82
COLUMBIA COLLEGE SECONDARY COLLEGE GOAL PROGRESS REPORT (Secondary Goals) Fall 2011

COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

COLUMBIA COLLEGE

SECONDARY COLLEGE GOAL PROGRESS REPORT

(Secondary Goals)

Fall 2011

Page 2: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

Summary

The Fall 2011 Secondary College Goal Progress Report shows the college’s progress relating to strategic Goals

stated in the Educational Master Plan. These goals are referred to as the 10 College Goals, and are central to

planning and resource allocation at the college.

Resource requests for the college are grouped as ‘projects’ in each department’s Unit Plan. All Unit Plan projects

are directly linked to one or two of the 10 College Goals. This report shows linkages between departmental

projects, and the secondary College Goal that it supports. To see project associations with primary goals, refer to

the Primary College Goal Progress Report.

This report is sorted by each of the 10 College Goals, and shows each Project and associated Activity supporting

that specific goal. The Status field indicates if the Activity is <New>, <Wait>, <Active>, <Complete> or

<Discontinued>.

Planning information was downloaded on August 14, 2011 and then compiled to make this document.

Page 3: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

CC Planning: Secondary College Goal Progress Report

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

01:Student SuccessSecondary Project Goal:

College Admin Svs

Auxiliary Services

Bookstore Server Upgrade Server Upgrade01:Student Success NEWOur existing Dell server and operating system needs to be replaced. The existing server has Red Hat ES 2.1 operating system which is no longer supported by Sequoia Retail Systems. The new operating system is Red Hat ES 4.0. The new server will also come with a three year warrantee.

Register Upgrade ACTIVEOur cash registers are also in need of an upgrade from Windows XP to Windows WEOPS. Because of this one of our registers will need a memory upgrade.

Sunday, August 14, 2011 Page 1 of 80Last Updated

Page 4: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Administration Curriculum SL Curriculum Support Curricunet License01:Student Success ACTIVEMaintenance of Curricunet licensing costs

Support Staff WAITAdditional staffing to support curriculum activiites and increasing demand for technical review

Handbook Maintenance ACTIVEClerical updates to hard-copy and web based Columbia College Curriculum Handbook

Curricunet Training COMPLETETraining for faculty and staff to ensure effective utilization of the available tools

Ad-Hoc Reporting COMPLETEImplementations of Ad-Hoc reporting capability for Curricunet. This will allow for a wide range of locally derived reports to be generated.

Curriculum Training ACTIVEOngoing faculty and staff trainnig in the area of curriculum development and supoprt. This would include a minimum of 2 people each year to the ASCCC Curriculum Institute.

Distance Education

Title III Grant Support Increase online offerings ACTIVEIncrase Part Time / Overload budget to support additional sections of Distance Learning offerings.

Hire Promrammer ACTIVEHire a programmer to assist with the development of various online or webbased applications and learning support.

DE Coordinator COMPLETEHire a full-time Distance Education Coordinator

Sunday, August 14, 2011 Page 2 of 80Last Updated

Page 5: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Administration Distance Education

Title III Grant Support Learning Support01:Student Success ACTIVESupport for the development of Learning Support Services for online students, or students at off-campus locations.

Arts and Sciences

Academic Achievement Center

Academic Achivement Center Office: Walls and Door

AAC Walls and Door ACTIVEAAC Walls and Door for the faculty office. Currently, there is no privacy or security. The faculty coordinator is unable to have private and confidential meetings with anyone. Also, unable to secure documents.

Academic Wellness AAC: SI Leader Budget WAITIncrease the Columbia College Academic Achievement Center SI Leader budget in order to meet student demand and student success.

second: I.A. NEWHire a second I.A. in order to offer expanded services.

Summer AAC Coordinator WAITProvide funding for a summer Coordinator for the AAC. This will cover a summer coordinator position in order to supervise and expand the summer AAC and SI programs.

Summer Tutors WAITIncrease the Columbia College Academic Achievement Center summer budget in order to establish permanent funding for summer AAC services. This budgetary increase is necessary in order to adequately address the growing need for summer academic support services.

Summer SI WAITPermanently augment the S.I. student worker budget line item by $1600. This will provide needed services fro summer.

Sunday, August 14, 2011 Page 3 of 80Last Updated

Page 6: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Behavioral & Social Science

Curriculum Development Multimedia Materials01:Student Success ACTIVEDVDs for multiple psychology courses.

Guest Speakers ACTIVEPay guest speaker fees for multiple psychology courses

Biofeedback Equipment ACTIVEPurchase biofeedback equipment for stress management course.

Mathematics Improve Student Access to Mathematics Classes

Increase adjunct pool ACTIVEQualified mathematics adjunct faculty are difficult to find in our area. Only one of our adjunct is available during the day. We are all being forced to teach overloads to cover our current math offerings. We need to advertise both in the local paper and on the internet, including the district website.

Increase math offerings NEWOffer more math sections for our students, especially the gateway courses Algebra I, Algebra II and Precalculus I.

Full-time faculty ACTIVEIn an attempt to accomodate some of the huge wait lists, we have been accepting 45 to 50 students per sections in high demand courses. This is significantly reducing the quality of instruction, creating burn-out among faculty and still well over 100 students are turned away. Increasing full-time math faculty would allow us to offer more sections of high-demand courses and help reduce the class sizes to reasonable levels.

Sunday, August 14, 2011 Page 4 of 80Last Updated

Page 7: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Mathematics Improve Student Access to Mathematics Classes

Smart classrooms01:Student Success NEWIncrease the number of Smart Classrooms available for math instruction including computer projection with ceiling mounted projector, document camera, internet access, audio-video recording, smartboards and capability for calculator projections. Demand in math could support a total of 6 full-time faculty (we currently have 4) and 4 dedicated classrooms (we currently have 2). Cost indicated in request is per classroom. All math classrooms should meet this standard.

Alternate delivery modes NEWDevelop alternative delivery math courses. Possibilities include hybrid on-line or late start courses.

Transfer/Math degree Sophomore-level math ACTIVEDevelop curriculum and provide staffing to offer sophomore-level mathematics courses: Calculus III, Linear Algebra, Differential Equations, Introduction to Proof.

Hire Math/Physics Faculty NEWHiring a faculty replacement for Dennis Albers.

Sophomore-level physics ACTIVEOffering the full 3 semesters of physics traditionally required of STEM students would support efforts to offer sophomore-level maathematics.

Institutional Research

Building Institutional Research Capacity

Hire research analyst NEWTo assist the Institutional Research and Grants offices in carrying out research duties. Obtaining needed data from valid sources, writing needed reports, etc.

Sunday, August 14, 2011 Page 5 of 80Last Updated

Page 8: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

Admissions and Records

Staff Training Staff Training01:Student Success NEW1)Provide training/inservice on all changes to GE and IGETC certifications2)Provide training/inservice on residency determination for application.3)Provide training/inservice on any college,district or state changes related to acceptance of transfer work and the evaluation for completion of degrees and certificates of achievement

EOP&S EOPS / CARE Program Planning / Evaluation

EOPS / CARE Staff Retreat ACTIVEA day-long EOPS / CARE Staff Retreat will be planned at the end of each academic year to evaluate / update unit plans, Student Learning Outcomes / Service Area Outcomes. Activities will be identified and planned for the coming year.

Shared Calendar ACTIVEEOPS / CARE will maintain a shared calendar that will be a project management tool to plan & organize events and activities.

Vocational Education

Automotive Special Populations- AT Increase Lab Assistant ACTIVEIncrerase Lab assistant time to 12 months.

Tool Room Attendant ACTIVEHire a 30 hour/week, 8 month/year tool room attendant for automotive, auto body, and welding labs tool rooms.

Child Development

Instructional and subject matter skill development

Hire support staff ACTIVEHire 50% support staff for new Center

Professional Growth ACTIVEAttend trainings and professional development activities and conferences.

Sunday, August 14, 2011 Page 6 of 80Last Updated

Page 9: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Child Development

Instructional and subject matter skill development

Update equipment01:Student Success ACTIVEUpdate equipment and furnishings to provide optimal learning environment and support sustainable practices. (For example rain barrel, other "green" technologies)

Support Instructional Lab Safe and healthy facility NEWProvide repair and maintenance to the Child Care facility as needed.

Licensing NEWMaintain licensed status of the Child Care Center as a lab for the instructional program

Equipment NEWPurchase equipment for the Child Development lab that meets industry standards

Computer Science

Program assessment and improvement

Education Plan Matrices ACTIVEDevelop an Education Plan matrix for each Degree/Certificate to be distributed to counselors and students to promote programs.

Review 2 year plan ACTIVEReview frequency of course offerings to ensure students' ability to complete degrees/certificates within 2 years.

CompTIA E2C Membership NEWANNUAL Membership(used to be payed by the state for CCCs) includes two instructors to get two free test vouchers for CompTIA exams per year, and students to get vouchers for more than half off ($168 versus $74) each for the two exams required for A+ certification.

Multimedia Technician NEWStaff and Benefits for Multimedia Technician to support both students and faculty in the CIS/Web/Graphics areas.

Sunday, August 14, 2011 Page 7 of 80Last Updated

Page 10: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Computer Science

Program assessment and improvement

CISCO Academy Fee01:Student Success ACTIVEContinue to maintain certification from CISCO Academy.

SLO Assessment ACTIVEPurchase, be trained on and use additional and improved assessment tools to implement a cycle of continuous quality improvement in our courses.

Baker Station Travel ACTIVEPay cost of using vans for field trips

Forestry and Natural Resources

Greenhouse redmodel Green house shed replace ACTIVEReplace storage shed for green house

Hospitality Management

Curriculum Development Expand Hpmgt 142 Offering DISCONTINUED

Develop online courses ACTIVEDeveloping online course offerings.

Facilities Replace walls in kitchen NEWReplace walls in kitchen with new washable surfaces that meet health code regulations.

Kitchen Work Tables ACTIVEReplace work tables in A lab, B lab, and bakery.

Remodel classroom and lab WAITRemodel labs and classroom to ACF standards

Classroom Furniture ACTIVEReplacing chairs and tables in Manzanita 2.

Remodel bakery NEWRemodel the bakery customer service area.

Instructional Technology

Upgrade ITC instructional technology

laptop computers ACTIVEPurchase laptops to be checked out by faculty and staff.

Sunday, August 14, 2011 Page 8 of 80Last Updated

Page 11: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Instructional Technology

Upgrade ITC instructional technology

desktop computers01:Student Success ACTIVEKeep all of the Desktop computers in the ITC up to date with newest technology and software.

Office Technology

Curriculum Revision Update courses ACTIVEReview and revise certificates

Expansion of Technology Software Enhancements DISCONTINUED

Explore new software to modernize program offerings

VOP Program Collaboration COMPLETEDevelop vitual office program with individual discipline faculty members.

Enhance technology NEWPurchase web cams and headsets to allow use of current technology in the lab.

Professional Development Attend VOP Online Class COMPLETEEnroll in a model virtual office class prior to introducing VOP program to Columbia College

Staff Development ACTIVEAttend discipline-specific professional development activities. Receive feedback from colleagues

Student Industry Experience

Medical Internships ACTIVEEstablish internships for transcription and coding students

Work Experience NEWSupervise students in work settings.

Welding Academic Wellness-WT Ed Plan ACTIVEEncourage students to seek an Ed Plan.

