2018-REV:00COMPANY PROFILE
INDICEINDEX
7
12
18
24
86 89
28
8
13
19
10
17
21
45
AZIENDA COMPANY
LA NOSTRA VISIONOUR VISION
IL NOSTRO TARGETOUR TARGET
RICERCHE SCIENTIFICHESCIENTIFIC RESEARCH
I NOSTRI CLIENTIOUR CUSTOMERS
CONTATTICONTACTS
COMPANY PERFORMANCE
OWAC ENGINEERING COMPANY
IL NOSTRO TEAMOUR TEAM
SERVIZI OFFERTIOFFERED SERVICES
LA NOSTRA MISSIONOUR MISSION
OWAC IN NUMERIOWAC IN NUMBERS
INTERNAZIONALIZZAZIONEINTERNAZIONALIZATION
ALLEGATI GRAFICIGRAPHIC ATTACHMENT
AZIENDACOMPANY
8
OWAC Engineernig Company
OWAC Engineering Comapany S.r.l. nasce da un’esperienza pluriennale
maturata nell’ambito di attività di supporto ed asistenza ad aziende,
sia pubbliche che private, nel settore dell’ingegneria ambientale, dei
processi industriali complessi, della produzione di energia elettrica da fonti
rinnovabili ed assimilate ( recupero di energia dai rifiuti).
Il nostro CORE BUSINESS è quello di individuare le migliori soluzioni per la
tutela dell’ambiente in cui viviamo.
L’azienda vanta infatti una lunga esperienza nella progettazione e
realizzazione di impianti di trattamento dei rifiuti urbani e speciali, nonchè
nelle bonifiche ambientali di siti inquinanti ed aree industriali dismesse.
I nostri obiettivi sono:
CAPACITÀ COMPETENZA INNOVAZIONE
OWAC Engineering Comapany S.r.l. born from many years of experience
gained in support activities and assistance to companies, both public
and private, in the field of environmental engineering, complex industrial
processes, the production of electricity from renewable and assimilated
sources (energy recovery from waste).
Our CORE BUSINESS is to identify the best solutions for the protection of
the environment in which we live.
The company has in fact a long experience in the design and construction
of urban and special waste treatment plants, as well as in the environmental
reclamation of polluting sites and disused industrial areas.
Our goals are:
CAPACITY COMPETENCE INNOVATION
IT
EN
Owac Engineering Company
9
OWACEngineering
Company
Owac Engineering Company
10
La nostra Mission
La nostra mission riguarda lo sviluppo di soluzioni innovative finalizzate
soprattutto all’innalzamento della Qualità della Vita attraverso miglioramenti
nel controllo ambientale, nella sicurezza e nell’efficienza dei processi
industriali.
I servizi generalmente svolti dalla società (progettazione, consulenze
specialistiche, monitoraggi, ecc.) hanno dunque, in genere, un positivo
impatto sulla popolazione coinvolta; per tale motivo, dall’analisi dei vari
progetti e delle attività svolte dal nostro team nel corso degli anni, è stato
possibile quantificare graficamente gli abitanti equivalenti che possono
beneficiare dei risvolti positivi legati alle attività di OWAC.
Our mission concerns the development of innovative solutions aimed above
all at raising the quality of life through improvements in environmental
control, safety and efficiency of industrial processes.
The services generally performed by the company (design, specialized
consultancy, monitoring, etc.) therefore generally have a positive impact
on the population involved; for this reason, from the analysis of the various
projects and activities carried out by our team over the years, it has been
possible to graphically quantify the equivalent inhabitants who can benefit
from the positive implications linked to the activities of OWAC.
IT
EN
Our Mission
La nostra Mission/ Our Mission
11
20080
300K
600K
900K
1.2MI
1.5MI
1.8MI
2009 2010 2011 2012 2013 2014 2015 2016 2017
Valore sociale dei servizi di progettazione e realizzazione Progettazione e realizzazione per Anno/utenti serviti
Il finale evidenzia quindi un progressivo incremento del numero di persone
destinatarie dei nostri servizi dal 2008 ad oggi.
The end therefore shows a progressive increase in the number of recipients of
our services from 2008 to today.
IT
EN
Social value of services design and implementation Design and implementation for Year / users served
UTE
NTI
SER
VITI
ANNO
La nostra Mission/ Our Mission
12
La nostra Vision
Per ciò che riguarda l’Italia e l’Europa l’obiettivo che ci prefissiamo è quello
di promuovere sistemi più performanti con l’ausilio di tecnologie al passo
con l’nnovazione.
Inoltre un’altro obiettivo è quello della ricerca tecnologica, che già stiamo
portando avanti studiando alcuni sistemi enzimatici.
Nel Panorama mondiale invece vorremo avviare una serie di attività
volte alla promozione di sistemi integrati e virtuosi per la gestione ed
il trattamento dei rifiuti urbani, oltre che per favorire il trasferimento
tecnologico in paesi nei quali le tematiche ambientali risultano ancora
arenti di una programmazione strutturata ed efficiente, seppur altamente
all’avanguardia in altri settori, quali quello civile ed informatico ( ad es. Cina,
Russia, Emirati Arabi, ecc.).
For what concerns Italy and Europe, the goal we set ourselves is to promote
more performing systems with the aid of technologies that are in step with
innovation.
Furthermore, another objective is that of technological research, which we
are already carrying out by studying some enzymatic systems systems.
On the other hand, in the world panorama we would like to start a series
of activities aimed at promoting integrated and virtuous systems for
the management and treatment of urban waste, as well as to promote
technology transfer in countries where environmental issues are still lacking
in structured planning and efficient, although highly advanced in other
sectors, such as civil and IT (eg China, Russia, United Arab Emirates, etc.).
