1
Common Services Centers
forPublic Services Closer Home
Abhishek Singh
Director, Government of India, 22nd October 2010
Digital development for India
1.2 billion people
600,000+ villages, 70% population rural
35 States & UTs; 240,000 + Local Bodies
Multi-party, Multi-tiered democracy
Multi-ethnic, Multi-religious, Multi-lingual
Low Literacy Rate (64.8%)
Low Broadband penetration
E-India Citizens
Businesses
International
Entities
Central
Department
/ Ministries
Integrated
Services
State
Department
Strategy
• Mission mode projects• Integrated projects• Common Services Centers• State Wide Area Network• State Data Centers
Vision
“Make all Government
services accessible to the common
man in his locality, through
common service delivery outlets
and ensure efficiency,
transparency & reliability of such
services at affordable costs to
realise the basic needs of the
common man.”
National e Governance Plan
Front-end Delivery Outlets
e-Kiosks : Above 100,000 CSCs
Access to information
G2G, G2C, B2C Services
Public Private Partnership
Three Tier Implementation Model
Broadband Connectivity
Common Services Centers: Vehicles of Inclusive Growth
Aligning stakeholders for mainstreaming rural India
Largest PPP initiative in Indian e-
Governance
Stakeholders - Citizens, Civil Society
Organizations, Businesses, Universities,
Media, Social Enterprises
Firm linkages with Government welfare
schemes (NREGS, NRHM, SSA)
BSNL to provide connectivity
Enabling Rural Transformation
E-Government
AgricultureSocial Inclusion
Tele-medicineEducation
Awareness
Challenges of public services delivery at the Last Mile
Last Mile Connectivity Backend ReadinessPower back-up solutions
Bridging the digital
divideStrengthening public
awarenessEnabling social
inclusion
Sr. No
Mode of CSC Connectivity
Plannedto be
covered
Status – CSC locations covered Target Date
1. Upgradation of 28000 Rural Exchanges of BSNL (Part Funding support of Rs 170 cr from DIT)
30,723 28,947 Oct 2010
2. Upgradation of existing 1000 BSNL Towers (WiMAX) (Part Funding support of Rs 160 cr from DIT)
11,722
10,686
(939 Tower Installed)
Oct 2010
3. 6863 WiMax Towers to be installed
(Part Funding support of Rs 550 cr from DIT)
51,939 P.O issued on 21.06.10 for 4062 towers
Mar 2011
For 1718 Towers- APO issued
For 1083 APO to be issued by 30 Oct 10
Jun 2011
4. Other Technologies (EVDO, Data Cards)
2895 671 Mar 2011
5 VSAT 2500 To be decided Mar 2011 (tentative)
Total 99,779 40,304
Connectivity as on 30th Sep 2010
CSC Status for 10 States
S. No
(1)
State
(2)
Number of CSCs to be set up
(3)
Number of CSCs
rolled out
(4)
% Rollout
(5)
Number of CSCs with
connectivity
(6)
% Connectivity
(7)
Number of CSCs with
online monitoring
tool
(8)
% CSCs with online
monitoring tool
1 Bihar 8463 6959 82.23 4878 70.10 4088 83.8
2 Chattisgarh 3385 2464 72.79 1888 76.62 1178 62.4
3 Haryana 1159 1159 100.00 854 73.68 63 7.4
4 Himachal Pradesh 3366 2552 75.82 1846 72.34 1431 77.5
5 Jharkhand 4562 4556 99.87 2569 56.39 2565 99.8
6 Orissa 8558 5985 69.93 3436 57.41 3375 98.2
7 Sikkim 45 45 100.00 19 42.22 19 100.0
8 Tripura 145 133 91.72 51 38.35 51 100.0
9 Uttar Pradesh 17909 7837 43.76 3424 43.69 2242 65.5
10 Uttarakhand 2804 1530 54.56 1136 74.25 913 80.4
Total 50396 33220 65.92 20101 60.51 12480 62.1
General Issues
• Completing the rollout of remaining CSCs.
• Regular and close follow up with BSNL for broadband connectivity at all CSCs
• Follow up with SCAs with respect to Power availability
• Enabling G2C services for delivery of citizen centric services.
• Finalization of Rates for Delivery of Services at CSCs
• Ensuring that all CSCs become Business Correspondents (BCs).
