89
S. MEHBOOB & COMPANY CONSULTING ENGINEERS EST. 1980 COMPANY PROFILE

COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

S. MEHBOOB & COMPANY CONSULTING ENGINEERS

EST. 1980

COMPANY PROFILE

Page 2: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

OUR PEOPLE Farooq Mehboob

B.Sc Mechanical Eng. East Pakistan U&ET Founded SMC in 1980 53 years of MEP Technical

& Managerial Expertise. ASHRAE Director and

Regional Chair for South Asia, Middle East & Africa

ASHRAE Fellow Member Presidential Member of

PHVACR Society

Farhan A. Mehboob Maroof A. Mehboob

M.Sc. In Mechanical Eng. Kings College London 28 years of Experience Over 400 Projects ASHRAE Pakistan Chapter

Presidential Member ASHRAE CTTC Chair ASHRAE Technical

Committees Presidential Member of

PHVACR Society

M.Sc in Mechatronics Kings College London 25 years of Experience Responsible for 300

Projects Member of IEE Member of IEEEP Member of Illumination

Society

Founder, CEO & Principal Consultant

Head of Mechanical Head of Electrical

Adeeba Mehboob

Senior Mechanical Designer

B.Eng Mechanical Eng. University College London

19 years of Experience ASHRAE RAL Sub Region

Chair BOG Member of ASHRAE

Pak.

Page 3: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

Our Mission Statement

“SMC is dedicated to providing Excellence in engineering services to our clients within their Budgetary and Technological Constraints and

it is Committed to the success of its projects as a goal.”

OUR COMPANY

SINCE 1980 104 EMPLOYEES 4 CITIES

71

23

6

4

KARACHI

DUBAI

LAHORE / FAISALABAD

ISLAMABAD

Page 4: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

COMPANY ORGANOGRAM

Principal Consultant / CEO

FAROOQ MEHBOOB

Head of Project – Mechanical / Director

FARHAN A. MEHBOOB

MEP Project Manager - North

TARIQ AMIN

IT Manager

Const. Manager - Mechanical

MEP Coordination Manager

KHURSHEED QURESHI

MEP Project Manager - South

ADEEBA MEHBOOB

Contracts Manager Accounts

Site Teams Site Teams Construction Manager - Elec

Manager Projects Mechanical Manager Projects Electrical Design Manager -

Mechanical Design Manager -

Electrical

Team Leader 1

Team Leader 2

Team Leader 3

Team Leader 1

Team Leader 2

Team Leader 3

Head of Project – Electrical / Director

MAROOF A. MEHBOOB

IT Department

SENIOR MANAGEMENT

MID LEVEL MANAGEMENT

DESIGN TEAM

Mech. Engg.

Mech. Engg.

Mech. Engg.

Mech. Engg.

Mech. Engg.

Mech. Engg.

CAD D. MEN

CAD D. MEN

CAD D. MEN

CAD D. MEN

CAD D. MEN

CAD D. MEN

Elec. Engg.

Elec. Engg.

Elec.. Engg.

Elec. Engg.

Elec. Engg.

Elec. Engg.

CAD D. MEN

CAD D. MEN

CAD D. MEN

CAD D. MEN

CAD D. MEN

CAD D. MEN

Page 5: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

KARACHI

ISLAMABAD LAHORE

MULTAN PESHAWAR

DUBAI OMAN

YERAVAN

BATUMI TBLISI

RIYADH

KENYA

RAWALPINDI

SARGODHA FAISALABAD

HYDERABAD

ALGERIA DAMMAM

IRAQ

OUR MARKETS

RETAIL

OFFICES

HOSPITALS

HOTELS

SCHOOLS

INSTITUTES

AIRPORTS

800 PROJECTS COMPLETED

GWADAR

Page 6: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

Interact in the maximum possible way with our clients.

Be Open and Flexible to adapt to our clients needs.

Deploy the most Effective Resources on the project.

Develop Solutions that are Innovative, Cost Effective and reflect

Engineering Excellence.

Go the Extra Mile for the Success of the project.

Pay Rigorous Attention to detail.

Integrated building design approach where all stake holders have

input to the design team.

OUR PHILOSOPHY

Our Motto “The Pursuit of Excellence with Professional Competence and Integrity.”

Page 7: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

‐ 39 Years of Technical leadership in Consultancy in Pakistan ‐ 16 Years of International Consultancy in the Middle East, Africa and Central Asia - Single Source MEP Consultants ‐ Extensive Collaboration with International Consultants and Architects & Hotel Operators ‐ Technology Innovators having the most experience in High Rise and Mixed Use developments & Automotive Sector ‐ Lighting, Energy & 3D Modelling using State of the Art Software ‐ Second generation of Ownership with continuity in Firm ‐ Successful Implementation of Mega Green Certified projects in Pakistan and UAE

WHAT DIFFERENTIATES US

Page 8: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

American Society of Heating Ventilation & Air Conditioning

Refrigeration Service Engineers Society, USA

Pakistan Engineering Council (PEC)

Pakistan Heating Ventilation and Air conditioning Society (PHVACR)

Institute of Electronic and Electrical Engineers (IEEE)

Chartered Institute of British Services Engineers (CIBSE)

Institute of Engineering and Technology (IET)

OUR PROFESSIONAL AFFILIATIONS

In addition to the above we are enlisted with the Pakistan and Dubai Authorities having Jurisdiction.

Page 9: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

American Society of Heating Ventilation & Air Conditioning

National Fire Protection Authority , USA

European Norms , EU

International Standards Organisation, USA

British Standards Institute , UK

Chartered Institute of British Services Engineers (CIBSE), UK

International Plumbing Code , USA

KEY DESIGN STANDARDS

In addition to the above we are enlisted with the Pakistan and UAE, Qatar Authorities having Jurisdiction.

Page 10: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

INTERNATIONAL COLLABORATIONS

GMP Architekten, Germany SBP, Germany Telenor – Norway Squire & Partners, UK Buro Happold, UK Atelier 10, UK Payette Associates – USA CPG – Singapore [Benazir Bhutto Intl. Airport, Telenor HQ] MAP - Korea Singapore Airlines Technical Services – Singapore [Flight Kitchens] WSP Flack and Kurtz – USA,UK Halcrow - UK Shankland Cox – UK The Manser Practice – UK RPW Design – UK WT Partnership – UK AirSys ATM – UK Carrefour - France

Page 11: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SMC is at the forefront of promoting Sustainable Design in Pakistan.