IT
EN
Our Vision
La nostra Vision/ Our Vision
13
Il nostro team
La società dispone di risorse umane di altà professionalità e competenza,
la cui costante e consolidata crescita, in termini di esperienza operativa e
capacità produttiva, ha permesso di costruire nel tempo un tream flessibile,
specializzato ed al contempo versatile, in grado di sviluppare i compiti
assegnati con precisione.
La società dunque si pone come interlocutore credibile ed affidabile, in
grado di far fronte alle diverse necessità del Cliente nel minor tempo e con il
massimo profilo tecnologico disponibile.
The company has human resources of high professionalism and
competence, whose constant and consolidated growth, in terms of
operational experience and production capacity, has allowed us to build
over time a flexible, specialized and at the same time versatile tream able to
develop the tasks assigned accurately.
The company therefore stands as a credible and reliable interlocutor, able
to cope with the various needs of the customer in the shortest time and with
the maximum technological profile available.
IT
EN
Our Team
Il nostro Team/ Our Team
14 Il nostro Team/ Our Team
15
Le nostre attività
Le principali attività di OWAC riguardano:
1. Progettazione e direzione lavori della costruzione di impianti industriali;
2. consulenze specifiche;
3. ricerca scientifica e innovazione tecnologica;
4. progettazione e gestione di sistemi di automazione industriale;
5. monitoraggio di impianti industriali.
The main activities of OWAC concern:
1. Design and construction of industrial plants;
2. specific consultancy;
3. scientific research and technological innovation;
4. design and management of industrial automation systems;
5. monitoring of industrial plants.
IT
EN
ARCHITETTURA
PROGETTAZIONE CIVILE ED
INDUSTRIALETRATTAMENTI
DEI RIFIUTI
PROGETTI DI BONIFICA
ENERGIE RINNOVABILI
Our Activities
Le nostre attività/ Our Activities
16 Le nostre attività/ Our Activities
17OWAC in numeri/ OWAC in numbers
OWAC in numeri
45Progetti
- Projects
€ 385.000.000Importo opere
progettate e realizzate negli ultimi 10 anni
-Amount works
designed and realized in the last 10 years
420.0000 mqmq di terreno Interessati da
iniziative industriali-
Smq of landInterested by
industrial initiatives
15Clienti istituzionali serviti
- Institutional
Customers served
18Numero di paesi in cui vi è erogato
il servizio-
Number of countries where the country is provided
Service
1.8MIUtenti potenzialmente
Serviti da opere Progettate / realizzate
- Users potentially Served by works
Designed / realized
112Clienti privati
Serviti-
Private clients served
27Fiere nelle quali owac ha
esposto i suoi servizi-
Exhibitions in which owac has exposed its services
10Collaborazioni
scientifiche-
Scientific Collaborations
OWAC in numbers
18
Il nostro target
OWAC si perfigura come consulente ideale per Aziende, Enti pubblici,
e Università, ovvero tutti i potenziali soggetti interessati, fornendo servizi
multidisciplinari ed integrati nel campo delle fonti di energia rinnovabile,
delle problematiche legate all’ambiente e dell’analisi dei processi industriali
diventando dunque un consolidato punto di riferimento nella ricerca di
soluzioni organizzative, progettuali, tecniche ed operative.
Nello specifico il nostro target interessa:
• Società industriali coinvolti nei campi del riciclaggio, trattamento e
smaltimento dei rifiuti solidi e liquidi;
• imprese pubbliche che desiderano migliorare le strategie di gestione dei
loro rifiuti;
• imprenditori che intendono iniziare a produrre energia verde da risorse
rinnovabili;
• istituti di credito interessati al risanamento ambietale.
OWAC is an ideal consultant for companies, public bodies, universities,
technical studies, or all the interested stakeholders, providing
multidisciplinary and integrated services in the field of renewable energy
sources, environmental issues and industrial process analysis thus becoming
a consolidated point of reference in the search for organizational, design,
technical and operational solutions.
Specifically, our target interests:
• Industrial companies involved in the recycling, treatment and disposal of
solid and liquid waste;
• public companies wishing to improve their waste management
strategies;
• entrepreneurs who want to start producing green energy from renewable
resources.
• Credit institutions interested in environmental rehabilitation.
IT
EN
Our Target
Il nostro target / Our Target
19I servizi offerti / The services offered
I servizi offerti
Servizi di ingegneria ambientale:- progettazione, direzione dei lavori e monitoraggio di impianti
di trattamento rifiuti e discariche per il conferimento rifiuti non
pericolosi;
- attività di decommissioning industriale;
- attività e procedure relative alla bonifica di siti di preminente
interesse pubblico per la riconversione industriale;
- Studi di Impatto Ambientale;
Servizi di ingegneria energetica:- progettazione, direzione dei lavori e monitoraggio di impianti
eolici, fotovoltaici e a biomasse;
- diagnosi ed efficientamenti energetici (ESCo);
Progettazione e direzione lavori per nuovi stabilimenti di trattamento dei rifiuti solidi urbani:- progettazione e direzione lavori di nuovi stabilimenti per il
trattamento dei rifiuti;
- implementazione di nuove tecnologie in stabilimenti di trattamento
rifiuti esistenti;
Consulenza e redazione di sistemi di gestione della salute e sicurezza sul lavoro ai sensi del D.Lgs. 81/08 (Testo Unico) e s.m.i.;Consulenza giuridica e servizi economico-finanziari.