Basic Skills ACTIVEEncourage students to seek basic skills classes.

Fund AWS certification NEWFund American Welding Society (AWS) certification for all welding instructors.

Sunday, August 14, 2011 Page 9 of 80Last Updated

Page 12: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Welding Curriculum Development- WT

Align curriculum with AWS01:Student Success ACTIVEProvide stipend for adjunct faculty to align curriculum with AWS,

Expansion of Technology Use- WT

Casting Equipment NEW

Animation Software ACTIVEPurchase animation software

Software ACTIVEPurchase software for powerpoint presentations (welding animations, etc).

Program Assessment and Improvement- WT

Supplies ACTIVEIncrease supply budget

Coordinator ACTIVEProvide 20% coordinator reassigned time.

Student Industry Experience-WT

Guest Speakers ACTIVEInvite industry leaders to speak to students regarding industry needs and trends.

Sunday, August 14, 2011 Page 10 of 80Last Updated

Page 13: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

02:Ed Program & SrvsSecondary Project Goal:

College Admin Svs

Auxiliary Services

Bookstore Textbook Affordability Textbook Rental02:Ed Program & Srvs

ACTIVEAs textbooks move to new editions and qualify for the rental program, the bookstore will make a number of copies available for students to rent. The cost listed is an example for 10 copies of a title.

Food Services Snack Bar Service Expand Smoothie Blender NEWAdd a Waring Blender Model No 0520502

Business Services

Business Office computer replacement computer replacements ACTIVEroutinely replace computers

replace network printers ACTIVEroutinely replace network printer and secondary (back-up) network printer

Family Services

Child Care Center

CCTR Family Files File Audit ACTIVEA file Aduit form will be developed and used to track family file CCTR compliance. A calendar to track quarterly file audits will be created.9/23/09 File aduit form has been established and will be introduced as time permits.

Sunday, August 14, 2011 Page 11 of 80Last Updated

Page 14: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Administration SL Operational effectiveness

VPSL Office area02:Ed Program & Srvs

COMPLETEImprove physical office space and allocation to increase overall effectiveness.

Faculty Coordinator NEWFull-time faculty coordinator to focus on development, implementation and assessment of SLOs college wide.

Arts and Science Office COMPLETEIncrease office space in the Arts and Science Division office area. Current space is inadequate to handle small meetings, confidential interactions, storage and general operations for a large division.

Voc Ed Office COMPLETEImprove workspace in Voc Ed Office area to increase effective use of physical space.

Student Learning Handbook ACTIVEUpdate and maintain Student Learning Handbook

Academic Wellness Educators

CC Academic Wellness Summer On-Ramp ACTIVESupport for summer on-ramp program to better prepare students for academic expectations starting in the fall. This is targeted to address needs for underprepared students.

Basic Skills Dialogue ACTIVECollege-wide discussions and planning regarding strategies for improving the developmental and basic skills support for our students

ESL Support ACTIVESupport growing need for resources to support English as a Second Language (ESL) program

Sunday, August 14, 2011 Page 12 of 80Last Updated

Page 15: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Administration Academic Wellness Educators

CC Academic Wellness Ealry Alert02:Ed Program & Srvs

ACTIVESupport for electronic Early Alert. Need to improve connectivity between instructors, students and learning support services.

First Semester Experience ACTIVEStaffing for the First Semester Experience program. To include tutoring, SI, counseling and instructional time.

AAC Coordinator COMPLETEHire a full-time faculty coordinator for the AAC

AAC support ACTIVESupport for the Academic Achievement Center. To include various staffing needs

X-Reg ACTIVESupport for X-treme Registration. To include advertising and staffing needed for this fall event.

Professional Development ACTIVESupport for travel or bringing resources to Columbia College to ensure our faculty, staff and administrators stay up to date with trends, funding issues and instructional practices

Research WAITObtain data that will let us know the raw number and proportion of students that drop courses within the first 3 weeks of a semester. This should be available at the program level

Teaching and Learning Fig NEWCoordination support for the Teaching and Learning Fig for AWE

Sunday, August 14, 2011 Page 13 of 80Last Updated

Page 16: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Administration Academic Wellness Educators

CC Academic Wellness AWE FIG support02:Ed Program & Srvs

ACTIVEAdministrative support for the Academic Wellness Educators FIGs (Focused Inquiry Groups) and Basic Skills Plan for Columbia College. Administrative and coordination support for this student success initiative will have a direct impact on student success and retention.

Enrollment Management

SL Student Centered Scheduling

Offering analysis WAITUtilize program review, institutional research, counseling and Class-Tracks to analyze course offering patterns. Identify and implement solutions to scheduling difficulties encountered by students.

Enrll Mgt Plan COMPLETEDevelop in integrated enrollment management plan (and committee) that connects with college-wide planning, instruction, student services and is supported by the College matriculation plan.

Scheduling Guidelines WAITWork with Deans and Academic Senate to develop guidelines to identify and prioritize class schedule improvements.

Arts and Sciences

Academic Achievement Center

Instructional Support Assistant

I.A. Increased Hours NEWIncrease position from 30 hours to 40 hours a week.

I.A. 12 month NEWIncrease the I.A. Position from a 11 month to a 12 month position.

Night Instructional Assistant

Night I.A. NEWHire a night I.A.in order for the AAC to serve the evening students at Columbia College.

Sunday, August 14, 2011 Page 14 of 80Last Updated

Page 17: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Biology Lab Equipment Micro/Biotech equipment02:Ed Program & Srvs

ACTIVEBuy 3 Water baths ($1200); 8 colony counters ($8000); 6 vortex mixer ($2100); 51 variable Micropippetes: ($12,425); 12 Hot plates ($2400)

Biology models ACTIVENeuron $8221/2head:$2173Heart:$460Torso:$14252Arm:$43482Leg:$47522Larynx:$342knee:$101shoulder:$1013skull:$5992disartic.skeleton:$630female&muscle skeleton:$2339bone:$1792vertebra:$140male&female bone pelvis:$94male&female half pelvis:$12272kidney,nephron,corpuscle:$4882eye&2eye,orbiit:$4902ear:$2265th vertebra:$247skin:$114rat:$65rat skeleton:$48monocot&dicot&herbaceous stem:$446Flower:$640dicot root:$4146DNA:$222

Autoclave ACTIVEBuy 2 new autoclaves. Current autoclave is defunct and we need the second for a growing program.

Microscopes ACTIVE1. 60 new compound binocular microscopes ($107,100) 2. 72 new stereo digital zoom (dissecting) microscopes with built-in lighting ($50,400)

Sunday, August 14, 2011 Page 15 of 80Last Updated

Page 18: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Biology Lab Equipment Electronic scales02:Ed Program & Srvs

ACTIVEPriority 1: Buy 1 replacement scale and 6 scales for the new lab in the new Science Building

Oven/incubator ACTIVEBuy 5 incubators for use in new science building

Physiology equipment DISCONTINUED

Spirometers included in technology probes.

Utility lab carts ACTIVEPurchase 2 lab carts to provide supplies to the labs in new building

Botany equipment ACTIVEBuy 1 laminar flow hood to improve student experiments.

Microslide cabinet DISCONTINUED

1 cabinet will be needed for new building to accommodate and consolidate slides used in Biology labs (2 purchased 6/07)

Chemistry Essentials Annual chemical costs ACTIVETo replace materials used in lab experiments

Buy 5 new heating mantles ACTIVETo increase number of mantles for 24 students

Chemistry Lab Upgrade Water baths ACTIVEPurchase 2 new water baths.

Spectrophotomers ACTIVEPurchase 6 Vernier SpectroVis Plus spectrophotomer and fluorometer, 1 pkg of 100 cuvettes and 6 cuvette racks.

5 Balances ACTIVEAcquire 5 Top loading balances.1 UX4200H (0.01g readability)4 UX420H (0.001g readability)

Infrared Spectrometer ACTIVEAcquire an infrared spectrometer.

Sunday, August 14, 2011 Page 16 of 80Last Updated

Page 19: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Chemistry Lab Upgrade Gas Chromatograph02:Ed Program & Srvs

ACTIVEAcquire a gas chromatograph.

Atomic absorption ACTIVEAcquire 1 AA-7000F Flame atomic absorption spectrophotometer with air regulator, aceylene regulator, & 2 hollow cathode lamps.

UV-Vis spectrometer ACTIVEAcquire a UV-Vis spectrometer.

Dissection Opportunities Human cadavers ACTIVE2 Cadavers ($8000), 2 dissection guerneys/storage ($16000), and dissection supplies ($500)

Dissection text & tools ACTIVEBuy cadaver dissection textbook, manual &/or DVD; tools, humectant & other supplies

Dissection specimens ACTIVEPreserved cats ($1800) & fresh pig hearts ($360)for Bio 10; Specimens for Bio 4 ($50) and Bio 6 ($100);

Field Geology Budget Field Geology Budget ACTIVEIncrease available funds for field geology activities.

Field Studies/Off-campus Science Labs

Field trips ACTIVE1. Increase opportunities for student learning in natural setting appropriate for each course.2. Increase funding for transportation.

Field equipment &supplies ACTIVEMaterials can be utilized by several science disciplines-2 Microscope cases ($370)-2 Cordless stereo microscopes ($570)-Portable GPS unit for specimen location and safety ($300)

Sunday, August 14, 2011 Page 17 of 80Last Updated

Page 20: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Field Studies/Off-campus Science Labs

Laptop computers02:Ed Program & Srvs

DISCONTINUED

The new laptops being purchased for the new Science/NR Bldg are covered by warranty for rugged use.

Hire Additional Staff Biology Instructor (FT) ACTIVEHire 2 replacements for retired instructors plus an additional instructor to meet the growing needs of the department. Each semester 8-9 lab sections are taught by adjunct, with wait lists for most Biology labs; new courses have been added; Allied Health sections have increased; Staffing shortages and funding issues are holding back FTES; finding qualified adjunct faculty in specialized courses is difficult in this area; Microbiology could be offered in Fall semester.

Lab Asst.P/T Phys.Science ACTIVEHire a Lab Assistant for 20 hours/week to meet demand for support staff due to increasing enrollment and additional courses requiring "hands-on" educational experiences.

Lab Asst.P/T Biology ACTIVEProvide additional support for increasing numbers and variety of classes and students.

Hire adjunct as needed ACTIVETo provide access to classes for more students:1. Chem 112. Bio 17, 10, 50, 60, 65, etc.

Sunday, August 14, 2011 Page 18 of 80Last Updated

Page 21: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Instructor of Physics, Tenure Track (Replacement)

Instructor of Physics02:Ed Program & Srvs

NEWOur only full-time instructor (Dennis Albers) will be retiring in Spring 2011. Finding qualified adjunct in Physics is very difficult in rural areas such as Columbia College. Despite our efforts to attract adjunct in this area, there are none at our disposal at this time. Our vision for the future of Physics includes greater integration with Mathematics and other sciences, providing a dynamic and relevant curriculum for our students, and a focus on transfer-level courses.

Lab Safety Chemistry safety Items ACTIVEUse student fees to purchase personal safety equipment

Safety equipment ACTIVE-8 Fire blankets:each lab and prep room in Sugar Pine using open flames($600).-8 First Aid Kits:all labs & prep areas in Sugar Pine ($280).-Saftey signs ($25)-60 Goggles ($210)

Develop Lab Safety Course WAITTo provide students with basic knowledge of safety issues and techniques common to all science labs.