• Leveraging the CSC network for UID / NPR
• Registration of CSCs on Online Monitoring Tool
• Timely Release of Revenue support by States
• Submission of Utilization Certificates
State Wise Issues
• Bihar : Release of fresh tender notice for all 9 Zones; Termination of Contract with Zoom
Developers; Status of SREI Sahaj
• Chattisgarh : Rollout of CSCs in Naxal affected districts
• Haryana: Finalization of the bid process for all zones; Requirement of UID empanelled
agencies as a condition to bid for CSC Scheme
• Himachal Pradesh : Rollout in non viable / less population locations
• Jharkhand : Rollout of CSCs in Naxal affected districts; Co-location at Panchayats
• Orissa: Rollout in Naxal affected districts;
• Sikkim: Registration on Online Monitoring Tool
• Tripura : Connectivity; Power Availability
• Uttar Pradesh: Finalization of Master Service Agreements (MSAs) with new SCA for Agra,
Bareilly and Faizabad Zones
• Uttarakhand: Selection of new SCA for zone allotted to COMAT; Non viable locations;
CSCs for financial inclusion in un-banked Areas
“Common Service Centers to open no-frills
bank accounts for citizens in unbanked areas”
CSCs to act as agents of Banks
“For Profit” companies allowed to be BCs as
per RBI circular dated 28th Sep 2010
All CSCs to become BCs
CSC Operators to facilitate financial literacy
for rural citizens
The Road Ahead……
CSCs for Government services delivery in rural India
“Common Service Centers Scheme to be
suitably repositioned as a network of
panchayat-level Bharat Nirman Common
Service Centers to provide government
services to citizens in rural areas”
Bharat Nirman Common Service Centers to be
set up in all the 250000 Gram Panchayats in India
Assured revenue through G2C services for
Bharat Nirman Common Service Centers.
EFC Note for Bharat Nirman CSCs
• Circulated to Line Ministries for comments
• 150,000 CSCs in 3 years
• Fixed Support for:
– Solar Backup support for all per CSCs
– Bandwidth Cost support for all CSCs
– Incentive to CSC operator
• Revenue Viabilty Gap funding for CSCs
• Firm linkages with Bharat Nirman Departments:
– NREGA, NRHM, SSA, Panchayats etc
Thank You
17
Nationwide CSC Rollout Status
S.N. State Total CSCs CSC Rolled out as on 30thSeptember 2010
1 Andhra Pradesh 5452 2115
2 Arunachal Pradesh 200 63
3 Assam 4376 3771
4 Bihar 8463 6959
5 Chandigarh 13 13
6 Chhatisgarh 3385 2464
7 Delhi 520 520
8 Goa 160 160
9 Gujrat 13695 13695
10 Haryana 1159 1159
11 Himachal Pradesh 3366 2552
12 Jammu&Kashmir 1109 484
13 Jharkhand 4562 4556
14 Karnataka 5713 800
18
S.N. State Total CSCs CSC Rolled out as on 30thSeptember 2010
15 Kerala 2234 2234
16 Madhya Pradesh 9232 8637
17 Maharashtra 10484 6487
18 Manipur 399 399
19 Meghalaya 225 179
20 Mizoram 136 117
21 Nagaland 220 70
22 Orissa 8558 5985
23 Puducherry 44 44
24 Rajasthan 6626 2292
25 Sikkim 45 45
26 Tamil Nadu 5440 3952
27 Tripura 145 133
28 Uttar Pradesh 17909 7837
29 Uttaranchal 2804 1530
30 West Bengal 6797 5578
Grand Total 123471 84830
19
20
CSC Rollout Status in Bihar
CSC Rollout in Bihar ( Vasudha Kendra)
• No. of CSCs Planned to be rolled out: 8463 (1:6)
• CSC Rolled out as on 30 September 2010: 6959
• CSCs with Connectivity: 4878
• No. of CSCs where Online Monitoring Tool installed: 4088
• SCA Name: SREI Sehaj, Zoom Developers and SARK Systems
• Services offered through CSCs:
– PDS Bar Coding
– Insurance and Banking Services
– IT Education Service
– Other B2C services like DTP, Photography etc
21
CSC Rollout in Bihar (Vasudha Kendra)
• eDistrict Status :
e District is being launched as pilot program in Nalanda and
Madhubani District of Bihar.
Initially 35 services have been planned for launch .