OWAC ENGINEERING COMPANY S.r.l., inoltre, è iscritto nell’elenco
dei soggetti di cui all’art. 26, c. 6, lett. b) del D.Lgs. 50/2016 per verifica
preventiva della progettazione per la Regione Campania (Decr. Dirigenziale
n. 10 del 10/11/2016 della Dir. Gen. 5 - Struttura di missione per lo
smaltimento dei R.S.B. - B.U.R.C. n. 75 del 14/11/2016)
Environmental engineering services:
- planning, works management and plant monitoring
of waste and landfill treatment for the provision of non-waste dangerous;
IT
EN
The services offered
20
- activities and procedures related to the remediation of polluted sites;
- activities and procedures related to the reclamation of pre-eminent sites
public interest for industrial reconversion;
- Environmental Impact Studies;
Energy engineering services:
- planning, works management and plant monitoring
wind, photovoltaic and biomass;
- energy diagnosis and efficiency (ESCo);
Design of industrial plants:
- design and construction supervision of new plants for the
waste treatment;
- implementation of new technologies in treatment plants
existing waste;
Consulting and drafting of health and safety management systems in the
workplace pursuant to Legislative Decree 81/08 (Consolidated Law) and
subsequent amendments;
Legal advice and economic-financial services.
OWAC ENGINEERING COMPANY S.r.l., moreover, is registered in the list
of subjects pursuant to art. 26, c. 6, lett. b) of Legislative Decree 50/2016 for
prior verification of the design for the Campania Region (Directorial Decree
No. 10 of 10/11/2016 of the Directorate General 5 - Mission structure for the
disposal of the RSB - BURC n 75 of 14/11/2016)
EN
I servizi offerti / The services offered
21
Internazionalizzazione
Al fine di esportare il sistema per la gestione ed il trattamento dei rifiuti
urbani e favorire il trasferimento tecnologico in paesi nei quali le tematiche
ambientali risultano ancora carenti OWAC Engineering Company Ha avviato
un processo di internazionalizzazione aziendale.
Tale processo ha riguardato, tra le altre attività, la partecipazione a fiere di
carattere internazionale con tematica principale sulla protezione ambientale,
la riduzione dell’inquinamento, l’innovazione tecnologica per il trattamento
di rifiuti solidi, reflui ed emissioni nocive, nonché la partecipazione a
tender internazionali relativi a manifestazioni di interesse per consulenze su
tematiche ambientali e studi di fattibilità per impianti di recupero energia
dai rifiuti (waste-to-energy).
I paesi principalmente coinvolti nelle recenti attività estere sono:
- Cina (Shanghai, Hong Kong, Macao, Chengdu, Guangzhou, Beijing);
- Kazakhstan (Astana, Almaty);
- Polonia (Katowice, Czestochowa);
- Oman (Muscat);
- Emirati Arabi (Abu Dhabi, Dubai);
- Argentina (Buenos Aires);
- Polinesia Francese (Papara);
- Kuwait.
In order to export the system for the management and treatment of urban
waste and promote technology transfer in countries where environmental
issues are still lacking OWAC Engineering Company Has started a process of
corporate internationalization.
This process involved, among other activities, participation in international
fairs with a main theme on environmental protection, pollution reduction,
technological innovation for the treatment of solid waste, waste water and
harmful emissions, as well as participation in international tenders related to
expressions of interest for advice on environmental issues and feasibility
IT
EN
Internationalization
Internazionalizzazione / Internazionalization
22 Internazionalizzazione / Internazionalization
23
studies for waste-to-energy plants.
The countries mainly involved in recent foreign activities are:
- China (Shanghai, Hong Kong, Macao, Chengdu, Guangzhou, Beijing);
- Kazakhstan (Astana, Almaty);
- Poland (Katowice, Czestochowa);
- Oman (Muscat);
- United Arab Emirates (Abu Dhabi, Dubai);
- Argentina (Buenos Aires);
- French Polynesia (Papara).
- Kuwait.
EN
Internazionalizzazione / Internazionalization
24
Ricerche scientifiche
Nell’ambito delle attività di ricerca e sviluppo portate avanti dal DIMA,
Owac ha recentemente attivato una collaborazione con il Dipartimento
di Ingegneria Meccanica ed Areonautica dell’Università La Sapienza
di Roma, ricevendo il mandato di rappresentarla nella promozione di
attività industriali legate alla produzione ed all’impiego di combustibili
solidi secondari con relativa valorizzazione energetica. Nel dettaglio, la
collaborazione in essere riguarda:
Ricerche inerenti l’innovazione tecnologica nel campo energetico ed
ambientale;
Ricerche nel settore dei materiali nel campo dei trattamenti e della
valorizzazione dei rifiuti urbani e speciali, con particolare riferimento al
recupero di materiali e di energia;
Sperimentazione di nuove attività tecnico scientifiche nel campo del
trattamento dei rifiuti in conformità alla normativa italiana ed europea volte
alla valorizzazione dei rifiuti per la produzione di energia;
Promozione di nuove attività industriali nel territorio asiatico per la
trasformazione dei rifiuti e la produzione di CSS combustibile;
Sviluppo di studi di fattibilità per la promozione e la realizzazione di sistemi
integrati di gestione dei rifiuti nel territorio asiatico;
Formazione di tecnici asiatici da poter impiegare nello sviluppo delle
energie rinnovabili;
Organizzazione di conferenze e work-shop per la promozione delle attività
tecniche svolte al fine di fornire un adeguato orientamento professionale;
Realizzazione di tesi di laurea e stage didattici per l’approfondimento di
particolari aspetti tecnico-scientifici.
IT
Scientific research
Ricerche scientifiche / Scientific reserch
25Ricerche scientifiche / Scientific reserch
26
As part of the research and development activities carried out by DIMA,
Owac has recently activated a collaboration with the Department of
Mechanical Engineering and Aeronautics of the La Sapienza University of
Rome, receiving the mandate to represent it in the promotion of industrial
activities related to production and the use of secondary solid fuels with
relative energy exploitation. In detail, the ongoing collaboration concerns:
Research into technological innovation in the energy and environmental
fields;
Research in the field of materials in the field of treatments and enhancement
of urban and special waste, with particular reference to the recovery of
materials and energy;
Experimentation of new technical and scientific activities in the field of waste
treatment in compliance with Italian and European legislation aimed at the
exploitation of waste for energy production;
Promotion of new industrial activities in the Asian territory for the
transformation of waste and the production of combustible CSS;
Development of feasibility studies for the promotion and implementation of
integrated waste management systems in the Asian territory;
Training of Asian technicians to be used in the development of renewable
energy;
Organization of conferences and work-shops for the promotion of technical
activities carried out in order to provide adequate professional guidance;
Realization of degree theses and didactic internships for the study of
particular technical-scientific aspects.