Safety inspections ACTIVE1. Identify specific safety concerns and staff responsibility 2. Perform regular inspections and post results3. Follow up on compliance with state & federal laws

Safety training ACTIVEProvide increased safety training for faculty and staff through seminars, videos, consultants, etc.

Sunday, August 14, 2011 Page 19 of 80Last Updated

Page 22: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Mt. Knight Improvement Construct buildings02:Ed Program & Srvs

NEWBuild ADA compliant restroom ($10,000-15,000), meetingroom/cookhouse ($10,000)and 10 tent cabin structures ($10,000)

Opportunities for Student Success

Add sections ACTIVEWhere growth is evident increase class offerings to ensure equal access to classes to all students (cost will vary)

Open labs ACTIVETo ensure that all students have needed time to complete assignments with paid instructors/ staff in attendance (cost is uncertain)

Physics Equipment Purchase equipment ACTIVEDemonstration Equipment essential for Physics:-8 Explorer GLX Datalogger ($2850)-8 Classic Dynamic System ($2036)-4pairs PAScar Dynamic Carts ($412)-8pairs PAScar Cart Picket Fences ($156)-4 Air Track Glider ($174)-1 Air Track Accessory Kit ($185)-3 Photogate Stand ($82)-10 Photogate Head ($488)-8 Motion Sensor ($693)-5 Classic Electrostatics Materials Kit ($320) -Printer compatible with hand-held Data Acquisition devices ($300).

Buy multimedia software COMPLETESkills & DVD editing $60The following items were purchased in 2007 and completed: MacBook $1200; Maintenance agreement $150;Keynote 3 & word processing $1460

Sunday, August 14, 2011 Page 20 of 80Last Updated

Page 23: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Physics Equipment Buy benchtop wind tunnel02:Ed Program & Srvs

DISCONTINUED

The windtunnel will allow students to carry out stage 3 of a 5-stage Newtonian modeling lab in which the behavior of a toy rocket is simulated, then the aerodynamic drag coefficient is measured. The windtunnel has been needed since 1989.

Restore Honeycomb Cavern

Honeycomb Cavern NEWCost for restoration of cavern entrance will be borne by the Columbia Grotto Speleological Society (volunteer labor and equipment).

Seek Alternative Funding Sources

Develop sponsors ACTIVEEncourage community participation in our educational goals. Act as local resource for schools and individuals. Give public acknowledgement for monetary assistance.

Apply for grants ACTIVE1. Fund a high elevation field station with mobile science lab components for environmental science, etc.2. Seek funds for Biology equipment

Literature and Language

Hiring Proposal, Basic Skills (New)

Hire FT BS Faculty (New) NEWTeach basic skills, preparation for college level, and college level courses in English Composition, day and evening, or technology mediated courses. Work with English faculty to develop and maintain currency of curriculum and support basic instructional needs. Work with other faculty and staff on matters of college governance, serving on relevant committees. Collaborate with AAC, FSE, On-Ramp, and other innovative programs designed to deliver English skills cross-curricularly.

Sunday, August 14, 2011 Page 21 of 80Last Updated

Page 24: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Literature and Language

Hiring Proposal, FT Faculty (Replacement)

Replacement FT Faculty02:Ed Program & Srvs

NEWHire a generalist replacement faculty in English to teach college level and upper level courses in English Composition and Literature, day and evening, or technology mediated courses as assigned. Work closely with other faculty to develop and maintain currency of curriculum and support basic instructional needs. Work with other faculty and staff on matters of college governance, serving on relevant committees as per YFA contract. Collaborate with Academic Achievement Center.

Instructor of Spanish, Tenure Track (Replacement)

Instructor of Physics NEW

Mathematics Improve Student Success Increase ISS hours ACTIVEIncreasing the hours of our Instructional Support Specailist to 40/week (currently 30) would allow the Math Lab to be available to students 8 hours per day(currently 6.5/day, with .5 hrs unstaffed).

Online homework system NEWExplore and implement a department wide online homework system.

Student Assistants ACTIVECreate a stable funding source for student assistants in the Math Lab. Cost is annually for 10 hrs/wk.

Sunday, August 14, 2011 Page 22 of 80Last Updated

Page 25: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Mathematics Improve Student Success Additional Math Lab staff02:Ed Program & Srvs

ACTIVECurrently, during peak hours, student demand for assistance exceeds what can be reasonably met by one staff person. Students sometimes have to wait too long to get their questions answered. This could be corrected with an additional staff person. Stagering schedules of the two staff would allow Math Lab hours to be extended even further to assist students taking night classes and allow our ISS to also focus on providing workshops to support student learning.

Supplemental Instruction NEWPartner with the AAC to provide SI support for more math courses. This will also require additional classrooms. The cost is per section.

Expand Math Lab ACTIVEDuring peak hours the current Math Lab is filled to capacity, preventing access to other students. Make-up exams are often given in the Lab, a quiet room would help students taking tests. A group study room would help keep noise levels down for other students in the Lab and provide a place for workshops. A different location would remove the distraction of the child playground noise, but would also require relocation of math classrooms and faculty offices.

Speech and Communications

Performing Arts T.A. Reader's Theater ACTIVETech assistance for production

National Audio Festival ACTIVEOpportunity to attend.

T.A. Radio Drama ACTIVEFor Radio Drama production

Sunday, August 14, 2011 Page 23 of 80Last Updated

Page 26: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Speech and Communications

Performing Arts Intercultural comm.02:Ed Program & Srvs

ACTIVEBudget for films

Digital tape recorders ACTIVESeveral Sony hand held digital tape recorders

Video camera ACTIVE

Dogwood lighting ACTIVETraining to use lighting in Dogwood. Also see Rod Harris note on lighting.

IMC Marketing MKT Feeder High Schools High School Newspapers WAITIncorporate Columbia College outreach messages into local High School news papers

MKT Marketing Plan Marketing Plan ACTIVEDevelop a marketing plan for Columiba College.

Alternative Media WAITExplore alternative Media venues such as Facebook, Twitter, UouTube, Text, and public internet advertising.

Institutional Research

Unit Planning Tool Revision CS IT request for UPT rev ACTIVEAdd fields for UPT users to tie Projects and/or Activities to CC EMP Goals and to Institutional SLOs.

Student Services

Administration Outside Funding Research Funding Sources ACTIVEResearch and apply for potential outside funding sources to augment program and services

Admissions and Records

Academic skills Development

X-REG Workshops ACTIVEProvide workshops to assist students in learning to utilize the college website for registration,obtaining grades, test scores, email activiation and all web services. These workshops will be in the activities planned for the X-REG yearly event.

CalWorks CalWORKs Newsletter SEMESTERLY NEWSLETTER NEW

Sunday, August 14, 2011 Page 24 of 80Last Updated

Page 27: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

CARE CARE Staff Support Clerical Support Needs02:Ed Program & Srvs

ACTIVEAssess clerical support needs based upon work responsibilities vs. hours available. Assess the level of responsibilities needed. Balance workload between programs to match funding.

CARE Coordinator Duties WAITThe duties of CARE Coordinator will be identified and assigned to classified staff. CARE Coordinator will be supervised by the EOPS / CARE Director. This activity will be in conjunction with an increase in hours assigned to CARE.

CARE Student Learning / Peer Support

Lunch and Learn Seminars NEWProvide CARE students with biannual seminars on topics related to the needs of students who are low-income single parents of young children. Includes lunch.

Peer Support Group NEWCARE will provide a monthly peer support group to be facilitated by the CARE Coordinator. Refreshments will be included.

CARE Student Orientation Activities

CARE Student Orientation ACTIVECARE will provide its students with a group CARE Student Orientation session at a minimum of once a year to share program information and to give out services. Quiz to assess competencies will be given.

CARE Student Handbook NEWA CARE Student Handbook will be developed and given to CARE students at CARE Orientation. Information to be included: CARE mission, student eligibility, program requirements for students, and services. Referrals specific to CARE students will be included.

Sunday, August 14, 2011 Page 25 of 80Last Updated

Page 28: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

CARE CARE Student Transportation Costs

Bus Passes02:Ed Program & Srvs

ACTIVECARE will provide bus passes to qualified CARE students to cover the amount needed to attend college. This is over and above the amount issued as an EOPS student.

Gas Cards ACTIVECARE will provide gas cards to its qualified CARE students to assist in the transportation expense of attending college.

DSP&S DSPS Curriculum Development

Skills 611 Adv Com Access NEWUsing CurricuNet, write curriculum for a second level computer access course and submit it to Curriculum Committee for review.

Skills 651 Diagnostic Lea ACTIVEInvestigate best practices for courses that integrate the LD eligibility model assessment with learning strategies instruction. Using CurricuNet, write curriculum and submit to Curriculum Committee for review.

Skills 610 Revision NEWUsing CurricuNet, revise current curriculum and submit it to Curriculum Committee for review.MS Word processing basics with word prediction software and other adaptive devices would be included in curriculum. Exploration of the internet with project-based approach would be implemented. This is a hybrid course partially online on Blackboard and face-to-face lab time.

DSPS Student Assistant Program

Recruit student assistant ACTIVEDesign methods to recruit student assistants. Coordinate efforts with AAC, Work Study, Work Experience, EOPS. Develop referral mechanisms and advertising campaign. Train student with current methodology.

Sunday, August 14, 2011 Page 26 of 80Last Updated

Page 29: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

DSP&S DSPS Student Assistant Program

AAC Spec. tutor training02:Ed Program & Srvs

ACTIVECoordinating with the existing AAC tutoring training program work with AAC Coordinator to offer specialized tutoring skills with DSPS special population.

Student Assistant Program ACTIVEDevelop training modules for Student Assistant Program.Identify tasks performed; identify training components; create procedural manuals; determine format for delivering modules; write the modules.

DSPS Technology Enhancement

Hardware and software NEWWhenever new technology is used or implemented, accessibility hardware and software must be upgraded and or purchased that will allow student accessibility to the new technology.

Access resource/liaison ACTIVEServe as accessibility resource/liaison for college Distance Learning projects, media production.DSPS Staff will regularly volunteer to serve on committees that address technology issues at the college.

Adaptive Computer Tech ACTIVEPurchase additional Adaptive Computer Technology for the High Tech Center Computer Lab. Purchase an additional 5-user web license to our existing user site license for Kurzweil for student use on and off campus under our umbrella license.

Alternate media creation ACTIVEDSPS will research outside sources for alternative media creation to support the needs of student and services in a timely manner in requests for media and text in alternative format.

Sunday, August 14, 2011 Page 27 of 80Last Updated

Page 30: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

EOP&S EOPS Outreach & Recruitment

Staff Awareness02:Ed Program & Srvs

ACTIVEEOPS / CARE will provide inservice and open house to promote staff awareness of program services. Staff awareness will promote informed referrals.

Outreach Plan Adjustment NEWGiven the need to limit enrollment, EOPS must prioritize the students it serves. The Outreach and Recruitment Plan will target populations who most likely to benefit from program services.

Referral Source ACTIVEThe EOPS application now includes a referral source. Data will be collected for Outreach & Recruitment planning.

CC Application Data NEWNeeds assessment on the CC Application will be analyzed for potential EOPS eligibility

EOPS / CARE Office Technology

Electronic Student Files ACTIVEEOPS / CARE will convert to electronic format for student files system. Purchase of a scanner will be needed. Front Desk, a shared file system, will be expanded in its use.

