3, Salah Salem Road, Nasr City, Cairo, EgyptGeneral Authority for Investment BLDG

Tel: +(202) 2405 5428 / Fax: +(202) 2405 5421www.comesaria.org

COMESAInvestmentTeaser

Note: This document was prepared by COMESA RIA from documents presented by the COMESA National Investment Promotion Agencies. It is designed to give an overview of the investment opportunities in the region and should be viewed within the context of these objectives. This document contains information in summary form and is therefore intended for general guidance only. It is not intended to be a substitute for detailed research or the exercise of professional judgment. COMESA RIA cannot accept any responsibility for loss occasioned to any person acting or refraining from action as a result of any material in this document. On any specific matter, reference should be made to the appropriate resource.

COMESA Investment Teaser

TOURISM

14 COMESA INVESTMENT TEASER

TOU

RIS

M

Sub-Sector Construction and Development

Project Description:

Three new resort cities are envisioned, namely, Lake Turkana, Isiolo, and Lamu. These areas have a number of unique tourist attraction sites, rich historical culture and are highly unexploited. Lake Turkana, Isiolo and Lamu resort cities have an EIRR of 20.8%, 12.8% and 17.1% respectively. They will be developed and operated by collaboration between public and private Sectors. The type of PPP is supposed to be “land lease type”, where lease charge is to be paid annually by the lessee (private resort operator) to the lesser (resort estate owner).

Project Location: Isiolo, Lamu and Lake Turkana

Lead Agency/ Project Promoter: Ministry of Tourism

Contact: Address:TelepostaTowers,18thfloor,KenyattaAvenueP.O. Box 30027-00100 Nairobi, KENYAMobile: +254 710 601 103

Current Status/ Stage of Project: EOI for Transaction Advisors

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Available upon request

Resort Cities KENYA

15

TOU

RIS

M

COMESA INVESTMENT TEASER

Sub-Sector Construction and Development

Project Description:

Kenya Railways Corporation, as part of its mandate to expand its assets, has developed a strategy to create exciting and innovative property developments. One of the key developments is the Lake View Resort City. The proposed Lake View Resort City will be located on the Kenya Railways land which measures 20 acres in Kisumu City on the shores of Lake Victoria. It will be situated between Jomo Kenyatta Highway, Bank Street, the railway station and the State Lodge.

The project will involve the development of the following facilities:• 5* hotel – 400 rooms• Two 3* hotels – 300 rooms each• Conference facilities for over 2000 people• Officepark–10commercialbuildings• Car park – for up to 2000 cars• Entertainment and recreation areas• Shopping Mall• Business Process Outsourcing (BPO) Park

The proposal is for a joint venture partner to assist with the development of the resort.

Opportunities include:• Construction • Leisure facilities services and management• Tourism services

Project Location: Kisumu

Lead Agency/ Project Promoter: Kenya Railways Corporation (KRC)

Actions Required/ Implementation Arrangements/ Contract Type: Seeking joint venture partner/s

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Available

Estimated Cost of the Project: USD 130 million

Period of Implementation: Estimate 48 months

Lake View Resort City in Kisumu KENYA

INFRASTRUCTURE; TRANSPORT, ENERGY, ICT, MINING AND WATER

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

117COMESA INVESTMENT TEASER

Sub-Sector Energy

Project Description:Olkaria Field is endowed with geothermal energy for the provision of steamandpower.KenGenhasbeenexploringthefieldandcurrently,the exploited capacity amounts to 487MW of power.

Project Location: Naivasha

Lead Agency/ Project Promoter: Kenya Electricity Generating Company (KenGen)

Contact: HeadOffice;StimaPlaza,PhaseiiiAddress: P. O. BOX 47936, 00100 NairobiTel: 0711036000 / 0732116000 / 203666000Email: [email protected]

Actions Required/ Implementation Arrangements/ Contract Type: Engineering Procuring and Construction (EPC)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available

Estimated Cost of the Project: USD 418.52 million

Sub-Sector Energy

Project Description:The implementation of Olkaria I Unit 6 geothermal power project is an extension to the recently completed Olkaria I Unit 4 & 5 under the GoK’s5000.Thestrategyistheprovisionofaffordablepowerthroughrenewable energy sources.

