27
COMPANY PROFILE CIVIL ENGINEERING CONSTRUCTION, GENERAL BUILDING & PROJECT MANAGEMENT

COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Embed Size (px)

Citation preview

Page 1: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

COMPANY PROFILECIVIL ENGINEERING CONSTRUCTION,GENERAL BUILDING & PROJECT MANAGEMENT

Page 2: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

TABLE OF CONTENTS

04 AFFILIATIONS 05 ABOUT US 06 STAFF & EQUIPMENT 07 SERVICES 08-20 CIVILS

21-22 INDUSTRIAL CIVILS23-24 PIPELINE BUILDING25 BUILDING26-27 BBBEE CERTIFICATE28 - CONTACT

Page 3: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

AFFILIATIONS

Page 4: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

ABOUT US

Afrostructures (Pty) Ltd, formed in 1980, is a construction company that specializes in Structural concrete, Pipelines, Earthworks and Building works.

Afrostructures (Pty) Ltd is self-sufficient in tendering and acquiring its own work, offering competitive pricing and expertise.

Our project teams strive to maintain a strong foundation of trust and mutual respect established over many years with clients, architects, engineers,

subcontractors and suppliers. Our established Company policy of shared performance responsibilities ensures the highest degree of professional service

delivery on all projects.

Page 5: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

STAFF & EQUIPMENT

The company employs approximately 350-500 hourly paid employees and 80 monthly paid staff, generating an average annual turnover of

approximately R180 - R250 million.

The Company runs its own internal stores division, which owns an extensive range of formwork, small plant and other

equipment. (including concrete mixers, crane trucks, mobile cranes and TLB’s)

Our team of experienced construction personnel provides efficient cost controls, accurate scheduling, quality controls resulting in efficient and timely execution of

the works throughout the duration of the project.

Sound knowledge of local building requirements, health and safety and other local authority requirements ensures all projects are completed on time and on

budget without compromising quality.

Page 6: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

• Bridges• Culverts• Concrete retaining walls• Concrete canalization• Treatment works• Water retaining reservoirs• Concrete roadways

CIVIL

• Office blocks• Factories• Warehouses• Extensive residential housing

BUILDING WORKS

• Various Pipework projects

PIPEWORK

• Specialized industrial concrete / building works

INDUSTRIAL CIVILS

Afrostructures (Pty) Ltd provides in-depth management and supervision on all projects, including hands on involvement by the Company’s Directors, Project Managers and Supervisors.

The Company’s main business is Civil Works, Pipelines and Building construction, consisting of:

SERVICES

Page 7: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: ZNT 3417/13T | Client / Developer: KZN Department of Transport

Engineer: Henwood & Nxumalo Consulting Engineers

Duration: 18 Months | Value: R 90 Million

Contract Description:As part of the Go! Durban project, this contract is comprised of two post tensioned pedestrian bridges. One 66m pre-stressed concrete box girder bridge. One simply supported voided bridge. Two new lines of 1km Bus Lane Retaining Walls and Traffic Barriers with associated storm water system and bus stations.

CIVILS

WYEBANK INTERCHANGE

Page 8: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Client / Developer: KZN Department of Transport

Engineer: Naidu Consulting (Pty) Ltd

Duration: 12 Months | Value: R 41 Million

Contract Description:The construction of the Mona River Bridge No. 3548 and the widening of the Tongati River Bridge No. 3547 on the P714 in the Ndwedwe RRTF area.

MONA RIVER BRIDGE

CIVILS

Page 9: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Client / Developer: ilembe District Municipality

Engineer: Black Balance

Duration: 10 Months | Value: R 19,2 Million

Contract Description:Construction of a 5 ML Reinforced Concrete Reservoir and Associated Pipeworks.

