8/3/2019 Comment Mqp for Motor 'Rev-A' for Cw Pump-1
1/5
QUANTUM OF CHECK
M M C N
1. 6. 7 D*
1.0
1.1
1.1.1 Dimensional & visual check Dimn. 100% Drawing Drawing V V V
1.1.2 Chemical analysis Record verfication1 Sample
/ Lot
Approved Drawing Approved Drawing V V V
1.1.3
Mechanical properties, Tensile,
Yield, Elongation ,
Heat treatment, Finish and hardness
Record verfication1 Sample
/ LotApproved Drawing Approved Drawing V V V
1.2
1.2.1
Dimensional & visual check
(straightness / edge camber, waveiness,
Record verfication1 Sample
/ LotApproved Drawing Approved Drawing P V V
Major
Major
11.
SUPPLIED MATERIALS (Major)
Major
QCR
TC
FORMAT OF
REPORTREFERENCE DOCUMENT
SHAFT
8.2.
Major TC
QCR
MAGNETIC SHEET STEEL
3. 4. 5.
AGENCY
REMARKSACCEPTANCE
NORMS
** 10.9.
COMPONENTS &
OPERATIONSCHARACTERISTICS
SL
NoCLASS
TYPE OF
CHECK
DATE : 26.05.2011
ITEM : 4100kW 18P 11kV VSTC1250
C.W.Pump Motor
PROJECT : 2 x 685MW THERMAL POWER
PLANT
AT RAIPUR, CHHATTISGARH
CLIENT : GMR CHATTISGARH ENERGY PVT LTD
CONSULTANT : DCPL
MAIN SUPPLIER : DOOSAN POWER SYSTEMSINDIA PVT.LTD. / KBL PUNE
MQP. No : MQP-G-3B
REV. 0
MANUFACTURER'S NAME & ADDRESS
HYOSUNG CORPORATION
KOREA
MANUFACTURING QUALITY PLAN
, ,
1.2.2 All test as per Maker ST` Record verfication1 Sample
/ LotApproved Drawing Approved Drawing V V V
1.3
1.3.1
Surface Hardness, Surface Finish,
Dimensions
Hardness, Visual,
Dimensional 100% Approved Drawing Approved Drawing P V V
1.3.2
Electrical Check Record verfication 100% Approved Drawing Approved Drawing P V V
1.3.3
Electrical Check MajorRecord
verfication100% Approved Drawing Approved Drawing TC P V V
1.3.4
Electrical Check MajorRecord
verfication100% Approved Drawing Approved Drawing TC P V V
APPROVAL SEAL
Temperature Indicators dial type
Current Transformer for Differential Protection
LEGEND * RECORDS, IDENTIFIED WITH "TICK" () SHALL BE ESSENTIALLY
INCLUDED BY SUPPLIER IN QA DOCUMENTATION.
** M : MANUFACTURER/Sub-contractor, C : DPSI / Nominated Inspection agency.
N : CUSTOMER , Customer to identify CHP in column N
P : PERFORM, W : WITNESS AND V : VERIFICATION.
CHP: GCPL Shall identified in column "N" as "W"
Major
BOUGHT OUT ITEM
Bearing
Winding & Bearing Temperature Detector
QCR
Major TC
Hyosung corporation LTD.
K.B.BYUN
REV-'0'
REVIEWED BY
DOC. No : MQP-G-3B
Major TC
DPSI APPROVED BY
For
GCEL
USE
Page 1 of 5
8/3/2019 Comment Mqp for Motor 'Rev-A' for Cw Pump-1
2/5
QUANTUM OF CHECK
M M C N
2.0
2.1
2.1.1 Final dimensional check Dimn 100% Approved Drawing Approved Drawing P V V
2.2
2.2.1Final dimensional check for bearingseating dia, coupling seating dia, run out
(eccentricity)
Dimn 100% Approved Drawing Approved Drawing P V V
3.0
3.1
3.1.1 Dimensional & visual check Dimn1 Sample
/ LotApproved Drawing Approved Drawing P V V
QCR
SHAFT
Major QCR
DATE : 26.05.2011HYOSUNG CORPORATION
KOREA
INPROCESS INSPECTION - MACHINING
TYPE OF
CHECK
COMPONENTS &
OPERATIONS
SL
No
ROTOR/STATOR - CORE PUNCHING
ROTOR / STATOR CORE PUNCHING
C.W.Pump Motor REV. 0
ITEM : 4100kW 18P 11kV VSTC1250
REMARKS
Major QCR
CLASSCHARACTERISTICS
STATOR FRAME
Major
FORMAT OF
REPORT
PROJECT : 2 x 685MW THERMAL POWER
PLANT
AT RAIPUR, CHHATTISGARH
CLIENT : GMR CHATTISGARH ENERGY PVT LTD
CONSULTANT : DCPL
MAIN SUPPLIER : DOOSAN POWER SYSTEMS
INDIA PVT.LTD. / KBL PUNE
MANUFACTURER'S NAME & ADDRESS MANUFACTURING QUALITY PLAN
REFERENCE DOCUMENT
AGENCY
MQP. No : MQP-G-3B
ACCEPTANCE
NORMS
3.1.2 Burr checking Dimn1 Sample
/ LotApproved Drawing Approved Drawing P V V
3.2
3.2.1 Dimensional & visual check includingslot size with gauge Dimn 1 Sample/ Lot Approved Drawing Approved Drawing P V V
3.2.2
Check locking of
1) Both end of core
2) Shaft with core
Visual 100% Approved Drawing Approved Drawing P V V
3.3
3.3.1Check records of approved brazing
proces and qualified brazersProcess 100% BPS / PQR ASME BPS / PQR ASME P V V
3.3.2 Preparatory checks befor brazing Visual 100% Approved Drawing Approved Drawing P V V
3.3.3Visual inspection of brazed joints
and procees controlVisual 100% Approved Drawing Approved Drawing P V V
3.3.4 Dynamic balancing at rated speed Mech. 100% ISO 1940 ISO 1940 grade 2.5 P V V
APPROVAL SEALDPSI
Hyosung corporation LTD.