Project Location: Naivasha

Lead Agency/ Project Promoter: Kenya Electricity Generating Company (KenGen)

Contact: HeadOffice;StimaPlaza,PhaseIIIAddress: P. O. BOX 47936, 00100 NairobiTel: 0711036000 / 0732116000 / 203666000Email: [email protected]

Actions Required/ Implementation Arrangements/ Contract Type: Joint Venture with Government

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available

Estimated Cost of the Project: USD 314 million

Olkaria VI (140MW) KENYA

Olkaria I Unit 6 ( 70MW) KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

118 COMESA INVESTMENT TEASER

Sub-Sector Energy

Project Description:

This project will increase geothermal generation through the development of a new 140MW power plant.

This provides the following opportunities:• LotI:Steam-fieldDevelopmentContract• Lot II: Power Plant - Civil, Electrical and Mechanical EPC

Contract• Lot III: Sub-station, transmission line and interconnection into

the grid• LotIV:Localinfrastructureworks(road,officesfortheEngineer,

Training School and Hostel)

Project Location: Naivasha

Lead Agency/ Project Promoter: Kenya Electricity Generating Company (KenGen)

Contact: HeadOffice;StimaPlaza,PhaseIIIAddress: P. O. BOX 47936, 00100 NairobiTel: 071 1036 000/073 211 6000/203 666 000Email: [email protected]

Current Status/ Stage of Project: Feasibility Study has been carried out

Actions Required/ Implementation Arrangements/ Contract Type: Joint Venture with Government

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 554 million

Olkari V KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

119COMESA INVESTMENT TEASER

Sub-Sector Energy

Project Description:This project comprises of two components. One component involves theestablishmentofajetty,storageandthere-gasificationfacilities.The other component will be the development of a power generation plant through a partnership between KenGen and the private Sector.

Project Location: Dongo Kundu, Mombasa

Lead Agency/ Project Promoter: Ministry of Energy and Petroleum

Contact: Address: P. O. Box 30582 Nairobi KenyaTel: +254 020 310112Email: [email protected] Website: http://www.energy.go.ke

Actions Required/ Implementation Arrangements/ Contract Type:

30-year concession for LNG facility and a 20-year power purchase agreement for a Build Own Operate Plant with additional time for decommissioning and land restoration.

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 685 million

Liquified Natural Gas (LNG) Storage and Regasification Facility with Associated Power Generation KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

120 COMESA INVESTMENT TEASER

Sub-Sector Energy

Project Description:

The Mombasa Petroleum Trading hub shall be a modern petroleum terminal comprising: • Twooffshorepetroleumjetties(singlebuoymoorings)withone

dedicatedtoloading/offloadingofcrudeoilandblackfuelsandtheothertorefinedproducts

• The jetties will allow discharge by crude carriers of up to VLCC capacity and product carriers of up to 120,000 DWT

• AmodernGreenfieldpetroleumtankfarmwithadesigncapacityof 800,000MT to be developed in phases from an initial minimum capacity of 300,000MT

The objective shall be to address the present constraints faced at the port of Mombasa but also to set up the infrastructure necessary to position the Kenyan coast as a petroleum trading hub to serve Eastern Africa, the East coast of Africa and ultimately serve as an important supply point for cargoes destined for South East Asia.

Project Location: Mombasa

Lead Agency/ Project Promoter: National Oil Corporation of Kenya (NOCK)

Contact: HeadOffice:AONMinetHouse,7thfloorOffNyerereRoadAddress: P.O. Box 58567-00200, Nairobi, KenyaTel: +254-20-695 2000Mobile: +254-734 333 000 / +254-722 203 747

Current Status/ Stage of Project: Negotiation of land ongoing

Actions Required/ Implementation Arrangements/ Contract Type: Joint Venture

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 500 million

Mombasa Petroleum Trading Hub KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

121COMESA INVESTMENT TEASER

Sub-Sector Energy

Project Description:

The Magwagwa Multipurpose Dam Project comprises the construction ofa95mhighand450mlongconcretefacedrockfilldamwithadesign total output of 120MW and an annual energy production of 510GWh/y. It also comprises a reservoir with a maximum capacity of 445*10,000,000 cubic meters expected to supply water to 19 service centres starting with Magwagwa town, whilst also providing water for irrigationandfisheries.