NONOTI 5ML RESERVOIR & PIPELINE

CIVILS

Page 10: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: MW/18/2013 | Client / Developer: Umhlatuze Municipality

Engineer: AECOM

Duration: 13 Months | Value: R 30 Million

Contract Description:Construction of Highlift pumpstation for Nsezi city of Mthlathuze, including:• Bulk excavation, dewatering, civil and building works. • Supply and installation of Mechanical equipment and pipework. • Tie in to existing reservoir under operating conditions.

NSEZI PUMP STATION

CIVILS

Page 11: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Client / Developer: Umgeni Water

Engineer: Umgeni Water

Duration: 54 Months | Value: R 46,7 Million

Contract Description:Construction of 5 ML and 12 ML reservoir, with associated pipework and roadworks.

MPOFANA WATER SUPPLY SCHEME

CIVILS

Page 12: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: 602 | Client / Developer: Island View Storage (Pty) Ltd

Engineer: Elliot, Breytenbach Consulting Engineers

Duration: 12 Months | Value: R 31 Million

Contract Description:Island View Storage (Richard’s Bay) Construction of 19no. new tank base foundations, bund walls, bund paving and drainage. New rail tank car decanting aprons with associated cut-off channels and drains as well as major spill sumps. Construction of a road loading facility with associated cut-off channels, drains and spillage sumps. Construction of pump bays for rail decanting and shipping, site drainage and roads and security fencing.

IVS STORAGE - RICHARDS BAY

CIVILS

Page 13: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: 610 | Client / Developer: D C Earthworks

Engineer: SSI

Duration: 5 Months | Value: R 5,5 Million

Contract Description:The construction of a Pedestrian foot bridge (mainly consisting of 2no. precast beams spanning +- 33m). Piled foundations to abutments as well as safe to use access ramps and precast balustrades.

MARGATE PEDESTRIAN BRIDGE

CIVILS

Page 14: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: WS 5695 | Client / Developer: Ethekwini Municipality

Engineer: Stewart Scott International

Duration: 8 Months | Value: R 14,7 Million

Contract Description:Addition of a new 32.4m diameter clarifier and all associated pipeworks etc. The clarifier was to be founded on precast driven piles, which design criteria included refusal against upward movement (floating) due to the high water table in the area. Large dia. HDPE pipes laid in deep water logged trenches under difficult circumstances.

NORTHERN WASTEWATER WORKS

CIVILS

Page 15: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: 1R-6248

Client / Developer: Ethekwini Municipalty

Engineer: Peter Fenton

Duration: 18 Months | Value: R 34 Million

Contract Description:Construction of a 10.5m wide bridge over the Mhlangane river and roadworks.

QUEEN NANDI DRIVE PHASE 4

CIVILS

Page 16: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: NRA N003-010-2005/2 | Client / Developer: Sanral

Engineer: P D Naidoo & Associates

Duration: 10 Months | Value: R 8,3 Million

Contract Description:The contract consisted of the widening of the existing Mariannhill Bridge over the N3 freeway, from Durban to Pietermaritzburg.

MARIANNHILL BRIDGE

CIVILS

Page 17: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: SDM/86/3/MIG/06 | Client: Sisonke District Municipality

Engineer: Ninham Shand

Duration: 9 Months | Value: R 19 Million

Contract Description:The construction of a rectangular “Pulsator” clarifier, filter building, related interlinking pipework, staff quarters building, construction of an earth dam as well as various other modifications to existing structures and pipeworks.

KOKSTAD WATERWORKS UPGRADE

CIVILS

Page 18: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract Description:Construction of a 7.5 ML reinforced concrete reservoir, associated earthworks, pipeworks, valves and steelwork.

UMBUMBULU RESERVOIR

CIVILS

Contract No: 364 | Client / Developer: EthekwIni Municipality

Engineer: City Engineers Department

Duration: 10 Months | Value: R 6,9 Million

Page 19: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract No: 8/2/1/57 | Client / Developer: Umhlatuze Water

Engineer: Bigen Africa

Duration: 14 Months | Value: R 30,6 Million

Contract Description:Reinforced Concrete Domed Roof Reservoir of 20 ML and Associated Pipeworks.