EOPS Counseling Services Adjunct Counseling Hours ACTIVEEOPS will increase the number of adjunct counseling hours available to students and to provide extended services to include late afternoon hours during semesters and summer counseling hours.

Full Time Counselor WAITEOPS / CARE will hire a full-time counselor to meet the needs of a growing EOPS student program.

Sunday, August 14, 2011 Page 28 of 80Last Updated

Page 31: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

EOP&S EOPS Staff Support Shared Admin. Asst.02:Ed Program & Srvs

NEWFinancial Aid to cover 50% of the cost for the Administrative Assistance position with the balance of costs shared equally among the other programs, including EOPS / CARE. Duties would be shared among programs.

Clerical Support Needs COMPLETEAssess the clerical program support needs of Special Programs Compare this need to the hours and level of responsibility in the current classified position of Administrative Assistant. Compare the hours worked for EOPS, CARE, and DSPS to determine if the costs for these services are equitably distributed among the programs.

EOPS Student Achievement Academic Recognition ACTIVEStudents with GPA's of 3.0 and above with high unit completion will be recognized for their accomplishments. EOPS will issue letters and certificates of acknowledgement.

Student Accomplishments WAITEOPS will send letters of acknowledgement to its students who have received Associate degrees,certificates,and scholarships or who are on the Dean's Honor List.

Honor Society Membership WAITEOPS will pay the Honor Society lifetime membership fee for qualifying students as a recognition of their academic achievements.

Grad Cap & Gown Rental WAITEOPS will recognize its graduates and recipients of certificates through paying for the rental of their caps and gowns and EOPS graduation regalia.

Sunday, August 14, 2011 Page 29 of 80Last Updated

Page 32: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

EOP&S EOPS Student Achievement Recognition Ceremony02:Ed Program & Srvs

WAITEOPS will reinstitute the Academic Recognition Ceremony for students with high academic achievement and goal attainment.

Online Student Services EOPS / CARE Website NEWEOPS / CARE will improve its website by adding blog capability to encourage student-to-student interaction on topics related to student success.

Student E-mail ACTIVEEOPS will use campus e-mail for all written communications with its students. It will encourage all of its students to activate and access their e-mail on a regular basis. Access to the communications module will be available to both clerical and counseling staff. EOPS will increase communication to students through regular e-mail submissions.

Online EOPS Orientation NEWEOPS plans to develop an online EOPS Orientation. This will be available to students who cannot attend the scheduled group orientations. This service will include a component that assesses student learning of program information.

Online Counseling WAITEOPS plans to work in partnership with the Counseling Office to add an online counseling component to its existing counseling services.

Student Retention EOPS Warning Contracts COMPLETEEOPS will evaluate the student's standing in meeting the EOPS Mutual Responsibilities Contract after each semester. Counselors use the Warning Contract as a tool for improving program compliance, student outcomes, and persistance rates.

Sunday, August 14, 2011 Page 30 of 80Last Updated

Page 33: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

EOP&S Student Retention Ed Plan Shared File02:Ed Program & Srvs

COMPLETEA regularly updated Educational Plan is essential for student retention. Counselors will use an Ed Plan in an electronic format when working with students. The plan will be saved in a shared file. This will expedite the process of updating plans, especially as other counselors may work with a common student. This will improve the quality and consistency of the ed plan, important in student goal attainment.

Academic Recognition ACTIVELetters of recognition will be issued to students who have improved their term grade point average and unit completion rate from unsatisfactory to satisfactory.

Early Alert ACTIVEEOPS will monitor its students for Early Alert status. Intervention counseling will be provided to its Early Alert students.

LASSI Implementation NEWThe use of LASSI, a learning and study skills inventory, to assess college success skills of new students and students with academic deficiencies, will be implemented.

Study Skills Assessment COMPLETEEOPS will purchase LASSI, a learning and study skills inventory, to assess college success skills of students new to college and students with academic deficiencies.

Flash Drives & Ed Plans ACTIVEFlash drives will be issued to new EOPS students upon completion of their Educational Plans. This will provide an incentive for timely completion of this activity.

Sunday, August 14, 2011 Page 31 of 80Last Updated

Page 34: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

EOP&S Student Retention EOPS Peer Mentors02:Ed Program & Srvs

NEWEOPS will use peer mentors to work with EOPS students who are new to college or who are on EOPS Warning Status. Mentors will be trained and supervised by EOPS counselors. Peer mentor training will focus on listening / supportive techniques, general college resources and information, and learning strategies. Evaluation of program will be developed.

Transfer Student Support Transfer / Career Center ACTIVEDevelop a Transfer / Career Center to provide students access to related web-based and written information. The center will sponsor transfer and career activities. Students will receive help in submitting online college & employment applications.

Transfer Student Database ACTIVEEOPS will track the progress of students in their transfer goals through an internal database.

Center Techician WAITHire a Transfer/ Career Center technician to oversee the area and assist students with their transfer / career needs. Staff will plan transfer / career activities. A designated certificated counselor will collaborate with the technician on career / transfer issues.

Transfer Student Tracking ACTIVEActivate use of a database to track EOPS students who transfer to a four year college or university.

Vocational Education

Automotive Curriculum Development- AT

Auto Body Program ACTIVECreate an Auto Body Program and certify the program with NATEF or iCAR. Provide 40% reassigned time.

Paint Equipment NEWPurchase required personnel equipment for painting.

Sunday, August 14, 2011 Page 32 of 80Last Updated

Page 35: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Business Administration

Technology Upgrade Technology Currency02:Ed Program & Srvs

ACTIVEMaintaing labs with software and technology that provides a learning environment necessary to meet industry standards and requirements.

Computer Lab on Campus NEWComputer labs are impacted and courses can not be offered because of lack of labs available. Need a lab with at least 20 computers.

Guest Speaker Input ACTIVEBring in dynamic people to present current industry activities

Staff Development ACTIVETraining for staff on use of new technologies adopted.

Online Course Management ACTIVEIncrease the effectiveness of the Blackboard (or other)course management tool(s) in teaching courses.

Business Lab Utilization ACTIVEIncrease BUSAD 90 activities associated with the course offerings and adjust hours as appropriate.

Child Development

Articulation Coordinate offerings DISCONTINUED

Coordinate course offerings, trainings with Calaveras, Oakdale sites

CARES College Career Fair COMPLETE

Articulation ACTIVEOccupational Olympics, CAP, visit high schools

CalSafe Collaboration Move CalSafe on campus ACTIVELocate CalSafe classroom on campus when space becomes available.

Curriculum development New curriculum DISCONTINUED

develop WebCT,fully online courses, distance learning courses,

Sunday, August 14, 2011 Page 33 of 80Last Updated

Page 36: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Child Development

Curriculum development Add new courses02:Ed Program & Srvs

ACTIVEDevelop new courses for CAP alignment.

Program assessment and improvement

Program assessment ACTIVEReview coursework for SLO's, Child Development Permit, develop rating rubric for multiple course offerings,Advisory Committee inputConnect program SLO's to college SLO's

NAEYC accreditation ACTIVEPursue NAEYC accreditation for Child Care Program.

Computer Science

Expansion of Technology Use

Expand Use of Online ACTIVEOffer Hybrid and/or Online Courses and purchase appropriate hardware and software as needed.

Fire Department

Remodel Fire Station Upgrade HVAC COMPLETEHVAC sytem aged and inadequate.

This activity was completed under Measure E as part of the construction/remodel of the PSC

Furnish Safety Center COMPLETEPurchase furnishings necessary for operation of Public Safety Center

Paint As Needed ACTIVEPaint the ceiling in Apparatus bays 1 and 2

Safety Center Technology ACTIVEPurchase and install computer system and related technologies in the Public Safety Center. Still need two more computers

Construct Safety Center COMPLETEConstruct addition to existing facility to house a fire engine, provide new office space for campus security and quarters for additional fire staff.

The Public Safety Center is included in the Facilities Master Plan

Sunday, August 14, 2011 Page 34 of 80Last Updated

Page 37: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Fire Department

Remodel Fire Station Diesel Exhaust System02:Ed Program & Srvs

COMPLETEPurchase and install a diesel exhaust extraction system.

This Item was completed during construction/remodel of the PSC

Hospitality Management

Academic Wellness Remodel Retail Bakery ACTIVERemodel bakery into full service retail bakery.

Hire full time faculty ACTIVEHire full time faculty to increase offerings and supervise retail/production bakery.

Expand Bakery offering ACTIVEIncrease course offerings

Technology Upgrade New classroom computer DISCONTINUEreplace the old computer in classroom

Flat Top Grill ACTIVEReplace flat top grill in a lab.

Replace Broilers ACTIVEReplace broilers in a and b lab.

Smallwares Bakery Courses ACTIVEProvide smallwares for approval of RBA Certification

Smallwares ACF Certificat ACTIVESmallwares for ACF Certification

POS System ACTIVEAdd additional terminals in the kitchens to allow students to sign and sign out.

Replace Fryer ACTIVEReplace fryer with state of the art fryer to better prepare students for the work place.

2 Laptops ACTIVE2 Laptops for use in the labs for competency evaluations.

Replace 2 refrig/freezer ACTIVEReplace 2 refrigerator freezer in culinary labs

Sunday, August 14, 2011 Page 35 of 80Last Updated

Page 38: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Hospitality Management

Technology Upgrade Add DVD/VHS Player02:Ed Program & Srvs

ACTIVEPurchase a DVD/VHS player for the classroom.

Instructional Technology

Expand access to computer labs

Proctoring center NEWDevelop a lab space to allow distance education students to take proctored exams.

Staff proctoring center NEWHire classified staff to serve as lab assistant/proctoring coordinator.

Office Technology

Articulation Careers day DISCONTINUED

present program to high school counsleors

High School Outreach DISCONTINUED

Will contact and present program information to local high schools to increase awareness of Columbia's OfTec progam.

High School Outreach DISCONTINUED

Will contact and present program information to local high schools to increase awareness of Columbia's OfTec progam.

High School Outreach ACTIVEWill contact and present program information to local high schools to increase awareness of Columbia's OfTec progam.

Instructional and subject matter skill development

Add Internship Sites ACTIVEStrengthen internship sites and skill competencies

Lab assistant NEWHire student to provide additional lab assistance.

Sunday, August 14, 2011 Page 36 of 80Last Updated

Page 39: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

03:Campus ClimateSecondary Project Goal:

College Admin Svs

Safety Parking Ciataion Work Stations

Instalation of Kiosk03:Campus Climate COMPLETEInstallation of work station Kiosks in PSC and Tamerack builds.

Community awarness COMPLETECommunity awarness of parking citation Kiosk locations and funtions.

Staff training COMPLETETrain security staff on usage of citation management website.

Sunday, August 14, 2011 Page 37 of 80Last Updated

Page 40: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Administration CC Strategic Planning1 Integrate UPT/SLO Tools03:Campus Climate WAITTake the current Unit Planning Tool user interface and integrate it both functionally and physically with the SLO Tool. This will provide the same basic functions and structure, but it will be physically linked with the SLO Tool and will have the same basic user interface as the SLO Tool

Research staffing WAITStaffing to assist Institutional Researcher

Program Review Dev 1 ACTIVEDevelop and implement an Instructional Program Review process that links to unit planning and drives resource allocation. Will include increasing access to planning documents via Web page

Temporary Research COMPLETEAcquire a Contract Researcher to accomplish critical Institutional Research projects until a replacement for the Institutinal Researcher that was lost in 2011 can be hired.