Project Location: Nyamira, Kericho, Bomet, Kisumu and HoamBay

Lead Agency/ Project Promoter: Lake Basin Development Authority

Contact:

Address: P.O. BOX 1516-40100 KISUMU OfficelocatedatKanyakwar,offKakamegaRd.Tel: 254-020-2023414Mobile 0790493456 / 0731482388 Email: [email protected] / [email protected]

Actions Required/ Implementation Arrangements/ Contract Type: Joint Venture

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 979.8 million

Magwagwa Multipurpose Dam KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

122 COMESA INVESTMENT TEASER

Sub-Sector Energy

Project Description:The development is proposed to generate 60MW of hydropower using the waters of the Arror River, as well as irrigating 2500 ha for crop production whilst conserving, rehabilitating and protecting the environment along the Arror.

Project Location: Kapsowar Town

Lead Agency/ Project Promoter: Kerio Valley Development Authority

Contact: Address: P.O. Box 2660-30100Tel: +254202663365Website: http://www.kvda.go.ke/

Current Status/ Stage of Project: EOI underway

Actions Required/ Implementation Arrangements/ Contract Type: Joint Venture

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 302.48 million

Arror Multipurpose Dam KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

123COMESA INVESTMENT TEASER

Sub-Sector Rail Transport

Project Description:The developments in the proposed cities will include ultra-modern railway stations, direct rail links with the international airport in the host city, commercial buildings, an industrial park, shopping arcades, malls and restaurants among other facilities.

Project Location: Nairobi, Mombasa, Taita Taveta and Kisumu

Lead Agency/ Project Promoter: Kenya Railways Corporation

Contact:

HeadOffice:WorkshopsRoadOffHailleSelasssieAvenueOpposite Technical University of KenyaAddress: P.O. Box 30121 – 00100 NairobiFax: 020 – 340040 / 224156Tel: 070990700 / 0728603881/2 / 0708572574 / 0708571587E-mail: [email protected] / [email protected]

Current Status/ Stage of Project: Ultra-modern railway stations, direct rail links

Actions Required/ Implementation Arrangements/ Contract Type:

Build Operate Transfer (BOT), franchises and Joint-Ventures under land lease.

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 2.15 Billion

Railway Cities KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

124 COMESA INVESTMENT TEASER

Sub-Sector Rail Transport

Project Description:Rehabilitation of existing 100 km railway line, doubling of sections and supporting infrastructure. Design and provision of rolling stock and operation of the commuter rail link between Nairobi CBD and the Airport.

Project Location: Nairobi

Lead Agency/ Project Promoter: Kenya Railways Corporation

Contact:

HeadOffice:WorkshopsRoadOffHailleSelasssieAvenueoppositeTechnical University of KenyaAddress: P.O. Box 30121 – 00100 NairobiFax: 020 – 340040 / 224156Tel: 070990700 / 0728603881/2 / 0708572574 / 0708571587Email: [email protected] / [email protected]

Current Status/ Stage of Project: Feasibility study has been completed and the preparation of terms of reference for detailed designs is ongoing

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 138 million

Nairobi Commuter Rail Services KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

125COMESA INVESTMENT TEASER

Sub-Sector Road Transport

Project Description:

The planned highway runs from the port of Lamu through Garissa-lsiolo (530km), Turkana, Nakadok to South Sudan and a link from lsiolo to Marsabit, Moyale and Ethiopia. This road network is expected to position the country as a transport and logistics hub of unparalleled means in the region.

The road network will provide critical infrastructure necessary to provide services and grow trade in the areas it traverses. Secondly, the road network is expected to ease market access and open the areas for expanded economic activities. Studies have shown that the highways have an economic internal rate of return of 12.9%.

