51
Company LOGO High Reliability Organizing Implementation in Fire Crews

Company LOGO High Reliability Organizing Implementation in Fire Crews

Embed Size (px)

Citation preview

Page 1: Company LOGO High Reliability Organizing Implementation in Fire Crews

Company

LOGO High Reliability Organizing

Implementation in Fire Crews

Page 2: Company LOGO High Reliability Organizing Implementation in Fire Crews

Agenda

1. Use Fire Analysis to go to HRO 1. Use Fire Analysis to go to HRO

2. Five HRO Processes 2. Five HRO Processes

3. Requisite Culture for Success 3. Requisite Culture for Success

Page 3: Company LOGO High Reliability Organizing Implementation in Fire Crews

Fire Management

Page 4: Company LOGO High Reliability Organizing Implementation in Fire Crews

Wildland Fire an HRO?

• “High Reliability Organizations– Nuclear power plants– Aircraft carriers– Wildland firefighting crews

Page 5: Company LOGO High Reliability Organizing Implementation in Fire Crews

Maybe yours, but not mine!

• How about our prescribed fire programs?Common “surprises” from 28 Escapes and 2 Near Misses 1996-2004 LLC Report

Page 6: Company LOGO High Reliability Organizing Implementation in Fire Crews

Mindfulness

•To be mindful

•Mindful updating

Page 7: Company LOGO High Reliability Organizing Implementation in Fire Crews

The past settles its accounts

“…the ability to deal with a crisis situation is largely dependent on the structures that have been developed before chaos arrives. The event can in some ways be considered as an abrupt and brutal audit: at a moment’s notice, everything that was left unprepared becomes a complex problem, and every weakness comes rushing to the forefront.”

Preventing Chaos in a Crisis, Lagadec, p. 54

Page 8: Company LOGO High Reliability Organizing Implementation in Fire Crews

1. Preoccupation with Failure

Thinking about our own fire dispatch unit, can we honestly say:

• We regard near misses as a kind of failure that reveals potential danger rather than as evidence of our success and ability to avoid danger

• We treat near misses and errors as information about the health of our system and try to learn from them

Page 9: Company LOGO High Reliability Organizing Implementation in Fire Crews

Triangle of Probability

1

30

300

Page 10: Company LOGO High Reliability Organizing Implementation in Fire Crews

Triangle of Probability

20

600

6000

Page 11: Company LOGO High Reliability Organizing Implementation in Fire Crews

2. Reluctance to Simplify

Thinking about our fire crew, can we say:

• People around here take nothing for granted

• People are encouraged to express different points of view

Page 12: Company LOGO High Reliability Organizing Implementation in Fire Crews

3. Sensitivity to Operations

• During an average day, people come into enough contact with each other to build a clear picture of the situation.

• People are familiar with operations beyond one’s own job.

Page 13: Company LOGO High Reliability Organizing Implementation in Fire Crews

4. Commitment to Resilience

• There is a concern with building people’s competence and response repertoires.

• People have a number of informal contacts that they sometimes use to solve problems.

Page 14: Company LOGO High Reliability Organizing Implementation in Fire Crews

5. Deference to Expertise

• If something out of the ordinary happens, people know who has the expertise to respond

• People in this organization value expertise and experience over hierarchical rank

Page 15: Company LOGO High Reliability Organizing Implementation in Fire Crews

Toward a “Mindful Culture”

• A healthy safety culture consciously creates mindfulness.

• Strive for an “informed culture”– a culture that creates and sustains intelligent wariness. – James Reason

• Informed cultures result from four co-existing subcultures:

Page 16: Company LOGO High Reliability Organizing Implementation in Fire Crews

Four Subcultures

–Reporting culture

–Just culture

–Flexible culture

–Learning culture

Page 17: Company LOGO High Reliability Organizing Implementation in Fire Crews

Dependency Diagram

First Second Third Fourth

JustCulture

TrustClarity

ReportingCulture

ReportingRelationships

FlexibleCulture

Adaptable

LearningCulture

Page 18: Company LOGO High Reliability Organizing Implementation in Fire Crews

Toward a Mindful Culture

First Second Third Fourth

JustCulture

TrustClarity

ReportingCulture

ReportingRelationships

FlexibleCulture

Adaptable

LearningCulture

Page 19: Company LOGO High Reliability Organizing Implementation in Fire Crews

Pay Attention Differently

• You STOP concentrating on some things.

• You START concentrating on other things.

• To Be MindfulIs to “See more Clearly” Not to Think Harder and Longer

Page 20: Company LOGO High Reliability Organizing Implementation in Fire Crews

“See more clearly”

• See where your model didn’t work, or see indicators you missed that signaled expectations weren’t being filled (failure)

• Strip away labels, stereotypes that conceal differences among details (simplification)

• Focus on what is happening here and now (operations)

• See new uses for old resources through improvisation and making do (resilience)

• Discover people who understand a situation better than you do and defer to them (expertise)

Page 21: Company LOGO High Reliability Organizing Implementation in Fire Crews

Plans and Their Drawbacks

• Plans influence what people see

• Plans can limit our view of our capabilities

• Plans focus attention on what we expect

Page 22: Company LOGO High Reliability Organizing Implementation in Fire Crews

Preoccupation with Failures

All Failures

Especially The Small Ones

Page 23: Company LOGO High Reliability Organizing Implementation in Fire Crews

Learning by Failure – Hard

Learning moments are short-lived

Don’t wait

Do it the right way

Page 24: Company LOGO High Reliability Organizing Implementation in Fire Crews

James Reason, 2006

Page 25: Company LOGO High Reliability Organizing Implementation in Fire Crews

The Person Model

Page 26: Company LOGO High Reliability Organizing Implementation in Fire Crews

The Legal Model

Page 27: Company LOGO High Reliability Organizing Implementation in Fire Crews

The System Model

Page 28: Company LOGO High Reliability Organizing Implementation in Fire Crews

Satisfying with “Justice Fruit”

Page 29: Company LOGO High Reliability Organizing Implementation in Fire Crews

Upward and Outward

Page 30: Company LOGO High Reliability Organizing Implementation in Fire Crews

A Balanced Approach?