Central Solar Domestic Hotwater System for a 500,000 ft2, Mall of Lahore

LEED PLATINUM Certified Building

Soorty Textile Unit No. 4, Karachi, 581,211 Sft. (Due for commissioning in June 2019)

Pioneer Cement Head Office Building, Lahore, 93,602 Sft. (Due for Commissioning in

December 2019)

LEED GOLD Certified

Dubai Real Estate Department: G+2 Floors Families Staff Accommodation on Plot No. 891-

4308 at Hatta

Omran – Workforce Accommodation at Dubai Land for Nakheel

LEED SILVER Certified

Habib Bank Limited Head Office purchased by Habib Bank Limted. This project has

exceeded the LEED credits originally planned and is currently under assessment for the

Gold rating.

SMC have worked on numerous Estidama & Trakhees approved projects which involve

compliance to various green regulations.

SUSTAINABLE DESIGN

Page 12: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

Preliminary Investigations Preliminary investigations cover data collection (primary and secondary) market surveys and forecasting leading to the development of pre feasibility studies. Feasibility Studies Complete services for preparation of feasibility studies in formats accepted to financial institutions are provided. These include: - In depth market analysis highlighting the previous, present and future market conditions - Development of detailed project cost - Preparations of financial plans including proposed operating results cash flows statements and

other relevant financial data

Detailed Engineering and Design Detailed Engineering and design services are offered including the preparation of schematic and detailed design drawings specifications and cost estimates.

RANGE OF SERVICES

Page 13: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

Contract Documents These include the following: • Tender Documents • Specifications • Bill of quantities • Prequalification Documents

Bid Evaluation Includes the detailed financial and technical scrutiny of the bids received and advising the client on the award of contract and negotiations for the award of contract. Supervision of construction • Top supervision i.e. assisting the supervision by the client. • Detailed supervision i.e. taking full responsibility for supervision of construction and final

acceptance of work by client.

Operation and Maintenance consulting Includes periodic detailed review of plant operations, development of operating policies and procedures, specialized trouble shooting and preparation of overhaul tender documents and specifications.

RANGE OF SERVICES

Page 14: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

MECHANICAL ENGINEERING The spectrum of the Mechanical Services offered are as follows: HVAC Engineering • Heating, Ventilation and Airconditioning • Process Piping • Industrial exhaust and Ventilation • Heat recovery • Clean Rooms Central Utilities Engineering • Power Generating Plants • Steam Generating Plants • Refrigeration Plants • District heating / cooling Systems • Cogenerating Plants Fire / Life Safety Engineering • Smoke and Evacuation and Control

RANGE OF SERVICES – MECHANICAL

Page 15: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

The spectrum of the Electrical Services offered are as follows: Electrical Engineering • Building Power • Stand-by Power Plants • Branch Wiring • Uninterruptible Power Supply Systems • Special Grounding Systems Lighting Design • Light 3D Real Modelling • Mood and Theme creation studies • Life Cycle studies • Control Systems • Retrofits Central Utilities Engineering • Power Generating Plants • Cogenerating Plants

RANGE OF SERVICES – ELECTRICAL/LIGHTING

Page 16: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

Building Electronic Systems Engineering • Monitoring and Control Systems • Fire Management • Security Management • Communications Network Integration • Audio Visual Systems • Distributed Direct Digital Control • Energy Management • Conservation Analysis Fire / Life Safety Engineering • Detection and Alarm Systems • Smoke Evacuation and Control • Emergency Communications Telecommunications Systems Design • Digital Exchange Design/ Selection/ configuration • LAN/ WAN Design/ Selection/ Configuration • Electronic Security systems

RANGE OF SERVICES – ELECTRICAL/ELV

Page 17: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

PLUMBING SERVICES The spectrum of the Plumbing Services offered are as follows: Sanitary Engineering • Storm and sanitary Sewer Systems • Domestic Water Systems • Gas Systems • Medical Gas Systems • Treated Water Supply Systems • Compressed Air and Vacuum Systems • Display fountains and Pools Site Utilities Engineering • Water Supply, Treatment and Distribution • Steam, Chilled / Hot Water Distribution • Site Sewer Systems • Waste Water treatment

RANGE OF SERVICES – PLUMBING

Page 18: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

PLUMBING SERVICES Central Utilities Engineering • High Temperature Hot water • District Heat /Cooling Systems • Piping Distribution Fire / Life Safety Engineering • Extinguishing Systems • Gas Suppression Systems

RANGE OF SERVICES – PLUMBING

Page 19: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SPECIALIZED SERVICES • Energy Modelling • Lighting Consultancy including Modelling • Energy conservation studies for buildings • Food service (industrial catering and kitchens) • Design and planning of industrial laundries • Hotel planning and feasibility studies • Building operation and maintenance • Specialized fountains

RANGE OF SERVICES – SPECIAL

Page 20: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

INDUSTRIAL & INFRASTRUCTURE PROJECTS PORTFOLIO

SMC has been involved with Industrial & Infrastructure Projects since the 1980’s. SMC’s “under one roof” MEP capability ensures optimum design in Technical and Financial terms. Our Industrial & Infrastructure projects range from Power Plants to Airports, military facilities, infrastructure for large developments to state of the art ‘LEED’ Certified industrial facilities of diverse types. SMC is currently involved with several large industrial projects in Pakistan and UAE.

Page 21: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

Soorty Enterprises Limited are one of the largest Textile Manufacturers in Pakistan

LEED Platinum Factory in Karachi

Is slated to open in First Quarter 2019

SOORTY GREEN FACTORY UNIT NO. 14 AT KORANGI, KARACHI

Page 22: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

• SMC have provided MEP, ELV &

Infrastrucuture Design Services for

a the new GreenField KIA Plant in

Pakistan

KIA LUCKY MOTORS, KARACHI

Page 23: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

• Design of Air-Conditioning &

Ventilation Systems for Pharma

Factory.