Program Review Dev 2 COMPLETEDevelop and implement a program review process for Service areas. Primary focus is to work with Institutional Research to identify critical data and information.

Training ACTIVEProgram review and Unit Planning training sessions to better integrate Program Review and Unit Planning

Planning Evaluation ACTIVEImplement ongoing evaluation of institutional planning processes and work on metrics and assessment tools to evaluate progress on college goals.

Sunday, August 14, 2011 Page 38 of 80Last Updated

Page 41: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Administration CC Strategic Planning1 Institutional Researcher03:Campus Climate NEWReplace the Institutional Researcher position lost in 2011.

Integrate UPT/SLO/PR WAITIntegration of web-based SLO Tool, Unit Planning Tool and Program Review applications

Unit Plan Training ACTIVEOngoing training for staff, faculty and administration on the utilization of the Unit Planning Tool. Special focus on integration of program review and unit planning.

Integrate UPT/Prog Rev ACTIVEIntegrate the user interface for program review with that of Unit Planning Tool. This will provide a single interface that both physically and functionally connect the processes and applications relating to Program Review and Unit Planning.

Classified Senate

Participation in Classified Senate

More C Staff in CS ACTIVESee Project Description

Staff Development

SDev Communication Staff Development Plan WAITComplete development of the Columbia College Staff Development Plan.

Website development ACTIVEIncrease Staff Development visibilitiy by reorganizing the current website and making information easier to accress. Make documents, forms and dates easy to find.

Annual Report WAITDevelop an annual report for staff development that collects information and indentifies staff development activities across the campus. This report would also describe how funded staff development activities have benefitted the college.

Sunday, August 14, 2011 Page 39 of 80Last Updated

Page 42: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Literature and Language

Poetry Slam Fall Poetry Slam03:Campus Climate ACTIVEA live presentation of poetry created by students and local members of the community, following the guidelines of the artistic form. Target date, late October.

Preferred on-campus location: Dogwood, or Cedar 1.

Off-campus location: Sonora Joes, Schnoogs. No charge for facilities.

Advertising costs for posters and flyers.

Student Services

Counseling Matriculation Professional Development ACTIVEProvide opportunities for Faculty and classified staff to attend workshops and training such as ETS, Eureka and Counselor update conferences.

Student Success Workshops ACTIVEProvide success workshops and SEP workshops for students on a regular basis.

Part-Time Counselor ACTIVESupport to maintain summer counseling as well as back fill during the academic year. As the probation project evolves, additional Guidance courses and counseling services will be required.

Orientation ACTIVEMonitor participation for in-person and online orientation sessions. Continue to evaluate online orientation and create additional opportunities for students to participate.

Matriculation Plan ACTIVEAnnually review and update the Matriculation Plan with the Matriculation Advisory Committee.

Sunday, August 14, 2011 Page 40 of 80Last Updated

Page 43: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

Counseling Matriculation X-REG03:Campus Climate ACTIVEProvide annual X-REG (Extreme Registration) every August where a one-stop shop of registration services is available on a Saturday.

Online Advising ACTIVEDevelop online advising services. Create protocol and guidelines and learn appropriate technology and resources.

Student Peer Assistants ACTIVEStudent assistant program to help with orientation and front office duties. Students act as peer mentors and assist w/ orientation activities.

Full-time Counselor WAITHire a full-time counselor with half assignment for articulation

Sunday, August 14, 2011 Page 41 of 80Last Updated

Page 44: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

04:Quality StaffSecondary Project Goal:

College Admin Svs

Auxiliary Services

Food Services Snack Bar Service Salad Prep Station04:Quality Staff NEWAdd a Silver King Model SKPS12 so that the snack bar can offer made to order salads

Waring Smoothie Blender NEWAdd a Waring Blender Model # 0520502 so that the snack bar can offer fruit smoothies

Add Counter Space NEWAdd a Advance TABCO filler table for extra counter space

Technology and Media Services

Restructure IT & Media Services staffing

permanent PT admin supt ACTIVECurrently the Tech & media services dept a a short term contract position for secretarial support. we need to hire a permanent part time position.

Hire Software Analyst ACTIVEThis position will be used to handle support calls for software used by Columbia College, as well as have responsibilities to maintain a Help Desk on campus.

Full time secretary DISCONTINUED

Upgrade half-time secretary to full time IT and Media Service secretary.

Sunday, August 14, 2011 Page 42 of 80Last Updated

Page 45: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Administration Academic Senate

Mentoring Lunches Mentoring Lunches/Dinners04:Quality Staff NEWProviding funds for lunches and or dinners for new faculty and their mentors. The cost of this would change depending on how many new and untenured faculty there are.

Professional/Staff Development

Leadership Institute NEWSend Senate President and President Elect to ASCCC Leadership Institute

Curriculum Institute NEWSend Curriculum Chair/Staff to ASCCC Curriculum Institute as needed and appropriate (i.e. when there is a new chair, significant changes to Title V, local curriculum training needs exist).

Accreditation Institute NEWSend faculty representatives with accreditaion responsibilities to ASCCC Accreditation Institute.

Other ASCCC Institutes NEWFund attendees to SLO Institute, Teaching Institute and/or Vocational Education Institute as needed and appropriate

Classified Senate

Yearly Hiring Priorities

Staff Development

SDev Planning Staff Development Plan NEWCreate a Columbia College Staff Development Plan that integrates with, and incorporates other college wide plans that involve staff delveopment. This plan would be reviewed and updated on a regular basis and would connect CC faculty and staff with a comprehesive range of staff development activites and resources across the campus

Sunday, August 14, 2011 Page 43 of 80Last Updated

Page 46: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Administration Staff Development

SDev Planning Unit Planning04:Quality Staff ACTIVEDevelop a mechanism to incorporate the unit planning process into the operations of Columbia College Staff Development.

Arts and Sciences

Biological and Physical Sciences

Add a full time Earth Science faculty

Hire ESC Faculty ACTIVEHire a full time Earth Science faculty member to teach earth science courses.

Student Services

CalWorks Policies/Procedures Revision, JPS

Replace office printers, CalWORKs Prgm and JPS

Printer Replacement NEWpurchase two DELL V715W All in One printers and ink refills

Counseling Retreat Counseling Retreat ACTIVEProblem solving meeting with all counselors including special programs and adjunct counselors.

EOP&S Student Worker Training Student Worker Evaluation ACTIVEThe Special Programs Program Technician will meet with the student workers to evaluate progress in job performance on an ongoing basis. The EOPS / CARE Director will consult with staff and student worker regarding job performance as needed.

Student Worker Training NEWEOPS will provide student worker training to include a comprehensive college / program information, policies and procedures manual.

Financial Aid New Staff member Hire new position ACTIVEHire new staff member to support Veteran and f/A students more effectively.

Vocational Education

Fire Department

Academic and Vocational Skills Development

Recruitment ACTIVEContinue to recruit quality student fire fighters utilizing campus and Tuolumne County Fire Department Resources

Sunday, August 14, 2011 Page 44 of 80Last Updated

Page 47: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Fire Department

Academic and Vocational Skills Development

Purchase Video Media04:Quality Staff ACTIVEOrder new video media that reflect current fire service practices

Fire Technology Profesional Development prof tech develop ACTIVEAttend professional development training within discipline

Program Development Hire additional instructo ACTIVEHire another faculty member to develop the program.

Welding Staff Mobility Golf Cart NEWPurchase Golf Cart

Sunday, August 14, 2011 Page 45 of 80Last Updated

Page 48: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

05:TechnologySecondary Project Goal:

College Admin Svs

Auxiliary Services

Job Enhancement Photoshop Class05:Technology ACTIVEI would like to take a photoshop for the web which would give me the tools to better design an eye catching web page.

Business Services

Business Office Mobile technology define use areas ACTIVEidentify uses to define software and hardware needs

train staff ACTIVEidentify and train staff in proper use of technology

purchase laptop computer ACTIVEpuchase laptop through established procedures with appropriate preloaded software.

Safety Security Home Web Page Design Security Home Page COMPLETEDevelope and design new Security Web Page with updated and current information.

Technology and Media Services

IT Equipment Replacement & Add Equipment

Add IT Equipment ACTIVEAdd IT equipment as needed to augment and improve instructional delivery and operational functionality.

Update Fir1 Computers NEWUpdate the Fir 1 Computer lab with the Computers at the ATTC. The Fir 1 computers are failing at a high rate, we had failures in 5 out of 21 in the 2010CFA term. the ATTC is underutilized and the equipment should be relocated back to campus.

The Fir 1 computers would be available for trickle down to faculty.

Sunday, August 14, 2011 Page 46 of 80Last Updated

Page 49: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Technology and Media Services

IT Equipment Replacement & Add Equipment

Update Classroom laptops05:Technology NEWUpgrade laptops in classrooms, to extend usable life. add memory,SSD harddisks and update to Win7 & Office 2010.

Replace IT Equipment ACTIVEReplace existing IT equipment as it becomes outdated or fails to functions. (Follow existing life cycle as defined in IT Plan.)

Update Outdated Computers ACTIVEUpdate all computers that currently meet the definition of outdated as defined by the Computer Replacement Tier Schedule found in the college IT Plan.

Sunday, August 14, 2011 Page 47 of 80Last Updated

Page 50: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Arts and Sciences

Academic Achievement Center

Technology Upgade 4 up-to-date computers05:Technology NEWAdequate technology is essential to provide academic support for studnets in the AAC and online. We should purchase 4 I-mac computers, apple.

Apple Macbook Pro ACTIVEExpand the range of technology used in the AAC and provide additional educational tools and support. Rational: More and more students are using Apple computers. Therfore, we need to be able to address the needs of students using a non-windows operating system in the AAC.

AAC 5 Netbook Computers WAITPurchase 5 netbook laptop computers to have secured at tables in the AAC for use in Tutoring Sessions.

Columbia College uses state of the art technology and technological support to provide students with innovative instruction and staff with high quality training and an efficient work environment

computer desks and chairs ACTIVEcomputer desks for the eight new computers.

SMART Board/w Laptop NEWIn order to provide support that integrates technology with student learning, A Smart_Board would enable studnets in the AAC to work with cutting edge technology that would allow for an interactive opportunity for both tutor and tutee.

Sunday, August 14, 2011 Page 48 of 80Last Updated

Page 51: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Biology Technology Needs Computer probes--new05:Technology ACTIVEPurchase student data acquisition probes to enhance learning potential: 1 CO2 gas ($275) 6 Conductivity ($900) 6 EKG ($960) 6 Thermocouple thermometer ($240)6 Relative humidity ($720)6 Temperature/pH pens ($530)

Instruction demo stations ACTIVEPurchase 3 digital microscopes & computers with camera & projection capabilities for 3 labs in new Science Building for instructor to demonstrate microscopic images through a teaching microscope, to capture those images on CD, & utilize web resources.

Digital still camera ACTIVEHigh resolution 7mp digital still camera with macro & 10x optical, 4 batteries & 2 memory cards for field trips & photos of students.