Page 31: Company LOGO High Reliability Organizing Implementation in Fire Crews

Use A Balanced Approach?

• Person Approach?

• Legal Approach?

• System Approach?

• Learning Approach

Page 32: Company LOGO High Reliability Organizing Implementation in Fire Crews

• Learning requires some preconditions:

psychological safety

learning orientation

efficacy

Learning Ground Rules

Page 33: Company LOGO High Reliability Organizing Implementation in Fire Crews

2. Reluctance to Simplify

Our Expectations

Page 34: Company LOGO High Reliability Organizing Implementation in Fire Crews

3. Operations-Sensitive Leadership

• Encourage others to speak up

• Check for comprehension

• “Over Learn” new routines

Page 35: Company LOGO High Reliability Organizing Implementation in Fire Crews

4. Commitment to Resilience

• A combination:–Keeping errors small and

–Improvising workarounds that keep the system functioning

• Build dynamic thinking skills

• Develop creativity

• Value variability

Page 36: Company LOGO High Reliability Organizing Implementation in Fire Crews

5. Defer to Expertise

• HROs shift decisions toward expertise and experience.

Page 37: Company LOGO High Reliability Organizing Implementation in Fire Crews

Sensemaking vs Decisionmaking

• “If I make a decision it is a possession; I take pride in it; I tend to defend it and not to listen to those who question it.

• If I make sense, then this is more dynamic and I listen and I can change it.

• A decision is something you polish. Sensemaking is a direction for the next period.”

--Paul Gleason

Page 38: Company LOGO High Reliability Organizing Implementation in Fire Crews

STICC – Explain Yourself

• Situation

• Task

• Intent

• Concern

• Calibrate

Page 39: Company LOGO High Reliability Organizing Implementation in Fire Crews

Continually Ask Yourself

• Scanning questions:– Can I see weak signals of failure and make

sense of them?– How many different slides do I have that

apply to this situation?– Am I aware of the unfolding situation? – Do I have the skills to make do? – Who knows how to do what?

Page 40: Company LOGO High Reliability Organizing Implementation in Fire Crews

Five Continuous Processes

deference

preoccupationreluctance

sensitivity

commitment

Manage the Unexpected

Mindful Updating

Page 41: Company LOGO High Reliability Organizing Implementation in Fire Crews

Five Processes

1. Preoccupation with failure 1. Preoccupation with failure

2. Reluctance to simplify 2. Reluctance to simplify

3. Sensitivity to operations 3. Sensitivity to operations

4. Commitment to resilience 4. Commitment to resilience

5. Deference to expertise 5. Deference to expertise

Page 42: Company LOGO High Reliability Organizing Implementation in Fire Crews

Cultural Progression to HRO

JustJust ReportingReporting FlexibleFlexible LearningLearning

Page 43: Company LOGO High Reliability Organizing Implementation in Fire Crews

Mindfulness Defined

• “By mindfulness we mean the combination of–Ongoing scrutiny of existing expectations,

–Continuous refinement and differentiation of expectations based on newer experiences,–Willingness and capability to invent new expectations that make sense of unprecedented events,–A more nuanced appreciation of context and ways to deal with it,–And identification of new dimensions of context that improve foresight and current functioning.”

Page 44: Company LOGO High Reliability Organizing Implementation in Fire Crews

Where we are going

Page 45: Company LOGO High Reliability Organizing Implementation in Fire Crews

Information to Knowledge

Informed Culture

Timely AvailableCandid Disseminated

Learning Culture

Page 46: Company LOGO High Reliability Organizing Implementation in Fire Crews

Agenda

1. Use Fire Analysis to go to HRO 1. Use Fire Analysis to go to HRO

2. Five HRO Processes 2. Five HRO Processes

3. Requisite Culture for Success 3. Requisite Culture for Success

Page 47: Company LOGO High Reliability Organizing Implementation in Fire Crews

Commitment – Pick Two

1. Preoccupation with failure 1. Preoccupation with failure

2. Reluctance to simplify 2. Reluctance to simplify

3. Sensitivity to operations 3. Sensitivity to operations

4. Commitment to resilience 4. Commitment to resilience

5. Deference to expertise 5. Deference to expertise

Page 48: Company LOGO High Reliability Organizing Implementation in Fire Crews

HRO Support at LLCwww.wildfirelessons.net

Page 49: Company LOGO High Reliability Organizing Implementation in Fire Crews
Page 50: Company LOGO High Reliability Organizing Implementation in Fire Crews

HRO Support at MFCwww.myfirecommunity.net

Page 51: Company LOGO High Reliability Organizing Implementation in Fire Crews

Questions? Contact Us

• Paula Nasiatka, LLC Manager– (520) 799-8760, [email protected]

• David Christenson, LLC Asst. Mgr.– (520) 799-8761, [email protected]

• Brenna MacDowell, LLC Editorial Asst.– (520) 799-8763, [email protected]