EN
Ricerche scientifiche / Scientific reserch
COMPANYPERFORMANCES
29
NATIONAL EXPERIENCES
National Experiences
30
06Integrated Environmental Authorization, Environmental Impact Assessment and Final Design of the enlargement of a Landfill for non-hazardous waste – Total capacity: 3,700,000 m3
Sicula Trasporti S.r.l.Lentini (SR)
ITALYAugust 2016 € 19,990,903.15
07 Preliminary Design of a plant for the recovery of recyclable material from urban waste - Capacity: 127,000 t/y
Sarim Ambiente S.r.l.Eboli (SA)
ITALYAugust 2016 € 11,286,290.52
08Final Design and Integrated Environmental Authorization of the enlargement of a Landfill for non-hazardous waste and its final capping multi-layers structure (original Authorization: DDG No. 76 03/03/2010)
Sicula Trasporti S.r.l.Catania (CT)
ITALYMay 2016 € 3,407,995.15
09 Consultancy report on the characterization for environmental remediation of a disused industrial site
Monte di Paschi di Siena Leasing & Factoring S.p.A.
Lentini (SR)ITALY
November 2015 € 228,531.09
10Final Design and Integrated Environmental Authorization of the enlargement of a Landfill for non-hazardous waste and its final capping multi-layers structure (original Authorization: DDG No. 697 27/09/2011)
Sicula Trasporti S.r.l.Lentini (SR)
ITALYNovember 2015 € 4,096,985.94
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
01 Design of a factory for production of bio-methane from organic waste - Treatment capacity: 40,000 t/y
National TenderASIA NAPOLI S.p.A.
Napoli (NA)ITALY
December 2017 € 18,000,000.00
02 Preliminary Design of a factory for production of bio-methane from organic waste - Treatment capacity: 50,000 t/y
OWAC S.r.l. Calatafimi (TP) ITALY November 2017 € 20,000,000.00
03 Final design of a factory for production of bio-methane from organic waste - Treatment capacity: 60,000 t/y
Sicula Trasporti S.r.l.Catania (CT)
ITALYMay 2017 € 23,000,000.00
04Environmental Impact Assessment, Final Design and Integrated Environmental Authorization of the improvement of an existing aerobic biostabilization plant - Total capacity: 465,000 t/y
Sicula Trasporti S.r.l.Catania (CT)
ITALYDecember 2016 € 14,789,776.01
05 Preliminary Design of a plant for the production of bio-methane and high-quality compost from organic urban waste
Sicula Trasporti S.r.l.Catania (CT)
ITALYOctober 2016 € 18,500,000.00
National Experiences
31
06Integrated Environmental Authorization, Environmental Impact Assessment and Final Design of the enlargement of a Landfill for non-hazardous waste – Total capacity: 3,700,000 m3
Sicula Trasporti S.r.l.Lentini (SR)
ITALYAugust 2016 € 19,990,903.15
07 Preliminary Design of a plant for the recovery of recyclable material from urban waste - Capacity: 127,000 t/y
Sarim Ambiente S.r.l.Eboli (SA)
ITALYAugust 2016 € 11,286,290.52
08Final Design and Integrated Environmental Authorization of the enlargement of a Landfill for non-hazardous waste and its final capping multi-layers structure (original Authorization: DDG No. 76 03/03/2010)
Sicula Trasporti S.r.l.Catania (CT)
ITALYMay 2016 € 3,407,995.15
09 Consultancy report on the characterization for environmental remediation of a disused industrial site
Monte di Paschi di Siena Leasing & Factoring S.p.A.
Lentini (SR)ITALY
November 2015 € 228,531.09
10Final Design and Integrated Environmental Authorization of the enlargement of a Landfill for non-hazardous waste and its final capping multi-layers structure (original Authorization: DDG No. 697 27/09/2011)
Sicula Trasporti S.r.l.Lentini (SR)
ITALYNovember 2015 € 4,096,985.94
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
01 Design of a factory for production of bio-methane from organic waste - Treatment capacity: 40,000 t/y
National TenderASIA NAPOLI S.p.A.