Lab computers & carts ACTIVEIn lieu of a computer lab: 48 laptops ($72000); 1 mobile cart for 30 ($2048); 1 mobil cart for 18 ($1992); 3 printers ($2400)

Software: new & upgrades ACTIVEReplace outdated programs: Biodiversity $2500, Commons $500, Ecology $500

Spectrophotometers ACTIVEPurchase 6 Vernier SpectroVis digital spectrophotometers with computer interface, software, cuvettes and cuvette racks for data acquisition and manipulation.

Staff computers & printer ACTIVEPurchase 6 computers for staff offices ($9000) and 5 printers ($4000)

Sunday, August 14, 2011 Page 49 of 80Last Updated

Page 52: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Biology Technology Needs Wireless router05:Technology COMPLETEBuy wireless router for Sequoia to access internet activities for instruction throughout building.

Digital lab cameras WAITFor data acquisition of visual images from microscopes to computers for experimental manipulation (6 Clear one cameras)

Computer probes--upgrade DISCONTINUED

Replace old probes to be compatible with new computers (see Computer probes--new) 6 pH 6 Heart rate 6 Respiration rate + low pressure 6 Dissolved oxygen

Earth Science Equipment Geiger Counter purchase NEWPurchase 6 geiger counters for use in earth science and natural resources courses.

Digital Planetarium ACTIVEPurchase Digitarium digital planetarium.

GPS Data Transmitters ACTIVEPurchase mini GPS data transmitters for student use. These can be used to telemeter data for mapping and tracking purposes (i.e. epoxy microtransmitters onto turtles, etc.).

Astronomy equipment ACTIVE8" portable telescope with GOTO function and GPS locator used on campus and at other locations

Sunday, August 14, 2011 Page 50 of 80Last Updated

Page 53: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Earth Science Equipment Fluxgate Magnetometer05:Technology ACTIVEPurchase Fluxgate Magnetometer for student use. Given a fluxgate magnetometer, students will collect magnetic field data, organize it into a geospatial database, manipulate and interpret the data, then analyze findings and communicate them to peers.

Meteorology station ACTIVEA new weather station will be better able to provide hands-on collecting and analyzing of weather data for student-centered research projects.

Plotter/Scanner ACTIVEPurchase 2 large format sheet-feed plotter/scanners for use in earth science, forestry, natural resources, watershed, ecology, biology, and GIS courses.

Kayak/Trailer Package ACTIVEPurchase kayak trailer package for student training in earth science, natural resources, and watershed courses.

Rock Drill ACTIVEPurchase a portable rock drill for coring geologic samples in the field.

Gravity Meter ACTIVEPurchase 1 gravity meter for student use in earth science courses. Given a gravimeter, students will collect, organize, interpret, and analyze gravimetric data.

Sediment Sampling Equip ACTIVEPurchase sediment sampling equipment for student use.

Ground Penetrating Radar ACTIVEPurchase a GPR unit for earth science student use in earth science courses.

Sunday, August 14, 2011 Page 51 of 80Last Updated

Page 54: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Earth Science Equipment Polarizing Microscopes05:Technology ACTIVEPurchase 2 polarizing microscopes for student use in earth science courses.

3D Laser Survey Equip ACTIVEPurchase 3D laser scanner for land surveying applications.

Stream Gaging Equipment ACTIVEPurchase 5 stream gaging equipment; students will collect, organize, interpret, and analyze discharge data.

Soil Sampling Equip ACTIVEPurchase soil sampling and analysis equipment for student use in earth science, forestry, and natural resources classes.

Upgrade Geology equipment ACTIVE1. Class set of compasses2. Ten portable soil pH meters3. Class set of hand lenses4. One laptop computer5. Miscellaneous lab activities/fossil sets, etc.

GIS/GPS Equipment ACTIVEPurchase a class set of GIS/GPS data collection hardware and software for student use.

Digital Weather Stations ACTIVEPurchase 2 digital weather stations for Columbia College main campus and Angels Camp campus.

Tablet pc purchase ACTIVEPurchase a class set of tablet pc's for use in earth science, forestry, and natural resources courses.

Rock Thin Section Equip ACTIVEPurchase rock thin section equipment for microscope analysis.

Sunday, August 14, 2011 Page 52 of 80Last Updated

Page 55: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Earth Science Equipment Astronomy Telescopes05:Technology ACTIVEPurchase 3 astronomy telescopes for use by students in Earth Sciences, Astronomy, and Physics courses.

Laptop/netbook computer cart

Laptops/Carts NR/EarthSci ACTIVEPurchase 36 laptop computers ($72,000), 2 portable carts ($4000), with printers ($2600) for student use in science classes on the 1st floor of Sugar Pine.

Literature and Language

Technology Upgrade for online instructors

Spring Review Reading ACTIVECelebrate and Acknowledge student contributors to Spring Review with public reading

Upgrade computers WAITTo upgrade office computers to support current and new technology necessary for online instruction: Built-in webcam and audio microphone. Additionally, new computer would have a faster processor, more RAM and storage space, and have updated software. Approximately three computers for current staff involved in online instruction.

Spring Review Publication ACTIVEPrinting and Production costs for production of Spring Review Magazine.

Music Speakers for Aspen Classroom

Speakers for Aspen Classr NEW4 New Speakers for Aspen Classroom

Technology for Lab Music Technology ACTIVEPurchase a high quality scanner, printer, computer and music notation software for use in Music Lab.

Sunday, August 14, 2011 Page 53 of 80Last Updated

Page 56: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

IMC Instructional Materials Center

IMC Technology Upgrades Graphic Art Equipment05:Technology ACTIVENeed to purchase and maintaing the following equipment:1) Digital Camera2) External Hard Drive (08-2010)3) Primary Graphics Computer (08-2010)4) Graphic Arts Copier (09-2010)

Computer Upgrade ACTIVEReprographics/Duplicating Operator needs upgraded computer to accommodate new duplicating system in IMC.

IMC Print Srvc Equipmet ACTIVEPurchase and maintain equipment to support the IMC Print Shop:

1) Desktop PC 2) Electric Binding system3) Auto Paper Folder4) Paper Punch5) Hand Paper Cutter

Institutional Research

Research office technology and web subscriptions

Renew EMSI subscrip. NEWUse research office budget resources to renew EMSI web tool for environmental scanning for research and grant office activities.

Renew PASW Statistics NEWUse research office budget resources to renew PASW (SPSS) maintanence agreement to keep data analytic software up to date.

Student Services

Admissions and Records

Office Technology Purchase Scanner NEWReplace current scanner

Student access to technology

Computer access NEWInstall computers in the Oak Pavilion for greater student access.

Vocational Education

Automotive Technology Learning- AT Teaching Technology ACTIVEPurchase scan tool and scope equipment that is compatible with powerpoint (wifi).

Sunday, August 14, 2011 Page 54 of 80Last Updated

Page 57: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Automotive Technology Upgrade-AT Purchase Laptops/software05:Technology ACTIVEFor lap tops and software for student learning stations in the automotive lab.

Above Ground Lifts ACTIVEPurchase three above graound lifts

Purchase Flywheel Rsfsr. NEWPurchase flywhee resurfacer

Smog Equipment NEWPurchase newsly required smog check equipment for B.A.R..

Forestry and Natural Resources

Technology upgrade equipment upgrade DISCONTINUED

upgrade GPS / GIS equipment for survey class

Upgrade forestry lab equi ACTIVEUpgrade forestry and natural resource lab equipment to meet industry standards.

Resurect Green House DISCONTINUE

Purchase GPS units ACTIVEBuy GPS units for FORES 1 class

Instructional Technology

Upgrade ITC for DE and Smart Classroom training

Ceiling Mounted Projector COMPLETEThe ITC needs a ceiling mounted projector for use with a Smart board

Smartboard for the ITC COMPLETEThe ITC needs a smart board to be able to train faculty, staff and students on the use of the Smart boards that will be installed in classrooms with the Title III Grant

Welding CAD Software Purchase CAD Software PCs NEW

Technology Upgrade- WT Weld Tester ACTIVEPurchase weld testing (bender, etc.) equipment.

Sunday, August 14, 2011 Page 55 of 80Last Updated

Page 58: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

06:Community LdrshipSecondary Project Goal:

College Admin Svs

Auxiliary Services

Bookstore Sustainability Recycle Plastic Container06:Community Ldrship

ACTIVEPlastic containers will be given to Child Care instead of thrown into the trash.

Customer Recycle Bins ACTIVEThe Snack Bar will purchase three bins that customers can use for glass bottles, plastic bottles and aluminum cans

Can Recycling ACTIVEThe Snack Bar purchased a recycle can that can be used for #10 cans. Once a week these cans will be transported to facilities.

Sunday, August 14, 2011 Page 56 of 80Last Updated

Page 59: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Administration Community Education

Community Ed Restructure Research06:Community Ldrship

WAITUtilize the institutional research office to help determine what the needs of the surrounding community are relating to Community Education.

Program Plan COMPLETECommunity Education needs to build a program plan the focuses on a sustainable budget

Com Ed Director WAITHire a full-time Community Education Director to coordinate activities for Community Education

Marketing WAITCommunity Education needs to develop new strategies to market its services to the surrounding communities

Student Services

DSP&S DSPS Community Leadership

DSPS Student Support Club NEWMechanisms used could be outreach materials directed to students with disabilities and others, highlighting services and activities of DSPS and points of contact; create a club or support group for students with disabilities.

The advisory committee develops task forces to study significant challenges to students with disabilities regarding access and support issues.

DSPS Peer Mentoring Program

Define goals NEWDefine goals of DSPS students by identifying a step-by-step process to continue their self-advocacy skill set.

Sunday, August 14, 2011 Page 57 of 80Last Updated

Page 60: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

DSP&S DSPS Peer Mentoring Program

Peer Taining06:Community Ldrship

NEWTraining in DSPS policies and procedures, ethics, boundaries and listening skills taught in a group or course setting. Help DSPS students to transition through school, feel less isolated and enhance self advocacy skills.

Sunday, August 14, 2011 Page 58 of 80Last Updated

Page 61: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

07: PartnershipsSecondary Project Goal:

Student Learning

Administration Classified Senate

Foster a collegial relationship with CSEA

CS-CSEA Relationship07: Partnerships NEWSee Project Description

Student Services

CalWorks CalWORKs Program Student Handbook

Printing of Handbook NEWconsultation,final draft of project with graphics, additional material, printing costs

Hours of Participation Verification

CARE CARE Outreach & Recruitment

Outreach & Recruit Plan ACTIVECARE will develop & implement a plan for outreach & recruitment in conjunction with EOPS.

DSP&S DSPS Program Outreach/Coordination

Advisory Committee ACTIVEDevelop DSPS Community Agency [Leadership] Liaison/Referral Procedures, including reestablishing the DSPS Advisory Committee.Identify agencies and individuals with whom liaison and referral would be appropriate. Establish means for regular communication, including Advisory Committee meetings.Meet with Special Programs Leadership and outside agencies to join forces to maximize the effective use of resources.

Disability Awareness Day NEWIn joint effort with Columbia College Health Services, college and community wide resources establish a Disability Awareness Day. Plan and implement activities for Disabilities Awareness month in the month of October.

Sunday, August 14, 2011 Page 59 of 80Last Updated

Page 62: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

DSP&S DSPS Program Outreach/Coordination

Staff Development Active07: Partnerships NEWDevelop DSPS Staff Development Activities. Design appropriate activities and communicate with Staff Development Committee regarding inclusion in In-service programs and other offerings.