HIGHNOON LABORATORIES

Page 24: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

• SMC have provided MEP Design

Services for a State-of-the-art

750,000 Logistics and Distribution

Centre for Carrefour, UAE.

MAF LOGISTICS COMPLEX, JAFZA, DUBAI

Page 25: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

• A vacation resort in Sindh featuring

housing, botanical and zoological

gardens, theme park, golf course

and hotels with a total construction

area of over 10 million square feet.

GORAG HILL DEVELOPMENT, DADU SINDH, PAKISTAN

Page 26: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

• SMC have provided full services for

MEP Design of Factory Building

ATARFIL FACTORY BUILDING & OFFICES, DUBAI

Page 27: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

• SMC have provided services for

Design of MEP Services and site

wide utilities design of area 600,000

Sft. building for Pepsi Middle East

Factory.

GREEN FIELD FACTORY, DUBAI

Page 28: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

S. No. Year Project Name Description 1. 1981 Merit Packaging Design of Ventilation and Air-Conditioning System.

2. 1981 Sandoz Jamshoro Central Chiller Plant Design

Design of Chiller Plant and Ancillary Equipment.

3. 1983 Singapore Airlines Flight Kitchen, Karachi Full MEP and Food Service System design for 125,000 square foot – 30,000 meals/day airline catering facility.

4. 1986 Baluchistan Coasters Design of Thermal Oil Boiler Plant and full MEP Services for factory.

5. 1988 Highnoon Laboratories Design of Air-Conditioning & Ventilation Systems for Pharma Factory

6. 1988 Kalco Pharma Design of Air-Conditioning & Ventilation Systems for Pharma Factory

7. 1988 ICI Polyester Plant Extension, Sheikhupura Design of Ventilation & Air-Conditioning for Creel Beam Area & Polyester manufacturing unit.

8. 1989 Pakistan Steel Design of Food Service Facilities for 15,000 workers.

9. 1991 Union Texas Petroleum Khaskeli West Camp MEP Design of Infrastructure & Buildings.

10. 1992 National Refinery Modifications to and upgrading of Cooling Towers.

11. 1993 National Fibres POY Area and Piping Design of HVAC System (under floor) and related piping works.

12. 1994 Zeb Pharma Industries Ltd. Design of Air-Conditioning and Ventilation Systems for Pharma Factory

OUR INDUSTRIAL & INFRASTRUCTURE PROJECTS

Page 29: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

S. No. Year Project Name Description 13 1995 Sabah Shipyard Sdn. Bhd. Full Infrastructure design for 288 MW Barge Mounted Power

Plant at Korangi, Karachi including, 132 kV GIS Grid Station, Tank Farms, Turbine Condenser piping & site wide infrastructure.

14 1995 ICI Sheikhupura Extension (CP Building & Spinning)

Design of Ventilation System.

15 1997 Urgut Fermentation Plant – Uzbekistan Design of Controlled Environment System for British American Tobacco Ltd.

16 1999 Air-Conditioning of Solid Form Area, Medipak Limited, Lahore

Design of Air-Conditioning & Ventilation Systems.

17 2000 Lasmo Oil Pakistan – Fuel Storage and Transfer System

Design of Fuel Storage, Pumping & Piping Systems.

18 2000 Allama Iqbal International Airport, Lahore Design of MEP Systems.

19 2002 Kadanwari Field for Lasmo Oil Pakistan Complete Front End Engineering Design (FEED) for Kadanwari Field Buildings & Infrastructure.

20 2002 Bhit Field Development Project Complete Front End Engineering Design (FEED) for Bhit Field Buildings & Infrastructure.

21 2003 MEP Design Work Gwadar Deep Water Port Design of M&E Services Infrastructure & Building Systems.

22 2003 P&G Procter & Gamble Pakistan (Pvt) Limited

Canteen Renovation at Hub Plant

OUR INDUSTRIAL & INFRASTRUCTURE PROJECTS

Page 30: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

S. No. Year Project Name Description 23. 2004 Indus Motor – HVAC Works for Major Booth

(Paint Shop) Air-conditioning for Major Paint Booth @ Indus Motor Company

24. 2004 AKU – Utilities Master Planning Design of Campus Infrastructure including – Central Chilled Water distribution. Electrical Power distribution and Central Air-Conditioning Plant.

25. 2007 New Benazir Bhutto International Airport, Islamabad

Associate Consultants of CPG Singapore for new Terminal Building and Infrastructure.

26. 2008 Gorag Hill Development, Dadu Sindh, Pakistan

Master Planning of Utilities & Services Infrastructure.

27. 2009 FC Training Centre, Tank – NWFP Infrastructure, Master Planning and design for Military Complex including Air Strip, Tank firing ranges and support buildings.

28. 2010 Atarfil Factory Building & Offices, Dubai MEP Design of Factory Building.

29. 2011 Dubai Logistic Complex for CNBM, Jafza, Dubai

MEP Design of Infrastructure & Buildings.

30. 2011 Green Field Factory, Dubai Design of MEP Services and site wide utilities design.

OUR INDUSTRIAL & INFRASTRUCTURE PROJECTS

Page 31: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

S. No. Year Project Name Description 31. 2012 Dairy Farm and Milk Processing Unit, Dubai Design of MEP Services and site wide utilities design.

32. 2014 Soorty Green Factory Unit No. 14 at Korangi, Karachi

60,000 square meter State of the Art LEED Platinum Garment Factory – Full MEP design for all areas include HVAC, Fire, Electrical, BMS, Lighting, Cogeneration Plant & Central Utilities.

33. 2016 MAF Logistics Complex, Jafza, Dubai 65,000 square meter Logistics Complex including meat processing, refrigerated storage facility, and air-conditioned warehouse for Carrefour – Full MEP Design.

OUR INDUSTRIAL & INFRASTRUCTURE PROJECTS

Page 32: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SMC has worked with AirSys ATM, UK on the detailed design and planning of the Allama Iqbal International Airport Lahore on all MEP disciplines. Currently our team is using the acquired expertise on the upcoming Benazir Bhutto International Airport, Islamabad where we have collaborated with CPG Singapore to design the majority of the MEP systems for the project.

