Common Mistakes in Drainage
Submissions to PUB (BPU)
Muhammad Zahid
Centralised Services Department (Building Plan Unit)
2
Agenda
• To highlight commonly made mistakes in Drainage
Submissions
• To share good and bad examples so that QPs can get
their submission right at first attempt
• To recap useful online links on Drainage Submissions
3
Most Commonly made mistakes in
Drainage Submissions
1. No cover letter and wrong CORENET form
2. Wrong classification of drainage works
3. Incomplete submission
4. Submission without referencing to COP
5. Non-checking of plan before submitting
4
1. Submissions without cover letter
Types of Form/Submission Form to be Used
Application for Development Control Clearance (DC)
Application for Detailed Plan Clearance (Minor Drainage Work)
Application for Detailed Plan Clearance (Other Drainage Work)
Application for Drainage Clearance for TOP
Application for Drainage Clearance for CSC
PUB-DCCLR
PUB-DPCLR
PUB-DPCLR
PUB-DRATOP
PUB-DD-CSIDRA
1. Submissions with wrong CORENET form
**ESS-CORR form shall not be used for making new ES submission
Most Commonly Made Mistakes
5
Submission on Amendments to approved DC/DP
QP must highlight area/ scope of
changes in Cover Letter & amendments
shall be clouded on plan
6
2. WRONG CLASSIFICATION
OF DRAINAGE WORKS
7
Recap: Classification of Drainage Works
• Works Affecting Minor Drainage – for internal drainage system within development plot, within HDB estate etc.
• Works Affecting Other Drainage – see definition below
Online/ Offline Detention tank system
Flood barrier or any other alternative flood protection measures
Basement pumped drainage system
within dev. with or without linkage to
underground special facilities
Public Drains to be handed over to PUB, and all works^ affecting
public drains maintained by PUB.
^Bus shelters, covered linkways (with drain below/abutting), and
developments affecting the DR
8
Covered Linkway, Bus shelter within RR –submitted as Works Affecting Minor Drainage
• Should be submitted under Works Affecting Other Drainage –Roadside Drain
9
Infra submission – submitted as Works
Affecting Minor Drainage
• Should be submitted under Works Affecting Other Drainage –
Roadside Drain
10
3. INCOMPLETE SUBMISSION
11
Missing Endorsements -DC
Page 7 of PUB-DCCLR
Form – to be endorsed
on the plans
12
Use of DR Endorsement
Drainage Reserve affecting the site
shall be clearly dimensioned and
indicated on the plans.
13
1. Conditions in endorsement shall be complied with.
2. Clear indication of the clearance on all sections & layout plans.
3. IF proposed supports/ footings < 300mm hor. clearance, QP shall clarify the reasons to justify why the
minimum clearance can’t be met.
CL shall be constructed as independent structure from drainage structures and QP shall confirm that
the foundations shall be stable when excavation up to 1m below the invert of affected drain.
4. IF supports/footings were to be mounted on the top slab of extg. covered rdside drain, PE shall submit
structural analysis report confirming extg. drain structures are in satisfactory cond. and capable to withstand
the intended loadings. Otherwise, the extg. drain shall be reconstructed.
Covered Linkways/ Bus Shelters affecting Public Drainage Endorsement
300mm
14
Other Endorsements
• Park Connector Network (PCN) within DR
• Use of DR as Footpath
• Use of DR as Cycling track
• Taxi stand affecting Public Drain
All necessary endorsements as required by PUB shall be clearly shown in
the Site plans for all DC/ DP/ TOP/ CSC stage
15
Essential details not provided
16
Clause 4.4.3 (page 12) of the COP – Vertical Grating
Prior to discharging any storm water within the
development site to the roadside/outlet drain, vertical
grating(s) shall be installed at the outlet discharge point(s)
o the internal drain(s) located within the development
site.
17
Incomplete discharge point details – DC/DP
Missing:
Proposed discharge point, Top level, IL at last
discharge point, & Road level at discharge point
Vertical grating details & provision at the outlet discharge
point of internal drains to public drain not indicated.
