34
1 ThyssenKrupp Resource Technologies Comminution systems today and tomorrow VDMA Minerals Symposium Lima, May 3 rd , 2013 Rilmar Ojeda

Comminution systems today and tomorrow VDMA … · Comminution systems today and tomorrow VDMA Minerals Symposium Lima, May 3rd, 2013 Rilmar Ojeda . 2 ThyssenKrupp Resource Technologies

Embed Size (px)

Citation preview

1 ThyssenKrupp Resource Technologies

Comminution systems today and tomorrow

VDMA Minerals Symposium

Lima, May 3rd, 2013

Rilmar Ojeda

2 ThyssenKrupp Resource Technologies

3 ThyssenKrupp Resource Technologies

Which comminution technology will be applicable ?

4 ThyssenKrupp Resource Technologies

ThyssenKrupp Mining Capabilities

SAG & Ball Mill Technology

HPGR in Hard Rock Comminution

ThyssenKrupp Service Center

Agenda

5 ThyssenKrupp Resource Technologies

ThyssenKrupp Mining Capabilities

SAG & Ball Mill Technology

HPGR in Hard Rock Comminution

ThyssenKrupp Service Center

Agenda

6 ThyssenKrupp Resource Technologies

ThyssenKrupp Mining Expertise And Product Portfolio

Mining In-Pit Primary Crushing Conveying &

Overburden Spreading

Secondary Crushing

& Screening

HPGR Crushing Grinding Filtration Material Handling &

Transshipment

7 ThyssenKrupp Resource Technologies

ThyssenKrupp Mining Capabilities

SAG & Ball Mill Technology

HPGR in Hard Rock Comminution

ThyssenKrupp Service Center

Agenda

8 ThyssenKrupp Resource Technologies

SAG and BALL Mill Technology

ThyssenKrupp Resource Technologies

9 ThyssenKrupp Resource Technologies

Mills with conical end walls / Shell supported mills

10 ThyssenKrupp Resource Technologies

11 ThyssenKrupp Resource Technologies

Field Welding

12 ThyssenKrupp Resource Technologies

13 ThyssenKrupp Resource Technologies

14 ThyssenKrupp Resource Technologies

HPGRs in Hard Rock Comminution

A Technology Broke Barriers

15 ThyssenKrupp Resource Technologies

First Approach of HPGRs to the Copper Industry

metallurgically

considered as a big

success!

widely percepted as a

failure due to

unresolved wear issues!

Cyprus Sierrita

1994 – 1996

POLYCOM 22/13

16 ThyssenKrupp Resource Technologies

17 ThyssenKrupp Resource Technologies

POLYCOM components

18 ThyssenKrupp Resource Technologies

POLYCOM components

19 ThyssenKrupp Resource Technologies

Latest Trends in Copper / Mineral Ore Processing

New ore bodies have often been harder and lower grade

traditional SABC circuit

20 ThyssenKrupp Resource Technologies

Freeport – Cerro Verde, Peru

First Copper Concentrator built on HPGR technology

Freeport -

Cerro Verde

21 ThyssenKrupp Resource Technologies

Freeport – Cerro Verde, Peru

First Copper Concentrator built on HPGR technology

Secondary

Crushing

4 x MP 1000

Ball Milling

4 x BM 7.3 x 11.0 m

4 x Tertiary HPGR

24/17

Design capacity: 108,000 mtpd in operation since 2006

22 ThyssenKrupp Resource Technologies

Freeport – Cerro Verde, Peru

First Copper Concentrator built on HPGR technology

Secondary

Crushing

4 x MP 1000

Design capacity: 108.000 mtpd (> 120.000 tpd achieveable)

23 ThyssenKrupp Resource Technologies

Freeport – PTFI Grasberg, Indonesia

First quaternary HPGRs in a brownfield copper application

Freeport –

PTFI Grasberg

24 ThyssenKrupp Resource Technologies

Freeport – PTFI Grasberg, Indonesia

First quaternary HPGRs in a brownfield copper application

Quaternary crushing mode

brownfield installation

Objectives:

1. capacity increase @ same grind

2. higher recovery @ finer grind

25 ThyssenKrupp Resource Technologies

2 x POLYCOM 20 / 15

2 x 1,800 kW (each)

feed < 20 mm

1,200 - 1,400 tph (actual)

> 2.000 tpd (max)

in operation since 05 / 2007

Freeport – PTFI Grasberg, Indonesia

First quaternary HPGRs in a brownfield copper application

26 ThyssenKrupp Resource Technologies

Anglo Platinum – Mogalakwena North, RSA

First Platinum Concentrator built on HPGR technology

Anglo Platinum –

Mogalakwena North

27 ThyssenKrupp Resource Technologies

Newmont – Boddington Gold Mine, Australia

First Gold Concentrator built on HPGR Technology

Newmont –

Boddington Gold Mine

28 ThyssenKrupp Resource Technologies

Newmont – Boddington Gold Mine, Australia

96.000 tpd plant

4 x POLYCOM 24/17

2 x 2,800 kW (each)

> 2.100 tph (design each)

up to 3,000 tph

start-up in 2009

29 ThyssenKrupp Resource Technologies

AngloGold Ashanti – Tarkwa Mine, Ghana

First commercial HPGR for heap leaching of gold ore

AngloGold Ashanti –

Tarkwa Mine

in operation since 2009

30 ThyssenKrupp Resource Technologies

Goldcorp Inc. – Penasquito, Mexico

First HPGR for pebble crushing in a hard rock application

Goldcorp Inc –

Penasquito

Start up in 2010

31 ThyssenKrupp Resource Technologies

ThyssenKrupp Mining Capabilities

SAG & Ball Mill Technology

HPGR in Hard Rock Comminution

ThyssenKrupp Service Center

Agenda

32 ThyssenKrupp Resource Technologies

THYSSENKRUPP SERVICE CENTRE

Arequipa

Johannesburg

Shanghai Definition Service Centre: - Workshop with state-of-the-art large

machinery

park (incl. 220 t bridge crane, CNC-controlled

vertical boring & turning mill and horizontal

boring machine)

- Specially trained Polysius experts

Key task:

- local mechanical refurbishment and new

manufacture of large wear parts e.g.

POLYCOM

roll bodies

Currently, there are service centres in South

Africa, Australia and Peru (status 08/2011). Perth

33 ThyssenKrupp Resource Technologies

34 ThyssenKrupp Resource Technologies

Thanks for your attention.