Natural Gas Combined Cycle Combustion Turbine Solar PV Utility-Scale Reference Plants & Levelized Costs Steven Simmons Northwest Power and Conservation Council May 28 2014 1

Combined Cycle Combustion Turbine Reference Plants

  • Upload
    others

  • View
    20

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Combined Cycle Combustion Turbine Reference Plants

Natural Gas Combined Cycle Combustion

Turbine

Solar PV Utility-Scale

Reference Plants & Levelized Costs

Steven Simmons

Northwest Power and Conservation Council

May 28 2014

1

Page 2: Combined Cycle Combustion Turbine Reference Plants

REFERENCE PLANTS

2

Page 3: Combined Cycle Combustion Turbine Reference Plants

CCCT Reference Plant 1

Model & Technology Based on Siemens H-Class (SCC6 8000H – SGT6)

Plant Output & Costs Output & Costs with Augmentation

Life Cycle Costs Operation Normalization

Location Boardman

OR

Baseload Capacity 392 MW

Capacity with 20MW Duct Firing

Augmentation 412 MW

Economic Life 30 years

Ramp Rate 35 MW/min

Capacity Adjustments • Elevation (-)

• Elec./Mech. Auxiliaries (-) • Inlet & Exhaust Losses (-)

• Duct Firing Aug (+)

Earliest In-Service 2014

Heat Rate 6,471 btu/kWh

Heat Rate with Duct Firing

6,531 btu/kWh

Fixed O&M 15.37 $/kW/year

CO2 Emission Rate

792 lb/MWh

Heat Rate Adjustments • Lower Heating to Higher

Heating Value (+) • Elec./Mech. Auxiliaries (-) • Inlet & Exhaust Losses (-)

• Duct Firing Aug (+)

Configuration 1x1

Capital Cost 425 $mm

Capital Cost with Duct Firing 433 $mm

Variable O&M 3.27 $/MWh

Water Usage 2,629 gpm*

(*for 2x1)

Capital Cost Adjustments • Conversion to 2012 $ (-) • Cost of Labor OR (+) • Plant Accessories (+)

• Duct Firing (+)

Cooling Wet

Capital Cost per kW 1,084 $/kW

Capital Cost with Duct Firing per MW

1,052 $/kW

Annual Life Cycle Degradation

0.39 % Capacity 0.31 % Heat Rate

Fuel Natural Gas – GTN pipeline

Levelized Cost of Energy (2015) 56.88 $/MWh

Capital Costs are Overnight and all costs in 2012 dollars

3

Page 4: Combined Cycle Combustion Turbine Reference Plants

CCCT Reference Plant 2

Model & Technology Based on Mitsubishi Heavy Industries J-Class (MPCP1 - M501J)

Plant Output & Costs Output & Costs with Augmentation

Life Cycle Costs Operation Normalization

Location Boardman

OR

Baseload Capacity 449 MW

Capacity with 20MW Duct Firing

Augmentation 469 MW

Economic Life 30 years

Ramp Rate 20 MW/min

Capacity Adjustments • Elevation (-)

• Elec./Mech. Auxiliaries (-) • Inlet & Exhaust Losses (-)

• Duct Firing Aug (+)

Earliest In-Service 2018

Heat Rate 6,408 btu/kWh

Heat Rate with Duct Firing

6,459 btu/kWh

Fixed O&M 15.37 $/kW/year

CO2 Emission Rate

784 lb/MWh

Heat Rate Adjustments • Lower Heating to Higher

Heating Value (+) • Elec./Mech. Auxiliaries (-) • Inlet & Exhaust Losses (-)

• Duct Firing Aug (+)

Configuration 1x1

Capital Cost 547 $mm

Capital Cost with Duct Firing 556 $mm

Variable O&M 3.27 $/MWh

Water Usage 137.2 gpm*

(*for 2x1)

Capital Cost Adjustments • Conversion to 2012 $ (-) • Cost of Labor OR (+) • Plant Accessories (+)

• Duct Firing (+)

Cooling Dry

Capital Cost per kW 1,217 $/kW

Capital Cost with Duct Firing per MW

1,186 $/kW

Annual Life Cycle Degradation

0.39 % Capacity 0.31 % Heat Rate

Fuel Natural Gas – GTN pipeline

Levelized Cost of Energy (2018) 60.32 $/MWh

Capital Costs are Overnight and all costs in 2012 dollars

4

Page 5: Combined Cycle Combustion Turbine Reference Plants

Solar PV Update

Proposed Reference Utility Scale Solar PV Plant Update 05.26.14 5 MW ac using flat plate single crystalline modules mounted on single-axis trackers. individual plants at scattered locations within the better solar resource areas 8.3 acres/MW solar pv (NREL) - so around 40 acres for a 5 MW plant

5

Page 6: Combined Cycle Combustion Turbine Reference Plants

0

1000

2000

3000

4000

5000

6000

7000

8000

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

20

26

20

27

20

28

20

29

20

30

20

31

20

32

$/k

W a

c 2

01

2$

Solar PV Utility Scale

Capital Cost Estimates & Projections ($/kW ac - 2012 $)