Napoli (NA)ITALY
December 2017 € 18,000,000.00
02 Preliminary Design of a factory for production of bio-methane from organic waste - Treatment capacity: 50,000 t/y
OWAC S.r.l. Calatafimi (TP) ITALY November 2017 € 20,000,000.00
03 Final design of a factory for production of bio-methane from organic waste - Treatment capacity: 60,000 t/y
Sicula Trasporti S.r.l.Catania (CT)
ITALYMay 2017 € 23,000,000.00
04Environmental Impact Assessment, Final Design and Integrated Environmental Authorization of the improvement of an existing aerobic biostabilization plant - Total capacity: 465,000 t/y
Sicula Trasporti S.r.l.Catania (CT)
ITALYDecember 2016 € 14,789,776.01
05 Preliminary Design of a plant for the production of bio-methane and high-quality compost from organic urban waste
Sicula Trasporti S.r.l.Catania (CT)
ITALYOctober 2016 € 18,500,000.00
National Experiences
32
16Final design of an integrated plant for the treatment of Municipal Solid Waste and the recovery of materials and energy (public tender: CIG 5533376E50)
Commissioner for the Waste Emergency in Sicily (O.P.C.M. 9/7/2010 n. 3887 – D.L. n. 43/2013)
Enna (EN)ITALY
March 2014 € 11,836,978.51
17 Final design of an integrated plant for the treatment of Municipal Solid Waste and the recovery of materials (public tender: CIG 55388378E1)
Commissioner for the Waste Emergency in Sicily (O.P.C.M. 9/7/2010 n. 3887 – D.L. n. 43/2013)
Messina (ME)ITALY
March 2014 € 11,868,548.20
18Environmental Impact Assessment, Final and Executive Design and Construction Management of a Landfill for non-hazardous waste – Capacity: 1,900,000 m3
Sicula Trasporti S.r.l.Lentini (SR)
ITALYJanuary 2014 € 40,195,425.48
19Integrated Environmental Authorization and Final Design of the functional improvement of a Landfill for non-hazardous waste – Capacity: 1.000.000 m3
Sicula Trasporti S.r.l.Catania (CT)
ITALYJune 2013 € 21,256,995.14
20 Site characterization, Site specific health risk assessment and Final design of the remediation project of a contaminated area
Società Mista per la Gestione del Servizio di Igiene Ambientale in Priolo-Gargallo S.p.a
Augusta (SR)ITALY
January 2013 € 1,063,406.55
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
11Remediation project of a disused industrial site (SISVA steel plant): preliminary design of a new industrial district for waste treatment and recyclable material recovery
Trailer S.p.A.Calvisano (BS)
ITALYJuly 2015 € 47,631,955.00
12 Final and Executive Design of a new sorting line in an existing mechanical MSW treatment plant, for producing secondary fuel (R.D.F.)
Sicula Trasporti S.r.l.Catania (CT)
ITALYMay 2015 € 2,323,901.25
13
Environmental Impact Assessment, Final Design and Integrated Environmental Authorization of the improvement of an existing aerobic biostabilization plant, with also a anaerobic digestion section for the production of high quality compost
Sicula Trasporti S.r.l.Catania (CT)
ITALYMarch 2014
November 2014€ 51,359,406.90
14Feasibility Study and Preliminary Design of an integrated plant for the treatment of Municipal Solid Waste and the recovery of materials and energy
Geosistemi S.r.lPartinico (PA)
ITALYApril 2014 € 41,284,257.35
15 Final design of an integrated plant for the treatment of Municipal Solid Waste and the recovery of materials (public tender: CIG 553112900C)
Commissioner for the Waste Emergency in Sicily (O.P.C.M. 9/7/2010 n. 3887 – D.L. n. 43/2013)
Gela (CL)ITALY
March 2014 € 21,690,737.80
National Experiences
33
16Final design of an integrated plant for the treatment of Municipal Solid Waste and the recovery of materials and energy (public tender: CIG 5533376E50)
Commissioner for the Waste Emergency in Sicily (O.P.C.M. 9/7/2010 n. 3887 – D.L. n. 43/2013)
Enna (EN)ITALY
March 2014 € 11,836,978.51
17 Final design of an integrated plant for the treatment of Municipal Solid Waste and the recovery of materials (public tender: CIG 55388378E1)
Commissioner for the Waste Emergency in Sicily (O.P.C.M. 9/7/2010 n. 3887 – D.L. n. 43/2013)
Messina (ME)ITALY
March 2014 € 11,868,548.20
18Environmental Impact Assessment, Final and Executive Design and Construction Management of a Landfill for non-hazardous waste – Capacity: 1,900,000 m3
Sicula Trasporti S.r.l.Lentini (SR)
ITALYJanuary 2014 € 40,195,425.48
19Integrated Environmental Authorization and Final Design of the functional improvement of a Landfill for non-hazardous waste – Capacity: 1.000.000 m3
Sicula Trasporti S.r.l.Catania (CT)
ITALYJune 2013 € 21,256,995.14
20 Site characterization, Site specific health risk assessment and Final design of the remediation project of a contaminated area
Società Mista per la Gestione del Servizio di Igiene Ambientale in Priolo-Gargallo S.p.a
Augusta (SR)ITALY
January 2013 € 1,063,406.55
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
11Remediation project of a disused industrial site (SISVA steel plant): preliminary design of a new industrial district for waste treatment and recyclable material recovery
Trailer S.p.A.Calvisano (BS)
ITALYJuly 2015 € 47,631,955.00
12 Final and Executive Design of a new sorting line in an existing mechanical MSW treatment plant, for producing secondary fuel (R.D.F.)
Sicula Trasporti S.r.l.Catania (CT)
ITALYMay 2015 € 2,323,901.25
13
Environmental Impact Assessment, Final Design and Integrated Environmental Authorization of the improvement of an existing aerobic biostabilization plant, with also a anaerobic digestion section for the production of high quality compost
Sicula Trasporti S.r.l.Catania (CT)
ITALYMarch 2014
November 2014€ 51,359,406.90
14Feasibility Study and Preliminary Design of an integrated plant for the treatment of Municipal Solid Waste and the recovery of materials and energy
Geosistemi S.r.lPartinico (PA)
ITALYApril 2014 € 41,284,257.35
15 Final design of an integrated plant for the treatment of Municipal Solid Waste and the recovery of materials (public tender: CIG 553112900C)
Commissioner for the Waste Emergency in Sicily (O.P.C.M. 9/7/2010 n. 3887 – D.L. n. 43/2013)
Gela (CL)ITALY
March 2014 € 21,690,737.80
National Experiences
34
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
21 Design and realization of Emergency and Permanent Safety measures and Remediation Project of the disused industrial facility “Snia-Viscosa”
Monte di Paschi di Siena Leasing & Factoring S.p.A.