Project Location: Port of Lamu through Garissa-lsiolo (530 km), Turkana, Nakadok to South Sudan.

Lead Agency/ Project Promoter: LAPSSET Corridor Development Authority

Contact: Phone: +254 (20) 2222084Email: [email protected]/ [email protected]: www.lapsset.go.ke

Current Status/ Stage of Project: EOI of Transaction advisor

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: The EIRR is at 12.9%

Highways (Lapsset- Lamu Port South Sudan-Ethiopia Transport Corridor) KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

126 COMESA INVESTMENT TEASER

Sub-Sector Road Transport

Project Description:

This project will involve the construction of a Greenfield bridge,connecting the Island City of Mombasa to the Northern mainland region of Nyali, as well as the subsequent operation and maintenance oftheprojectona30-yearcontractunderadesign,build,financeandoperate (DBFO) model.

Project Location: Nyali

Lead Agency/ Project Promoter: Kenya Urban Roads Authority (KURA)

Contact:

Address:IKMPlace,BishopsRoad,Off5thNgongAvenue,P.O. Box 41727 00100 NairobiTel: 020 8013844Mobile: 0717 105 233KURA Hotline: 020 2722222

Current Status/ Stage of Project: Request for quotation

Actions Required/ Implementation Arrangements/ Contract Type:

Design, Build, Finance and operatePublic Private Partnership (PPP) model

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 200 million

Period of Implementation: 30 years

Second Nyali Bridge KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

127COMESA INVESTMENT TEASER

Sub-Sector Road Transport

Project Description: The operation and maintenance of the 28 km Southern Bypass

Project Location: Southern Bypass

Lead Agency/ Project Promoter: Kenya National Highways Authority

Contact:

Address: BlueSheild Towers,Hospital Road, Upper HillP.O. BOX 49712-00100 NairobiTel: +254 020 2989000/ 0204954000/ 0700423606Email: [email protected] Website: www.kenha.co.ke

Current Status/ Stage of Project: Submission of RFQ from bidders ongoing

Actions Required/ Implementation Arrangements/ Contract Type:

Operate and Maintain (O&M)Public Private Partnership (PPP) model

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 40 million

Operation and Maintenance of of Southern Bypass KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

128 COMESA INVESTMENT TEASER

Sub-Sector Road Transport

Project Description:GOK plans to develop and rehabilitate 10,000 km of the road network withinthenextfiveyears.The3,000kmphaseoneoftheprogrammeadopts a “Finance-Design-Build-Maintain-Transfer” PPP scheme.

Project Location: Nairobi, Nakuru and Mombasa Counties

Lead Agency/ Project Promoter: Ministry of Transport and Infrastructure (MOTI)

Contact: Address: Transcom House, Ngong roadP.O. Box 52692 – 00200, NairobiTel: +254-020-2729200

Current Status/ Stage of Project: The evaluation exercise on the submitted Request for Proposals (RFP) for the 3,000 km phase one of the programme is ongoing.

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Further Remarks (if any): The private developer is compensated via fixed and performance-related periodical payments (annuity) by the government from public funds.

Phase One - Roads 10,000 km Annuity Programme KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

129COMESA INVESTMENT TEASER

Sub-Sector Maritime Port

Project Description:This is a regional project involving Kenya, Ethiopia, Uganda and Southern Sudan. The port constitutes a total of 32 berths. The governmentwillconstructthefirstthreeberthsandengagetheprivateSector to build the remaining 29 berths on the PPP framework.

Project Location: Manda Bay

Lead Agency/ Project Promoter: Kenya Ports Authority (KPA)

Contact: Address: P.O. Box 95009 Mombasa KenyaTel: +254-041-2312211Email: [email protected] / [email protected] Website: http://www.kpa.co.ke

Current Status/ Stage of Project:Contractors China Communication Construction Company and SupervisionConsultantsYashoonEngineeringwillbuildthefirstthreeBerths.Constructionwilltakefiveyearstobecompletedbyendof2019.