AIRPORTS

Page 33: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

BENAZIR BHUTTO INTERNATIONAL AIRPORT, ISLAMABAD

Construction of a new Airport (Benazir Bhutto International Airport) in the capital of the country was a long outstanding demand and requirement of the people. A site for new airport was selected after detailed study of various avenues available. Construction of this airport is from grass root level therefore all major components of an airport facility shall have to be developed. Benazir Bhutto International Airport will be a modern airport with modular facilities for both domestic and international passengers and cargo movements to cater for all present and projected demands for the next 30 years. The site is located at Pind Ranjha near Fateh Jang, about 20km from zero point Islamabad and 30Km from the existing airport at Chaklala. Approximately 3,200 acres of land has been acquired by CAA, for this Project.

Page 34: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

LAHORE AIRPORT, LAHORE

This Modern 760,000 sft. Passenger Terminal Is Being Built According To A Two‐Level Linear Concept.

The Facility Is Designed To Cater to the Needs of More Than 6.5 Million Passengers Annually.

Page 35: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SMC has had a great deal of experience with a wide spectrum of Medical fit-outs in the country but most of all with the Aga Khan University and College in Karachi where we have been deeply involved in the expansion and planning of their campus besides working on their state of the art Operation theatres and Laboratories. SMC have designed District Cooling Plants and Hydraulic decoupling facilities to enable this Mega Hospital complex of excellence to morph into a flexible campus where change or addition to their HVAC facilities has become possible and very easy.

OUR HOSPITAL PROJECTS

Page 36: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

84 acres Pakistan's leading Health Care Facility and Medical University.

Built in 1984 The University did not have adequate provisions for the addition of large numbers

of new buildings on campus and was likely to exceed 1,000,000 sft. of constructed area in ten

years.

Services for the District Cooling Plant for 10,000 TR AC Plant, Water Supplies etc.

AGA KHAN UNIVERSITY ‐ UTILITIES MASTER PLAN, KARACHI

Page 37: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

25,000 sft. Dedicated Ambulatory Care Building

Includes a Nuclear Medicine Suite and custom designed rooms for Tuberculosis patients.

State of the art I.T. / Telemetry, Nurse Call Systems

AKU - NAZERALI WALJI BUILDING, KARACHI

Page 38: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

20,000 Sft. building

4 Cardiac O.T.’s to the most stringent DIN 1946‐4

standards

Ancillary Surgery Facilities.

Patient Rooms have Bed Wall Units incorporating

all facilities.

AKU – KHIMJI BUILDING, KARACHI

Lounges & Teaching facilities fully wired to allow

Medical data as well as Surgery broadcast to be

distributed in real time for assessment, teaching to

external sources.

Medical Gas & Compressed Air Systems

I.T. Systems

Page 39: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

40,000 sft.

Dedicated chemical, pathology & BSL 3

Laboratory facility

AKU – SOPARIWALA BUILDING, KARACHI

Page 40: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

S. No. Year Project Name Description 1. 1984 Cardiac Centre Lahore, Pakistan 300 Bed-Specialist Cardiac Hospital with eight Cardiac OT's-HVAC Design

2. 1986 Al-Shifa Eye Hospital, Rawalpindi, Pakistan

200 Bed-Specialist Opthalmic hospital with eye surgery facilities- HVAC Design

3. 1986 Combined Military Hospital, Rawalpindi, Pakistan 100 Bed Military Hospital –HVAC Design

4. 1989 Family Hospital, Lahore, Pakistan 150 Bed General Hospital- MEP Design 5. 1993 KMA Hospital, Karachi, Pakistan 250 Bed General Hospital MEP Design

6. 1993 Sheikh Khalifa Bin Zayyed Hospital, Rahim Yar Khan, Pakistan 300 Bed General Hospital HVAC Design

7. 1994 Shaikh Khalifa Bin Zayyed Hospital, Quetta, Pakistan 300 Bed General Hospital with 1 3OT's- MEP Design

8. 1999 Jubilee Block Civil Hospital, Karachi, Pakistan MEP Design of 4 Operating rooms

9. 2000 Aga Khan University Ambulatory Care Building, Karachi, Pakistan State of the Art Ambulatory Care facility with GAMMA Cameras-MEP Design

10. 2000 Aga Khan University Cardiac Services Building, Karachi, Pakistan Cardiac OTS(3) plus CCU's & ICU's, State of the Art facility – MEP Design

11. 2003 Aga Khan University Laboratory Building- Karachi, Pakistan State of the Art Biochemistry Lab BSLII & BSLIII facilities – MEP Design

12. 2004 Aga Khan University – Utilities Master Planning

Utilities Master Planning including Central Chilled Water Plant (10,000TR)- MEP Design

LIST OF HOSPITAL PROJECTS

Page 41: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SMC have an edge when it comes to Hotel projects in Pakistan having worked on over 24 Hotels of all the leading chains of the world. Our CEO and founder Engineer Farooq Mehboob served as Regional Chief Engineer for InterContinental Hotels for 16 years and covered all hotels from Kabul to Siam (Bangkok). This provides SMC with a deep understanding of the Operations of such complex facilities and the edge to synchronize with Hotel operators of all tiers.

OUR HOTEL PROJECTS

Page 42: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SERENA HOTEL, ISLAMABAD

• 220 Luxury Rooms With State of The Art Facilities

• A Ballroom For 200 Persons

• Three Unique Restaurants, Shopping Arcade

• Swimming Pool And Health Club

• 800 Tons of Cooling

Page 43: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AL MUROOJ ROTANA HOTEL, DUBAI, UAE

• Opposite The Dubai Mall & part of the Al Murooj Complex

• 14 storey 5 Star Rotana Hotel Tower with 248 rooms.

• Equipped with a Spa, Gymnasium and 4 Restaurants.

• 1200 Tons of Cooling

Page 44: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

PEARL CONTINENTAL HOTEL, GWADAR

• Gwadar’S First 5 Star Hotel Features 120 Rooms.

• No City Utilities Available.

