Company Background

• Founded in Cleveland, Ohio (1947)

• 17 facilities worldwide (4 US/13 Overseas)

• US: (Arkansas, North Carolina, New Mexico, Ohio)

• Americas: (Canada, Mexico, Brazil)

• EMEA: (UK, Poland, Spain, South Africa)

• Asia-Pac: (Australia, Thailand, China, Indonesia, Malaysia, New Zealand)

• 2500+ employees worldwide

• Publically traded on NASDAQ (PLPC)

• Acquired Direct Power and Water corp. in 2007

Markets Served

Ballasted Roof Mounts

Power Xpress™

BPRM – Ballasted PowerRail™ Mount

Pole Mounted Racks

TPM – Top of Pole Mount

MPM-G2 – Multi Pole Mount, 2nd Generation

Power Xpress

Roof Mounts

Power Rail™

PRODUCT DISCUSSION

Power Xpress™

Ballasted Power Rail

Ballasted Mounting Solutions

5° and 10° options

Fully ballasted

No penetrations

Full containment ballast trays

Integrated grounding

Pre-assembled clamps

Minimal parts

3/8” EPDM roof protection

Ballast reports

Power Xpress™

Power Xpress™

Power Fab CRS-G2

RAD Hardware Compatible

Integrated Grounding

New Tilt bracket

Integrated Ballast Pan

Achieve low distributed loads

Installs in High Wind Zones

Spec Inter-row shading

spacing

3/8” EPDM Protective Gasket

EPDM to protect roof

RAD Hardware Compatible

Ballast Pans act as spacers

Single Tool assembly

Capable of installs up to 150mph

Zero degree tilt

BRPM Features/ Selling Points

BPRM Ballasted PowerRail™ Mount

BPRM Ballasted PowerRail™ Mount

Top-of-Pole Mount

Pole-Mounted Racks

MPM-G2

POWER-FAB TPM Top-of-Pole Mount System

Great for homes with limited roof space due to shading, orientation, or slope

On-line Configurator tool available

Manufacturer Recommended Foundations

Module Specific Design

Six seasonal elevation set points (15-65 degrees)

Single Pole Ground Penetration

High Wind Version rated up 130mph

Mounts up to 15 60-cell modules per pole

Upgrades and Options Available

Powder Coating

Galvanized Steel and/or anodized aluminum

TPM Technical Discussion

POWER-FAB TPM Top-of-Pole Mount System

POWER-FAB MPM-G2 Multi-Pole Mount G2 Racking System

Uses Heavy Duty P14 Module rails

Seasonal Adjustability

RAD Hardware Compatible

Square Horizontal Tubing

Integrated Wire Management

Capable of High Ground Clearance

Multiple Foundation options

POWER-FAB MPM-G2 Multi-Pole Mount G2 Racking System

Fewer Parts to install = Lower

Installed Costs

Form meets Function

Wire Management Lends to a

Professional Looking installation

Helical, Concrete, Pile Driven Pier

Compatibility

Residential, Commercial and

Agricultural applications

POWER-FAB MPM-G2 Multi-Pole Mount G2 Racking System

• Embedded Concrete

• Concrete Blocks/Footers

• Pile Driven Systems in Compacted Soil

• Earth Screws

Augured Hole

Embedded Concrete

Concrete Blocks

Driven Pole Earth Screw

MPM-G2 Foundations

MPM - Load Sharing – Why is it beneficial?

Reduced Foundation Size

Load is spread over multiple pipes/piers

More Pipes/Piers = Less Load Per Pipe/Pier

Foundation Size is also Related to Site and Install Criteria

Cheaper Pipe/Labor:

Smaller Pipe Sizes Used

Pipe Usually Sold by Weight

Smaller Pipe More Available than Larger Pipe

Smaller Pipe/Piers = Less Labor

Increased Ground Clearance

Load Sharing allows for Taller Installs

Can used as a Shade Structure

MPM-G2 - Technical Discussion

How Do the Different Design Criteria Relate? Ground Snow Load vs. Ground Clearance vs. Max Tilt Angle