• Issues and Challenges
Non availability of G2C services
Non availability of broadband Connectivity through BSNL
Few Naxal affected area
22
CSC Rollout Status in Chattisgarh
23
CSC Rollout in Chattisgarh (Choice Centre)
• No. of CSCs Planned to be rolled out: 3385 (1:6)
• CSC Rolled out as on 30 September 2010: 2464
• CSCs with Connectivity: 1888
• No. of CSCs where Online Monitoring Tool installed: 1178
• SCA Name: AISECT and Zoom Developers
• Services offered through CSCs:
– Education service includes AISECT course, IGNOU
– Banking & Insurance Services
– Suvidha online Services includes Bus/ Rail Ticketing, DTH, Mobile
Recharge etc
– DTP, Photocopy and Photography
24
CSC Rollout in Chattisgarh (Choice Centers)
• Issues and Challenges
Non availability of broadband Connectivity at many locations
Non availability of adequate G2C services
Naxal Related issues
25
CSC Rollout Status in Haryana
26
CSC Rollout in Haryana (eDisha Ekal Seva Kendra)
• No. of CSCs Planned to be rolled out: 1,159 (1:6)
• CSC Rolled out as on 30 September 2010: 1,159
• CSCs with Connectivity: 854
• No. of CSCs where Online Monitoring Tool installed: 63
• SCA Name: Selection of Replacement SCA for all the zones in the
state under process
27
CSC Rollout in Haryana (eDisha Ekal Seva Kendra)
• eDistrict Status
Pilot project in Rohtak District is scheduled to be launched in
October’10
• Issues and Challenges
Exit Management and issues with previous SCAs
Non Availability of G2C services
28
CSC Rollout Status in Himachal Pradesh
29
CSC Rollout in Himachal Pradesh ( Lok Mitra Kendras)
• No. of CSCs Planned to be rolled out: 3366 (1:6)
• CSC Rolled out as on 30 September 2010: 2552
• CSCs with Connectivity: 1846
• No. of CSCs where Online Monitoring Tool installed: 1431
• SCA Name: Zoom Developers and GNG Terasoftware Consortium
• Services offered through CSCs:
– Collection of Water Bill
– Issuance of Senior Citizen and Disability Card
– Data Entry of Government Departments i.e. Health Department
– Bouquet of B2C Services
30
CSC Rollout in Himachal Pradesh ( Lok Mitra Kendra)
• Issues and Challenges
Non availability of broadband Connectivity
Few Infeasible Locations (Less Population/ High Terrain)
Insufficient G2C services
31
CSC Rollout Status in Jharkhand
32
CSC Rollout in Jharkhand (Pragya Kendras)
• No. of CSCs Planned to be rolled out: 4562 (1 :1)
• CSC Rolled out as on 30 September 2010: 4556
• CSCs with Connectivity: 2569
• No. of CSCs where Online Monitoring Tool installed: 2565
• SCA Name: Zoom Developers, UTL and AID
• Services offered through CSCs:
– eNagrik Sewa ( Issue of Certificates)
– Data Digitization of 18th Cattle Survey
– VLEs of Palamau district selected as Para Legal Advisors by District Legal
Service Authority
– MNREGA’s wage disbursal, Photography for beneficiaries through CSCs
– Digitization of Land Records in Palamau District
– Jail Sakshatkar
– B2C services33
CSC Rollout in Jharkhand (Pragya Kendras)
• eDistrict Status
Pilot project in Ranchi District of the state is planned to be launched by end of
October’10.
Digitization of 6 Lakh ration card for Public Distribution System (PDS), Old age
Pensioner record is undertaken.
• Issues and Challenges
Broadband Connectivity through BSNL
Inadequate G2C services
Naxal Problem in all Districts
34
CSC Rollout Status in Orissa
35
CSC Rollout in Orissa
• No. of CSCs Planned to be rolled out: 8558
• CSC Rolled out as on 30 September 2010: 5985
• CSCs with Connectivity: 3436
• No. of CSCs where Online Monitoring Tool installed: 3375
• SCA Name: Zoom Developers, BASIX and SREI Sehaj
• Services offered through CSCs:
– Electricity Bill Payment
– Issue of Birth and Death Certificate
– Education Services
– Banking and Insurance Serrvices
– B2C services like Railway/ Bus Reservation, DTP, Recharges, DTH etc
36
CSC Rollout in Orissa
• eDistrict Status
Pilot project undertaken in Mayurbhanj and Ganjam District of
the state.