• The Project Includes, On Site Power Generation,

Desalination Plant, And Sewerage Treatment Plant.

• 765 Tons Cooling

Page 45: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

EOBI SERENA HOTEL & BUSINESS COMPLEX, LAHORE

This upcoming project houses th

e new Serena Hotel in Lahore al

ongwith a dedicated Office Wing

and Retail and Spa facilities.

2400 Tons of Cooling

6.4 MW Power

Page 46: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

GRAND HYATT BAHRIA GOLF CITY, ISLAMABAD

Currently Under Construction,

this new luxury Resort Hotel in

the outskirts of Islamabad is

located in Bahria Golf City.

Page 47: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

GRAND MILLENNIUM HOTEL – DUBAI, UAE

450,000 Sft. Office & Hotel Towers On A Common Podium.

2155 Tons of Cooling

Page 48: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

S. No.

Year

Project Name Description

1. 2001 Al-Murooj Rotana, Dubai 360 Room LuxuryHotel

2. 2007 Millenium Hotel, Port Rashid, Dubai 250 Room MilleniumHotel.

3. 2007 BareeqTower,Dubai 400 Room-4 Star Plus Hotel, Business Bay Dubai-Under Construction

4. 2008 Hotel & Office Building @ PortRashid 2B+G+20 Floor Hotel Tower

5. 2008 Movenpick East West Hotel, YasIsland, Abu Dhabi

350 Rooms Hotel (Design completed)

6. 1984 Paradise Hotel, Karachi 3-StarHotel-HVAC Design

7. 1985 Karachi Sheraton Hotel Design of Sprinkler System & Rehabilitation of public areas.

8. 1988 Sheraton Hotel, Lahore Hotel Design Completed-Project not executed.

9. 1990 Holiday Inn, Multan 120 Rooms 4 Star Hotel

10. 1992 Serena Hotel, Gilgit 80 Room Resort Hotel in Northern Pakistan

11. 1993 Swat Serena Hotel 80Room Resort Hotel in Northern Pakistan

12. 1994 Airport Hotel, Karachi Rehabilitation Project

13. 1995 Galaxy Hotel 3-Star Days Inn-150 Rooms

14. 1995 Islamabad Serena Hotel 5-Star, 200 Room Luxury Hotel

15. 2002 Pearl Continental Hotel Gwadar 160 Room 5 Star Luxury Hotel- Completed 2006

OUR HOTEL PROJECTS

Page 49: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

S. No.

Year Project Name Description

16. 2013 Essem Hotel & Shopping Mall, Islamabad (Intercontinental Hotels Group)

28 Storey, 325,000Sft. 5Star Deluxe Hotel & Shopping Mall (under construction)

17. 2006 Grand Hyatt, Islamabad 1.2 Million square foot mixed use development including and 400 Room Hotel (under construction)

18. 2008 EOBI Serena Hotel & Business Complex, Lahore

250 Rooms Hotel in design

19. 2010 Nishat Boutique Hotel, Lahore 12 Storey, 3 Star Hotel

20. 2014 Hotel at Bahria Town Icon, Karachi In Design

21. 2014 Sheraton Hotel & Resort, Bahria Golf City, Islamabad

19 Storey, 676,067Sft. 5StarHotel (under construction)

22. 2016 Heritage Club & Hotel, Bahria Town, Karachi 123,000Sft. Luxury Hotel

23. 2016 Heritage Hotel, BahriaTown, Lahore 135,000Sft. Luxury Hotel

OUR HOTEL PROJECTS

Page 50: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

Office towers are the playgrounds of the Corporate world, ever evolving with the needs of the individual. They require future proofing and the ability to adapt to a wide spectrum of businesses and unique interior topologies. SMC have had the honor to associate with some of the finest towers built in the recent history of the country. From being certified by International green standards to being independent of Utilities and having the dynamism of adapting to diverse tenants or clients, we have covered all bases.

OUR OFFICE PROJECTS

Page 51: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

HBL TOWER (G4 MEGA), KARACHI

High Rise Commercial Office Building 28 Storey: 2 basements, 15 office floors, 9

Parking Floors. 2074 persons 411,000 sft Area 3.5 MW Power

900 Tons of Cooling 3 Variable Speed Water Cooled Centrifugal Chillers Primary Secondary Pumping + DOAS System Office Spaces designed for UFAD Central Bacnet BMS System Pre Certified as a LEED Silver Building

Page 52: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

TELENOR 345 HEAD OFFICE, ISLAMABAD

All work zones designed with Active Chilled Beams Central Bacnet BMS System

Designed largely on ASHRAE 189.1‐2011 Rain Water Harvesting

Sewage Treatment Plant 240 kW Solar PV Panels

Water Efficient Plumbing Fixtures

Total Area of 468,000 sft. with AC Area of 172,737 sft Cooling Load Density of 383 sft/TR 2 Water Cooled Screw Chillers 2 Medium Water Temperature Screw Chillers Primary Secondary Pumping DOAS System

Page 53: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

UBL HEADQUARTER, KARACHI, PAKISTAN

High Rise Commercial Office Building

28 Storey with 5 basement 2319 Occupancy 299,700 sft Total Area 114,519 sft Air Conditioned Area

950 Tons of Cooling 3 Water Cooled Centrifugal Chillers Primary 7 Secondary Pumping + DOAS System Central Bacnet BMS System

Page 54: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

CENTREPOINT, KARACHI, PAKISTAN

High Rise Commercial Office Building 27 Storey with 8 Parking Floors. 1633 Occupants 325,000 sft 1610 Tons of Cooling

2 Absorption Chillers and 1 Multi‐energy Chiller Primary Secondary Pumping + DOAS System 100% Cogeneration & dual fuel security 2.936 MW Power Central Bacnet BMS System

Page 55: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

TRUST INSURANCE COMPANY OFFICE TOWER, BAHRAIN, U.A.E.

25 storey 320 feet tall Office Tower 175,000 sft. Building comprises of over 60 Modern Office units

along with Health club, Pool and recreations spaces. 630 Tons Central Chilled Water plant 3000 KVA power distribution network.

Central Battery Emergency Illumination BMS, Access Control, CCTV, MATV Fire & Gas Detection & Prevention.