Rieti (RI)ITALY
October 2010February 2013
€ 2,000,000.00
22 Final Design for Emergency and Permanent Safety Measures of two Municipal Solid Waste landfills
Municipality of AugustaAugusta (SR)
ITALYSeptember 2012
June 2013€ 1,126,317.05
23Environmental Impact Assessment, Final and Executive Design, and Integrated Environmental Authorization of an aerobic biostabilization plant for organic fraction of MSW
Sicula Trasporti S.r.l.Catania (CT)
ITALYOctober 2009August 2012
€ 10,934,166.45
24Environmental Impact Assessment, Final Design, and Integrated Environmental Authorization of a Plant for integrated treatment of contaminated soil
ETA Service S.r.l.Catania (CT)
ITALYNovember 2011
March 2013€ 10,170,858.24
25 Feasibility Study and Preliminary Design of a gasifying plant for organic waste
Sicula Trasporti S.r.l.Catania (CT)
ITALYApril 2011 € 76,300,000.00
26 Executive Design and Construction Management of a plant for the mechanical treatment of Municipal Solid Waste
Sicula Trasporti S.r.l.Catania (CT)
ITALYApril 2009
October 2011€ 24,767,210.46
27Revision of the Environmental Impact Assessment, Final Design and Integrated Environmental Authorization of a Landfill for non-hazardous waste – Capacity: 500.000 m3
Sicula Trasporti S.r.l.Lentini (SR)
ITALYSeptember 2010
March 2011€ 15,515,255.00
28 Executive project and works management Sicula Compost S.r.l. CataniaAugust 2017March 2018
€ 14.726,000.00
29 Integration of the executive project and works management Sicula Compost S.r.l Melilli Since December 2017 € 11.656,000.00
National Experiences
35
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
21 Design and realization of Emergency and Permanent Safety measures and Remediation Project of the disused industrial facility “Snia-Viscosa”
Monte di Paschi di Siena Leasing & Factoring S.p.A.
Rieti (RI)ITALY
October 2010February 2013
€ 2,000,000.00
22 Final Design for Emergency and Permanent Safety Measures of two Municipal Solid Waste landfills
Municipality of AugustaAugusta (SR)
ITALYSeptember 2012
June 2013€ 1,126,317.05
23Environmental Impact Assessment, Final and Executive Design, and Integrated Environmental Authorization of an aerobic biostabilization plant for organic fraction of MSW
Sicula Trasporti S.r.l.Catania (CT)
ITALYOctober 2009August 2012
€ 10,934,166.45
24Environmental Impact Assessment, Final Design, and Integrated Environmental Authorization of a Plant for integrated treatment of contaminated soil
ETA Service S.r.l.Catania (CT)
ITALYNovember 2011
March 2013€ 10,170,858.24
25 Feasibility Study and Preliminary Design of a gasifying plant for organic waste
Sicula Trasporti S.r.l.Catania (CT)
ITALYApril 2011 € 76,300,000.00
26 Executive Design and Construction Management of a plant for the mechanical treatment of Municipal Solid Waste
Sicula Trasporti S.r.l.Catania (CT)
ITALYApril 2009
October 2011€ 24,767,210.46
27Revision of the Environmental Impact Assessment, Final Design and Integrated Environmental Authorization of a Landfill for non-hazardous waste – Capacity: 500.000 m3
Sicula Trasporti S.r.l.Lentini (SR)
ITALYSeptember 2010
March 2011€ 15,515,255.00
28 Executive project and works management Sicula Compost S.r.l. CataniaAugust 2017March 2018
€ 14.726,000.00
29 Integration of the executive project and works management Sicula Compost S.r.l Melilli Since December 2017 € 11.656,000.00
National Experiences
37
INTERNATIONAL EXPERIENCES
International Experiences
38
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
01 Preliminary Design of a mechanical and biological treatment plant for municipal solid waste, with energy production (Capacity: 50,000 t/y)
Huanchuang (Xiamen) Technology Co., Ltd.
Indonesia November 2015 € 3,500,000.00
02 Preliminary design of a mechanical, biological and thermal waste treatment plant (Capacity: 75,000 t/y)
GB ConsultantTahiti
FRENCH POLYNESIANovember 2015 € 30,000,000.00
03 Preliminary design of a mechanical solid-waste treatment plant GovernmentSomanyaGHANA
January 2015 € 12,000,000.00
04 Preliminary Design of a mechanical solid-waste treatment plant AL JABERDoha
QATARJanuary 2015 € 28,000,000.00
05 Preliminary Design of electricity production plants KAFCA RUSSIASaint Petersburg
RUSSIASeptember 2014 € 2,500,000.00
06 Preliminary Design of the environmental remediation of the JSC paper-factory site. City: Kondopoga
KAFCA RUSSIAKondopoga
(Corelia Republic)RUSSIA
September 2014 € 7,000,000.00
07 Preliminary Design of an aerobic biostabilization plant P.M.R. LtdBudapest
HUNGARYJuly 2014 € 3,500,000.00
08 Preliminary Design of a wastewater treatment plant EKO-PROJEKTKatowicePOLAND
June 2014 € 7,000,000.00
09 Preliminary Design of nine incinerators for Municipal Solid Waste treatment
KAFCA RUSSIAMoscowRUSSIA
May 2014 € 810,000,000.00
10 Environmental Impact Assessment and Final Design of a Plant for integrated treatment of contaminated soil
EKO-PROJEKTKatowicePOLAND
March 2014 € 20,000,000.00
11 Preliminary Design of a mechanical solid-waste treatment plant EKO-PROJEKTCzestochowa
POLANDJanuary 2014 € 12,000,000.00
12 Preliminary Design of an aerobic biostabilization plant EKO-PROJEKTCzestochowa
POLANDOctober 2013 € 5,000,000.00
13 Preliminary Design of a mechanical solid-waste treatment plant P.M.R. Ltd Budapest
HUNGARYSeptember 2013 € 8,000,000.00
International Experiences
39
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
01 Preliminary Design of a mechanical and biological treatment plant for municipal solid waste, with energy production (Capacity: 50,000 t/y)
Huanchuang (Xiamen) Technology Co., Ltd.