• Issues and Challenges
Broadband Connectivity through BSNL
Naxalite problem
Non availability of basic infrastructure
Not adequate Power Supply in few areas
Inadequate population in few areas
37
38
CSC Rollout Status in Sikkim
CSC Rollout in Sikkim
• No. of CSCs Planned to be rolled out: 45
• CSC Rolled out as on 30 September 2010: 45
• CSCs with Connectivity: 19
• No. of CSCs where Online Monitoring Tool installed: 43
• SCA Name: Infrastuture Leasing & Financial Services Ltd
• Services offered through CSCs:
– IT training to 450 Teachers
– Basic IT training for Sikkim Armed Police (SAP) and local unemployed
youths.
– Distribution of Various forms
– eTicketing and Mobile Recharge
– Other B2C services
39
CSC Rollout in Sikkim
• Issues and Challenges
Connectivity related issues
Slow work in progress due to heavy rain and land slides
Most of the far flung areas are not connected with capital
Inadequate Population in few areas
40
CSC Rollout Status in Tripura
41
CSC Rollout in Tripura (e-Pariseva Kendras)
• No. of CSCs Planned to be rolled out: 145
• CSC Rolled out as on 30 September 2010: 133
• CSCs with Connectivity: 51
• No. of CSCs where Online Monitoring Tool installed: 57
• SCA Name: BASIX India Ltd
• Services offered through CSCs:
– Bhartiya Samruddhi Financial Services Ltd has started its financial
services through CSCs
– B2C services like DTP, Photocopy Mobile and DTH Recharges etc.
42
CSC Rollout in Tripura
• Issues and Challenges
Broadband Connectivity through BSNL
Inadequate infrastructure related to Road, Transport services.
Insufficient Power Supply
43
44
CSC Rollout Status in Uttar Pradesh
CSC Rollout in Uttar Pradesh (Jan Seva Kendra)
• No. of CSCs Planned to be rolled out: 17,909 (1:6)
• CSC Rolled out as on 30 September 2010: 7837
• CSCs with Connectivity: 3424
• No. of CSCs where Online Monitoring Tool installed: 2272
• SCA Name: SREI Sahaj, CMS Computers
• Services offered through CSCs:
– e-District Services in three District
– Issue of Birth, Death, Caste, Domicile, Handicapped and Income
certificate from three districts
– NREGA related Data Entry Work
– Public Grievances through integration with Lokvani services
45
CSC Rollout in Uttar Pradesh (Jan Seva Kendra)
• eDistrict Status
Pilot eDistrict project was launched in Six Districts of the state namely
Sitapur, Raebareli, Gorakhpur, Sultanpur, Gautam Budh Nagar and
Ghaziabad. Presently 23 services are being delivered through the centres.
CSCs in Raebareli, Sitapur and Gorakhpur have been integrated with the
eDistrict centres.
Proposal for launching eDistrict in other 66 Districts has been sent to DIT
for approval.
• Issues and Challenges
Delay in appointing new SCAs after termination of earlier SCAs (3i Infotech
and Comat Technologies) for 6409 CSCs (Agra, Bareilly,Faizabad)
Non availability of adequate G2C services
Non availability of broadband Connectivity
Lack of Awareness about CSCs with Government Officials and citizens
46
CSC Rollout Status in Uttarakhand
47
CSC Rollout in Uttarakhand (Uttara Kendras)
• No. of CSCs Planned to be rolled out: 2804 (1:6)
• CSC Rolled out as on 30 September 2010: 1530
• CSCs with Connectivity: 1136
• No. of CSCs where Online Monitoring Tool installed: 913
• SCA Name: Reliance Communications Ltd
• Services offered through CSCs:
– Railway Reservation
– Telecom Recharges
– DTH Recharges
– Utility Bill Payments
– Insurance Services
48
CSC Rollout in Uttarakhand (Uttara Kendras)
• eDistrict Status
eDistrict Pilot Project is ready for implementation in Pauri District of
the state.
Initially in First Phase six Services will be launched and later twenty
more services are planned for delivery.
• Issues and Challenges
Non availability of G2C services
Non availability of broadband Connectivity
Inadequate Population in few areas
SCA should ensure adequate Business Services through CSCs
49