18
Vertical grating or vertical grating incorrectly
positioned
19
On the next resubmission, same error was made.
20
Example of Plan with Insufficient information
21
Comments:
22
Comments (cont’d):
23
Submission without referencing to COP.
24
Submission without referencing to COP (cont’d)
25
Non-checking of plans before submitting.
26
No Indication of Platform levels
27
An example of Clear indication of Crest Levels
For development with basement, crest level and swan neck (if applicable)
level shall be clearly indicated on the 1st sty plan
28
New/ A&A Proposal with affected site area >
0.2ha with Detention tank
** Design calculations for detention tank shall be submitted
29
Recap: Submission Requirements for Development
with Detention tank – Drainage DC/ DP Submission
• Catchment & sub-catchment plans clearly indicating catchment for each tank
(if more than one tank is required) and outlet discharge point of internal
drainage system to the public drain
• Site analysis with corresponding runoff coeffs for controlled/ non-controlled
catchment
• Design calculations or modelling results that will be adopted to control the
peak runoff discharge
• Clear site layout plans indicating location and footprint of the detention tank
(s) or pumping facilities – Effective depth of detention tank, connection point to the internal drainage system, swan neck
crest level at the 1st sty level shall be clearly indicated
For new erection and reconstruction works to commercial, industrial, institutional and residential developments greater
than or equal to 0.2 hectares in size and Additions & Alterations (A&A) works to existing commercial, industrial,
institutional and residential developments where affected area is greater than or equal to 0.2 hectares in size, the
following documents endorsed by a QP shall be submitted:-
30
Basement pump
sump provided
with sump pit
Detention Tank 1
Detention Tank 2
Proposal with Basement Pumped Drainage &
Detention tank
31
Catchment plan – Clear Indication of sub-catchment served by each DT,
controlled/ uncontrolled catchments & outlet discharge points
32
PE Calculation For Online Detention
System
33
• Detention tank can only be assessable from the 1st Storey
• Overflow facilities should be provided for the detention
tank
• Outlet from the Detention tank shall be channeled to a
sump/ the internal drain before discharging to roadside
drain
Good Practices for Design of Detention Tank
34
Preparing Your Drainage Detailed Plan (DP)
Submission
Here are some tips to get your 1st DP submission to PUB right, QP
may wish to refer to our online Newsletter Iusse No. 8 on September
2018 on:
• Works Affecting Roadside Drains
• Covered Linkways / Bus Shelters
35
Things to Take Note for Drainage
• Where an entrance culvert / crossing is proposed at a stretch of
closed drain, gratings / openings shall be provided at the closed
drain sections immediately upstream and downstream of the
proposed entrance culvert /crossing.
• The internal width and clear depth of the roadside drains / culverts
(including entrance culverts) shall be at least 600mm wide or align
with the existing drain size (whichever is wider) or the size given by
PUB.
36
Incomplete Info in As-Built Survey plan – TOP/CSC
• Critical to indicate– Outlet discharge point Top & Invert
level
– Rd level at discharge point
– Details of vertical grating
– Vertical grating @ discharge pt
37
Swan neck crest level at 1st level on As-Built
Drawings (for Basement pumped drainage)
38
Good example of RS endorsed As-Built Survey Plans for TOP submission with Offline DT system
AS-BUILT
Indication
Clear indication
alignment, type,
size, flow direction,
summit point,
outlet discharge
point
• Critical to indicate– Alignment, type, size and flow direction
– Discharge point top & Invert level
RS
endorsement
39
Good example of QP endorsed As-Built Drawings
for TOP submission with Detention tank
Inlet &
Outlet
details of DT
PE
endorsement
DT cross
sectional
details
Mark out
Detention
tank
40
Good example of QP endorsed As-Built
Drawings for TOP submission with Detention
tank
Cross sectional
details of Swan
neck 1st floor i.e.
crest level
Mark out
Stormwater tank
location
AS-BUILT
Indication
41
Recap- Items for Drainage TOP submission (involving DT
and pumped drainage system in particular)
a.1. As-built Survey plans indicating platform levels, crest level, adj. road level, and flood protection
levels etc. (to comply with COP Cl.11)
b.