Proposed - Seventh Plan Reference SEPA

LBNL E3

EIA NWPCC Sixth Plan

Adelanto - 10 MW Foothills I - 17 MW

Five Points Solar Station -15 MW Pine Tree - 8.5 MW

Picture Rocks - 20 MW Modeled City of Palo Alto Project Low

LBNL Analyst Projection High LBNL Analyst Projection Low

Modeled City of Palo Alto Projects High Bevans Point - 2 MW

SunShot Goal $1/W (dc) Centinela - 170 MW

Estimates & Projections 2013 - 3,107 $/kw ac 2015 - 2,654 $/kw ac 2020 - 2,098$/kw ac

Proposed

6

Page 7: Combined Cycle Combustion Turbine Reference Plants

Recent Solar PV Power Purchase

Agreements

1. Macho Springs Solar by First Solar PPA with El Paso Electric at 57.80 $/MWh

Includes New Mexico Production Tax Credit (w/o is approximately 84.90 $/MWh)

Uses Thin Film technology

2. Recurrent Energy to build a 150MW solar pv plant in West Texas PPA with Austin Energy for less than 50 $/MWh

2016 operation date – would be largest solar pv plant in Texas

7

Page 8: Combined Cycle Combustion Turbine Reference Plants

LEVELIZED COST OF ENERGY

8

Page 9: Combined Cycle Combustion Turbine Reference Plants

Discussion

Levelized Cost of Energy (LCOE) – a measure to compare costs of different generating technologies over plant life cycles - expressed in $/MWh (or $/kWh).

LCOE reflects the cost per unit of electricity for building, financing, operating, and maintaining a generating plant through the life cycle.

Important assumptions include:

• Capital costs • Fuel costs

• Financing costs • Emission costs

• O&M costs • Utilization

9

Page 10: Combined Cycle Combustion Turbine Reference Plants

Discussion

Important factors for Solar PV LCOE estimates 1. Capital Cost estimates – the

primary cost component for solar projects

2. Financing assumptions – see #1

3. Capacity Factor – based on location, how much electricity can the plant produce?

4. We see some PPA costs lower than published LCOE –why?

- CA sites on distressed farm land

- financing options ?

- better locations (capacity factors)

Natural Gas Combined Cycle Combustion Turbine 1. Fuel costs are significant – 30 year

foresight of natural gas prices suggests risk

2. Future emission cost?

10

Page 11: Combined Cycle Combustion Turbine Reference Plants

Discussion The Council financial model - Micro Fin – was used to calculate LCOE. The model generates annual costs for debt and equity service, taxes (income and property), expenses (O&M, fuel) based on the inputs, calculates NPV and produces a levelized cost for the cost components.

Model assumptions include:

Solar PV Ntrl Gas CCCT

IOU financed – 9.8% ROE, AT WACC 5.3% IOU financed – 9.8% ROE, AT WACC 5.3%

Capacity Factor 26.4% (Boise ID area location)

Capacity Factor 85%

Life cycle degradation Life cycle degradation

Investment Tax Credit – 30% until 2017, then 10%

Currently no CO2 emission penalty

Transmission – point to point, BPA 2014 Trans. Rate Schedule

Transmission – point to point, BPA 2014 Trans. Rate Schedule

11

Page 12: Combined Cycle Combustion Turbine Reference Plants

Discussion

Compared to recently released LCOE values from

EIA Annual Energy Outlook 2014

Black and Veatch Report for NREL (Cost & Performance Data for Power Generation Technologies)

12

Page 13: Combined Cycle Combustion Turbine Reference Plants

13

0

20

40

60

80

100

120

140

160

2015 2020 2025 2030 2035

$/M

Wh

20

12

$

Levelized Cost of Energy $/MWh Solar PV Utility Scale

Capital O&M Transm/Losses

Black & Veatch LCOE EIA AEO2014 Council w/Muni.Fin.

IOU financing Capacity factor – Boise ID area

Page 14: Combined Cycle Combustion Turbine Reference Plants

0

10

20

30

40

50

60

70

80

Council CCCT Adv 1 Council CCCT Adv 2

$/M

Wh

20

12

$

Levelized Cost of Energy $/MWh Ntrl Gas Combined Cycle CT – Year 2020

Capital Fuel O&M

Trans/Losses Council CCCT High Fuel Council CCCT Low Fuel

EIA AEO2014 Black & Veatch LCOE

High Fuel

Low Fuel

No CO2 emission penalty attached

14

Page 15: Combined Cycle Combustion Turbine Reference Plants

0

20

40

60

80

100

120

140

Council Solar PV EIA AEO2014 Solar PV Council CCCT Adv 2 EIA AEO2014 CCCT

$/M

Wh

20

12

$

Levelized Cost of Energy $/MWh Solar PV & Ntrl Gas CCCT – Year 2020

Capital Cost Fuel & Var O&M Fixed O&M Transmission

15