OVERVIEW

1. Inside Lighting: Luminaries Lay-out

2. Inside Lighting Calculation-Visual

3. Inside lighting Circuiting and control

4. Lighting panel and control panel schedule

5. Luminaries Schedule

6. Inside Lighting Cut sheets

Page 3: Commercial Project

Building lighting lay-outBuilding lighting lay-out

Page 4: Commercial Project

Lighting StatisticsLighting Statisticsand Specificationsand Specifications

Room # Ave Max Min Max/Min Spec. Type

100 Vest. 20.7 24 17.1 1.4:1 20 Recessed cf down lights

101 Rec. 21.4 28.8 12.5 2.3:1 20 Recessed cf down lights

103/104 rec/file 52.8 69.7 29.8 2.3:1 50 Recessed lensed fluorescent

106 Copy 53.2 71.7 33.6 2.1:1 50 Recessed lensed fluorescent

110 Library 61.8 90.7 35.8 2.5:1 60 Recessed parabolic fluorescent

126 open office 43.3 61 19.8 3.1:1 40 Direct indirect fluorescent

126 open office 43.4 69.7 16.7 4.2:1 40 Recessed 2 x4 parabolic

123 Conference 47.8 74.5 26.4 2.8:1 50Dir / Indir, + w/w,+ inc dn

Page 5: Commercial Project

Top View of the Center IslandTop View of the Center IslandOpen Office Area W/ Linear Open Office Area W/ Linear

DesignDesign

Page 6: Commercial Project

Top View of the Center IslandTop View of the Center IslandOpen Office Area W/ Linear Open Office Area W/ Linear

DesignDesign

Page 7: Commercial Project

Top View of the Center Top View of the Center IslandIsland

Open Office Area, Non-Open Office Area, Non-Linear DesignLinear Design

Page 8: Commercial Project

Top View of the Center Top View of the Center IslandIsland

Open Office Area, Alternate Open Office Area, Alternate DesignDesign

Page 9: Commercial Project

Elevation viewElevation viewZonal CalculationsZonal Calculations

Calculation Points (2.5’ AFF)

Luminaire Mounting Height (8.5’ AFF)

Floor CavityRoom Cavity

Ceiling Cavity

= Room Cavity Ratio

RCR= 5 × height of the cavity × (L + W) ÷ Area

Coefficient of Utilization(from the manufacturers photometric data charts)

Page 10: Commercial Project

How Many LuminariesHow Many LuminariesDo We Need in This AreaDo We Need in This Area

Quantity of Fixtures =

Foot Candle (required) × Square Feet of Area

÷

Lumens per Lamp × Lamps per Fixture ×CU × LLF

Page 11: Commercial Project

Enter solids, Calculations Enter solids, Calculations ZonesZones

And Luminaries (with IES files)And Luminaries (with IES files)

Page 12: Commercial Project

Circuiting and ControlCircuiting and Control

Low Voltage Control Switches

Emergency and Exit sign lighting

Night Lights

Page 13: Commercial Project

Lighting Control PanelLighting Control Panel

Page 14: Commercial Project

Lighting Control Panel Lighting Control Panel ScheduleSchedule

Page 15: Commercial Project

Lighting Panel ScheduleLighting Panel Schedule

Page 16: Commercial Project

Luminaries ScheduleLuminaries Schedule

Page 17: Commercial Project

Cut SheetsCut Sheets

Page 18: Commercial Project

Photometric Data Cut Photometric Data Cut SheetsSheets

Page 19: Commercial Project

Thank You