HILLTOP RESERVOIR

CIVILS

Page 20: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Client / Developer: MAN Truck & Bodies

Engineer: Martin & Associates

Duration: 3 Months | Value: R 2.2 Million

Contract Description:Replace existing asphalt driveway with concrete surface bed, including subsoil drainage.

MAN DRIVEWAY REPLACEMENT PROJECT

INDUSTRIAL CIVILS

Page 21: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Client / Developer: NTE Hermannsburg Factory

Engineer: Bosch Projects

Duration: 3 Months | Value: R 4 Million

Contract Description:Demolition and relocation of the spray drier furnace, including all concretefoundations, steel structures and associated works.

RELOCATION OF SPRAY DRIER FURNACE PROJECT

INDUSTRIAL CIVILS

Page 22: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract Description:Emergency Intervention and Reticulation for the Bhongweni Area and the Trunk Sewer servicing the Greater Kokstad Area.

PIPE LINE

KOKSTAD TRUNK SEWER PHASE 1

Client / Developer: Harry Gwala District Municipality

Engineer: MNA (Pty) Ltd

Duration: 6 Months | Value: R 6 Million

Page 23: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Contract Description:Construction of Water Reticulation Pipelines, Standpipes and 600 KL and 1 ML Prefabricated Steel Tanks.

KWAHAZA WATER SUPPLY SCHEME

Client / Developer: Ungungundlovu District Municipality

Engineer: Molemo Consulting Engineers

Duration: 12 Months | Value: R 30,1 Million

PIPE LINE

Page 24: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

Client / Developer: Little Rock Trading

Engineer: Impact

Duration: 24 Months | Value: R 55,5 Million

Contract Description:The construction of 15 up-market residential homes within the Kiribati complex, including all relevant civil infrastructures. The development is located in the Zimbali Eco estate.

KIRIBATI COMPLEX

BUILDING

Page 25: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

BBBEE RATING

At Afrostructures we are proud to be a level 3 contributor.

Page 26: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

5 Star Compliance Solutions

Reg: 2015/190734/07 Tel: 0827743090, Fax: 086 618 6811 Managing Director: Linda Sewnarain

Email: [email protected]

Broad-Based Black Economic Empowerment Certificate Issued to:

Afrostructures (Pty) Ltd

Measured Entity:

Company Name Afrostructures (Pty) Ltd Trade Name Afrostructures (Pty) Ltd Address 3 Torlage Street, New Germany, 3610 Registration Number 1995/003404/07 Vat Number 4810149767 Certificate Number 5 Star G 110 REV 0

Issued in accordance with the Codes of Good Practice issued in terms of section 9(1) of the Broad-Based Black Economic Empowerment Act, 2003 (Act 53 of 2003) on 11 October 2013 - 36928

________________ Technical Signatory Linda Sewnarain

Element Actual Score

Target Score

BBBEE Status

Ownership 25.00 25 Black Ownership 25% Management Control 05.99 19 Black Female Ownership 15.39%

Skills Development 17.88 20 Empowering Supplier Yes Enterprise & Supplier development 36.68 40 Designated Group Supplier 7.69%

Socio-Economic Development 05.00 05 Applicable Scorecard Generic

Total 90.55 109 Procurement Recognition Level 110%

Issued Date 09 October 2017

Expiry Date 08 October 2018

Discounting Applicable No Modified Flow Through Applicable No

Page 27: COMPANY PROFILE - afrostructures.co.zaafrostructures.co.za/images/Company-Profile-email.pdf · Our project teams strive to maintain a strong foundation of trust and mutual ... budget

CONTACT US

Telephone: 031 817 2600Fax: 031 817 2626 Physical Address: 3 Torlage Street, New Germany , 3610Postal Address: P.O. Box 608, New Germany, 3620www.afrostructures.co.za