16
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE

COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

  • Upload
    abeni

  • View
    32

  • Download
    1

Embed Size (px)

DESCRIPTION

COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM. MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE. SHAWNEE HEIGHTS HIGH SCHOOL. Replace Chiller & Rebuild Central Station AHU Replace Gym AHU Add Cooling to Gym - PowerPoint PPT Presentation

Citation preview

Page 1: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

COMING NOVEMBER 2012SHAWNEE HEIGHTS BOND REFERENDUM

MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE

Page 2: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

Replace Chiller & Rebuild Central Station AHUReplace Gym AHUAdd Cooling to GymReplace General Exhaust Fans, Locker Rooms, Rest RoomsReplace Electrical Service ComponentsExisting Auditorium RemodelPrecast Panel and Window Replacement

New AuditoriumRemodel Existing Stage CraftRoof ReplacementReplace Heating Systems in Shop ClassroomsReplace locker room AHU & Add CoolingReplace BleachersReplace PE & Varsity LockersRenovate South-East Gym Entry

SHAWNEE HEIGHTS HIGH SCHOOL

Page 3: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

SHAWNEE HEIGHTS HIGH SCHOOL

Page 4: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

SHAWNEE HEIGHTS MIDDLE SCHOOL

Replace WindowsReplace General Exhaust Fans, Locker Rooms, Rest Rooms

Replace Locker Room Air Handling UnitsReplacement of Water ServiceMasonry Restoration

Page 5: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

SHAWNEE HEIGHTS MIDDLE SCHOOL

Page 6: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

Remove “Morton” BuildingParking for Events

Office RenovationRoof Replacement

TECUMSEH NORTH ELEMENTARY

Page 7: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

TECUMSEH NORTH ELEMENTARY

Page 8: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

Replace WindowsAwning Over East ExitCafeteria Lighting, Ductwork, and Renovation

Masonry RestorationCyclical Caulking

TECUMSEH SOUTH ELEMENTARY

Page 9: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

TECUMSEH SOUTH ELEMENTARY

Page 10: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

Additional Parking and Drive LaneReplace BoilersReplace Water HeatersUpgrade Controls to add to Global Control SystemClassroom, Cafeteria, Music, Band and Office

Expansion and RenovationReplace/ Repair WindowsMetal Panel Repair/ ReplacementFinish ReplacementRetro-Commission HVAC Systems

BERRYTON ELEMENTARY

Page 11: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

BERRYTON ELEMENTARY

Page 12: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

Replace Water HeaterKitchen & Cafeteria ExpansionMasonry Restoration

Control Joint RepairRoof Replacement

SHAWNEE HEIGHTS ELEMENTARY

Page 13: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

SHAWNEE HEIGHTS ELEMENTARY

Page 14: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

10 GB/S Fiber Within All Buildings

INFORMATION TECHNOLOGY

Page 15: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

FINANCIAL IMPACT

• Total Bond $17,500,000• Average 5.16 mills increase over the next 20

Years• Staggered with the Existing Bonds to Minimize

Impact • Average of $59.34 on a $100,000 House over

the next 20 Years

Page 16: COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM

WHAT YOU CAN DO

• Educate Yourself and Others• Ask Questions and Share answers• Be Positive• Make Administration Aware as Questions Arise