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Available

Estimated Cost of the Project: USD 410 million

Period of Implementation: 5 years

Further Remarks (if any): Economic internal rate of return is 23.4%

Lamu Port (Lapsset- Lamu Port South Sudan-Ethiopia Transport Corridor) KENYA

INFR

ASTR

UC

TUR

E; T

RAN

SPO

RT, E

NER

GY,

ICT,

MIN

ING

AN

D W

ATER

130 COMESA INVESTMENT TEASER

Sub-Sector Air Transport

Project Description:

Three airports of international standards are being constructed in Isiolo, Lamu and Turkana, and will primarily serve the resort cities in these areas. The construction of these airports is also aimed to give thecountry’stransportSectorgreatimpetusbycreatingefficiencyinthe transport and logistics Sector.

The three airports are a prime avenue for investment especially for the government given that airports are strategic investment avenues for a country.

Project Location: Isiolo, Lamu and Turkana

Lead Agency/ Project Promoter: LAPSSET Corridor Development Authority

Contact: Phone: +254 (20) 2222084Email: [email protected] / [email protected]: www.lapsset.go.ke

Current Status/ Stage of Project: EOI of Transaction advisor

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available upon request

Estimated Cost of the Project: USD 506 million

Further Remarks: The EIRR is 20.7%

Airports (Lapsset- Lamu Port South Sudan-Ethiopia Transport Corridor) KENYA

MANUFACTURING AND INDUSTRY

MAN

UFAC

TURI

NG A

ND IN

DUST

RY

193COMESA INVESTMENT TEASER

Sub-Sector Heavy Industries

Project Description:This project involves the design and construction of an integrated steel mill plant to take advantage of the high demand for steel and readily available raw materials in the country.

Project Location: Kitui, Kajiado, and TaitaTaveta Counties

Lead Agency/ Project Promoter: Ministry of Industrialisation, Trade and Co-operatives and Numerical Machining Complex (NMC)

Contact:

Address:SocialSecurityHouse,BlockA,17th,23rdflrP.O. Box 30418-00100, Nairobi, KenyaTel: +254 20-2731531Fax: +254 20-2731511Email: [email protected] / [email protected]

Address:WorkshopRoad,OffBunyalaRoad.P.O. Box 70660 – 00400 KenyaTel: +254 202241 701 / +254 2242 435 / +254 2240 850 / +254 22250549 / +254 22244143Mobile: +254 0716 431 114Email: [email protected] Website: http://www.nmc.co.ke

Current Status/ Stage of Project: Available for uptake

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Available upon request

Estimated Cost of the Project: USD 1.5 billion

Integrated Steel Mill KENYA

REAL ESTATE

SERVICES

SERV

ICES

227COMESA INVESTMENT TEASER

Sub-Sector Healthcare

Project Description:

DevelopmentofthefirstfullhealthPPPprojectinKenyatoprovidelocalaccess to state of the art specialty care thereby reducing the need to travel.

A Build-Operate-Transfer PPP where the private party finances,constructs, operates and maintains (O&M) the envisaged seven-storey to house 300 beds hospital building.

Project Location: Nairobi

Lead Agency/ Project Promoter: Kenyatta National Hospital (KNH)

Contact: Address: P. O. Box 20723 - 00202Tel: 0709 854000/ 0730 643000/ 0722 829500/1E-mail: [email protected]: www.knh.or.ke

Current Status/ Stage of Project: Evaluation of Expression of Interest for a Transaction Advisor has been done.

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility studies are being undertaken

Estimated Cost of the Project: USD 36 million

300-Bed Hospital at Kenyatta National Hospital (KNH) Private Wing KENYA

LOGISTICS

LOG

ISTI

CS

241COMESA INVESTMENT TEASER

Sub-SectorSpecial Economic Zones

Project Description: Establishment of a special economic zone with modern infrastructure and advanced technology.