2. As-built Drawings and Calculations for drains, pumped drainage system (basement and DT),
structural detention and retention features and ABC waters design features
3. Standard Operating Procedures for pumped drainage system (basement and DT) (COP Cl.
10.3)
4. PE endorsed inspection and testing & commissioning certificates of the detention tank and
pumps /ABC waters design features
5. PE written confirmation to declare the following:
• The maximum stormwater discharge from the development is in compliance with the maximum
allowable peak runoff stipulated in the COP and constructed according to approved plans.
• He has liaised with the Developer/Owner to ensure that a Maintenance/Managing Agent has
been established to undertake the SOP of the maintenance, operation and monitoring of the
detention tank system and/or ABC Waters design features.
• He has informed the Developer/Owner/MCST/MA/Town Council to conduct and maintain proper
records of regular tests and inspection of the detention tank system, including regular
preventive maintenance of the system which includes but not limited to pumps, valves, and
cleansing of tank and to submit documents, when requested by PUB.
6. Letter of Undertaking from the Developer/Owner/MCST/MA/Town Council of premises with
detention tank systems to submit the Certificate of Inspection on the pumped drainage system
(for basement/detention tank) endorsed by the PE(Mech/Elect).
For Dev. with Detention
tank or basement
pumped drainage
c.7. Standard Operating Procedures of Flood Barriers (both manual and automatic)
8.. PE endorsed inspection and testing of flood barriers, and on-site leak test reports.
For Dev. with Flood
barrier
42
Recap: Submission for CSC/ DLP Application with
External Drainage Works
• QP to fill up the Handing Over form
as part of CSC submission to
facilitate site inspection
** There shall not be any hardcopy for filling in on site
anymore
43
RECENT NEW CHANGES
44
1. New DC Submissions with effect 1 Dec 18
To indicate all ground and platform levels
using SHD format:
• 104.5mRL (based on Mean sea level of
100.000m) will be shown as 4.0m
(based on SHD = 0.000m)
• QPs are required to endorse on the
plans (DC/DP/TOP/CSC) the following
note: “The reduced levels are based on
the Singapore Height Datum of
0.000m”). This phrase shall be added
to the rest of PUB’s NOTES on the DC
plan.
PUB-DCCLR-NOV2018 Ver 1.3
45
Application for Deviation On
Drainage Matter (PUB-DEV-
DRA)
• To provide a clear channel for
QPs to surface alternative designs
deviating from PUB’s COP and
requirements for management
decision
2. New CORENET FORMS with effect
16 Nov 18
46
Application for PUB Overall
Clearance for CSC (PUB-CSC-
CLR)
• For QPs to obtain PUB’s overall
CSC Clearance (drainage +sew)
before applying for BCA’s CSC
Clearance.
• Email requests to BPU have
ceased since 1st January 2019.
47
Application for PUB Overall
Clearance for TOP (PUB-TOP-CLR/
• For QPs to obtain PUB’s overall TOP
clearance (drainage +sew) before
applying for BCA’s TOP Clearance.
• Email requests to BPU have ceased
since 1st January 2019.
48
USEFUL ONLINE LINKS ON
DRAINAGE SUBMISSIONS
49
Useful Links (found in PUB’s QP Portal)
• Useful drainage design guidelines can be found in the following
www.pub.gov.sg/compliance/qualifiedpersonsportal/cop
COP on Surface Water Drainage (note that 7th edition has taken
effect 1 Dec 18)
Drainage
• Drainage Handbook on Managing Urban Runoff
• Technical Guide on On-site Stormwater Detention Tank
Systems
Alternate Sources of Water
• Rainwater Harvesting
ABC Waters Design Guidelines
Quick submission guides can be found in the following
www.pub.gov.sg/compliance/qualifiedpersonsportal/quicksubmissionguides
50
SUMMARY THE BPU ONLINE NEWSLETTER ISSUED
(FROM NO. 1 TO 8)
51