Ferndale Rd Colo Vale Project Progress and Completion

Colo_Vale_Project_Overview.compressed

Embed Size (px)

Citation preview

Page 1: Colo_Vale_Project_Overview.compressed

Ferndale Rd Colo Vale Project Progress and Completion

Page 2: Colo_Vale_Project_Overview.compressed

Project Overview �  5 lot Sub Division in Colo Vale, NSW

�  25 Acre Lot with existing home. Total lot subdivided into 5 acre lots.

Page 3: Colo_Vale_Project_Overview.compressed

Project Deliverables

1.  Roadwork 1.  Construction of 2 Private Roads 2.  Upgrade Council cul-de-sac

2.  Hydraulic Services 1.  Sewer installation 2.  Water Main Upgrade 3.  Private Service Installation

3.  Electrical Services 1.  Upgrade Endeavour Power Network 2.  Consumer Power to Lots 3.  Telstra Installation to Lots

4.  Lot 1Home Renovation

5.  Lot 2 Vegetation Clearing

Page 4: Colo_Vale_Project_Overview.compressed

Roadwork

�  Lot 1 and 2 Private Road

�  Driveway to Lot 2

�  Opened access way. Water is due to seepage from neighboring dam

Page 5: Colo_Vale_Project_Overview.compressed

Roadwork

�  Lot 1 and 2 Private Road

�  Driveway to Lot 2

�  Cutting back shared access way.

�  Unstable and soft ground

Page 6: Colo_Vale_Project_Overview.compressed

Roadwork �  Lot 1 and 2 Private Road

�  Completed shared access way to Lot 1 and Lot 2.

�  10m Easement

Page 7: Colo_Vale_Project_Overview.compressed

Roadwork �  Lot 1 and 2 Private Road

�  Completed shared access way to Lot 1 and Lot 2.

Page 8: Colo_Vale_Project_Overview.compressed

Roadwork �  Lot 1 and 2 Private Road

�  Completed Drainage for lot 2 driveway. Drain controls water from neighboring dam.

�  Effected surface has been re-seeded with rye grass.

Page 9: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5

�  Driveway to Lot 3,4,5

�  Cutting back shared access way.

�  Unstable and soft ground

�  Stock piling topsoil. More topsoil was extracted than expected.

Page 10: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5

�  Driveway to Lot 3

�  Roadwork to; increase the width, storm-water management, Services, Driveways

Page 11: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5

�  Driveway to Lot 3

�  Environmental Controls

�  Environment management was a big concern in the project.

Page 12: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5

�  Access way to Lot 3,4,5.

�  Box culvert construction for management of storm-water.

Page 13: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5

�  Access road to lots 3,4,5.

�  Roll testing sub-grade

�  Unanticipated rework was required due to the instability of the sub grade.

Page 14: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5

�  Access road to lots 3,4,5.

�  First layer of road-base

Page 15: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5

�  Access road to lots 3,4,5.

�  Second layer of road-base.

�  Dealing with drainage issues to the storm-water washout pits.

Page 16: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5

�  Access road to lots 3,4,5.

�  Second layer of road-base.

�  Neighbor's dam was leaking. Had to ensure adequate drainage as well as engage the neighbor to fix their dam.

Page 17: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5 �  Complete box culvert.

Page 18: Colo_Vale_Project_Overview.compressed

�  Private Access to Lot 3 - 5 �  Complete Access Road to lots 3,4,5.

Roadwork

Page 19: Colo_Vale_Project_Overview.compressed

�  Private Access to Lot 3 - 5

Roadwork

�  All effected areas have been rejuvenated and seeded with Rye grass.

Page 20: Colo_Vale_Project_Overview.compressed

Roadwork �  Private Access to Lot 3 - 5 �  All effected areas have been rejuvenated and

seeded with Rye grass.

Page 21: Colo_Vale_Project_Overview.compressed

Roadwork �  Cul-De-Sac Upgrade

�  Initiation of Works

�  Widening of road.

�  Construction of storm-water

�  Construction of turning circle for trucks and council vehicles

Page 22: Colo_Vale_Project_Overview.compressed

Roadwork �  Cul-De-Sac Upgrade

�  Cut through cul-de-sac to private access way to lots 3,4,5.

