327,- (Incl.VAT)

Contract Scheme Unit PriceDuration as Contract 1 January 2014 – 31 December 2014Actual Duration(Incld.Addendum) 1 January 2014 – 12 December 2018

Scope Of Works

1. Cement Silo2. Civil Works at Cement Grinding3. Civil Works at Cement Mill Feed4. Civil & Finishing Works at CoalStorage

12

PROJECT EXPERIENCE

Cement Silo P14 Plant Capacity 10000 tpd at Citeureup

Page 13: COMPANY PROFILE - Waskita

Owner CBMI - DDK JO

Location Palembang, South Sumatra, IndonesiaProject Value Rp 101.864.283.077,- (Incl.VAT)Contract Value (Incld.Addendum) Rp 101.864.283.077,- (Incl.VAT)

Contract Scheme Lump Sum Fixed PriceDuration as Contract 16 August 2015 – 17 August 2016Actual Duration(Incld.Addendum)

16 August 2015 – 16 February 2017

Scope Of Works

CIVIL WORK1. Main Substation Building2. Cement Silo3. Cement Component Dosing4. Clinker Silo 2 &35. Coal Storage

6. Water Treatment Building7. Raw Material Dosing8. Sandy Clay –Trench9. Limestone Storage10. Cement Grinding Building

13

PROJECT EXPERIENCE

Baturaja Cement Project (Plant II)

Page 14: COMPANY PROFILE - Waskita

Owner PT. Semen Padang

Location Dumai, RiauProject Value Rp 52.662.500.000,- (Excl.VAT)Contract Value (Incld.Addendum) Rp 52.662.500.000,- (Excl.VAT)

Contract Scheme Lump Sum Fixed PriceDuration as Contract 6 July 2009 – 1 May 2010Actual Duration(Incld.Addendum) 6 July 2009 – 1 May 2010

Scope Of Works

1. Cement Silo2. Packer Building3. Unloading Faculity4. Office & OthersFacility

14

PROJECT EXPERIENCE

Silo and Packing Plant Dumai

Page 15: COMPANY PROFILE - Waskita

Owner PT. Semen PadangLocation Padang, Sumatra, IndonesiaProject Value Rp 169.290.000.000,- (Incl.VAT)Contract Value (Incld.Addendum) Rp 180.167.022.566,- (Incl.VAT)

Contract Scheme Unit PriceDuration as Contract 17 October 2014 – 5 July 2015Actual Duration(Incld.Addendum)

17 October 2014 – 9 August 2016

Scope Of Works

1. Cyclone Preheater Upper Structure2. Kiln Feed Structure3. Raw Mill Foundation4. CF Silo Structure5. Kiln Foundation

15

PROJECT EXPERIENCE

CC-1 Package : Civil Construction for Foundation and Upper Structure Building Indarung Project

Page 16: COMPANY PROFILE - Waskita

Owner PT. Semen Padang

Location Padang, Sumatra, IndonesiaProject Value Rp 140.880.597.000,- (Excl.VAT)Contract Value (Incld.Addendum) Rp 156.764.192.211,- (Excl.VAT)

Contract Scheme Unit PriceDuration as Contract 7 August 2015 – 3 May 2016Actual Duration(Incld.Addendum) 7 August 2015 – 27 February2017

Scope Of Works

1. Silo Clinker Teluk Bayur2. Unloading Clinker3. Raw Coal Handling4. CCR Building5. SubstationCCR6. Transport Tunnel

16

PROJECT EXPERIENCE

CC-8 Package : Civil Works Construction of Indarung VI Project

Page 17: COMPANY PROFILE - Waskita

Owner PT Dahana (Persero)Location Subang, West Java, IndonesiaProject Value Rp 108.900.000.000,- (Excl.VAT)Contract Value (Incld.Addendum) Rp 108.900.000.000,- (Excl.VAT)

Contract Scheme Lump Sum Fixed PriceDuration as Contract 22 October 2015 – 18 July 2016Actual Duration(Incld.Addendum) 22 October 2015 – 28 April 2017

Scope Of Works

Phase I :1. Engineering & Site Preparation2. Civil & Steel Structure Worksfor

Utility Building3. Utility Procurement (ME)

Phase II :1. Engineering & Site Preparation2. Civil & Steel Structure Works UtilityBuilding

and Main Process3. Pek. Procurement, Instalation dan

Commissioning Utility Work (MEWork)4. Process Equipment Installation

17

PROJECT EXPERIENCE

Engineering, Utility, Building, Civil Works Facilities and Prototipe Nitrogliserin Project

Page 18: COMPANY PROFILE - Waskita

Owner Ministry of Energy and Mineral Resources

Project Location Balikpapan & Tarakan, East Borneo, Indonesia

Project Value Rp. 152.780.000.000,- (Incl.VAT)

Contract Scheme Lump Sum Fixed Price

Duration as Contract May 2020 – December 2020

Scope Of Works

1. Design2. Main Equipment Instalation3. Pipeline for LPG Distribution

18

ON GOING PROJECT

LPG Facility and Pipeline Distribution at Tarakan and Balikpapan

Page 19: COMPANY PROFILE - Waskita

MailingAddress: Head Office Waskita BuildingJl, MT, Haryono Kav, No.10 Cawang, Jakarta 13340Ph: (+6221) 8508510/20 E-mail: [email protected] website:www.waskita.co.id

Disclaimer:This material Rev by Rady is for information only, and we are not soliciting any action based upon it, This report is not to be construed as an offer to sell or the solicitation of an offer to buy anysecurity in any jurisdiction where such an offer or solicitation would be illegal, The information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurateor complete, and it should not be relied upon as such, Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice, It is intended forthe use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of PTWaskita Karya (Persero) Tbk.

Thank You