K.B.BYUN
DOC. No : MQP-G-3B REV-'0'
LEGEND * RECORDS, IDENTIFIED WITH "TICK" () SHALL BE ESSENTIALLY
INCLUDED BY SUPPLIER IN QA DOCUMENTATION.
** M : MANUFACTURER/Sub-contractor, C : DPSI / Nominated Inspection agency.
N : CUSTOMER , Customer to identify CHP in column N
P : PERFORM, W : WITNESS AND V : VERIFICATION.
CHP: GCPL Shall identified in column "N" as "W" REVIEWED BY APP ROVED BY
Major QCR
QCR
ROTOR CORE ASSEMBLY
Major
Major
Major
Major
QCR
QCR
Major
Major Report
QCR
QCR
ROTOR COMPLETE INCLUDING BRAZING OF S. C. RING
For
GCEL
USE
Page 2 of 5
8/3/2019 Comment Mqp for Motor 'Rev-A' for Cw Pump-1
3/5
8/3/2019 Comment Mqp for Motor 'Rev-A' for Cw Pump-1
4/5
QUANTUM OF CHECK
M M C N
1. 6. 7 D*
4.3
4.3.1 Tan Delta Elec. 100% IEC 60894-App.B - fig. 1 IEC 60894 P V V
5.0
5.1
5.1.1Visual check including size of lugs and
quality of joints(crimping)Measurement Approved Drawing Approved Drawing P V V
5.1.2Check for identity & completeness of
components and accessories & clearingMeasurement IEEE 112 or IEC 60034 IEEE 112 or IEC 60034 P V V
5.2
Major 100% TC
Major 100% TC
ASSEMBLED MOTOR
FINISHED ASSEMBLED MOTOR
WOUND STATOR - After Impregnation
Major QCR
MANUFACTURING QUALITY PLAN
11.
C.W.Pump Motor
2. 3. 4.
CLASSTYPE OF
CHECK
DATE : 26.05.2011
ACCEPTANCE
NORMS
FORMAT OF
REPORT
AGENCY
5. 9.
MANUFACTURER'S NAME & ADDRESS
8.
COMPONENTS &
OPERATIONSCHARACTERISTICS
SL
No
HYOSUNG CORPORATION
KOREA
ITEM : 4100kW 18P 11kV VSTC1250
PROJECT : 2 x 685MW THERMAL POWER
PLANT
AT RAIPUR, CHHATTISGARH
CLIENT : GMR CHATTISGARH ENERGY PVT LTD
CONSULTANT : DCPLMAIN SUPPLIER : DOOSAN POWER SYSTEMS
INDIA PVT.LTD. / KBL PUNE
REFERENCE DOCUMENT REMARKS
PAINTING & PRESERVATION
MQP. No : MQP-G-3B
REV. 0
** 10.
7.2.1Visual check & check for paint coat
thicknessMeasurement Approved Drawing Approved Drawing P W V
5.3
5.3.1. Dimensional check as per drawing Measurement Approved Drawing Approved Drawing P W V
5.3.2
Resistance measurement of Winding,
RTD, BTD and Space Heater before
start of the machine
Measurement IEEE 112 or IEC 60034 IEEE 112 or IEC 60034 P W V
5.3.3Reduced voltage running test actual
direction of rotationMajor Measurement IEEE 112 or IEC 60034 IEEE 112 or IEC 60034 P W V
5.3.4Measurement of IR on stator winding
and Space heater before & after HV testMajor Measurement IEEE 43 IEEE 43 P W V
5.3.5 IR value for BTD, RTD Major Measurement IEEE 43 IEEE 43 P W V
5.3.6 Polorization Index Measurement IEEE 43 IEEE 43 P W V
APPROVAL SEAL
100%
Major 100% TC
100%
100%
ROUTINE TESTS
TC
100% TC
TC
TC
TC
100%
TC
Major 100%
Major
DPSI
Major
REV-'0'
REVIEWED BY APP ROVED BY
Hyosung corporation LTD.
K.B.BYUN
LEGEND * RECORDS, IDENTIFIED WITH "TICK" () SHALL BE ESSENTIALLY
INCLUDED BY SUPPLIER IN QA DOCUMENTATION.
** M : MANUFACTURER/Sub-contractor, C : DPSI / Nominated Inspection agency.
N : CUSTOMER , Customer to identify CHP in column N
P : PERFORM, W : WITNESS AND V : VERIFICATION.
CHP: GCPL Shall identified in column "N" as "W"
DOC. No : MQP-G-3B