Page 56: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

Mixed Use Development projects are now fast becoming the norm in the Pakistani market and pose interesting design challenges in terms of Plant Configurations and Demand assessments which impact the feasibility , Operating Energy costs and Capital expenditure of the project. Such projects push the Design team to their innovative boundaries as all aspects of development projects need to be addressed in a holistic manner. These are some of the Mini cities part of our portfolio starting with the Mega Al Murooj Complex near Downtown Dubai which encompasses the pinnacle of mixed use with a 5 star Luxury Rotana hotel, 14 Residential towers of which 4 are fully serviced apartments blocks, a Sports and Leisure centre with its own artificial lake, Departmental store and larged external landscaped recreational spaces.

SOME OF OUR RETAIL & MIXED USE DEVELOPMENT PROJECTS

Page 57: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AL MUROOJ COMPLEX, DUBAI, UAE

• $ 95.4 Million Multi Purpose Luxury Complex

• 8 Residential Towers of 14 Floors Each

• 5 Star Hotel, Leisure Center & Departmental Store

• Area : 2.5 Million Sft.

• 6000 TR District Cooling Plant

• Electrical Load : 19.6 MW

• Access Control, High Speed Internet, CCTV, Security

• LPG Bulk Storage & Distribution, Energy Recovery

• ELV Systems

Page 58: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

BAHRIA TOWN ICON, KARACHI

• Set to be the Tallest building in Pakistan

• 3.2 Million Square Feet Iconic project

• 9000 Tons of Cooling

• 18 MW Power

• 30 MW Power

• 60 Storey Office Tower

• Independent Tier 3 Data Centre

• Luxury Retail & Entertainment Mall, Cinemas & Hypermarket

• 7 Parking Basements with Intelligent Traffic Management Solutions

• 30 Storey High End Residential tower

Page 59: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

ONE CONSTITUTION AVENUE, ISLAMABAD

• 1.4 Million Square Feet Complex

• 4500 Tons of Cooling

• 3.286 MW Power

• 45 Storey Development

• High End Retail Mall, Luxury Serviced Apartment

Towers & Residences

Page 60: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

MALL OF LAHORE, LAHORE

• 60 high end deluxe apartments,

besides offices and a

designer shopping Mall.

• All domestic hot water is generated

using 140 solar collectors.

• 0.5 million square feet

• 750 Tons of Cooling

• 1.5 MW Power

Page 61: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

PARK LANE TOWER, ISLAMABAD

• This Modern and State of the Art Mixed Us

e Tower Including Shopping Mall, Office &

Residential Apartments.

• 570,000 Sft.

• 2100 Tons of Cooling

• 12.7 MW

• Currently under construction phase

Page 62: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

PARK ONE COMMERCIAL & RESIDENTIAL COMPLEX, ISLAMABAD

• 800,000 Sft. Retail and Residential Project

• 4000 Ton Cooling Plant

Page 63: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

CARREFOUR HYPERMARKETS

Lahore

SMC have had a long relationship with the Mega Majid Al Futtaim group based in Dubai who are majority share holders in Carrefour, one of the biggest global Hypermarket chains and have completed 58 Hypermarkets & Supermarkets around the

world.

Fortress Stadium City Centre Nishat Emporium Packages Mall Gujranwala

Burjuman Centre Deira City Centre JLT Icon Tower JBR Murjan Tower Jumeirah Me’aisem Mall Wafi Centre Jebel Ali Arenco Bldg, Al-Barsha Al-Rimal Duja Tower

Bawabat Al Sharq Al Seef Mall Al Falah Street

Al Majaz Mall

Dolmen Mall Lucky One,Tabba Mall

Safeer Mall, Sohar Carrefour Sohar Barka Mall, Muscat Alwadi Alkabeer Mall Nizwa Grand Mall Carrefour Sur Mall of Oman Al Khoud Grand Mall, Muscat

West Avenue Mall

Wakra Mall Ain Khalid Al Mirghab Barwa

Commercial Avenue

Mall of Qatar Al Muaither

WTC, Islamabad

Dubai

Karachi

Islamabad

Abu Dubai

Fujairah Safeer Mall

Ajman Safeer Mall

Sharjah

Oman Qatar

Riyadh Riyadh Park Mall Ashbilia Mall Landmark Sondos Al Sharq Dammam Road

Dammam

Georgia Carrefour at

Tbilisi Gildani Mall ISANI Axis Mall East Point Mall Batumi Mall

Armenia Carrefour at Yerevan IMEX, Yerevan Mall Komitas Tsereteli

Kenya

2 Rivers Mall The Hub Karin

Page 64: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

The Modern Home demands a lot more than comfort and luxury in the digital age. The ‘Internet of things’ revolution is already here and it changing our lives rapidly. Having had a great deal of experience in the Middle East with their soaring towers providing every facility under the sun to their residents , we are able to address the needs of the very discerning client to the very value conscious buyer.

OUR RESIDENTIAL PROJECTS

Page 65: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

54 storey Residential & Commercial Tower

Luxury Apartments, Indoor Swimming Pools,

Recreation & Sports facilities &

Shopping areas.

Over 1 Million sft.

680 feet high skyscraper

2500 Tons Central Chilled Water plant

15 MW power distribution network

8 Nos. 2500 A Busbar Rising Mains.

Central Battery, AV Intercom, CCTV, MATV

Emergency Illumination

BMS & Fire & Gas Detection & Prevention.

MARINA CROWN, DUBAI

Page 66: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

41 storey Residential & Commercial Tower

Over 300 luxury apartments in Singlex & Duplex.

Indoor Swimming Pools, Recreation & Shopping.

0.5 Million sft.

480 feet high skyscraper

2500 TR Central Chilled Water plant

9 MW power distribution network

6 Nos. 2500 A Busbar Rising Mains.

Approval from authorities including DEWA, Dubai

Municipality, Nakheel, JAFZA, Etisalat & Civil

Defence

Central Battery

Emergency Illumination

BMS, Fire & Gas Detection & Prevention

AV Intercom, CCTV, MATV

JUMEIRAH LAKE TOWER, DUBAI, U.A.E.