Ground Clearance

Affects Overall Height of System

Taller Systems require Stronger Pipe and Bigger Foundations

Can be used to Elevate rack above Snow Accumulation

Max Tilt Angle

Steeper Tilts Increase Snow Slough Value

Must Have Ground Clearance Above Snow Levels

Steeper Tilts are Affected by the Elements More Severely

MPM-G2 - Technical Discussion

Relationships Between Criteria

MPM4 is Unavailable in Excessive Conditions

High Snow Loads and Low Ground Clearances

High Wind Speeds and Snow Loads

Low Tilt Angles and High Snow Loads

Pier Frequency

More Piers in Excessive Conditions

Excessive Wind/Snow Require More to Support Rack

High Wind Speeds = More Pressure

Square Footage of Array Requires More Support

MPM-G2 - Technical Discussion

Power Peak™ Ground Mount

Power Peak™ Ground Mount

Power Peak™ Ground Mount

Power Peak™ Ground Mount

Power Peak™ Structure

Pile Driven Vertical Posts Strong Back Assy.

Module Rails Vertical Attachment

Strut Attachment

Power Peak

Power Peak™

Material Specs

Structural Aluminum Alloys

– Extruded – 6000 Series

– Fabricated – 5052 H-32

Stainless Steel Alloys – Type 304

Galvanized Steel ASTM-A123

Plastics

** Racking Materials selected for superior corrosion

resistance and strength to last the life of the module

Power Peak™ Component Features

1) Strong Back Assembly

Factory Preassembled with preset

module rail mounts

2” Vertical adjustment

Field adjustable strut

2) Module Rails One piece, lightweight aluminum Portrait or Landscape module mounting Built-in cable tray for wire management

3) Module Clamp Assembly Fast ¼ turn twist-in field assembly Integrated grounding

Strong-Back

Assembly

Module Rail

Clamp Assembly

Module Rail

Power Peak

Power Peak™ Ground Mount

Pre-Assembly Saves Time!

RAD Hardware & WEEB Pre-Assembly Saves Time in the Field

Strut Attachment Pre-Assembly Saves Time in the Field

Pre-Assembly Strut Attachment Pre-Assembly

Factory Pre-Assembly

Rail Bracket & Grounding Clip Pre-Assembly Saves Time in the Field

Quick Field Assembly

Rail mounted in Rail Bracket

Field Adjustability

Type 1

Crystalline Bedrock

Type 2

Sedimentary and Foliated Rock

Type 3

Sandy Gravel and/or Gravel

Type 4

Sand, Silty or Clayey Sand, Silty Gravel and Clayey Gravel

Type 5

Clay, Sandy Clay, Silty Clay, Clayey Silt, Silt and Sandy Silt

Soil Types

Soil Composition Facts/Data Methods to analyze soil structure

Push-Pull Soil Testing

Power Peak™

Site Specific Design

Save Money in the field

– Field Adjustability

– Pre-Assembly

Material Specification

Finish Specification

– G90 vs ASTM 123A

In Stock right here in Minneapolis to hold 12-40 modules

PowerRail™ Family

Pre-Assembly Saves Time!

PowerRail™ P6/P8

PowerRail - Pivot Easy Foot - PEF

PowerRail Features/ Selling Points

Many different attachment options

RAD Hardware Compatible

Various Types of L-Feet

Wire Management

Reduced Install Time/ Reduced Labor

Wire Management

RAD Hardware

Reduced Cost

P6 vs P8

Design Friendly

Can attach to all types of structures

Industry Leading Customer Support

• Product Support Specialists

• Specification Tools

• Product Configuration Tools

• Selection and Pricing Guides

• Design Guidelines

• Request for Quote Forms

• Engineering Support

• CAD drawings

• Structural Calculations – wind, seismic, dead loads

• Full Scale Wind Tunnel reports for ballasted systems

• Foundation Recommendations - CAD drawings

• 3rd Party PE certification

• Assembly Instructions & Installation Guidelines