15
National Aeronautics and Space Administration Commercial Spaceflight Commercial Spaceflight Status Briefing June 16, 2011 Phil McAlister Phil McAlister NASA HQ WWW.NASAWATCH.COM WWW.NASAWATCH.COM

Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

National Aeronautics and Space Administration

Commercial SpaceflightCommercial SpaceflightStatus Briefing

June 16, 2011

Phil McAlisterPhil McAlister

NASA HQ

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 2: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

Major Accomplishments / Milestones

• COTS Cargo– All COTS augmentation milestones negotiated and signed. Several

il h l d b l dmilestones have already been completed. – March 29: SpaceX Demo 2 and 3 combination briefing to NASA HQ.

• CCDev 1 Projects– All CCDev 1 Space Act Agreements complete.

• CCDev 2 Projects– April 18: Awarded four (4) new Space Act Agreements.p ( ) p g

• Commercial Crew Program (CCP)– April 5: Commercial Crew Program Office officially established at KSC.– Commercial Crew Program Office will manage the CCDev 2 Projects.Commercial Crew Program Office will manage the CCDev 2 Projects.– May 24-25: Industry Workshop held in Florida to discuss CCP

requirements.

2

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 3: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

COTS Cargo Accomplishments

SpaceX Flight Images

AJ-26 Engine Test Firing

Launch Pad Construction3

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 4: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

Commercial Crew Structure and Timelines

CY 2012

February CCDev

CY 2011CY 2010Title Purpose

April

Develop and demonstrate technologies that enable commercial human spaceflight y

Awards

CCDev Round 2

Agreements Complete

p gcapabilities.

Mature the design and development of elements of the system such asCCDev Round 2

Commercial

October Announcement for Proposals

April Awards

Agreements Complete

of elements of the system, such as launch vehicles and spacecraft.

Mature the design for the Commercial Crew Program June

Advanced Planning Team Established

Request for Proposals

Awards

atu e t e des g o t eintegrated end-to-end commercial crew systems.

4

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 5: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

CCDev 1 Accomplishments

SNC Motor FiringBoeing Air Bag Test Article Manufacturing of key components of the

Engineering Development Unit

ULA Emergency Detection System Prototype and Test Bed Blue Origin Composite Crew Pressure Vessel

5

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 6: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

CCDev 2 Announcement Overview

• The goals of CCDev 2 investments are to:– advance orbital commercial crew transportation system (CTS) concepts– enable significant progress on maturing the design and development of

elements of the system, such as launch vehicles and spacecraft, while ensuring crew and passenger safety

• New competition open to all U S commercial providers• New competition open to all U.S. commercial providers.• Proposals included NASA investment needed and company

contribution.Awards are for Space Act Agreements featuring pay for performance• Awards are for Space Act Agreements, featuring pay-for-performance milestones from April 2011 to May 2012.

• The Announcement for Proposals was released on October 25, 2010 and proposals were due on December 13 2010and proposals were due on December 13, 2010.

• 22 proposals were received requesting a total of $1billion from NASA.– Proposals included spacecrafts, launch vehicles, sub-systems, and trade-

studiesstudies

6

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 7: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

Selection Process and Results

• Four companies were selected for award:– Blue Origin: $22M– Boeing: $92.3M– Sierra Nevada: $80M– SpaceX: $75M Total = $269.3M

• Within the selected concepts, there is diversity in spacecraft approaches (two capsules, a lifting body, and a biconic shape spacecraft) and in the launch vehicles they propose to use.

• All proposals showed an understanding of the importance of safety and a commitment to safe spaceflight.

• NASA believes this portfolio of concepts best meet the goals of CCDev 2 within the available funding. It will significantly mature the design and development of system elements and accelerate the availability of commercial crew transportation system capabilities.

7

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 8: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

CCDev 2 Partners and Suppliers

CCD 2CCDev2

8

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 9: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

Blue Origin CCDev 2 Project

System Description: Crew transportation system comprised of a reusable biconic Space Vehicle launched first on an Atlas V launch vehicle and then on Blue Origin’s own Reusable Booster System.

CCDev 2 Content: Mature Space Vehicle design p gthrough System Requirements Review, mature the Pusher Escape System, and accelerate engine development for Reusable Booster System.

CCDev 2 Milestones (partial):• Space Vehicle Mission Concept Review• Space Vehicle System Requirements Review

P h E G d Fi i• Pusher Escape Ground Firing• Pusher Escape Pad Escape Test• Reusable Booster System Engine Thrust

Chamber Assembly Test

NASA investment: $22M9

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 10: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

Boeing CCDev 2 Project

System Description: Commercial crew transportation system comprises the reusable CST-100 spacecraft, launch services, and ground systems. CST-100 is

tibl ith lti l l h hi l d i blcompatible with multiple launch vehicles and is reusable for up to ten missions.