Project :ocation: Ali Sabieh

Lead Agency/ Project Promoter: National Investment Promotion Agency of Djibouti (NIPA)

Contact: Tel: +253 21 32 73 52Email: [email protected]

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Estimated Cost of the Project: USD 150 million

Period of Implementation: Scheduled for 2018 – 2019

Sub-Sector Technology Parks

Project Description:

Main activities in the Konza Technological City project include:• Ready-built structures to house Business Process Outsourcing

(BPO) and Information Technology (IT) enabled services• Commercialofficespaceandhotels• Residential real estate• Large scale commercial shopping malls • Recreation and entertainment facilities

Project Location: Makueni County

Lead Agency/ Project Promoter: Konza Technopolis Development Authority

Contact: Tel +254 20 4343013/4 Email [email protected]

Current Status/ Stage of Project: Infrastructure development ongoing

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available

Estimated Cost of the Project: USD 500 million

Further Remarks (if any)Receiving requests for expression of interest for engineering, procurement,constructionandfinanceforinfrastructuredevelopmentfor phase one of Konza techno city.

Establishment of a Special Economic Zone (3) DJIBOUTI

Konza Technological City KENYA

LOG

ISTI

CS

242 COMESA INVESTMENT TEASER

Sub-Sector Industrial Parks

Project Description:The Kenya leather park, set on a 500 acre site, will encourage value addition and innovation towards unlocking economic potential of the leather Sector in Kenya.

Project Location: Kenanie, Machakos County

Lead Agency/ Project Promoter: Ministry of Industrialization & Enterprise Development

Contact: Tel: +254 20-2731531Fax: +254 20-2731511Email: [email protected] / [email protected]

Current Status/ Stage of Project: LandidentifiedfortheKenyaLeatherPark

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study available upon request

Estimated Cost of the Project: USD 11.8 million

Sub-Sector Industrial Parks

Project Description:

To develop a world-class mixed use Industrial Park that will include various clusters of businesses, manufacturing and services, in Olkaria.Theprojectwillcover1200acresandwillbenefit fromtheproximity to the geothermal power stations and the Nairobi-Kampala railway.

Project Location: Olkaria, Naivasha

Lead Agency/ Project Promoter: Kenya Electricity Generating Company (KenGen)

Contact: HeadOffice,StimaPlaza,PhaseIIIAddress: P. O. BOX 47936, 00100 NairobiTel: 0711036000 / 0732116000 / 203666000Email: [email protected]

Current Status/ Stage of Project: Infrastructure development ongoing

Actions Required/ Implementation Arrangements/ Contract Type: Leasing

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available

Kenya Leather Park KENYA

Kengen Industrial Park KENYA

LOG

ISTI

CS

243COMESA INVESTMENT TEASER

Sub-Sector Storage

Project Description: The project entails infrastructural modification to berths 11-14 tosupport loadings from modern container handling equipment.

Project Location: Mombasa

Lead Agency/ Project Promoter: Kenya Ports Authority (KPA)

Contact: Address: P.O Box 95009 Mombasa KenyaPhone: +254 041 2312211Email: [email protected] / [email protected]: http://www.kpa.co.ke

Current Status/ Stage of Project: Currently receiving EOIs

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available

Estimated Cost of the Project: USD 120 million

Sub-SectorStorage

Project Description:The project entails the development of new container terminal of an area of 100 ha on the western side of the existing Kipevu Oil Terminal, creating an additional capacity of 1.2 million TEU.

Project Location: Mombasa

Lead Agency/ Project Promoter: Kenya Ports Authority (KPA)

Contact: Address: P.O Box 95009 Mombasa KenyaPhone: +254 041 2312211Email: [email protected] / [email protected] Website: http://www.kpa.co.ke

Current Status/ Stage of Project: Construction of phase 1 is ongoing while transaction advisor for phase 2 is onboard, and the drafting of concession plan is ongoing.

Actions Required/ Implementation Arrangements/ Contract Type: Public Private Partnership (PPP)

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available

Estimated Cost of the Project: USD 330.1 million

Conversion of Berths 11-14 into Container Terminals KENYA

Mombasa 2nd Container Terminal Phase 2&3 KENYA

LOG

ISTI

CS

244 COMESA INVESTMENT TEASER

Sub-Sector Science and Technology

Project Description:

The project will integrate data, generate and disseminate hydro-meteorological information and products for river basins in real-time in supportofwater resourcesassessmentandmanagement, floodand drought early warning, disaster prevention and mitigation and contribution to the national goal of sustainable development of water supply, hydroelectric power production and infrastructure development.