Page 67: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

DUBAI LAGOON, DUBAI ‐ UAE

4.4 Million Sft.

43 Luxury Apartment Buildings

10,600 Tons of Cooling

Page 68: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

54 storey Residential & Commercial Tower

Luxury apartments, Indoor Swimming Pools, Recreation &

Sports facilities, Shopping areas.

680 feet high skyscraper

2500 TR Central Chilled Water plant

15 MVA power distribution network

8 Nos. 2500 A Busbar Rising Mains.

Central Battery

Emergency Illumination

BMS, Fire & Gas Detection & Prevention

AV Intercom, CCTV, MATV.

BUKAMSEEN RESIDENTIAL & COMMERCIAL TOWER, SHARJAH, U.A.

Page 69: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

250,000 sft

4‐Residential Towers of 14 Floors each

5 Star Hotel Tower with 250 rooms, a food court &

extensive water bodies.

TRUST COMMERCIAL & RESIDENTIAL COMPLEX ‐ ALGERIA

4800 Tons District Chilled water plant

15 MW of power distribution

State of the art building systems such as Access cont

rolhigh speed internet etc.

Page 70: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

OUR RESIDENTIAL PROJECTS

S. No.

Year Project Name Description

1. 2001 Al Murooj Complex, Dubai

95.4 Million Multi Purpose Luxury Complex Features Eight Residential Towers Of 14 Floors Each, And 612 Deluxe Apartments, Penthouses, State Of The Art Leisure Center, Departmental Store, 14 Storey 5 Star Rotana Hotel Tower With 248 Rooms & The City’S Only Floating Food Court Constructed Over An Artificial Lake, Located In An Up Market Area Of Dubai. Office, Sheikh Zayed Road.

2. 2001 Jabal Ali Residential Complex, Dubai

3. 2002 Marina Crown, Dubai

Residential & Commercial Tower is being Constructed in the Prime area of Dubai along the Beach Road Offering High End Facilities such as Centrally Air-Conditioned Luxury Apartments, Indoor Swimming Pools, Recreation Spaces & Sports Facilities, Shopping Areas.

4. 2002 Park Lane Tower, Lahore 570,000 Sft. Mixed Use Tower including Shopping Mall, Office & Residential Apartments.

5. 2003 Bukamseen Tower, Sharjah, UAE 54 Storey, Residential & Commercial Tower

6. 2004 Trust Commercial & Residential Complex, Algeria

This $ 75 million multi purpose luxury complex is to be the first of its kind in Algeria. It features 4 residential and 4 office tower of 14 floors each. A 5 star 300 bed hotel and a 1 million sq. ft. Mall are part of the project. The total project built area is in excess of 3 million sq. ft.

7. 2005 Dubai Lagoon, Dubai

Located at Dubai Investment Park this is a development consisting of over 48 buildings with an overall area of approximately 4.4 million square feet. The buildings are mainly residential with support buildings for Shopping, Mosque and Utility etc. The Entire complex is served by a 12,000 TR chilled water distribution network, 64 MW of Electric Power. The development features a Large Lagoon as well.

Page 71: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

OUR RESIDENTIAL PROJECTS

S. No.

Year Project Name Description

8. 2005 Jumeirah Lake Tower, Dubai 41 Storey, Residential & Commercial Tower

9. 2005 B&M FZCO 2B+G+10 Comm. & Res. Building 2B+G+10 Residential & Commercial Building

10. 2005 High Rise Retail & Residential Complex, Lahore

11. 2006 Reviera Dreams 2B +G +10 Storey Building on Plot CBD-19, Dubai 2B+G+10 Floors Residential Building

12. 2007 Al Hawai Tower, Dubai 2B+G+P+24 Floors Commercial/Residential Building

13. 2007 G+4 Buildings on Plot No. 245 – 511 @ Al Muhaisanah 4th, Dubai Staff Accommodation for Health Department

10. 2007 Residential & Commercial Complex, Plot No. 217 - 322 @ Al Hudaiba, Satwa, Dubai

11 2007 B+G+3 Residential Building at Al Quoz, Dubai 684,721 Sft. B+G+3 Residential Tower

12 2007 B+G+7 Proposed Residential Building at Muraqabat, Dubai B+G+7 Residential Building

13 2007 B+G+2P+10 Commercial, Residential Building @ Al Barsha, Dubai 307,296 Sft. B+G+2P+10 Commercial, Residential Building

14 2007 B+G+14 Residential Building @ TECOM, Dubai B+G+14 Storey Residential Building

Page 72: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

OUR RESIDENTIAL PROJECTS

S. No.

Year Project Name Description

15. 2008 Bahria Town Icon, Karachi 60 Storey 2,590,523 Sft. Mixed Use + Residential + Office + Retail

16. 2008 Harbour Heights, Abu Dhabi 41 Storey, Residential Tower

17. 2008 G+2 Floors Families Staff Accommodation on Plot No. 891-4308 at Hatta

18. 2008 Omran – Workforce Accommodation at Dubai Land for Nakheel

19. 2008 Residential Building on Plot No. 26, RAWDHAT, Abu Dhabi

20. 2009 Expo Complex, Residential & Commercial Complex, Constantine, Algeria

21. 2010 Bateen Palace, Main Kitchen and Staff Accommodation, Abu Dhabi

22. 2010 2B+G+7 Mixed Use Development @ Muraqabat, Dubai 2B+G+7 Residential & Commercial Tower

23. 2010 Hili Fun City, Staff Accommodation, Al Ain

24. 2012 One Constitution Avenue, Islamabad 45 Storey, Commercial and Residential Tower having built up area 1.4 million sq. ft.

25. 2014 2B+G+Podium+12 Al Qamzi Building, Dubai

Page 73: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

OUR RESIDENTIAL PROJECTS

S. No.

Year Project Name Description

26. 2014 2B+G+10 Commercial or Residential Building at Al Barsha, Dubai

27. 2014 Park Lane Tower, Islamabad 570,000 Sft. Modern and State of the Art Mixed Use Tower Including Shopping Mall, Office & Residential Apartments.