Indonesia November 2015 € 3,500,000.00
02 Preliminary design of a mechanical, biological and thermal waste treatment plant (Capacity: 75,000 t/y)
GB ConsultantTahiti
FRENCH POLYNESIANovember 2015 € 30,000,000.00
03 Preliminary design of a mechanical solid-waste treatment plant GovernmentSomanyaGHANA
January 2015 € 12,000,000.00
04 Preliminary Design of a mechanical solid-waste treatment plant AL JABERDoha
QATARJanuary 2015 € 28,000,000.00
05 Preliminary Design of electricity production plants KAFCA RUSSIASaint Petersburg
RUSSIASeptember 2014 € 2,500,000.00
06 Preliminary Design of the environmental remediation of the JSC paper-factory site. City: Kondopoga
KAFCA RUSSIAKondopoga
(Corelia Republic)RUSSIA
September 2014 € 7,000,000.00
07 Preliminary Design of an aerobic biostabilization plant P.M.R. LtdBudapest
HUNGARYJuly 2014 € 3,500,000.00
08 Preliminary Design of a wastewater treatment plant EKO-PROJEKTKatowicePOLAND
June 2014 € 7,000,000.00
09 Preliminary Design of nine incinerators for Municipal Solid Waste treatment
KAFCA RUSSIAMoscowRUSSIA
May 2014 € 810,000,000.00
10 Environmental Impact Assessment and Final Design of a Plant for integrated treatment of contaminated soil
EKO-PROJEKTKatowicePOLAND
March 2014 € 20,000,000.00
11 Preliminary Design of a mechanical solid-waste treatment plant EKO-PROJEKTCzestochowa
POLANDJanuary 2014 € 12,000,000.00
12 Preliminary Design of an aerobic biostabilization plant EKO-PROJEKTCzestochowa
POLANDOctober 2013 € 5,000,000.00
13 Preliminary Design of a mechanical solid-waste treatment plant P.M.R. Ltd Budapest
HUNGARYSeptember 2013 € 8,000,000.00
International Experiences
41
MAINAPPLICATION
Main Application
42
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
01 Photovoltaic control system Sicula Trasporti S.r.l.CataniaITALY
Operative from June 2011 € 3,500,000.00
02 Biostabilization control system Sicula Trasporti S.r.l.CataniaITALY
Operative from December 2014
€ 30,000,000.00
03 Leachate and Biogas extraction control system Progettogeoambiente S.r.l.CataniaITALY
January 2015 € 12,000,000.00
04 Leachate extraction control system Sicula Trasporti S.r.l.LentiniITALY
Operative from January 2018
€ 28,000,000.00
Main Application
43
ID TASKS ASSIGNED AND CARRIED OUT CUSTOMER LOCATION PERIOD INVESTMENT COST
01 Photovoltaic control system Sicula Trasporti S.r.l.CataniaITALY
Operative from June 2011 € 3,500,000.00
02 Biostabilization control system Sicula Trasporti S.r.l.CataniaITALY
Operative from December 2014
€ 30,000,000.00
03 Leachate and Biogas extraction control system Progettogeoambiente S.r.l.CataniaITALY
January 2015 € 12,000,000.00
04 Leachate extraction control system Sicula Trasporti S.r.l.LentiniITALY
Operative from January 2018
€ 28,000,000.00
Main Application
ALLEGATI GRAFICIGRAPHIC ATTACHMENTS
Allegati Grafici / Graphic Attachments
PLANT FOR THE PRODUCTION OF COMPOST Capacity: 70.000 t/y (Catania – Italy
Allegati Grafici / Graphic Attachments
Allegati Grafici / Graphic Attachments
PLANT FOR THE PRODUCTION OF QUALITY COMPOST AND NATURAL FERTILIZERT Capacity: 45.000 t/y (Melilli – Italy)
Allegati Grafici / Graphic Attachments
50 Allegati Grafici / Graphic Attachments
DESIGN OF A FACTORY FOR PRODUCTION OF BIO-METHANE FROM ORGANIC WASTE Treatment capacity: 40,000 t/y (Napoli – Italy)
51
DESIGN OF A FACTORY FOR PRODUCTION OF BIO-METHANE FROM ORGANIC WASTE Treatment capacity: 40,000 t/y (Napoli – Italy)
Allegati Grafici / Graphic Attachments
52 Allegati Grafici / Graphic Attachments
FINAL DESIGN OF A FACTORY FOR PRODUCTION OF BIO-METHANE FROM ORGANIC WASTE Treatment capacity: 60,000 t/y (Catania – Italy)
53
FINAL DESIGN OF A FACTORY FOR PRODUCTION OF BIO-METHANE FROM ORGANIC WASTE Treatment capacity: 60,000 t/y (Catania – Italy)
Allegati Grafici / Graphic Attachments
54 Allegati Grafici / Graphic Attachments
ENLARGEMENT OF A LANDFILL FOR NON-HAZARDOUS WASTE Total capacity: 3,700,000 m3. Lentini (SR) – Italy
55
ENLARGEMENT OF A LANDFILL FOR NON-HAZARDOUS WASTE Total capacity: 3,700,000 m3. Lentini (SR) – Italy
Allegati grafici / Graphic Attachments
56 Allegati Grafici / Graphic Attachments
AEROBIC BIOSTABILIZATION PLANT Total capacity: 150.000,000 t/y (Catania – Italy)
57
AEROBIC BIOSTABILIZATION PLANT Total capacity: 150.000,000 t/y (Catania – Italy)
