19
Lt Christopher Barnes Air Force Research Laboratory Biodynamics & Protection Division Warfighter Fatigue Countermeasures [email protected] COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED OPERATIONS: AN EXPERIMENTAL APPROACH

COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

Lt Christopher BarnesAir Force Research Laboratory

Biodynamics & Protection DivisionWarfighter Fatigue Countermeasures

[email protected]

COMMUNICATION AND DECISION MAKING IN C4ISR

SUSTAINED OPERATIONS: AN EXPERIMENTAL APPROACH

Page 2: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE JUN 2003 2. REPORT TYPE

3. DATES COVERED 00-00-2003 to 00-00-2003

4. TITLE AND SUBTITLE Communication and Decision Making in C4ISR Sustained Operations:An Experimental Approach (Briefing Charts)

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Air Force Research Laboratory,Biodynamics & ProtectionDivision,Brooks AFB,TX,78235

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES The original document contains color images.

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT

18. NUMBEROF PAGES

18

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

2

Credits

• Dr. Donald Harville: Air Force Research Laboratory Warfighter Training Research Division

• Dr. James C. Miller: Air Force Research Laboratory Warfighter Fatigue Countermeasures R&D Program

• Dr. Linda Elliott: Veridian Engineering

• 21ST Century Systems, Inc., providing the Agent Enabled Decision Group Environment (AEDGE) software

Page 4: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

3

People and FacilitiesDoD Unique

• Staff – Government and Contractor Psychologists, Physiologists, Technicians, and Research Assistants

• Research conducted primarily in 10,000 sq ft Chronobiology and Sleep Lab (CASL) complex– Control, Prep, Testing, Medical Exam rooms,

Biochemistry Lab, Bedrooms (5)– 2,100 sq ft of temporal-isolation living and

testing space

• Fatigue in C4ISR Performance Lab

• 83-ft Rail Garrison habitat

Page 5: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

4

Current Study

• Experiment – SS: Lts awaiting ABM training, Tyndall AFB

• 10 3-person teams • TDY one week– 40 HOURS training

– C4ISR roles / tactics – AEDGE interface– Cognitive tests (asymptote)

• Experimental session : Friday 6pm to 10am Saturday– Taxied back to quarters– Return to Tyndall

Page 6: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

5

Current Study: C4ISR Context

• Effects of Sleep Deprivation on C4ISR team communication, coordination, decision making, and problem solving

– AEDGE Platform: Capture Generic Functions

– 3 human roles & agent-based role

• ISR (Predator UAVs, Global Hawk, JSTARS)

• Strike (Bombers, Jammers, Fighters)

• Sweep (Fighters, AWACS)

• HVAA (RJ, Tankers, SAMS, Carrier)

Page 7: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

6

Event-based assessment of interdependent team coordination / decisionmaking ISR assets must confirm targets (50% decoys)STRIKE jammers must target SAM sites, to protect SWEEP fightersSTRIKE bombers must target SAM sites SWEEP fighter assets must protect STRIKE assets

All communications and decision events captured

Page 8: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

7

Assessment of Teamwork

• Coordination/Sequencing of Events

• Dynamic Problemsolving

Immediate Indicators

• Handovers (asset re-allocation)

• Communication

• Email

• Audio

Page 9: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

8

Audio Capture of Communications

• Digitally recorded communications are a critical source of assessment

– Sequencing

– Assets

– Other

• Encouragement

• Fatigue

Page 10: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

9

Communications: Initial Coding

Figure 3. Representation of communication concepts

Page 11: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

10

Predictions and Analyses

• Ascertain fatigue effects on Communication and Coordination processes

– Mission Planning

– Mission Execution

• Communications

• Sequencing of events

• Allocation of Assets among teammembers

– After-action Reviews

Page 12: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

11

Provide Information and StrategyScenario 1 Preliminary Data

HVAA

66 Strategy10 I-Target

ISR Sweep39 I-Asset6 I-Asset

28 I-Target17 Strategy

Strike

78 S

trate

gy

23 I-

Ass

et

12 I-

Targ

et Mean mission outcome (N=4) =

(hostile loss – friendly loss) =

787.25

Page 13: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

12

Provide Information and StrategyScenario 6 Preliminary Data

HVAA

34 Strategy13 I-Target

ISR Sweep22 I-Asset

21 I-Target

1 I-Asset

6 Strategy

Strike

28 S

trate

gy

19 I-

Ass

et

24 I-

Targ

et Mean mission outcome (N=4) =

(hostile loss – friendly loss) =

439.00

Page 14: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

13

Request Information and StrategyScenario 1 Preliminary Data

HVAA

1 I-Target 66 Strategy

ISR Sweep17 I-Asset

2 I-Target

Strike

78 S

trate

gy

9 I-

Ass

et

3 I-

Targ

et

2 I-Asset

17 Strategy

Page 15: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

14

Request Information and StrategyScenario 6 Preliminary Data

HVAA

34 Strategy0 I-Target

ISR Sweep0 I-Asset 10 I-Asset

9 I-Target6 Strategy

Strike

28 S

trate

gy

5 I-

Ass

et

10 I-

Targ

et

Page 16: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

15

Encouragement and FatigueScenario 1 Preliminary Data

HVAA

ISR Sweep1 Encouragement 3 Encouragement0 Fatigue 0 Fatigue

Strike

0 Fa

tigue

2 En

cour

agem

ent

Page 17: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

16

Encouragement and FatigueScenario 6 Preliminary Data

HVAA

ISR 5 Encouragement

3 FatigueSweep2 Encouragement

14 Fatigue

Strike

2 Fa

tigue

4 En

cour

agem

ent

Page 18: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

17

Fatigue Effects on Mission Outcomes (N=4)

Scenario 1Means, SD

Scenario 6Means, SD

p

Mission Outcome(hostile lost –friendlies lost)

787.25, 293.54

439.00, 88.62

.001

Friendly fuel outs 48.75, 33.26

22.50, 28.72

.004

Friendly jammerslost

7.5, 15.00

0,0

.015

Page 19: COMMUNICATION AND DECISION MAKING IN C4ISR SUSTAINED ... · Report Documentation Page Form Approved OMB No. 0704-0188 ... • Dr. Linda Elliott: Veridian Engineering • 21ST Century

18

Contact Information

Dr. Jay MillerWarfighter Fatigue Countermeasures

Air Force Research LaboratoryBrooks AFB, TX (210) 536-3596

[email protected]

Lieutenant Christopher Barnes Warfighter Fatigue Countermeasures

Air Force Research LaboratoryBrooks AFB, TX (210) 536-2177

[email protected]

Dr. Linda R. ElliottVeridian Engineering

Brooks AFB, TX (210) 536-8090

[email protected]

Dr. Donald HarvilleInformation Systems Training Branch

Air Force Research LaboratoryBrooks AFB, TX (210) 536-3844

[email protected]