21
Commuter Productivity Brett Herron

Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Commuter

Productivity

Brett Herron

Page 2: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

The Transport

Development IndexThe Rubric for Integrated Transport in Cape Town

The TDI provides a rubric through which TCT, the City of Cape Town’s

transport authority, can evaluate the effectiveness of its transport

service delivery interventions . Four user groups are identified in the TDI

with access priority information per Transport Analysis Zone. It then

evolves into a competitive advantage component or mobility index.

Public Transport

Non-Motorised

Transport FreightPrivate Car

GOODS

USER GROUPPEOPLE

USER GROUPS

Page 3: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

1 Northern Corridor

2 Kraaifontein

3 Parow/Bellville

4 Blue Downs

5 Belgravia

6 Grassy Park

7 Mitchells Plain/Gugulethu

8 Khayelitsha

9 Somerset West

10 Central Cape Town

11 Kuilsrivier

12 Durbanville

13 Oostenberg

14 Langa/Bishop Lavis

15 Strand

16 Simonstown

17 Wynberg

18 Sea Point

TDI is based on Transport Analysis Zones

(TAZs)1

18

16

1312

6

17

2

4

11

7

35

8

10

14

9

15

The Transport

Development Index

Page 4: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Population Distribution

Per Income Group

(Census Small Area: 2011)

As can be seen from the map of

Cape Town, the majority of the

population in the Low Income

bracket are located in far-flung

areas.

Page 5: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Access Priorities and

Priority Costs

Identifies the access

priorities of each User

Group and their

related costs.

Priorities may be

financial or non-

financial and

therefore the

interventions should

be different and

targeted towards

reducing the

identified priority cost.

Transport

Development Index

Direct Costs

Indirect Costs

Incidental Costs

Time

Congestion

Crime

Safety

Reliability

Flexibility

Page 6: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Public Transport

User Group

Modal Split per Income Group

Public Transport

Private Transport

NMT

Legend

Page 7: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Public Transport

User Group

Modal Split per Income Group

Public Transport

Private Transport

NMT

Legend

The TDI has revealed that, contrary to the

original assumption of 80% , which the

City of Cape Town had been using for

over a decade, 95% of the public

transport user group is in the low to low-

medium income groups

Page 8: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

TDI FINDINGSTHE PUBLIC TRANSPORT USER GROUP

• Flexibility

• Safety

• Direct Cost

• Crime• Congestion

Page 9: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Direct Cost of Access versus Income – Income Group 1

Transport

Development Index

0

50,000

100,000

150,000

200,000

250,000

0%10%20%30%40%50%60%70%80%

Po

pu

latio

n U

sin

g P

T

Ra

tio

: D

ire

ct

Co

sts

vs

Inc

om

e (

Mo

nth

ly)

Population Using PT PT

Information being verified – no data for beyond the Cape Town boundary yet

Page 10: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Factual Highlights

• 95% of public transport users are in the low and low-

medium income groups

• The largest priority cost for the low-income user group is

the direct cost for public transport users who are in far-

flung areas. Otherwise the largest priority costs are

flexibility, safety and crime

• The average direct transport cost for the

low-income public transport user group is

45% of monthly household income, against the

internationally accepted norm of between

5 and 10%

TDI Conclusions

Page 11: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

~ Transport for Cape (TCT) launched Oct 2012

~ Articulates our VISION OF ONES

One Network

One Plan

One Management System

One Contracting Authority

One Ticket and One Timetable

One Enforcement System

One Brand

Page 12: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

What is an IPTN plan?

The IPTN plan determines the role of appropriate public transport modes to provide users of the system with optimal solutions to travel from origin to destination in a seamless and

most cost effective manner

Ensures the correct mode responds to the correct function to ensure maximum efficiency

Ensure viability and efficiency within the development of the City

Rail – Mass rapid transport across the Metropolitan area

BRT – Large volumes carried by dedicated bus ways

Feeder bus – Distribution and feeder service

Mini-bus taxi – on demand local service

Metered-taxi

NMT

Page 13: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Purpose of an IPTN

• Provides the long-term public transport network plan for the City

• Establish the role of each mode of transport• Rail• BRT• Scheduled Feeder bus• Mini-bus taxi

• Provide strategic direction for investment

• Shows commitment towards achieving an efficient and well-run city

Page 14: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

IPTN for 2032

Page 15: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Proposed Rail Network

Page 16: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

BRT Network

Page 17: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development
Page 18: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

MyCiTi to date:

• 41.7 million passenger trips

• February 2016 : 1 707 790 passenger trips

• 67 035 weekday passengers

• 37 routes / 42 Stations / 600 bus stops

• 235 peak buses / 518 drivers

Page 19: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

Towards a comprehensive CONGESTION MANAGEMENT PROGRAMME:

3 STREAMS:

• Infrastructure

• Operational

• Behavioural

Page 20: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

CONGESTION MANAGEMENT PROGRAMME

• Smart Growth Strategy: Coordinated Land Use & Transport Planning – TRANSIT ORIENTATED DEVELOPMENT STRATEGY (TOD)

• Development & Promotion of Alternative Modes of Travel: Public Transport & Non-Motorised Transport

• Improvement of existing infrastructure: alleviate bottlenecks & improve capacity. Phase 1 underway – R750m capex allocation.

• Travel Demand Management: improve occupant efficiency / reduce number and/or length of trips / optimise use of available assets

Page 21: Commuter Productivity Brett Herron - Accelerate Cape Townacceleratecapetown.co.za/wp/wp-content/uploads/2016/04/Commut… · Commuter Productivity Brett Herron. The Transport Development

METRORAIL?