Allegati Grafici / Graphic Attachments
58 Allegati Grafici / Graphic Attachments
59
AEROBIC BIOSTABILIZATION PLANT, WITH ANAEROBIC DIGESTION Total capacity: 150.000,000 t/y SECTION FOR HIGH QUALITY COMPOST PRODUCTION - (Catania – Italy)
Allegati Grafici / Graphic Attachments
60 Allegati Grafici / Graphic Attachments
61
INTEGRATED PLANT FOR THE TREATMENT OF MUNICIPAL SOLID WASTEAND THE RECYCLING OF MATERIALS Total capacity: 72.000,000 t/y (Gela – Italy)
Allegati Grafici / Graphic Attachments
62 Allegati Grafici / Graphic Attachments
63
LANDFILL FOR NON-HAZARDOUS WASTE Capacity: 1,900,000 m3- (Lentini – Italy)
Allegati Grafici / Graphic Attachments
64 Allegati Grafici / Graphic Attachments
65
FUNCTIONAL IMPROVEMENT OF A LANDFILL FOR NON-HAZARDOUS WASTE Capacity: 500.000 m3 (Catania – Italy)
Allegati Grafici / Graphic Attachments
66 Allegati Grafici / Graphic Attachments
67
REMEDIATION PROJECT OF A CONTAMINATED AREAlot area 8,2 ha - (Augusta – Italy)
Alllegati Grafici / Graphic Attachments
68 Allegati Grafici / Graphic Attachments
69
EMERGENCY AND PERMANENT SAFETY MEASURES AND REMEDIATION PROJECT OF THE DISUSED INDUSTRIAL FACILITY “SNIA-VISCOSA” - lot area 17,0 ha - (Rieti – Italy)
Allegati Grafici / Graphic Attachments
70 Allegati Grafici / Graphic Attachments
71
AEROBIC BIOSTABILIZATION PLANT FOR ORGANIC FRACTION OF MSW Total capacity: 315.000,000 t/y (Catania – Italy)
Allegati Grafici / Graphic Attachments
72 Allegati Grafici / Graphic Attachments
73
PLANT FOR INTEGRATED TREATMENT OF CONTAMINATED SOILTotal capacity: 150.000,000 t/y (Catania – Italy)
Allegati Grafici / Graphic Attachments
74 Allegati Grafici / Graphic Attachments
75
GASIFYING PLANT FOR ORGANIC WASTE Total capacity: 200.000,000 t/y (Catania – italy)
Allegati Grafici / Graphic Attachments
76 Allegati Grafici / Graphic Attachments
77
MUNICIPAL SOLID WASTE MECHANICAL TREATMENT PLANTTotal capacity: 1.000,000 t/y (Catania – Italy)
Allegati Grafici / Graphic Attachments
78 Allegati Grafici / Graphic Attachments
79Allegati Grafici / Graphic Attachments
SEWAGE TREATMENT PLANTMaximum potentiality: 225,000 m3/y; 750 m3/d (Catania – Italy)
80 Allegati Grafici / Graphic Attachments
81
EWAGE TREATMENT PLANT Maximum potentiality: 32,000 m3/y; 100 m3/d - (Augusta - Italy)
Allegati Grafici / Graphic Attachments
82 Allegati Grafici / Graphic Attachments
83Allegati Grafici / Graphic Attachments
84 Allegati Grafici / Graphic Attachments
85
PRELIMINARY DESIGN OF A MECHANICAL, BIOLOGICAL AND THERMAL WASTE TREATMENT PLANT (Tahiti – French Polynesia)
Allegati Grafici / Graphic Attachments
86
18
Allegati Grafici / Graphic Attachments
87
18 LECHATE EXTRACTION CONTROL SYSTEM (Lentini - Italy)
Allegati Grafici / Graphic Attachments
88 Allegati Grafici / Graphic Attachments
89
BIOSTABILIZATION CONTROL SYSTEM(Catania - Italy)
Allegati Grafici / Graphic Attachments
90
I NOSTRI CLIENTIOUR CUSTOMERS
91
Banca Monte dei Paschi di Siena / Mercantile Leasing / Banca Antonveneta / Banca Italease / Agenzia riscossioni esattoria / Thales Alesnia Space / Dema / Vulcanair aircraft / Banca Marco Polo / Regione Siciliana, Soprintendenza per i beni Culturali e Ambientali di Palermo / Sicula trasporti S.r.l. / Sicula Compost / Ecoin / Corioni S.r.l. / Regione Campania / Tecnogarden service s.r.l. / Margraf industria marmi vicentini / Società mista per la gestione del servizio di igiene ambientale in Priolo Gargallo S.p.a. / Trailer trasporto sicuro / Sarim / Wisco nuova vita all’acqua / Italveco S.r.l. / Integra / Feralpi Group.
I Nostri Clienti / Our Customers
92
Hava’1 / IGM rifiuti industriali / Petrolchimica / GSE Giglione servizi ecologici S.rl. /Iren luce e gas /Panelli impianti ecologicici S.p.A. / Omega / SIE S.r.l. servizi tecnologicici per l’ecologia / Ecodem / Nico / Riccoboni Holding / Unirecuperi S.r.l. / CEIET.
I Nostri Clienti / Our Customers
I NOSTRI PARTNEROUR PARTNER
Squar-e architettura / APATEQ / Martin GmbH für Umwelt - und Engietechnik /ORSI S.r.l. / ASTEC / HMR ingegneria e servizi.
CONTATTICONTACTS
Address: Via Resuttana, 360 - 90146
Palermo (ITALY)
Ph. : 0039 091 303243
Fax: 0039 091 7219247
E-mail: [email protected]
Website: www.owac.eu
OWAC ENGINEERING COMPANY S.R.L.È UN’AZIENDA CERTIFICATA ISO 9001:2015
Palermo / Brescia / Tortona [email protected] www.owac.eu