Health Services Mental Health - Suicide Prevention/Intervention

info cards/training supp NEW

training F/C /campus NEW

Training ASIST/Denver NEW

Vocational Education

Administration High Sierra Institute Baker Equipment ACTIVEUpdate equipment at the High Sierra Institute at Baker Station

Contract services ACTIVEProvide services including phone, web hosting, repair, printing, utilities, coordination,and consulting.

Instructional Supplies ACTIVEPurchase instructional supplies for the High Sierra Institute at Baker Station.

Support staff for HSI ACTIVEProvide appropriate support staff throughout the High Sierra Institute season.

Maintain Facility ACTIVEMaintain a safe and appropriate educational facility at Baker Station.

Baker Station - Photo DISCONTINUED

Provide tables and furnishings to allow photography classes to meet and do course-work at Baker Station

Automotive Create ALternative Fuels Training Program

Hybrid Technology Equip NEWPurchase necessary hybrid training equipment

Sunday, August 14, 2011 Page 60 of 80Last Updated

Page 63: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Automotive Create ALternative Fuels Training Program

Trained Faculty in Hybrid07: Partnerships NEWAutomotive faculty will become trained in hybrid technology to enable a certificate program in alternative fuels.

Student Industry Experience- AT

Guest Speakers ACTIVEInvite guest speakers to class.

Apprenticeship NEWProvide Release Time for an Apprenticeship Program

Forestry and Natural Resources

Student Industry Experience

Incorporate GIS/GPS DISCONTINUED

Incoporate GIS/GPS technology into program/courses

Internship ACTIVEDevelop internship opportunities for students.

Welding Enhance Green Technology Equipment/Training NEWSeek resources to build partnerships between the regional industry and the welding technology program for green technology. Obtain equipment and faculty training to develop curriculum and course offerings in this sector.

Sunday, August 14, 2011 Page 61 of 80Last Updated

Page 64: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

08:Inst.EffectivenesSecondary Project Goal:

College Admin Svs

Facility Projects Funding Proposals08:Inst.Effectivenes WAITFunding alternatives for FMP projects' facility and operational costs not funded by Measure E will be sought

Build big things NEWGet bucks and build stuff

Business Services

Business Office Documentation Users ACTIVEProduce electronic user manuals for reference on procedural details for Business Office activities.

Procedures ACTIVEProduce and maintain a prodedure manual of Business Office activities.

Training ACTIVEProduce electronic training manuals for Business Office activities.

Services and Duties Staffing ACTIVEHire part-time, 30 hour/week, staff. Responsibilities would include window and phone service with a focus on one-stop service to students covering registration information, fee payment, and some financial aid processing. Staff will also handle agency sponsorships for students including fee deferrals.

Safety New Student Parking Lot New Parking Lot NEWAdd new student parking lot at Symons Field to reduce student parking overflow and increase overall campus parking space.

Security Reporting Software

Security Software NEWNew reporting software to be purchased and installed in security office to improve record keeping and technology automatation.

Sunday, August 14, 2011 Page 62 of 80Last Updated

Page 65: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Safety Upgrade/Add Security vehicles

Upgrade current Vehicle08:Inst.Effectivenes ACTIVEUpgrade current Security Truck with newer model.

Purchase electric cart COMPLETEPurchase electric cart to suppliment security fleet.

Purchase 4WD vehicle COMPLETEPurchase 4WD Security vehicle to insure all weather security access.

Technology and Media Services

Media Services Equip Replacement & Add Equipment

Replace Media Equipment ACTIVEReplace existing media equipment as it becomes outdated or fails to functions. (Including bulb replacements.)

Add Media Equipment ACTIVEAdd media equipment as requested to augment and improve instructional delivery.

Provide limited support for Apple Computers

ongoing maint & support ACTIVEOngoing support for apple computers in the Library and the IMC

Purchase a Mac Book COMPLETEThe Technology department needs to purchase a Mac Book personal Computer as a test bed to test network connectivity and software issues with Columbia Colleges network and online services such as blackboard.

President's Office

Development Grants support staff08:Inst.Effectivenes

Sunday, August 14, 2011 Page 63 of 80Last Updated

Page 66: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Administration CC Student Learning Outcomes

SLO Peer Mentors08:Inst.Effectivenes ACTIVEObtain faculty and staff mentors to work one on one or in small groups to facilitate SLO development and implementation

Campus wide meetings ACTIVECampus wide meetings regarding SLOs and TL will need to be held to discuss and communicate the issues and actions associated with the development and implementation of SLOs

Coordinator WAITFull-time faculty SLO coorinator. This position would support the development, implementation, and assessment of SLOs for the college.

SLO Development ACTIVESupport SLO Development by providing college wide activites relating to SLO Development, Implementation and Assessment. These might likely occur on FLEX Day or during the regular semester.

SLO Tool Development COMPLETEDevelop a local SLO Management Tool to better manage, track and share SLOs with the College Commmunity. This will also be used for SLO reporting purposes

Oakdale Outreach

CC Oakdale Outreach Oakdale - Staff Prog. Rep WAITNeed 1.0 FTE Program Rep II for Oakdale center

Oakdale - Supplies ACTIVEInstructional and non-instructional supplies for Oakdale outreach sites

Oakdale - Furnishings WAITFunds to provide furniture for proposed Oakdale outreach site

Sunday, August 14, 2011 Page 64 of 80Last Updated

Page 67: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Administration Oakdale Outreach

CC Oakdale Outreach Oakdale - Lease08:Inst.Effectivenes DISCONTINUED

Lease a 'store-front' property to house staff and at least two class rooms in Oakdale

Oakdale - Signage WAITOne-time start-up funds to produce signage for the Oakdale facilty

Oakdale - Computers WAITOne-time funds needed to supply potential Oakdale site with computer and networking services

Oakdale - Contrct Service WAITCost to cover janitorial, garbage, courier, etc. services for proposed Oakdale outreach site

Oakdale - Advertising ACTIVECost to cover advertising our course offerings and services to students in Oakdale

Oakdale - PT Staffing WAITPart-time staffing needed for counseling and assessment support for students

Oakdale - Mileage WAITCost to cover mileage to Oakdale site

Oakdale - security WAITCover expenses relating to security for proposed Oakdale site

Oakdale - Modernization DISCONTINUED

Funds needed to modernize potential Oakdale site to accommodate instructional and operation space

Oakdale - Security system WAITOne-time funds to install a security system in proposed Oakdale outreach site

Oakdale - Promotion WAITFunds for promotional activities associated with Oakdale facility and programs

Sunday, August 14, 2011 Page 65 of 80Last Updated

Page 68: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Administration Oakdale Outreach

CC Oakdale Outreach Oakdale - Phone/Network08:Inst.Effectivenes WAITCost to cover phone and internet service for proposed Oakdale Outreach site

Oakdale - Utilities WAITcost to cover utilities needs for proposed Oakdale Outreach site

VPSL SL Curriculum Support Curriculum Secretary WAITFull-time curriculum secretary to support curriculum needs for the college. Current staffing is for a 50% curriculum secretary. This would be a 50% increase.

Curricunet License ACTIVEMaintain licensing of Curricunet software

Ad Hoc Reporting COMPLETEAcquire the Ad Hoc reporting tool for CurricUNET. This will help with staffing challenges in that it will streamline reporting that is time consuming for current staff.

VPSL Responsibilities ACTIVEDocument VPSL and VPSL Office ongoing curriculum responsibilities in Senate or Curriculum bylaws

Arts and Sciences

Administration Arts & Sciences Division Office Modernization

Office Remodel ACTIVERemodel Arts & Sciences Division Office to expand area for increased meeting space, storage, and better work flow.

Biological and Physical Sciences

Improve Marketing of Courses

Learning communities NEWEncourage paired courses to increase freshman enrollment into Biology 17. Costs could vary depending upon faculty teaching loads.

Sunday, August 14, 2011 Page 66 of 80Last Updated

Page 69: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Improve Marketing of Courses

Appeal to retirees08:Inst.Effectivenes ACTIVEPromote courses of interest for life-long learning, such as wildflowers, birds, mushrooms, field biology, fisheries, natural history & geology, etc.; contact senior center; work with Marketing Director.

Appeal to local schools ACTIVEPromote and conduct local school tours to introduce students to the Science programs; and/or outreach visits to local school classrooms;Seek out students with high GPA; develop contacts and partnerships with school counselors and Science teachers; act as resource for local school science teachers.

IMC Instructional Materials Center

IMC Planning Document Management Plan ACTIVEContinue to develop a long range document management plan for Columbia College. This would include the delineation of both hard-copy and electronic files, the imaging, storage, and sharing of documents.

Copier management plan ACTIVEDevelop and implement a plan for the coordinated managment, servcies and oversight of all major duplicating equipment on campus. This would coordinate with the Document Management Plan

IMC-EMS - Datatel programming fix ACTIVEFix duplication on entries after datatel download into EMS. As of 09-2010 the fix is still manual.

Facility Photos NEWAdd reference photographs for each facility that is rented or utilized. Done to assist potential users in determining appropriateness of the facility.

Sunday, August 14, 2011 Page 67 of 80Last Updated

Page 70: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

IMC Instructional Materials Center

IMC-EMS - Online Facility Use Form08:Inst.Effectivenes NEWCreate an interactive form that potential users can acesss online to make Facility Requests. Information would be automatically submitted back to the EMS coordinator.

Marketing MKT College Promotional Pocket Folders/Brochures

Pocket Folder/Brochure ACTIVECurrent supply is running low and quote from printer is $3,619 + tax for reprinting.

Student Services

Admissions and Records

staffing Staffing NEWReinstate Director of Admissions and Records position

DSP&S DSPS Staff Development Trainings, seminars NEWTrainings, seminars, conferences, course work, orientations and inservicesTrainings on new systems, hardware, software and instructional methods. Active meetings, communication and sharing of resources for cross training of new information, skills, abilities and integration.

DSPS Technical Efficiency DSPS Internal Database ACTIVEMaintain internal database to accurately reflect the status of the DSPS student need and required forms.

Compliance Campus-wide ACTIVEWith the help of external evaluators, identify compliance concerns and ways to address problem areas and implement solutions.

Paperless file system NEWPurchase database, document scanners and all other necessary equipment to transfer existing files and input future documents into database that is accessible to all necessary personnel.

Provide updated computers NEWIn partnership with EOPS/CARE, purchase updated computer systems for staff use.

Sunday, August 14, 2011 Page 68 of 80Last Updated

Page 71: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Automotive Academic Wellness-AT Basic Skills08:Inst.Effectivenes ACTIVEEncourage students to enroll in basic skills classes.

AWE NEWEncourage students to participate in AWE activities.

Facilities- AT Remove Rails ACTIVERemove protruding metal rails from Madrone canopy floor.

Build Offices ACTIVEBuild a welding/auto body/automotive shop office and faculty office onto automotive lab for student accessibility.

Retaining Wall NEWBuild a retaining wall where project vehicles are parked.

Work Stations Create Tool Storage Templ NEWProvide stipend for a student (?) to create templates for tool storage throughout the automotive lab.

Purchase 8 Hand Tool Sets NEWPurchase 8 basic hand tool sets to be used with recently aquired work station benches.