28. 2014 Park One Commercial & Residential Complex, Islamabad 800,000 Sft. Retail & Residential Tower

29. 2015 G+3 Residential Building, Plot No. 4210612, Al Warqaa First, Dubai G+3

30. 2015 B+G+12+ROOF+GYM, Plot No. 2410560, Al Nahda Second, Dubai B+G+12+ROOF+GYM Residential Tower

31. 2015 Labour Accommodation, Plot No. 8110200, Warsan Third, Dubai

32. 2016 2B+G+14 Floor + R, Commercial & Residential Building, Dubai (Al Moosawi's) 2B + G + 14 Storey commercial & residential building.

33. 2016 Elan Square, Commercial & Apartments Complex, Plot No. A-4, Blue Area, Islamabad 192,000 Sft., 15 Storey Residential & Commercial Tower

34. 2017 B+G+4P+21 Residential Tower @ Jumeirah Village Circle, Dubai B+G+4P+21 Storey Residential Tower

35. 2017 G+4P+19 Commercial & Residential Tower @ Jumeirah Village Circle, Dubai G+4P+19 Storey Residential & Commercial Tower

36. 2017 4B+G+M+12+GYM Residential Building, Abu Dhabi 4B+G+M+12 Storey Residential Tower

Page 74: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

OUR RESIDENTIAL PROJECTS

S. No.

Year Project Name Description

37. 2017 Umm Ramool Residential and Commercial Complex, Dubai B+G+6 Residential & Commercial Tower

38. 2018 Emaar Beach Front Development Zone 2 Residential Buildings, Dubai G+M+5P+22 & G+M+5P+29 Residential Towers

39. 2018 Proposed Residential Villas at Hor Al Anz, Dubai

Page 75: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SMC are associated with a diverse portfolio of challenging and boundary pushing projects in whichever industry or arena they may occur. This section highlights some of our current landmark projects.

MISCELLANEOUS

Page 76: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

RAFI CRICKET STADIUM, BAHRIA TOWN, KARACHI

Designed by renowned architects GMP, Berlin currently under construction this Stadium will be

Pakistans largest with a capacity of over 50,000

SMC are providing complete MEP Design services.

Page 77: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

BAHRIA GRAND MOSQUE, BAHRIA TOWN, KARACHI

Currently under construction

Planned to be the 3rd largest Mosque in the world

70,000 capacity

Annexed with a Museum, Educational facilities,

Women’s learning Centre & University

Page 78: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SAPPHIRE TEXTILE MILLS

350,000 sft Area

1700 Tons of Cooling

MW of Power

Evaporative Cooling

Free Cooling during some months of the year

Page 79: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

REVIT PROJECTS S.

No. Project Name Year of Design Project Status Project Details

1 Carrefour Hypermarket at Wafi Centre, Dubai 2014 Completed Retail

2 Dubai Police_G+3 Residential Building, Plot No. 4210612, Al Warqaa First, Dubai 2015 Completed Residential Building

3 Dubai Police_B+G+12+Roof+GYM, Plot No. 2410560, Al Nahda Second, Dubai 2015 Completed Residential Building

4 Dubai Police_Labour Accommodation, Plot No. 8110200, Warsan Third, Dubai 2015 Completed Residential Building

5 Dubai Police_G+M Covered Parking Building, Dubai 2015 Completed Parking Building 6 Dubai Police_Ground Floor, L-Shaped Steel Building, Dubai 2015 Completed Residential Building 7 Carrefour Supermarket at Gldani Mall, Tbilisi, Georgia 2015 Completed Retail

8 2B+G+14 Floor + R, Commercial & Residential Building, Dubai 2016 Completed Retail /Residential

Building

9 B+G+4P+21 Residential Tower @ Jumeirah Village Circle, Dubai 2017 Completed Residential Building

10 G+4P+19 Commercial & Residential Tower @ Jumeirah Village Circle, Dubai 2017 Completed Residential Building

11 4B+G+M+12+GYM Residential Building, Abu Dhabi 2017 In progress Office / Residential Building

12 Bahria Icon Tower, Karachi 2008 Partial Mixed use Building

13 Soorty Green Factory Unit No. 14 at Korangi, Karachi 2014 Central Plant Room Industrial / Textile

14 Golf Course House, Bahria Town, Karachi 2016 Exterior / Façade Lighting Villa / Residential

Page 80: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

SMC have been an active inhouse REVIT user since 2015

Successfully delivered REVIT projects as per UAE submission standards to UAE

Authorities

Professionally Certified REVIT staff with Senior Drafting Staff personnel trained

SMC have completed the following REVIT Projects

SMC REVIT CAPABILITIES

Sample Projects

Highlights

Central Model to include

Architecture

Structure

Interiors

Site/Landscape

REVIT REQUIREMENTS REVIT SAMPLES

Page 81: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AUTOMOTIVE PLANT

SYSTEMS

Page 82: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AUTOMOTIVE PLANT SYSTEMS HVAC

Ventilation Studies

Spot Cooling

Wind Study

Thermal Modelling

Energy Modelling

Page 83: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AUTOMOTIVE PLANT SYSTEMS PROCESS

Compressed Air Steam Hot Water

Page 84: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AUTOMOTIVE PLANT SYSTEMS PLUMBING

CW/HW Supplies

Fire Water

Drainage

Irrigation

Gas Systems

Compressed Air System

Water Conservation

Page 85: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AUTOMOTIVE PLANT SYSTEMS LIFE SAFETY

TGFS Fire Fighting Aspirating Smoke Detection Thermal Cameras Voice Evacuation Emergency Lighting

Page 86: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AUTOMOTIVE PLANT SYSTEMS POWER

Co Generation SCADA Infrastructure

Page 87: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AUTOMOTIVE PLANT SYSTEMS LIGHTING

Daylighting

Controls

CBS

Page 88: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area

AUTOMOTIVE PLANT SYSTEMS ELV

Publis Address

Data

Voice

CCTV

Access Control

Perimeter Security

BMS

Page 89: COMPANY PROFILE - SMC -min.pdfMEP Design of Infrastructure & Buildings. 10. 1992 National Refinery Modifications to and upgrading of Cooling Towers. 11. 1993 National Fibres POY Area