Page 23: Colo_Vale_Project_Overview.compressed

Roadwork �  Cul-De-Sac Upgrade

�  Storm water at the end of Ferndale rd. and new turning circle.

Page 24: Colo_Vale_Project_Overview.compressed

Roadwork �  Cul-De-Sac Upgrade

�  Completed Works

Page 25: Colo_Vale_Project_Overview.compressed

Roadwork �  Cul-De-Sac Upgrade

�  Completed Works

Page 26: Colo_Vale_Project_Overview.compressed

Roadwork �  Cul-De-Sac Upgrade

�  Completed Works

�  AFTER BEFORE

Page 27: Colo_Vale_Project_Overview.compressed

Hydraulic Services �  Sewer Connection

�  Connection to Lot 2.

�  Large quantities of rock extracted.

�  Photo taken before trenching and rock extraction.

Page 28: Colo_Vale_Project_Overview.compressed

Hydraulic Services �  Sewer Connection

�  Lot 2 Sewer connection

�  Large quantities of rock extracted

Page 29: Colo_Vale_Project_Overview.compressed

Hydraulic Services �  Sewer Connection

�  Lot 2 Sewer connection

�  Large quantities of rock extracted

�  Photo taken after trenching and placement.

Page 30: Colo_Vale_Project_Overview.compressed

Hydraulic Services �  Sewer Connection

�  Sewer to Lots 3,4,5.

�  Large quantities of rock extracted

Page 31: Colo_Vale_Project_Overview.compressed

Hydraulic Services �  Water Main Installation

Page 32: Colo_Vale_Project_Overview.compressed

Hydraulic Services �  Water Main Installation

�  Upgraded water main

�  Large quantities of rock extracted

Page 33: Colo_Vale_Project_Overview.compressed

Hydraulic Services �  Private Water Services

�  High rainfall in the Southern Highlands.

�  Heavy rainfall management was a big risk to the project.

Page 34: Colo_Vale_Project_Overview.compressed

Hydraulic Services �  Private Water Services

�  Turn ups for the water meters to lots 3,4,5.

�  Telstra conduit is visible.

Page 35: Colo_Vale_Project_Overview.compressed

Hydraulic Services

�  Completed private water services for lots 3,4,5

�  Also in shot; Water Main Valve, Electricity Box (Council), Telstra Pit, Storm water spreader (rocks).

�  Private Water Services

Page 36: Colo_Vale_Project_Overview.compressed

Electrical Services �  Endeavour Energy Network Upgrade

Page 37: Colo_Vale_Project_Overview.compressed

Electrical Services

�  Private electricity to lots 2,3,4,5.

�  Image Right: Lot 2 power comes off the new transformer.

�  Private Service Upgrade

Page 38: Colo_Vale_Project_Overview.compressed

Electrical Services �  Private Service Upgrade

�  Trenching to lot 2 involved significant rock removal

�  Image Right: Lot 2 power comes off the new transformer.

Page 39: Colo_Vale_Project_Overview.compressed

Electrical Services �  Private Service Upgrade �  Trenching to lot 3 involved significant rock removal

Page 40: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

Page 41: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

Page 42: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

�  New Bathrooms

�  Roofing

�  Painting

�  Renovate Kitchen

�  Clear Lot and Gardens

�  Upgrade floors

Page 43: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

Page 44: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

Page 45: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

Page 46: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

Page 47: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

�  Strappers Shed and Stables

Page 48: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

Page 49: Colo_Vale_Project_Overview.compressed

Home Renovation �  Renovation of Existing Home

Page 50: Colo_Vale_Project_Overview.compressed

Vegetation Clearing �  Clearing of Vegetation on Lot 2

�  1 of 6 mulch piles after clearing had taken place

Page 51: Colo_Vale_Project_Overview.compressed

Vegetation Clearing �  Clearing of Vegetation on Lot 2

�  Mulching the piles of vegetation with 20 ton shin-cutter

Page 52: Colo_Vale_Project_Overview.compressed

Vegetation Clearing �  Clearing of Vegetation on Lot 2

�  Mulching the piles of vegetation with 20 ton shin-cutter and forest clearing machine.

Page 53: Colo_Vale_Project_Overview.compressed

Vegetation Clearing �  Clearing of Vegetation on Lot 2

�  View after clearing and mulching.