CCDev 2 Content: Mature CST-100 design through g gPreliminary Design Review & perform development tests.

CCDev 2 Milestones (partial):• Phase 0 Safety ReviewPhase 0 Safety Review• Launch Abort Engine Fabrication & Hot Fire Test Demo• Landing Air Bag Drop Demonstration #1• Phase 1 Wind Tunnel Tests• Parachute Drop Tests Demonstration• Launch Vehicle Emergency Detection System/Avionics

System Integration Facility Interface Simulation Test• Preliminary Design ReviewPreliminary Design Review

NASA investment: $92.3M 10

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 11: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

SNC CCDev 2 Project

System Description: Dream Chaser is a reusable, piloted lifting body, derived from NASA HL-20 launched on an Atlas V.

CCDev 2 Content: Mature Dream Chaser design through a Preliminary Design Review with some subsystems to Critical Design Review, and conduct significant hardware , gtesting.

CCDev 2 Milestones (partial):• System Requirements ReviewSystem Requirements Review• Canted Airfoil Fin Selection• Cockpit Based Flight Simulator• Vehicle Avionics Integration Laboratory

S t D fi iti R i• System Definition Review• Flight Control Integration Laboratory• Engineering Test Article Structure Delivery• Separation System Testy• Preliminary Design Review

NASA investment: $80M 11

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 12: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

SpaceX CCDev 2 Project

System Description: The crew transportation system is based on the existing Falcon 9 launch vehicle and Dragon spacecraft which have been designed since inception for crew carriage with relatively minimalinception for crew carriage with relatively minimal modification. The longest-lead and most safety-critical system is the Launch Abort System (LAS).

CCDev 2 Content: Mature the flight proven Falcon 9 /CCDev 2 Content: Mature the flight-proven Falcon 9 / Dragon transportation system focusing on developing an integrated, side-mounted LAS.

CCD 2 Mil t ( ti l)CCDev 2 Milestones (partial):• LAS Propulsion Conceptual Design Review• LAS Propulsion Component Preliminary Design

Review• Crew Accommodation Concept Prototype and In-Situ

Trials (2)• LAS propulsion component initial test cycle• Concept Baseline ReviewConcept Baseline Review

NASA investment: $75M 12

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 13: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

Commercial Crew Program

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

MissionsDemo/Test Flights

Fiscal Year

Design/Development/Certification

• The objective of the proposed commercial crew initiative is to facilitate the development of a U S commercial crew spacefacilitate the development of a U.S. commercial crew space transportation capability with the goal of achieving safe, reliable, and cost effective access to and from low-Earth Orbit and the International Space Station (ISS).International Space Station (ISS).

• Acquisition strategy will feature competitive agreements, pay-for-performance milestones, and a fixed government investment.

• Competition among multiple partners is a fundamental aspect of the• Competition among multiple partners is a fundamental aspect of the strategy: incentivizes performance, supports cost-effectiveness, and eliminates NASA dependence on a single provider.

• The 2010 NASA Authorization Act established commercial crew asThe 2010 NASA Authorization Act established commercial crew as the primary means for ISS crew transportation.

13

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 14: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

Why Commercial Crew and Why Now?

1) Federal budgets, including NASA’s, are extremely constrained– COTS and CCDev have shown that we can change the cost equation

W h t f d lti l t f l th $6B– We hope to fund multiple partners for less than $6B2) Well understood technology

– Human spaceflight is hard, but no breakthroughs are needed– We have been launching people into orbit for over 45 years

3) Strong and mature industrial base– Global commercial space industry revenues have doubled from $80B

$to $160B during the last five years4) Strong potential for customers other than the U.S. government

– Non-U.S. astronauts, space tourism, research and development5) Decision to extend the International Space Station to at least 2020

– For the first time in history, we have a long‐term, sustainable market for commercial human space transportation services

14

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM

Page 15: Commercial SpaceflightCommercial Spaceflight Status Briefing · 2013-04-25 · Mature the design and development CCDev Round 2 of elements of the system such as Commercial October

Benefits of a Successful Commercial Crew Program

• After the Shuttle is retired later this year, only Russia and China will have the capability of getting people into Earth orbit.A th i f th U S t l h t l E th bit• As the primary means for the U.S. to launch crew to low-Earth orbit, the Commercial Crew Program will:

– End the gap in U.S. human access to spaceGi d t th I t ti l S St ti– Give us assured access to the International Space Station

– Strengthen America’s leadership in space– Allow NASA to focus on exploration, enabling us to go further, faster

C t ib t t th ti l– Contribute to the national economy• By pushing the boundaries of private enterprise and commerce into

low‐Earth orbit, we will have planted the first truly sustainable flagpole i i i tin our expansion into space.

NASA is fully committed to making Commercial Crew

15

NASA is fully committed to making Commercial Crew safe and successful

WWW.NASAWATCH.COM

WWW.NASAWATCH.COM