Eight Student Work Statio NEWProvide eight self-contained work stations w/lap tops

Welding Articulation- WT Occupational Olympics ACTIVEContinue to host the Occupational Olympics- Wedling.

Visit High Schools ACTIVEProvide stipend for high school outreach.

Professional Development- AT

Update Training ACTIVEEach instructor must meet 20 hours of update training per year (NATEF).

Pedagogy Training NEWFund teacher credential classes for adjunct staff.

Sunday, August 14, 2011 Page 69 of 80Last Updated

Page 72: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Welding Professional Development- WT

Instructor Certification08:Inst.Effectivenes ACTIVEProvide funds for adjunct instructor certification with AWS (CWI/CWE).

Program Assessment and Improvement- AT

Tool Benches ACTIVEPurchase materials so that the prison can fabricate custom tool benches.

Fabricate Tool Boards ACTIVEProvide stipend and materials to fabricate custom tool boards for the automotive lab.

Auto Body Program ACTIVEProvide financial support for auto body program creation and certification.

NATEF Mandates ACTIVEPurchase NATEF recommended and/or mandated tools and equipment.

Coordinator Reassig Time ACTIVEProvide 30% coordinator reassigned time for automotive and auto body.

Ed Plan ACTIVEEncourage students to seek an Ed Plan.

Reflash Subscription ACTIVEPurchase manufacturer subscription for reflashing.

Purchase Scanners/Scopes ACTIVEPurchase updated scan tools and hand-held scopes.

Sunday, August 14, 2011 Page 70 of 80Last Updated

Page 73: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

09: FacilitiesSecondary Project Goal:

College Admin Svs

Vice President College and Admin.

Relocate Business Services09: Facilities

Sunday, August 14, 2011 Page 71 of 80Last Updated

Page 74: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Arts and Sciences

Academic Achievement Center

Academic Achievement Center Facility

AAC Improvements09: Facilities WAITHave a facility that is safe and conducive to Student Learning and success.

AAC Remodel/Relocation WAITRemodel either the current space or an existing building on campus in order to provide a true teaching and learning center that could house the AAC and Supplemental instruction and test proctoring in addition to the ¿First Semester Experience¿ and ¿On Ramp¿ programs.

AAC New Building WAITBuild a Teaching and Learning facility that will house the AAC, SI, FSE, On-Ramp, Faculty Dev., and a computer lab.

Facilities Facilities Improvements NEWComputer carrel for four new computers

AAC Coordinator--Office NEWAAC Coordinator office walls and door for privacy, safety, security.

Table and Chairs ACTIVEDevelop and maintain a functional, accessible and safe facility. Purchase more tables and chairs

Biological and Physical Sciences

Maintenance and Repair Autoclave servicing ACTIVEAnnual calibration required by law; necessary for preparing materials for Biology labs.

Deionized water servicing ACTIVEPure water is necessary for making chemical solutions and for experimental results in Science (Sugar Pine).

Sunday, August 14, 2011 Page 72 of 80Last Updated

Page 75: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Arts and Sciences

Biological and Physical Sciences

Maintenance and Repair Greenhouse repair/replace09: Facilities ACTIVERepair water system. Replace greenhouse when possible.

Microscope maintenance ACTIVE1. Yearly servicing of 95 microscopes2. Bulb replacements

Repair Biology equipment ACTIVE1. Electrophoresis power supply2. Repair leg & arm models3. Repaint models as needed4. Repair spectrophotometer

Copier maintenance ACTIVE1. Toner cartridge2. Servicing

Mathematics Vibrant Math Center Enhance Jun. 1 technology ACTIVEJuniper 1 needs a ceiling-mounted projector with computer and document projection capabilities. Installation of existing equipment and software needed.

New Math Center NEWCreate a new Math Center. Ideal qualities:- expanded Math Lab space including larger general study area (away from the noise of the child playground), a quiet testing/study room, a groupwork/workshop room,computer stations- 4 smart classrooms- 6 faculty offices opening into the Math Lab- located near the new science building

Sunday, August 14, 2011 Page 73 of 80Last Updated

Page 76: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

DSP&S DSPS Facility Enhancement (Learning Center)

Prog & Office space09: Facilities ACTIVEAcquire necessary office space for Program Staff that facilitates confidentiality, alternative media activities, and administrative responsibilities. Implement regular communication with area Dean, Facilities Committee, and Master Planning to ensure that Program needs with regard to office space are fully understood and addressed in future planning and development projects.

Accessible storage space NEWImprove accessible storage space for supplies and equipment. Create/purchase/acquire attractive, easily accessible storage space.

Smart classroom/academic NEWAcquire a dedicated smart classroom/tutoring area for DSPS. This classroom provides a confidential area, free of distractions to promote student success.

Testing Center NEWSecure a dedicated soundproof testing area with soundproof walls floor to ceiling. Students with disabilities require an area that is distraction free and confidential to preserve integrity of exam.

Van Parking NEWSecure a dedicated parking area for DSPS van. Implement regular communication with area Dean, Facilities Committee, and Master Planning to ensure that a safe dedicated parking space is secured for the DSPS van.

Sunday, August 14, 2011 Page 74 of 80Last Updated

Page 77: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

EOP&S Testing Center Assessment Testing Space09: Facilities NEWThe college will identify a designated space for individual to small group Assessment testing that is quiet and distraction-free which can be monitored by staff. EOPS requires Assessment testing as an eligibility requirement.

College Testing Center NEWStudent Services and Instruction will assess the college's need for a Testing Center and explore possible locations and staffing of the center.

Vocational Education

Computer Science

Program and Facilities Development

PC Hardware Repair Equipm NEWFor PC Hardware Repair program ¿ additional hard drives, USB cameras, SCSI interfaces, USB printers, parts

Internship Development ACTIVEExplore Work Experience/Internships as part of Computer degrees/certificates.

Oakdale PC/Network sppt NEWTo support the offering of courses in the PC and Network Support Technician curriculums with tear apart computer etc.

Scanners for Fir labs NEWReplace old scanners in Fir 4 and Fir 1.

Student Industry Experience

Dev Career Webpages ACTIVEDevelop pages off the Computer Science website with info about careers in the industy and their educational requirements.

Forestry and Natural Resources

Program and facilities development

Short courses ACTIVEcreate short term courses in special topics and cross-discipline areas

Welding Facilities- WT Scrap Metal Yard ACTIVEProvide a safe and efficient scrap metal yard that is near the welding lab.

Sunday, August 14, 2011 Page 75 of 80Last Updated

Page 78: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Vocational Education

Welding Facilities- WT Asphalt Yard09: Facilities NEWAsphalt yard area between Madrone and Mahogany Buildings.

Enclose canopy NEWEnclose part of Madrone 2 canopy for a machine room.

Storage Building ACTIVEReplace existing storage buidling.

Abrasive Room ACTIVEBuild an abrasive room to be used by welding and auto body.

Washer NEWInstall a self contained (recycle) pressure wash system/area.

Sunday, August 14, 2011 Page 76 of 80Last Updated

Page 79: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

10:Fiscal ResourcesSecondary Project Goal:

President's Office

Development Institutionalize Title III-funded staff

Director of Development10:Fiscal Resources NEWInstitutionalize Director of Development position. The Title III grant states that 50% of the Directors salary & benefits will be paid for by the college in 11-12.

Admin Specialist ACTIVEInstitutionalize Administrative Specialist. The Title III grant states that 33% of the Admin Specialist will be paid by the College in 11-12.

Sunday, August 14, 2011 Page 77 of 80Last Updated

Page 80: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Learning

Administration Classified Senate

Classified Senate Scholarship

CS Scholarship Fund10:Fiscal Resources ACTIVESee Project Description

Student Services

DSP&S DSPS Program Development

Instructional Aide ACTIVEThe current contracted position for the Instruction Aide be changed to a Permanent Full-Time Position.

DSPS Program Review ACTIVEThe Program Review process for student services is undergoing revision by the Dean of Student Services and Institutional Research. DSPS will participate in MIS activity once the process is available.

Resource/Procedure Manual ACTIVEUpdate a resource/procedural manual that clearly describes services and the procedures for serving students and managing office protocol.

DSPS Program Plan & Eval. ACTIVEPer Title 5, Section 56046 which addresses this requirement, staff will set meeting schedules to develop and submit this plan within deadlines to organize and prioritize information.

DSPS Staff Retreat NEWPlan a meeting day at the beginning of each academic year to plan and set goals based on DSPS unit plans, student learning outcomes and program plan.

Increase DSPS Revenue ACTIVEWork with college staff and committees, including the College Council, the college researcher, the Foundation, and the YCCD grant writers to identify additional sources of revenue for program improvement.

Sunday, August 14, 2011 Page 78 of 80Last Updated

Page 81: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

DSP&S DSPS Program Development

Clerical Support10:Fiscal Resources ACTIVEAssess clerical support needs based upon work responsibilities for DSPS. Assess the level of responsibilities within the classification, and the balance of workload between DSPS and EOPS.

PT Perm Tram Driver NEWPart-time permanent Tram Driver to handle mobility assistance needs/services mandated under Title V

DSPS Adjunct Counselor ACTIVEHire DSPS Adjunct Counselor to provide extended services to include late afternoon hours during semesters and summer counseling hours.

DSPS Equipment loan pgrm ACTIVEDesign and implement a program to loan equipment such as digital recorders, AlphaSmart 3000, MP3 players, daisy players, talking calculators, FM Transmitters, to students for use in class and off campus.

PT Perm LD Specialist NEWHire a permanent LD Specialist who works part-time solely on the labor-intensive assessment procedures necessary to qualify learning disabled students for services.

DSPS Program Specialist ACTIVEHire a permanent Program Specialist for the DSPS and EOPS/CARE programs. The specialist will coordinate and perform advance and complex work in support of specially funded student services programs.

Sunday, August 14, 2011 Page 79 of 80Last Updated

Page 82: COLUMBIA COLLEGE · changes to GE and IGETC certifications 2)Provide training/inservice on ... Education Plan Matrices Develop an Education Plan matrix for ACTIVE each Degree/Certificate

UNIT DEPARTMENT PROJECT NAME ACTIVITY NAME

Secondary College Goal Progress Report: 2010-2011

2ND PRIORITY GOAL STATUSACTIVITY DESCRIPTION

Student Services

DSP&S DSPS Program Development

Forms & Resource handbks10:Fiscal Resources ACTIVEDesign program documents to include an updated DSPS Faculty and Student Handbooks for implementation purposes. Forms utilized by students and staff will improve compliance with Title V regulations and DSPS information dissemination model. Provide all handbooks electronically.

DSPS Online Orientation NEWDesign an online orientation to DSPS services that students can access immediately upon verification that they are eligible for services and return to on an as needed basis.

Administrative Sect. 50% NEWHire Administrative Secretary (50%) to assist DSPS Coordinator with program budgetary needs and controlling expenditures.

Provide Staff Training NEWPlan bi-annual trainings for staff to the HTC Training Unit and budgetary updates to include YCCD .

Student Equipment Lending ACTIVEPurchasing of equipment to loan to students with disabilities.Laptop computer, audio players, ebook readers, note taking equipment, supplies and shared programs.

Health Services Increase director position from 80% to 100%

Augment health budget ACTIVEAdd general fund resource to health services to cover a % of director's salary up to the 100% position.

Sunday, August 14, 2011 Page 80 of 80Last Updated