Project Location: Nzoia, Tana and Nyando river basins

Lead Agency/ Project Promoter: Kenya Meteorological Department

Contact: Postal Address: P. O. Box 30259 - 00100, GPO, NairobiTel: 254 20 3867880 / +254 20 3876957 / +254 20 3873682E-mail: [email protected] / [email protected]

Current Status/ Stage of Project: Available for uptake

Actions Required/ Implementation Arrangements/ Contract Type: Joint Venture

Availability of Pre-feasibility Studies, Feasibility Studies, and Other Studies:

Feasibility study is available

Estimated Cost of the Project: USD 335.53 million

Integrated Hydro-Metrological Information and Decision Support System KENYA

CONTACTS

255COMESA INVESTMENT TEASER

CONTA

CTS

Burundi Investment Promotion AuthorityTelephone: (+257) 22 27 59 96/97 E-mail: [email protected] Website: www.investburundi.bi

Comoros National Investment Promotion AgencyTelephone: (+269) 77 38 570 Fax: (+269) 773 84 91E-mail: [email protected] Website: www.invest-comoros.com

Djibouti National Investment Promotion AgencyTelephone: (+253) 21 32 73 52Fax: (+253) 21 35 88 37E-mail: [email protected] Website: www.djiboutinvest.com

Dr Congo National Agency For Investment Promotion (ANAPI) Telephone: (+243) 9999 25 026Fax: (+243) 816 99 65 48E-mail: [email protected]: www.anapi.org

Eritrean Center for InvestmentTelephone: (+291) 1 11 88 22Fax: (+291) 1 12 42 93E-mail: [email protected]

Ethiopian Investment Commission (EIC)Telephone: (+251) 11 551 0033Fax: (+251) 11 551 4396E-mail: [email protected]: www.investethiopia.gov.et

Kenya Investment Authority (KENINVEST) Telephone: (+254) 730 104 200/210E-mail: [email protected]: www.investmentkenya.com

256 COMESA INVESTMENT TEASER

CONTA

CTS

Economic Development Board of MadagascarTelephone: (+261) 2022 67040Fax: (+261) 2022 66105E-mail: [email protected] Website: www.edbm.gov.mg

Malawi Investment and Trade CentreTelephone: (+265) 1 770 800 / 771315Fax: (+265) 1 771781E-mail: [email protected] Website: www.mitc.mw

Mauritius Board Of InvestmentTelephone: (+230) 203 3800Fax: (+230) 208 2924 E-mail: [email protected] Website: www.investmauritius.com

Rwanda Development Board (RDB) Telephone: (+250) 727 775 170Fax: +250 252 580 388E-mail: [email protected] Website: www.rdb.rw

Seychelles Investment BoardTelephone:(+248) 429 55 05Fax: (+248) 422 51 25E-mail: [email protected] Website: www.sib.gov.sc

Ministry of Investment - SudanTelephone: (+249) 918 000 072Fax: (+249) 183 787 192Website: www.sudaninvest.org

Swaziland Investment Promotion AuthorityTelephone: (+268) 2404 04 70Fax: (+268) 2404 33 74E-mail: [email protected] Website: www.sipa.org.sz

257COMESA INVESTMENT TEASER

CONTA

CTS

Uganda Investment Authority (UIA)Tel. :(+256) 414 301 000E-mail :[email protected] :www.ugandainvest.go.ug

Zambia Development Agency (ZDA)Tel. :+260 211 220177 / 223859Fax :(+260) 211 225 270E-mail :[email protected] :www.zda.org.zm

Zimbabwe Investment Authority (ZIA)Tel. :(+263) 475 7931Fax :(+263) 477 3843E-mail :[email protected] :www.investzim.com

3, Salah Salem Road, Nasr City, Cairo, EgyptGeneral Authority for Investment BLDG

Tel: +(202) 2405 5428 / Fax: +(202) 2405 5421www.comesaria.org

COMESAInvestmentTeaser